This document is an Attachment E - Price Proposal Form for a federal contract opportunity for the NWC B686 Conolly Hall Upgrades and NWC Modular Buildings project at the Naval Station Newport in Newport, RI. The contract will be solicited as a Base Bid, with Options and Unit Prices for construction services. The Base Bid includes work on two packages: Package 1 for the Conolly Hall upgrades and Package 2 for the installation of modular buildings to support the Conolly Hall renovations. The contract duration is 1,123 calendar days from the date of award, with planned phasing and milestone dates provided. Option 1 is for replacement of window systems and exterior doors, including hazardous materials abatement. Option 2 is for a unit price for bedrock removal and disposal as required for the modular buildings. Offerors must submit a planned schedule with their bid proposals. The project is subject to periods of exclusionary work during the International Seapower Symposium in September 2025 and 2027, when no construction may occur.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NWC B686 Conolly Hall Upgrades WON 1691406 NWC Modular Buildings
NAVAL STATION NEWPORT, NEWPORT, RI
May 16 2024
PRICE SCHEDULE
PART 1 GENERAL
1.0 PROJECT
Basis of Bid for shall be the construction work in accordance with WON 1691406 NWC B686 Conolly Hall Upgrades and NWC Modular Buildings.
This contract will be solicited as Base Bid, Options, and Unit Prices to provide Construction Services. A description of the base bid and options is contained herewith under WON 1691406.
The scope of work for this construction solicitation is prepared in two packages, awarded under one construction contract. The contractor is responsible for providing scope of work noted in both packages:
Package 1: NWC B686 Conolly Hall Upgrades
Package 2:NWC Modular Buildings to support B686 Conolly Hall during construction
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
BASE BID ITEM 0001 - Package 1 NWC B686 Conolly Hall Upgrades/ Package 2 NWC Modular Buildings to support B686 Conolly Hall during construction
Basis of Bid for Item CLIN 0001 shall be all construction work as noted in the scope of work for Base Bid – Items listed as CLIN 0001a through 0001v.
CLIN 0001 - BASE BID PRICE- Price includes the following:
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0001 |
| 0001a |
| BASE BID Package 1: B686 Conolly Hall Upgrades General Conditions as noted in contract documents |
| 0001b |
| BASE BID Package 1: All interior Hazard Materials abatement and disposal work all floors, entire scope of work for Hazardous Materials, as noted in contract documents excluding work noted in Options |
| 0001c |
| BASE BID Package 1: All interior demolition and disposal work for all floors, entire scope of work for demolition, as noted in contract documents excluding work noted in Options |
| 0001d |
| BASE BID Package 1: All interior architectural/structural floor plan layouts, finishes, for new work and repair work, noted for the entire building, as noted in contract documents excluding work noted in Options |
0001e
BASE BID Package 1: All new work general mechanical scope, including all TABS, Controls work, Commissioning and Acceptance, as noted in contract documents excluding work noted in Options
0001f
BASE BID Package 1: All new work general electrical scope – switches, power and lighting, including all controls work, Commissioning and Acceptance, as noted in contract documents excluding work noted in Options
| 0001g |
| BASE BID Package 1: All new work general plumbing, including all controls work, Commissioning and Acceptance, as noted in contract documents excluding work noted in Options |
| 0001h |
| BASE BID Package 1: All new work general telecommunications including all fiber, controls work, Commissioning and Acceptance, as noted in contract documents excluding work noted in Options |
| 0001i |
| BASE BID Package 1: All new work general electronic safety and security/physical security including all controls work, Commissioning and Acceptance, as noted in contract documents excluding work noted in Options |
| 0001j |
| BASE BID Package 1: All new work for Fire Suppression system, Fire Detection & Alarm Systems, including testing/Government acceptance, as noted in contract documents excluding work noted in options |
| 0001k |
| BASE BID Package 1: All new work for Parking Garage Lighting, including testing/Government acceptance, as noted in contract documents excluding work noted in options |
| 0001l |
| BASE BID Package 1: All new work for Parking Garage Fire Suppression, system, Fire Detection & Alarm Systems, including testing/Government acceptance, as noted in contract documents excluding work noted in options |
| 0001m |
| BASE BID Package 1: All work noted for existing NWC furniture and equipment relocation to other NWC building or storage building within 10 miles (items to be determined upon contract award with NWC) |
0001n
BASE BID Package 1: All work noted for Contractor relocation of construction items in laydown area during ISS period of no construction work
0001o
BASE BID Package 2: Modular Buildings General Conditions as noted in contract documents
| 0001p |
| BASE BID Package 2: All new work for Site/Civil/Utility, including electric service, entire project sitework, outside the facility 5-foot work, as noted in contract documents to provide and install Modular Buildings |
| 0001q |
| BASE BID Package 2: All new work for bedrock removal and disposal as required to install utilities, as noted in contract documents to provide and install Modular Buildings |
| 0001r |
| BASE BID Package 2: All new work to mobilize, provide, install and lease Modular Buildings as noted in contract documents throughout duration of construction of Package 1 B686 Conolly Hall Upgrades contract completion and acceptance |
| 0001s |
