Attachment M- REVISED P2 NWC Mod Bldgs Specs.pdf
PDF 6 MB Posted
- Solicitation number
- N4008524R2601
About this file
This document is a specification for the construction of modular buildings at the Naval War College located at Naval Station Newport in Newport, Rhode Island. The specification covers various divisions of work including concrete, fire protection, plumbing, HVAC, electrical, and telecommunications. Key details include:
The project involves the construction of modular buildings at the Naval War College located at Naval Station Newport in Newport, Rhode Island. The specification includes detailed requirements for materials, installation, and quality control for various building systems and components such as cast-in-place concrete, fire extinguishers, portable and mobile buildings, sprinkler systems, plumbing, HVAC, electrical distribution, and telecommunications. The contract number is N40085-21-D-0059 and the project number is 1691406. The specification includes a detailed submittal register listing the required submittals for the various specification sections.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
eProjects Work Order No.: 1691406 Contract No.: N40085-XX-X-XXXX
NAVAL WAR COLLEGE MODULAR BUILDINGS
At
NAVAL STATION NEWPORT
NEWPORT, RHODE ISLAND
SPECIFICATIONS
PREPARED BY:
Oak Point Associates 231 Maine Street
Biddeford, Maine 04005
A/E Contract No.: N40085-21-D-0059, N4008523F5978
PREPARED BY:
Architectural: Tyler G. Barter, AIA Mechanical: Christine Lyle, P.E.
Civil: Paul J. Miller, P.E. Electrical: Dale Lincoln, P.E.
Structural: David Martin, P.E. Fire Protection: Fisher Engineering Geotechnical: N/A Safety: N/A
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date: April 17, 2024
NAVAL WAR COLLEGE MODULAR BUI LDI NGS 1691406
NAVAL STATI ON NEWPORT, NEWPORT, RI
PROJECT TABLE OF CONTENTS
DI VI SI ON 03 - CONCRETE
03 30 00 CAST- I N- PLACE CONCRETE
DI VI SI ON 10 - SPECI ALTI ES
10 44 16 FI RE EXTI NGUI SHERS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 34 23 PORTABLE AND MOBI LE BUI LDI NGS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13 WET PI PE SPRI NKLER SYSTEMS, FI RE PROTECTI ON
21 13 16 DRY PI PE SPRI NKLER SYSTEMS, FI RE PROTECTI ON
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBI NG, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00. 00 20 BASI C MECHANI CAL MATERI ALS AND METHODS
23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 09 00 I NSTRUMENTATI ON AND CONTROL FOR HVAC
23 09 13 I NSTRUMENTATI ON AND CONTROL DEVI CES FOR HVAC
23 09 23. 02 BACNET DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER BUI LDI NG
CONTROL SYSTEMS
23 30 00 HVAC AI R DI STRI BUTI ON
23 81 00 DECENTRALI ZED UNI TARY HVAC EQUI PMENT
DI VI SI ON 26 - ELECTRI CAL
26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS
26 08 00 APPARATUS I NSPECTI ON AND TESTI NG
26 12 19. 10 THREE- PHASE, LI QUI D- FI LLED PAD- MOUNTED TRANSFORMERS
26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
26 27 14. 00 20 ELECTRI CI TY METERI NG
26 51 00 I NTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 08 10 ELECTRONI C SECURI TY SYSTEM ACCEPTANCE TESTI NG
28 10 05 ELECTRONI C SECURI TY SYSTEMS ( ESS)
28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM,
ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
PROJECT TABLE OF CONTENTS Page 1
32 05 33 LANDSCAPE ESTABLI SHMENT
32 11 20 SUBBASE COURSE
32 11 23 AGGREGATE BASE COURSES
32 12 17 HOT MI X BI TUMI NOUS PAVEMENT
32 92 19 SEEDI NG
DI VI SI ON 33 - UTI LI TI ES
33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG
33 30 00 SANI TARY SEWERAGE
33 40 00 STORM DRAI NAGE UTI LI TI ES
33 46 16 SUBDRAI NAGE SYSTEM
33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON
33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 26 PAGES
N40085-21-D-0059
NAVAL WAR COLLEGE MODULAR BUILDINGS
03 30 00 SD-01 Preconstruction Submittals
1.7.3.1Concrete Curing Plan
1.7.5Quality Control Plan
1.7.6Quality Control Personnel
Certifications
1.7.6Quality Control Organizational
Chart
1.7.8Laboratory Accreditation
SD-02 Shop Drawings
1.7.2.1 GReinforcing Steel
SD-03 Product Data
2.1Formwork Materials
2.3.1Cementitious Materials
2.4.1Concrete Curing Materials
2.6Reinforcement
2.3.4Admixtures
2.2.2Biodegradable Form Release
Agent
1.7.3.2Pumping Concrete
SD-05 Design Data
1.7.1.1 GConcrete Mix Design
SD-06 Test Reports
1.7.1.1 GConcrete Mix Design
1.7.4.3Aggregates
3.12.2.3 GCompressive Strength Tests
3.12.2.4 GAir Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
03 30 00 3.12.2.1 GSlump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.7.3.3VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.7.3.4Safety Data Sheets
