This document is an amendment to a federal solicitation for the design-bid-build B686 Conolly Hall Upgrades and Modular Buildings at the Naval War College in Newport, Rhode Island. The amendment updates the proposal due date, provides revised drawings and specifications, and addresses various questions and responses related to the contract requirements. Key details include:

  • The proposal due date is updated to July 22, 2024 by 2pm.
  • Revised drawings and specifications are provided, including updates to HVAC, electrical, and telecommunications systems.
  • Responses are provided to 57 questions on topics such as project phasing, submittal requirements, fire alarm systems, utility connections, and product substitutions.
  • The contract will be awarded by the Naval Facilities Engineering Command and is for construction services to upgrade Conolly Hall and install new modular buildings to support the Naval War College.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Attachment E- REVISED Price Schedule NWC B686 Conolly Hall.pdf PDF
Attachment S- 1B 01-NhChi (1-line Sept 15 2022) Dwg_F.pdf PDF
Attachment M- REVISED P2 NWC Mod Bldgs Specs.pdf PDF
Attachment L- REVISED P2 NWC Mod Bldgs Drawings.pdf PDF
Attachment Q-REVISED Specifications and Drawings.pdf PDF
Attachment R- 1A CONOLLYTEMPTRAILERELEC Dwg Sig_F.pdf PDF
Amendment 0004.pdf PDF
ATTACHMENT Q Specifications and Drawing Update.pdf PDF
Amendment 0003.pdf PDF
B686 Conolly Hall Site Visit Log.pdf PDF
Attachment A -Pre-Proposal Inquiry Log Rev.xlsx XLSX spreadsheet
Amendment 0002.pdf PDF
ATTACHMENT N- NSN CONOLLY SITE VISIT PROCEDURES.docx DOCX document
Amendment 0001.pdf PDF
ATTACHMENT P SECNAV FORM 5512.pdf PDF
ATTACHMENT O CONOLLY HALL MAP.pdf PDF
RFP N4008524R2601.pdf PDF
Attachment I- eOMSI FDW Conolly Hall.pdf PDF
Attachment E- Price Proposal Form_.docx DOCX document
Attachment K-Package 1 NWC B686 Conolly Specs.pdf PDF
Attachment H- Historical Small Business Utilization.docx DOCX document
Attachment C- Construction Experience Project Data.docx DOCX document
Attachment D- Past Performance Questionnaire.docx DOCX document
Attachment F- Small Business Participation Commitment.docx DOCX document
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment L-Package 2 NWC Mod Bldgs Drawings.pdf PDF
Attachment G- Individual Small Business Subcontracting Plan.docx DOCX document
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment M- Package 2 NWC Mod Bldgs Specs.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

N40085-24-R-2601

This amendment is issued to incorporate the following:

1. Update the Proposal Due date to 22 JULY 2024 as stated in Amendment 0004 within the PIEE system

2. Provide Continuation Sheet for updated Drawings

3. Provide updated Wage Determination

4. Provide PPI Responses

5. Provide signed drawings - Attachment L- REVISED Package 2 NWC Mod Bldgs Drawings

(attached separately)

6. Provide signed drawings - Attachment M- REVISED Package 2 NWC Mod Bldgs Specs (attached separately)

7. Provide Amended Drawings Attachment R - 1A CONOLLYTEMPTRAILERELEC Dwg (attached separately)

8. Provide Amended Drawings Attachment S - 1B 01-NhChi (1-line Sept 15 2022) Dwg (attached separately)

9. Provide signed Drawings - Attachment Q- REVISED Specification and Drawings (attached separately)

10. Provide Attachment E- REVISED Price Schedule NWC B686 Conolly Hall (attached separately)

1. Update Proposal Due date in PIEE System

Amendment 0004 incorporated a change to the proposal due date from 16 July 2024 to 22 July

2024 by 2pm, but was not changed in the PIEE system. Amendment 0005 is adjusting the due date to 22 July 2024 by 2pm in the PIEE system.

2. Provide Continuation Sheet for updated drawings.

P1 NWC B686 Conolly Hall Upgrades - DRAWINGS

Architectural

DRAWINGS A102B, A103A, A104A, A105A, A106A: Add “Keynote 27 Provide and install dedicated circuit power, 120-V on 20 amp service, and CAT 6 cable from each Break Room to nearest telcom closet, for each 40”x40” vending machine to be Government furnished and supplied, in the following rooms: 2 (two) each in Break Room CL-104, 2 (two) each in Break

Room C-117, 2 (two) each in Break Room C-227, 2 (two) each in Break Room C-325, 2 (two) each in Break Room C-427.”