| BASE BID Package 2: All new work to provide all required maintenance for all leased scope of work included for Package 2 Modular Buildings throughout duration of construction of Package 1 B686 Conolly Hall Upgrades, as noted in contract documents through contract completion and acceptance |
| 0001t |
| BASE BID Package 2: All new work to decommission and demobilize and terminate lease for all scope of work included for Package 2 Modular Buildings as noted in contract documents after completion and acceptance Package 1 B686 Conolly Hall Upgrades |
| 0001u |
| BASE BID Package 2: All new work to return site/civil conditions to pre-existing status included for Package 2 Modular Buildings as noted in contract documents after contract completion and acceptance Package 1 B686 Conolly Hall Upgrades |
| 0001v |
| BASE BID Package 2: All work noted for existing NWC furniture and equipment relocation to other NWC building or storage building within 10 miles (items to be determined upon contract award with NWC) |
| 0001 |
| TOTAL COSTS FOR BASE BID WORK P1-NWC B686 Conolly Hall Upgrades + P2-Modular Buildings NOTED FOR CLIN 0001 |
| P1 $_ _ |
P2 $ ___
TOTAL $ _
OPTION 1 ITEM 0002- Package 1 NWC B686 Conolly Hall Upgrades Option 1 - Window Systems Replacement/Exterior Door System Replacement, including required Hazardous Materials Abatement
Basis of Bid for Option 1 for Item CLIN 0002 shall be all construction work as noted in the scope of work for Option 1 – Items listed as CLIN 0002a through 0002d.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0002 |
| 0002a |
| OPTION 1 Package 1 B686 Conolly Hall Upgrades: General Conditions, as required, for scope of work in contract documents to support Option 1 work only |
| 0002b |
| OPTION 1 Package 1 B686 Conolly Hall Upgrades: All Hazard Materials abatement and disposal work for new work windows systems and exterior door systems as noted in contract documents |
0002c
OPTION 1 Package 1 B686 Conolly Hall Upgrades - All demolition work windows systems and exterior doors systems as noted in contract documents
| 0002d |
| OPTION 1 Package 1 B686 Conolly Hall Upgrades - All new work windows systems and exterior doors systems as noted in contract documents |
| 0002 |
| TOTAL COSTS FOR Package 1 OPTION 1 WORK NOTED FOR CLIN 0002 |
Grand Total for Entire Project: Base Bid, and Option 1:
CLIN TOTAL
| TOTAL COSTS FOR BASE BID (P1 + P2), and OPTION 1 (P1) |
| TOTAL PRICE FOR CLIN 0001, 0002, |
1.2 Option 2 UNIT PRICES ITEM 0003 –WON 1691406 BASE BID Package 2 : NWC Modular Buildings to support B686 Conolly Hall during construction
This contract will be solicited with unit prices to be applied to estimated quantities for selected work. A description of the items and schedule of the unit price work is contained in the bid schedule under base bid line items 0003a. See Contract Clauses, “FAR 52.211-18, Variation in Estimated Quantity” and “FAR 52.236-16, Quantity Surveys.”
Option 2 Unit Prices Form
| Item |
| Description |
| Estimated Quantity |
| Unit |
| Unit Price |
| Amount |
| 0003a |
| OPTION 2 Bedrock removal and disposal as required to install utilities, as noted in contract documents to provide and install Modular Buildings |
| 50 |
| CY |
| $_ _ |
| $_ __ |
Total Amount for Items OPTION 2 UNIT PRICE 0003a $__ __
PLANNED CONTRACT DURATION: 1123 calendar days from date of award- All MILESTONE dates noted subject to change Planned Project Phasing/Planned Milestone Dates:
Phase I: All work described in Package 2 Modular Buildings:
Date of Award to planned completion date 31 March 2025 – Liquidated Damages to be assessed
Phase II: After BOD of Modular Buildings, Move furniture and equipment from NWC to Modular Buildings:
1 April 2025 to 30 June 2025
Phase III: All work described in Package 1 to renovate Conolly Hall:
1 July 2025 to planned completion date 31 March 2027– Liquidated Damages to be assessed
Phase IV: After BOD of Conolly Hall, move furniture and equipment from modular buildings back into NWC:
1 April 2027 to 30 July 2027
Phase V: After all modular buildings have been vacated and all furniture moved out, disassemble & remove modular buildings and restore modular building site to its original condition:
1 August 2027 to 30 September 2027
Planned Contract Completion Date (CCD) is 30 September 2027.
Contractor must submit planned schedule with bid proposal of the work for review.
All dates noted subject to change.
No construction work for Package 1 B686 Conolly Hall and Package 2 Modular Buildings may occur for a week in September 2025 and 2027: September 15 -19 2025, and September 13 – 17, 2027 (dates subject to change). The NWC is planned to host the Chief of Naval Operations International Seapower Symposium (ISS). The Contractor is responsible for preparing all the project worksites in a safe and presentable manner prior to September 12, 2025, and September 10, 2027. The contractor is responsible and required to relocate all construction items from exteriors and laydown area along B686 Conolly Hall to a limited laydown area in the eastern half of the gravel parking lot to the north of B991 Hewitt Hall during these times of no construction work. The exterior areas along B686 Conolly Hall will be turned over for Government use during this exclusionary work period. This period of exclusionary work shall be listed in the project schedule and show no work being performed. The limited laydown area must be vacated and turned back to government, in same condition as received, no later than September 26, 2025, or upon Contracting Office Rep and NWC determination.
Contractor bid proposal prices for Option 1 shall be maintained and valid from required contractor proposal due date through 3 January 2025.
Basis of Bid for each option item shall be the addition of the full scope of work complete to the Base Bid. If any, or all Options are exercised, the Contract Completion date remains the same.
-- End of Document -- Document 00 22 13.00 20 Page 6