1.7.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.1Curing Compound
10 44 16 SD-02 Shop Drawings
1.4 GSchedule
SD-03 Product Data
2.1.1 GFire Extinguishers
2.1.4 GAccessories
2.2.1 GCabinets
2.2.2 GWall Brackets
2.2.2.1 GIdentification Signs
3.2.1 GReplacement Parts List
SD-07 Certificates
2.1.1 GFire Extinguishers Certifications
13 34 23 SD-02 Shop Drawings
1.5.3Shop Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
13 34 23 Part 2Products
SD-04 Samples
2.1.1Selection Samples
SD-07 Certificates
1.5.1Manufacturer's Qualifications
1.5.3Delegated Design Engineer or
Architect
SD-11 Closeout Submittals
1.7Warranty
21 13 13 SD-01 Preconstruction Submittals
1.6.2.1 GQualified Fire Protection Engineer
(QFPE)
1.6.2.2 GSprinkler System Designer
1.6.2.3 GSprinkler System Installer
1.6.2.4 GQualifications of Welders
SD-02 Shop Drawings
1.6.1.2 GShop Drawings
1.3 GCoordination Information
SD-03 Product Data
2.2.1 GUnderground Pipe
2.3.1 GAboveground Pipe Up to the
Backflow Preventer
2.3.2.1 GSteel Pipe
2.3.2.2 GFittings
2.3.5 GValves
2.3.6Riser Check Valves
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
21 13 13 2.8.5 GRelief Valves
2.7 GSprinklers
2.3.4 GPipe Hangers and Supports
2.4.1 GSprinkler Alarm Switch
2.4.2 GValve Supervisory (Tamper)
Switches and Seals
2.6 GFire Department Connection
2.5 GBackflow Prevention Assembly
2.5.1 GBackflow Preventer Test
Connection
2.8.6 GAir Vent
2.1.2 GNameplates
2.9 GDocument Storage Cabinet
3.4.16 GDocument Storage Cabinet
2.8.8 GGauges
SD-05 Design Data
1.4.1.2 GHydraulic Calculations
SD-06 Test Reports
3.7.2 GTest Procedures
3.8.2.2 GBackflow Preventer Tests
SD-07 Certificates
1.6.2.1 GLetter of Confirmation
3.7.1 GQFPE Field Observation Report 1
3.7.1 GQFPE Field Observation Report 2
3.7.1 GQFPE Field Observation Report 3
3.7.1 GQFPE Field Observation Report 4
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
21 13 13 3.7.4.1 GVerification of Compliant
Installation
3.7.4.1 GRequest for Pre-Government
Test
3.7.4.2 GRequest for Government Final
Test
SD-10 Operation and Maintenance
Data
1.6.1.6 GOperating and Maintenance
(O&M) Instructions
1.6.1.6 GSpare Parts
1.6.1.4 GList of Sprinklers
SD-11 Closeout Submittals
1.6.1.7 GAs-built drawings
3.10 GRequest to schedule on-site
training
21 13 16 SD-01 Preconstruction Submittals
1.6.2.1 GQualified Fire Protection Engineer
(QFPE)
1.6.2.2 GSprinkler System Designer
1.6.2.3 GSprinkler System Installer
1.6.2.4 GNitrogen Generation System
Commissioning Technician
1.6.2.5Qualifications of Welders
SD-02 Shop Drawings
1.6.1.2 GShop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
21 13 16 1.3 GCoordination Information
SD-03 Product Data
2.3.2.1 GSteel Pipe
2.3.2.2 GFittings
2.3.5 GValves
2.10.5 GRelief Valves
2.9 GSprinklers
2.3.4 GPipe Hangers and Supports
2.6.1 GSprinkler Alarm Switches
2.6.3 GValve Supervisory (Tamper)
Switches and Seals
2.6.2 GHigh/Low-Nitrogen Pressure
Supervisory Switch
2.5.1 GNitrogen Generation System
2.1.2 GNameplates
2.4 GDry Pipe Valve
2.10.7 GGauges
SD-05 Design Data
1.4.1.2 GHydraulic Calculations
SD-06 Test Reports
3.6.2 GTest Procedures
SD-07 Certificates
GLetter of Confirmation
3.6.1 GQFPE Field Observation Report 1
3.6.1 GQFPE Field Observation Report 2
3.6.1 GQFPE Field Observation Report 3
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
21 13 16 3.6.1 GQFPE Field Observation Report 4
3.6.4.1 GVerification of Compliant
Installation
3.6.4.1 GRequest for Pre-Government
Test
3.6.4.2 GRequest for Government Final
Test
SD-10 Operation and Maintenance
Data
1.6.1.6 GOperating and Maintenance
(O&M) Instructions
1.6.1.6 GSpare Parts
1.6.1.4 GList of Sprinklers
SD-11 Closeout Submittals
1.6.1.7 GAs-built drawings
3.9 GRequest to schedule on-site
training
22 00 00 SD-03 Product Data
3.5.1.1 GBackflow Prevention Assemblies
2.4.1WaterSense Label for Lavatory
Faucet
2.4 GFixtures
2.4.2 GFlush Valve Urinals
2.4.2 GWaterSense Label for Urinal
2.4.3 GFlush Tank Water Closets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
22 00 00 2.4.3 GWaterSense Label for Flush Tank
Water Closet
2.4.4 GWall Hung Lavatories
2.4.5 GGeneral Purpose Sinks
2.4.7 GMop Receptors
2.4.6 GElectric-Water Coolers
2.4.6 GEnergy Star Label for Electric
Water Cooler
2.8 GWater Heaters
2.9 GPumps
2.10 GDomestic Water Service Meters
2.11 GDomestic Water Freeze
Protection System
SD-06 Test Reports
3.5Tests, Flushing and Disinfection
3.5.1.1 GTest of Backflow Prevention
Assemblies
SD-10 Operation and Maintenance
Data
3.5.1 GPlumbing System
23 07 00 SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