Mechanical

DRAWING M-112: Add 1” valved and capped HWS&R branch pipes onto mains in Corridor at column lines 3/G.

DRAWING M-114: Fan coil units FCU 2-4.01 in Lobby-C200B and FCU 2-5.01 in Lobby-C200A shall be piped to the winter chiller distribution water piping system.

DRAWING M-114: In Corridor C200 at column lines E/8, pipe risers shall be labeled “3/4 inch

CHWS&R up”.

DRAWING M-115: In Lobby C300B, fan coil unit FCU 3-3.03 shall not be connected to the winter chiller distribution piping system.

DRAWING M-115: In Corridor C300 at column lines E/8, pipe risers shall be labeled “3/4 inch

CHWS&R up and down”.

DRAWING M-116: In Office C416, fan coil unit FCU 4-5.43 shall not be connected to the winter chiller distribution piping system.

DRAWING M-116: In Office C424, fan coil unit with missing tag shall be tagged as “FCU 4-5.16.”

DRAWING M-116: In Office C402, fan coil unit shall be tagged as “FCU 4-5.40.”

DRAWING M-401: On plan A1, existing unit heater UH-1 located near pump P-10 shall be included to be demolished.

DRAWING M-403: On plan A1, unit to be demolished at column lines E/2 shall be labeled as

“VAV unit with HW reheat coil.”

DRAWING M-506: At riser DTW-10W, add “fan coil unit FCU 3-3.04 and piping after fan coil unit

3-3.02 on 3rd floor.”

DRAWING M-507: At riser DTW-2N, add “fan coil unit FCU 3-3.03 and piping after fan coil unit

3-4.04 on 3rd floor.”

DRAWING M-602: In Variable Air Volume Box Schedule, revise boxes “VAV-7, 9 & 10 to inlet size

5 inch.”

DRAWING M-603: In Fan Coil Schedule, FCU’s 1-5.01 and 1-6.01 shall be revised to 2-row CHW coils.” Fan coil units FCU 1-1.01 thru 1-4.02, FCU 1-5.02, FCU 1-7.03, FCU 1-9.02, FCU 1-9.03, FCU 2-7.01 and FCU 2-7.02 will not include second coils. Fan coil units FCU’s 2-4.01 and 2-5.01 shall be revised to 2-row secondary winter chiller coils. Fan coil units FCU’s 2-6.01 thru 2-6.04 shall be revised to 1-row secondary winter chiller coils.

DRAWING M-603: In the Fan Coil Schedule Remarks column, FCU’S 1-8.01, 2-7.01 thru 2-7.14 shall replace note 2 with note 1. Fan coil unit 2-4.01 shall replace note 1 with note 2.

DRAWING M-604: In Fan Coil Schedule, FCU’s 3-3.03 and 3-3.04 will not include second 2-row coils.

DRAWING M-605: In Fan Coil Schedule, FCU’s 4-3.01 and 4-3.02 shall be revised to include 2-row CHW coils and 2-row secondary winter chiller coils. Fan coil unit FCU B-4.01 shall be revised to include a 2-row secondary winter chiller coil.” Fan coil units FCU’s 4-4.01 thru 4-4.03 shall be revised to include “1-row secondary winter chiller coils.”

DRAWING M-605: In the Fan Coil Schedule Remarks column, FCU’S B-3.01, B-5.01 and B-5.02 shall replace note 2 with note 1. Fan coil unit 4-4.01 shall replace note 1 with note 2.

DRAWINGS M-603, M604, M605: Some scheduled fan coil unit size cooling and heating capacities may not be quite accurate as shown in the schedule. The fan coil unit model sizes and airflows shown in the schedules are accurate for the bidding process.

DRAWING M-701: In Sequence of Operation, add note 1.E to read “Warmup Cycle 1. Prior to occupancy, the unit shall be energized, the outside air and relief air dampers shall be closed, the return air damper and return bypass damper shall be 100% open and the supply and return fans shall start. All toilet/janitor exhaust VAV units shall be closed. 2. The cooling coil valve shall be closed. 3. The hot water control valve shall modulate open to warm the space up to 68 degrees F (adjustable). Once the space temperature is satisfied, unit shall revert to occupied mode.”.