23 09 00 SD-02 Shop Drawings
3.2 GDDC Contractor Design Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
23 09 00 3.2 GFinal As-Built Drawings
SD-03 Product Data
2.2 GManufacturer's Product Data
SD-06 Test Reports
3.4.2 GStart-Up Testing Report
3.5.1 GPVT Procedures
3.5.5 GPVT Test Report
1.10.1 GPre-Construction Quality Control
(QC) Checklist
1.10.2 GPost-Construction Quality Control
(QC) Checklist
SD-10 Operation and Maintenance
Data
3.6 GOperation and Maintenance
(O&M) Instructions
3.8.1 GTraining Documentation
1.9.2 GController Configuration Settings
1.9.1 GConfiguration Software
1.9.3 GProgramming Software
SD-11 Closeout Submittals
2.5 GEnclosure Keys
3.1.7.1 GPassword Summary Report
1.10.3 GCloseout Quality Control (QC)
Checklist
23 30 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
23 30 00 2.6.1.1Insulated Nonmetallic Flexible
Duct Runouts
2.6.2Manual Balancing Dampers
2.6.3.1Diffusers
2.6.3.2Registers and Grilles
2.7.1.1 GCentrifugal Fans
2.8 GEnergy Recovery Devices
2.6.1Indoor Air Quality for Duct
Sealants
SD-10 Operation and Maintenance
Data
3.5.1 GOperation and Maintenance
Manuals
2.7.1.1 GCentrifugal Fans
2.8 GEnergy Recovery Devices
23 81 00 SD-03 Product Data
2.6.1 GCoil Corrosion Protection
3.4Training
2.1.1 GAir-Source Heat Pumps
2.3.2 GMini-Split-System Heat Pumps
SD-10 Operation and Maintenance
Data
3.4 GOperation and Maintenance
Manuals
26 08 00 SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
26 08 00 3.1 GAcceptance Tests and
Inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance Test and Inspections
Procedure
26 12 19.10 SD-06 Test Reports
3.7.1 GAcceptance Checks and Tests
SD-09 Manufacturer’s Field
Reports
2.3.1 GTransformer Test Schedule
26 20 00 SD-02 Shop Drawings
2.13 GPanelboards
2.3 GCable Trays
3.1.9.1 GMarking Strips
SD-03 Product Data
2.12 GReceptacles
2.13.3 GCircuit Breakers
2.10 GSwitches
2.14 GEnclosed Circuit Breakers
2.23 GSurge Protective Devices
2.3 GCable Trays
SD-06 Test Reports
3.5.2 G600-volt Wiring Test
3.5.4 GGrounding System Test
3.5.3 GGround-fault Receptacle Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
26 20 00 SD-07 Certificates
2.11 GFuses
SD-10 Operation and Maintenance
Data
1.5.1 GElectrical Systems
26 27 14.00 20 SD-02 Shop Drawings
1.3.1 GInstallation Drawings
SD-03 Product Data
2.1 GElectricity Meters
2.1.2 GCurrent Transformer
2.2 GCommunications
SD-06 Test Reports
3.2.1 GAcceptance Checks and Tests
3.2.2 GSystem Functional Verification
3.2.1 GBuilding Meter Installation Sheet
2.1.1 GMeter Configuration Template
3.2.1 GMeter Configuration Report
SD-10 Operation and Maintenance
Data
1.4.1 GElectricity Meters and
Accessories
SD-11 Closeout Submittals
3.2.2 GSystem Functional Verification
26 51 00 SD-02 Shop Drawings
1.5.1 GLuminaire Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
26 51 00 1.5.8 GOccupancy/Vacancy Sensor
Coverage Layout
1.7.2 GLighting Control System One-Line
Diagram
2.5.1 GSequence of Operation for
Lighting Control System
SD-03 Product Data
2.2 GLuminaires
2.3 GLight Sources
2.4 GLED Drivers
1.6.1 GLuminaire Warranty
1.6.2 GLighting Controls Warranty
2.5.1.1.1 GLocal Area Controller
2.5.1.2.1 GLighting Relay Panel
2.5.1.2.2 GLighting Control Panel
2.5.2.1 GSwitches
2.5.2.2 GWall Box Dimmers
2.5.2.3 GScene Wallstations
2.5.2.4 GOccupancy/Vacancy Sensors
2.5.2.5 GPhotosensors
2.5.2.6 GTime Clocks
2.5.2.4.4 GPower Packs
2.6.4 GMini Inverters
2.6.1 GExit Signs
2.6.3 GEmergency Drivers
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
26 51 00 1.5.2 GLuminaire Design Data
SD-06 Test Reports
1.5.3 GANSI/IES LM-79 Test Report
1.5.4 GANSI/IES LM-80 Test Report
1.5.5 GANSI/IES TM-21 Test Report
1.5.6 GANSI/IES TM-30 Test Report
3.2.1.1 GOccupancy/Vacancy Sensor
Verification Test
3.2.1.1 GPhotosensor Verification Test
SD-07 Certificates
1.5.7 GLED Driver and Dimming Switch
Compatibility Certificate
SD-10 Operation and Maintenance
Data
1.7.1 GLighting System
1.7.2 GLighting Control System
3.3.1.1 GMaintenance Staff Training Plan
3.3.1.2 GEnd-User Training Plan
27 10 00 SD-02 Shop Drawings
1.6.1.1 GTelecommunications drawings
1.6.1.2 GTelecommunications Space
Drawings
SD-03 Product Data
2.3 GTelecommunications cabling
2.4.5 GPatch panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
27 10 00 2.5 GTelecommunications outlet/connector assemblies
2.4.2 GEquipment support frame
2.4.3 GConnector blocks
SD-06 Test Reports
3.5.1 GTelecommunications cabling
testing
SD-07 Certificates
1.6.2.1 GTelecommunications Contractor
1.6.2.2 GKey Personnel
1.6.2.3 GManufacturer Qualifications
1.6.3 GTest plan
SD-09 Manufacturer’s Field
Reports
2.9.1 GFactory reel tests
SD-10 Operation and Maintenance
Data
1.10.1 GTelecommunications cabling and
pathway system
SD-11 Closeout Submittals
1.10.2 GRecord Documentation
28 08 10 SD-05 Design Data
3.1 GTest Plan
SD-06 Test Reports
3.2Pre-Acceptance Test Certification
3.4 GFinal Test Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
28 08 10 SD-07 Certificates
1.4.1Qualifications
28 10 05 SD-02 Shop Drawings
1.3.3.1 GESS Components
1.3.3.2 GOverall System Schematic
SD-03 Product Data
2.3.6 GPremise Control Unit
2.3.7 GDetection Sensors
2.4.4 GAccess Control Unit
2.4.5 GAccess Control Devices
2.5.1 GCameras
2.5.1.2 GCamera Lenses
2.5.1.3 GCamera Housing and Mounts
2.5.3.3 GVideo Recording
2.7 GCommunications Interface
Devices
2.7.4 GNetwork Switch
2.7.5 GVideo and ESS Transmission
2.8.1 GBatteries
2.10 GComponent Enclosure
2.11 GEquipment Rack
SD-05 Design Data
1.5.1 GBackup Battery Capacity
Calculations
2.4.2 GThroughput Rates
1.5.2CCTV Storage Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
28 10 05 SD-07 Certificates
1.3.4.1 GContractor Qualifications
1.3.4.2 GInstructor Qualifications
2.7.3 GData Encryption
SD-10 Operation and Maintenance
Data
3.6.1 GTraining Plan
3.6 GTraining Content
1.3.3.1 GESS Components
1.6 GESS Software
SD-11 Closeout Submittals
1.7 GAs-Built Drawings
28 31 76 SD-01 Preconstruction Submittals
1.10.2.1 GQualified Fire Protection Engineer
(QFPE)
1.10.2.2 GFire alarm system designer
1.10.2.3 GSupervisor
1.10.2.4 GTechnician
1.10.2.5 GInstaller
1.10.2.6 GTest Technician
1.9 GFire Alarm System Site-Specific
Software Acknowledgement
SD-02 Shop Drawings
1.10.1.3 GNameplates
2.2.4 GInstructions
1.10.1.4 GWiring Diagrams
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
28 31 76 1.10.1.5 GSystem Layout
1.10.1.11 GCoordination Information
SD-03 Product Data
1.10.1.12 GEquipment List
2.3 GFire Alarm and Mass Notification
Control Unit (FMCU)
2.4 GLocal Operating Consoles (LOC)
2.5 GAmplifiers
2.5 GTone Generators
2.5 GDigitalized voice generators
2.7 GManual Stations
2.8 GSmoke Detectors
2.9 GAddressable Input Monitor
Modules
2.10 GAddressable Output Control
Modules
2.11 GIsolation Modules
2.12 GNotification Appliances
2.12.3 GTextual Display Sign Control
Panel
2.12.3 GTextual Display Signs
2.14.1 GBatteries
2.14.2 GBattery Chargers
2.14.3 GBattery Cabinets
2.15 GSurge Protective Devices
2.16.1 GAlarm Wiring
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
28 31 76 2.22 GBack Boxes and Conduit
2.19 GCeiling Bridges
2.21 GTerminal Cabinets
2.17.1 GRadio Transmitter and Interface
Panels
2.18.2 GSprinkler Electric Water Alarm
Bell
2.20 GDocument Storage Cabinet
SD-05 Design Data
1.10.1.6 GNotification Appliances
Calculations and Data
1.10.1.7 GInitiating Devices Calculations
and Data
1.10.1.8 GAmplifiers Calculations and Data
1.10.1.9 GBattery Power Calculations and
Data
1.10.1.10 GVoltage Drop Calculations
SD-06 Test Reports
3.6.2 GTest Procedures
SD-07 Certificates
1.10.2.1 GLetter of Confirmation
3.6.1 GQFPE Field Observation Report 1
3.6.1 GQFPE Field Observation Report 2
3.6.1 GQFPE Field Observation Report 3
3.6.1 GQFPE Field Observation Report 4
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
28 31 76 3.6.4.1 GVerification of Compliant
Installation
3.6.3 GRequest for Pre-Government
Test
3.6.4.1 GRequest for Pre-Government
Test
3.6.4.2 GRequest for Government Final
Test
SD-10 Operation and Maintenance
Data
1.10.1.13 GOperation and Maintenance
(O&M) Instructions
3.9.1 GInstructor's Information
3.9.1 GRequest to Schedule On-Site
Training
SD-11 Closeout Submittals
1.10.1.14 GAs-Built Drawings
1.14.1Spare Parts
31 00 00 SD-01 Preconstruction Submittals
3.4.1 GRock Excavation Plan
3.8 GDisposition of Surplus Materials
1.6.4 GPreconstruction Meeting
SD-03 Product Data
2.2 GFlowable Fill Mix Design
2.5Geotextile
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
31 00 00 1.6.6 GRequirements for Off-Site Soils
2.1.7 GPorous Fill
3.9.2.1 GFill and backfill material testing
2.1.3 GStructural fill
3.9.2.2 GStructural fill
2.1.5 GStormwater filter sand
2.1.5 GStormwater filter sand
3.9.2.3 GStormwater filter sand
3.9.2.3 GStormwater filter sand
2.1.4Pea gravel
3.9.2.3Pea gravel
3.9.2.4Density tests
1.6.1 GGeotechnical Evaluation Report
32 05 33 SD-03 Product Data
2.3Mulches Topdressing
SD-07 Certificates
3.3.1Maintenance Inspection Report
32 11 20 SD-06 Test Reports
2.2.1 GInitial Tests
3.11.1 GIn-Place Tests
32 11 23 SD-06 Test Reports
2.2.1 GInitial Tests
3.10.1 GIn-Place Tests
32 12 17 SD-03 Product Data
2.6 GGranite Curb
2.7.1 GWaterborne Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
32 12 17 SD-05 Design Data
2.3.1Job Mix Formula
2.2 GASPHALT CEMENT BINDER
2.3 GMIX DESIGN
SD-06 Test Reports
2.5.1Bituminous Mixture Tests
3.8.2Pavement Courses
32 92 19 SD-03 Product Data
2.5.3Wood Cellulose Fiber Mulch
2.4Fertilizer
2.7Erosion Control Materials
SD-06 Test Reports
2.2.3Topsoil Composition Tests
2.2.4 GImported Soil Testing
SD-07 Certificates
2.1 GSeed
33 11 00 SD-01 Preconstruction Submittals
3.1.1 GConnections
SD-03 Product Data
2.1.1 GPipe, Fittings, Joints and
Couplings
2.1.2 GValves
2.1.2.2 GValve Boxes
2.2.1 GPipe Restraint
2.2.2 GTapping Sleeves
2.2.1.2 GPrecast Concrete Thrust Blocks
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
33 11 00 3.2.2 GDisinfection Procedures
SD-06 Test Reports
3.3.1.4 GBacteriological Samples
3.2.1.1.5Hydrostatic Sewer Test
3.3.1.3Leakage Test
3.3.1.1Hydrostatic Test
SD-07 Certificates
2.1.1Pipe, Fittings, Joints and
Couplings
2.1.1.1.1Lining
2.1.2Valves
SD-08 Manufacturer’s Instructions
2.1.1.1Ductile-Iron Piping
33 30 00 SD-01 Preconstruction Submittals
1.3.1 GContractor's License
SD-03 Product Data
2.2.1Gravity Pipe
2.2.2Pressure Pipe
SD-06 Test Reports
3.2.1.1 GHydrostatic Sewer Test
3.2.1.2.1 GLow-Pressure Air Tests
3.2.1.4Deflection Testing
SD-07 Certificates
3.2.2.1 GPre-Installation Inspection
Request
3.2.2.2 GPost-Installation Inspection
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
33 40 00 SD-03 Product Data
2.1Pipe For Storm Drains
SD-07 Certificates
2.2.5Frame and Cover for Gratings
3.7.2.1.2Post-Installation Inspection
Report
3.3Placing Pipe
33 46 16 SD-03 Product Data
2.1 GPipe for Subdrains
SD-06 Test Reports
2.4Subdrain bedding material
33 71 02 SD-03 Product Data
2.4 GMedium Voltage Cable
2.6 GMedium Voltage Cable Joints
2.5 GMedium Voltage Cable
Terminations
2.8 GLive End Caps
2.13.1 GComposite/Fiberglass Handholes
SD-06 Test Reports
2.14.1 GMedium Voltage Cable
Qualification and Production Tests
3.17.1 GField Acceptance Checks and
Tests
3.3 GCable Installation Plan and
Procedure
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
33 71 02 1.4.1 GCable splicer/terminator
1.4.2 GCable Installer Qualifications
33 82 00 SD-02 Shop Drawings
1.6.1.1 GTelecommunications Outside
Plant
1.6.1.2 GTelecommunications Entrance
Facility Drawings
SD-03 Product Data
2.7 GWire and cable
2.4 GCable splices, and connectors
2.3 GClosures
SD-06 Test Reports
3.5.1 GAcceptance tests
1.6.3 GOutside Plant Test Plan
SD-07 Certificates
1.6.2.1 GTelecommunications Contractor
1.6.2.2 GKey Personnel
1.6.2.3 GManufacturer's Qualifications
SD-08 Manufacturer’s Instructions
3.1.6.1 GCable tensions
3.1.7.1 GFiber Optic Splices
SD-09 Manufacturer’s Field
Reports
2.11.1 GFactory Reel Test Data
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 26 PAGES
NAVAL WAR COLLEGE MODULAR BUILDINGS
33 82 00 1.6.1.1 GTelecommunications outside plant (OSP)
SD-11 Closeout Submittals
1.8.1 GRecord Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SECTI ON 03 30 00
CAST- I N- PLACE CONCRETE
02/ 19, CHG 4: 08/ 22
PART 1 GENERAL
1. 1 SUMMARY
Thi s Sect i on speci f i es r ei nf or ced concr et e f or Modul ar Bui l di ng f oundat i ons.
1. 2 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN CONCRETE I NSTI TUTE ( ACI )
ACI 117 ( 2010; Er r at a 2011) Speci f i cat i ons f or Tol er ances f or Concr et e Const r uct i on and Mat er i al s and Comment ar y
ACI 121R ( 2008) Gui de f or Concr et e Const r uct i on Qual i t y Syst ems i n Conf or mance wi t h I SO
ACI 301 ( 2016) Speci f i cat i ons f or St r uct ur al Concr et e
ACI 302. 1R ( 2015) Gui de f or Concr et e Fl oor and Sl ab Const r uct i on
ACI 304. 2R ( 2017) Gui de t o Pl aci ng Concr et e by Pumpi ng Met hods
ACI 304R ( 2000; R 2009) Gui de f or Measur i ng, Mi xi ng, Tr anspor t i ng, and Pl aci ng Concr et e
ACI 305. 1 ( 2014) Speci f i cat i on f or Hot Weat her Concr et i ng
ACI 305R ( 2020) Gui de t o Hot Weat her Concr et i ng
ACI 306. 1 ( 1990; R 2002) St andar d Speci f i cat i on f or Col d Weat her Concr et i ng
ACI 306R ( 2016) Gui de t o Col d Weat her Concr et i ng
ACI 308. 1 ( 2011) Speci f i cat i on f or Cur i ng Concr et e
ACI SP- 2 ( 2007; Abst r act : 10t h Edi t i on) ACI Manual of Concr et e I nspect i on
ACI SP- 15 ( 2011) Fi el d Ref er ence Manual : St andar d Speci f i cat i ons f or St r uct ur al Concr et e ACI 301- 05 wi t h Sel ect ed ACI Ref er ences
SECTI ON 03 30 00 Page 1
AMERI CAN HARDBOARD ASSOCI ATI ON ( AHA)
AHA A135. 4 ( 1995; R 2004) Basi c Har dboar d
ASTM I NTERNATI ONAL ( ASTM)
ASTM A615/ A615M ( 2022) St andar d Speci f i cat i on f or Def or med and Pl ai n Car bon- St eel Bar s f or Concr et e Rei nf or cement
ASTM A884/ A884M ( 2019) St andar d Speci f i cat i on f or Epoxy- Coat ed St eel Wi r e and Wel ded Wi r e Rei nf or cement
ASTM A934/ A934M ( 2022) St andar d Speci f i cat i on f or Epoxy- Coat ed Pr ef abr i cat ed St eel Rei nf or ci ng Bar s
ASTM A1064/ A1064M ( 2022) St andar d Speci f i cat i on f or Car bon- St eel Wi r e and Wel ded Wi r e Rei nf or cement , Pl ai n and Def or med, f or Concr et e
ASTM C31/ C31M ( 2022) St andar d Pr act i ce f or Maki ng and Cur i ng Concr et e Test Speci mens i n t he Fi el d
ASTM C33/ C33M ( 2023) St andar d Speci f i cat i on f or Concr et e Aggr egat es
ASTM C39/ C39M ( 2021) St andar d Test Met hod f or Compr essi ve St r engt h of Cyl i ndr i cal Concr et e Speci mens
ASTM C42/ C42M ( 2020) St andar d Test Met hod f or Obt ai ni ng and Test i ng Dr i l l ed Cor es and Sawed Beams of Concr et e
ASTM C78/ C78M ( 2022) St andar d Test Met hod f or Fl exur al St r engt h of Concr et e ( Usi ng Si mpl e Beam wi t h Thi r d- Poi nt Loadi ng)
ASTM C94/ C94M ( 2023) St andar d Speci f i cat i on f or Ready- Mi xed Concr et e
ASTM C143/ C143M ( 2020) St andar d Test Met hod f or Sl ump of Hydr aul i c- Cement Concr et e
ASTM C150/ C150M ( 2022) St andar d Speci f i cat i on f or Por t l and Cement
ASTM C172/ C172M ( 2017) St andar d Pr act i ce f or Sampl i ng Fr eshl y Mi xed Concr et e
ASTM C173/ C173M ( 2016) St andar d Test Met hod f or Ai r Cont ent of Fr eshl y Mi xed Concr et e by t he Vol umet r i c Met hod
ASTM C231/ C231M ( 2022) St andar d Test Met hod f or Ai r
SECTI ON 03 30 00 Page 2
Cont ent of Fr eshl y Mi xed Concr et e by t he Pr essur e Met hod
ASTM C260/ C260M ( 2010a; R 2016) St andar d Speci f i cat i on f or Ai r - Ent r ai ni ng Admi xt ur es f or Concr et e
ASTM C311/ C311M ( 2022) St andar d Test Met hods f or Sampl i ng and Test i ng Fl y Ash or Nat ur al Pozzol ans f or Use i n Por t l and- Cement Concr et e
ASTM C494/ C494M ( 2019; E 2022) St andar d Speci f i cat i on f or Chemi cal Admi xt ur es f or Concr et e
ASTM C618 ( 2023; E 2023) St andar d Speci f i cat i on f or Coal Fl y Ash and Raw or Cal c i ned Nat ur al Pozzol an f or Use i n Concr et e
ASTM C989/ C989M ( 2022) St andar d Speci f i cat i on f or Sl ag Cement f or Use i n Concr et e and Mor t ar s
ASTM C1017/ C1017M ( 2013; E 2015) St andar d Speci f i cat i on f or Chemi cal Admi xt ur es f or Use i n Pr oduci ng Fl owi ng Concr et e
ASTM C1077 ( 2017) St andar d Pr act i ce f or Agenci es Test i ng Concr et e and Concr et e Aggr egat es f or Use i n Const r uct i on and Cr i t er i a f or Test i ng Agency Eval uat i on
ASTM C1260 ( 2021) St andar d Test Met hod f or Pot ent i al Al kal i React i v i t y of Aggr egat es ( Mor t ar - Bar Met hod)
ASTM C1293 ( 2008; R 2015) St andar d Test Met hod f or Det er mi nat i on of Lengt h Change of Concr et e Due t o Al kal i - Si l i ca React i on
ASTM C1567 ( 2022) St andar d Test Met hod f or Pot ent i al Al kal i - Si l i ca React i v i t y of Combi nat i ons of Cement i t i ous Mat er i al s and Aggr egat e ( Accel er at ed Mor t ar - Bar Met hod)
ASTM C1602/ C1602M ( 2022) St andar d Speci f i cat i on f or Mi xi ng Wat er Used i n Pr oduct i on of Hydr aul i c Cement Concr et e
ASTM C1778 ( 2016) St andar d Gui de f or Reduci ng t he Ri sk of Del et er i ous Al kal i - Aggr egat e React i on i n Concr et e
ASTM D5759 ( 2012; R 2020) Char act er i zat i on of Coal Fl y Ash and Cl ean Coal Combust i on Fl y Ash f or Pot ent i al Uses
ASTM E329 ( 2021) St andar d Speci f i cat i on f or Agenci es Engaged i n Const r uct i on I nspect i on, Test i ng, or Speci al I nspect i on
SECTI ON 03 30 00 Page 3
CONCRETE REI NFORCI NG STEEL I NSTI TUTE ( CRSI )
CRSI 10MSP ( 2018) Manual of St andar d Pr act i ce
CRSI RB4. 1 ( 2016) Suppor t s f or Rei nf or cement Used i n Concr et e
NATI ONAL I NSTI TUTE OF STANDARDS AND TECHNOLOGY ( NI ST)
NI ST PS 1 ( 2009) DOC Vol unt ar y Pr oduct St andar d PS 1- 07, St r uct ur al Pl ywood
1. 3 DEFI NI TI ONS
a. " Cement i t i ous mat er i al " as used her ei n must i ncl ude al l por t l and cement , pozzol an, f l y ash, and sl ag cement .
b. " Exposed t o publ i c v i ew" means si t uat ed so t hat i t can be seen f r om eye l evel f r om a publ i c l ocat i on af t er compl et i on of t he bui l di ng. A publ i c l ocat i on i s accessi bl e t o per sons not r esponsi bl e f or oper at i on or mai nt enance of t he bui l di ng.
c. " Chemi cal admi xt ur es" ar e mat er i al s i n t he f or m of powder or f l ui ds t hat ar e added t o t he concr et e t o gi ve i t cer t ai n char act er i st i cs not obt ai nabl e wi t h pl ai n concr et e mi xes.
d. " Suppl ement ar y cement i ng mat er i al s" ( SCM) i ncl ude coal f l y ash, s l ag cement , nat ur al or cal c i ned pozzol ans, and ul t r a- f i ne coal ash when used i n such pr opor t i ons t o r epl ace t he por t l and cement t hat r esul t i n i mpr ovement t o sust ai nabi l i t y and dur abi l i t y and r educed cost .
e. " Desi gn st r engt h" ( f ' c) i s t he speci f i ed compr essi ve st r engt h of concr et e at t i me( s) speci f i ed i n t hi s sect i on t o meet st r uct ur al desi gn cr i t er i a.
f . " Mass Concr et e" i s any concr et e syst em t hat appr oaches a maxi mum t emper at ur e of 158 degr ees F wi t hi n t he f i r st 72 hour s of pl acement .
I n addi t i on, i t i ncl udes al l concr et e el ement s wi t h a sect i on t hi ckness of 3 f eet or mor e r egar dl ess of t emper at ur e.
g. " Mi xt ur e pr opor t i oni ng" i s t he pr ocess of desi gni ng concr et e mi xt ur e pr opor t i ons t o enabl e i t t o meet t he st r engt h, ser vi ce l i f e and const r uct abi l i t y r equi r ement s of t he pr oj ect whi l e mi ni mi zi ng t he i ni t i al and l i f e- cycl e cost .
h. " Mi xt ur e pr opor t i ons" ar e t he masses or vol umes of i ndi v i dual i ngr edi ent s used t o make a uni t measur e ( cubi c met er or cubi c yar d) of concr et e.
i . " Pozzol an" i s a s i l i ceous or s i l i ceous and al umi nous mat er i al , whi ch i n i t sel f possesses l i t t l e or no cement i t i ous val ue but wi l l , i n f i nel y di v i ded f or m and i n t he pr esence of moi st ur e, chemi cal l y r eact wi t h cal c i um hydr oxi de at or di nar y t emper at ur es t o f or m compounds possessi ng cement i t i ous pr oper t i es.
j . " Wor kabi l i t y ( or consi st ence) " i s t he abi l i t y of a f r esh ( pl ast i c) concr et e mi x t o f i l l t he f or m/ moul d pr oper l y wi t h t he desi r ed wor k ( v i br at i on) and wi t hout r educi ng t he concr et e' s qual i t y. Wor kabi l i t y depends on wat er cont ent , chemi cal admi xt ur es, aggr egat e ( shape and
SECTI ON 03 30 00 Page 4 si ze di st r i but i on) , cement i t i ous cont ent and age ( l evel of hydr at i on) .
1. 4 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" c l assi f i cat i on.
Submi t t al s not havi ng a " G" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00
SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Concr et e Cur i ng Pl an
Qual i t y Cont r ol Pl an
Qual i t y Cont r ol Per sonnel Cer t i f i cat i ons
Qual i t y Cont r ol Or gani zat i onal Char t
Labor at or y Accr edi t at i on
SD- 02 Shop Dr awi ngs
Rei nf or ci ng St eel ; G
SD- 03 Pr oduct Dat a
For mwor k Mat er i al s
Cement i t i ous Mat er i al s
Concr et e Cur i ng Mat er i al s
Rei nf or cement
Admi xt ur es
Bi odegr adabl e For m Rel ease Agent
Pumpi ng Concr et e
SD- 05 Desi gn Dat a
Concr et e Mi x Desi gn; G
SD- 06 Test Repor t s
Concr et e Mi x Desi gn; G
Aggr egat es
Compr essi ve St r engt h Test s; G
Ai r Cont ent ; G
Sl ump Test s; G
Wat er
SECTI ON 03 30 00 Page 5
SD- 07 Cer t i f i cat es
Rei nf or ci ng Bar s
VOC Cont ent f or For m Rel ease Agent s, Cur i ng Compounds, and Concr et e Penet r at i ng Seal er s
Saf et y Dat a Sheet s
Fi el d Test i ng Techni c i an and Test i ng Agency
SD- 08 Manuf act ur er ' s I nst r uct i ons
Cur i ng Compound
1. 5 MODI FI CATI ON OF REFERENCES
Accompl i sh wor k i n accor dance wi t h ACI publ i cat i ons except as modi f i ed her ei n. Consi der t he advi sor y or r ecommended pr ovi s i ons t o be mandat or y.
I nt er pr et r ef er ence t o t he " Bui l di ng Of f i c i al , " t he " St r uct ur al Engi neer , " and t he " Ar chi t ect / Engi neer " t o mean t he Cont r act i ng Of f i cer .
1. 6 DELI VERY, STORAGE, AND HANDLI NG
Fol l ow ACI 301, ACI 304R and ASTM A934/ A934M r equi r ement s and r ecommendat i ons. Do not del i ver concr et e unt i l f or ms, r ei nf or cement , embedded i t ems, and chamf er st r i ps ar e i n pl ace and r eady f or concr et e pl acement . Do not st or e concr et e cur i ng compounds or seal er s wi t h mat er i al s t hat have a hi gh capaci t y t o adsor b vol at i l e or gani c compound ( VOC) emi ssi ons. Do not st or e concr et e cur i ng compounds or seal er s i n occupi ed spaces.
1. 6. 1 Rei nf or cement
St or e r ei nf or cement of di f f er ent s i zes and shapes i n separ at e pi l es or r acks r ai sed above t he gr ound t o avoi d excessi ve r ust i ng. Pr ot ect f r om cont ami nant s such as gr ease, oi l , and di r t . Ensur e bar s i zes can be accur at el y i dent i f i ed af t er bundl es ar e br oken and t ags r emoved.
1. 7 QUALI TY ASSURANCE
1. 7. 1 Desi gn Dat a
1. 7. 1. 1 Concr et e Mi x Desi gn
Si xt y days mi ni mum pr i or t o concr et e pl acement , submi t a mi x desi gn f or each st r engt h and t ype of concr et e. Submi t a compl et e l i s t of mat er i al s i ncl udi ng t ype; br and; sour ce and amount of cement , suppl ement ar y cement i t i ous mat er i al s, and admi xt ur es; and appl i cabl e r ef er ence speci f i cat i ons. Submi t mi l l t est and al l ot her t est f or cement , suppl ement ar y cement i t i ous mat er i al s, aggr egat es, and admi xt ur es. Pr ovi de document at i on of maxi mum nomi nal aggr egat e s i ze, gr adat i on anal ysi s, per cent age r et ai ned and passi ng si eve, and a gr aph of per cent age r et ai ned ver ses si eve si ze. Pr ovi de mi x pr opor t i on dat a usi ng at l east t hr ee di f f er ent wat er - cement i t i ous mat er i al r at i os f or each t ype of mi xt ur e, whi ch pr oduce a r ange of st r engt h encompassi ng t hose r equi r ed f or each t ype of concr et e r equi r ed. I f sour ce mat er i al changes, r esubmi t mi x pr opor t i on dat a usi ng r evi sed sour ce mat er i al . Pr ovi de onl y mat er i al s t hat have been pr oven by t r i al mi x st udi es t o meet t he r equi r ement s of
SECTI ON 03 30 00 Page 6 t hi s speci f i cat i on, unl ess ot her wi se appr oved i n wr i t i ng by t he Cont r act i ng Of f i cer . I ndi cat e c l ear l y i n t he submi t t al wher e each mi x desi gn i s used when mor e t han one mi x desi gn i s submi t t ed. Resubmi t dat a on concr et e component s i f t he qual i t i es or sour ce of component s changes.
Requi r ed aver age st r engt h can be document ed by f i el d exper i ence i f f i el d st r engt h t est dat a ar e avai l abl e and r epr esent a s i ngl e gr oup of at l east 10 consecut i ve st r engt h t est s f or one mi xt ur e, usi ng mat er i al s and condi t i ons s i mi l ar t o t hose expect ed f or wor k, and encompassi ng a per i od of not l ess t han 45 days. The aver age of f i el d st r engt h t est s shal l equal or exceed f cr ' . Changes i n mat er i al s, condi t i ons, and pr opor t i ons wi t hi n t he t est r ecor d shal l not have been mor e cl osel y r est r i ct ed t han t hose f or t he pr oposed wor k. Test r ecor ds shal l not be mor e t han 24 mont hs ol d.
Obt ai n mi x desi gn appr oval f r om t he cont r act i ng of f i cer pr i or t o concr et e pl acement .
1. 7. 2 Shop Dr awi ngs
1. 7. 2. 1 Rei nf or ci ng St eel
I ndi cat e bendi ng di agr ams, assembl y di agr ams, spl i c i ng and l aps of bar s, shapes, di mensi ons, and det ai l s of bar r ei nf or ci ng, accessor i es, and concr et e cover . Do not scal e di mensi ons f r om st r uct ur al dr awi ngs t o det er mi ne l engt hs of r ei nf or ci ng bar s. Repr oduct i ons of cont r act dr awi ngs ar e unaccept abl e.
1. 7. 3 Cont r ol Submi t t al s
1. 7. 3. 1 Concr et e Cur i ng Pl an
Submi t pr oposed mat er i al s, met hods and dur at i on f or cur i ng concr et e el ement s i n accor dance wi t h ACI 308. 1.
1. 7. 3. 2 Pumpi ng Concr et e
Submi t pr oposed mat er i al s and met hods f or pumpi ng concr et e. Submi t t al must i ncl ude mi x desi gns, pumpi ng equi pment i ncl udi ng t ype of pump and si ze and mat er i al f or pi pe, and maxi mum l engt h and hei ght concr et e i s t o be pumped.
1. 7. 3. 3 VOC Cont ent f or f or m r el ease agent s, cur i ng compounds, and concr et e penet r at i ng seal er s
Submi t cer t i f i cat i on f or t he f or m r el ease agent , cur i ng compounds, and concr et e penet r at i ng seal er s t hat i ndi cat e t he VOC cont ent of each pr oduct .
1. 7. 3. 4 Saf et y Dat a Sheet s
Submi t Saf et y Dat a Sheet s ( SDS) f or al l mat er i al s t hat ar e r egul at ed f or hazar dous heal t h ef f ect s. SDS must be r eadi l y accessi bl e dur i ng each wor k shi f t t o empl oyees when t hey ar e at t he const r uct i on s i t e.
1. 7. 4 Test Repor t s
1. 7. 4. 1 Fl y Ash and Pozzol an
Submi t t est r esul t s i n accor dance wi t h ASTM C618 f or f l y ash and pozzol an. Submi t t est r esul t s per f or med wi t hi n 6 mont hs of submi t t al dat e.
SECTI ON 03 30 00 Page 7
1. 7. 4. 2 Sl ag Cement
Submi t t est r esul t s i n accor dance wi t h ASTM C989/ C989M f or s l ag cement .
Submi t t est r esul t s per f or med wi t hi n 6 mont hs of submi t t al dat e.
1. 7. 4. 3 Aggr egat es
Submi t t est r esul t s i n accor dance wi t h ASTM C33/ C33M and ASTM C1293 or ASTM C1567 as r equi r ed i n t he par agr aph t i t l ed ALKALI - AGGREGATE REACTI ON.
1. 7. 5 Qual i t y Cont r ol Pl an
Devel op and submi t f or appr oval a concr et e qual i t y cont r ol pr ogr am i n accor dance wi t h t he gui del i nes of ACI 121R and as speci f i ed her ei n. The pl an must i ncl ude appr oved l abor at or i es. Pr ovi de di r ect over si ght f or t he concr et e qual i f i cat i on pr ogr am i ncl usi ve of associ at ed sampl i ng and t est i ng.