DRAWING M-701: In Sequence of Operation, add note 1.F to read “Cool Down Cycle 1. Prior to occupancy, the unit shall be energized, the outside air and relief air dampers shall be closed, the return air damper and return bypass damper shall be 100% open and the supply and return fans shall start. All toilet/janitor exhaust VAV units shall be closed. 2. The heating coil valve shall be closed. 3. The chilled water control valve shall modulate open to cool the space down to 78 degrees F (adjustable). Once the space temperature is satisfied, unit shall revert to occupied mode.”

DRAWING M-701: In Sequence of Operation, add note 6.I to read “Alarm DDC of OA or EA damper commanded on and status not proven within 120 seconds (adjustable).

DRAWING M-701: In the Air Handling Unit DOAS Table, delete requirement for EA motorized damper trending.

DRAWING M-704: On the Water Pumps Control Diagram A3, add differential pressure controls with bypass control valves in downstream piping for pumps P-1, P-2, P-3, P-4, P-5, P-7 & P-8 as identified in the Sequence of Operations on drawing M-705.

Electrical

DRAWINGS EP101, EP102, EP103, EP104, EP105, EP106: Add “NOTE Provide and install dedicated circuit power, 120-V on 20 amp service, and CAT 6 cable from each Break Room to nearest telcom closet, for each 40”x40” vending machine to be Government furnished and supplied, in the following rooms: 2 (two) each in Break Room CL-104, 2 (two) each in Break

Telecommunications

DRAWINGS ET101, ET102, ET103, ET104, ET105, ET106: Add “NOTE Provide and install dedicated circuit power, 120-V on 20 amp service, and CAT 6 cable from each Break Room to nearest telcom closet, for each 40”x40” vending machine to be Government furnished and supplied, in the following rooms: 2 (two) each in Break Room CL-104, 2 (two) each in Break

P1 NWC B686 Conolly Hall Upgrades - SPECIFICATIONS

SPECIFICATION 230923.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS, Add “2.1.3 Additional Direct Digital Controls (DDC) Requirements:

Direct Digital Controls (DDC) shall be a first-tier subcontractor to the prime contractor and shall not be affiliated with any other subcontractor.

All new controls shall be Johnson Controls, Inc. (JCI) Metasys Extended Architecture with

Metasys “U/I” (“MUI”) graphics. All controllers (primary, secondary, unitary, etc.) shall be of the latest Metasys line, (SNE, CGM, CVM, XPM, etc.). [Note ‘SNC’ controllers shall NOT be used.]

Factory controls are prohibited with the exception of chillers, boilers and stand-alone DX equipment.

All new building control systems shall be tied into the existing Naval Station Newport DDC LAN, currently at Metasys Version 12 with ADX server.

Control network shall be MS/TP; provide cabling, BACnet communication cards, etc. as required for a fully functioning network. Supervisory controller shall be the only IP addressable item.

Provide CISCO communication switches (models IE-2000-4TS-G-B, IE-2000-8TC-G-B, WS-C3850-

12S, C9300-24S, or newer versions) as required with CISCO power supply. Provide SFP modules as required to make all connections. Minimum one switch per network engine + one at fiber entry point.

Provide lockable enclosures for supervisory DDC controller and separate lockable enclosure for

CISCO communication switch.

Provide Cat 6e cable and fiber optic cable / patch cords as required to complete the building’s

DDC infrastructure and connect to the base-wide network.

Provide a full points list as part of the DDC submittal. For third party points connected via

BACnet (such as chillers, boilers, etc.), the prime contractor shall obtain points list from the manufacturer, and coordinate handoff/point translation from manufacturer to JCI to ensure only necessary and fully-described points are mapped to Metasys.

Comply with Naval Station Newport point naming standardization (mimics JCI standard naming convention) as well as Naval Station Newport alarm standardization.

Coordinate all work, point naming (mimics JCI standard naming convention), alarm structure, uploads/downloads, etc. during construction with the Navy’s DDC Expert on site at Naval Station

Newport.

All new installations and renovations shall conform to the existing Naval Station Newport DDC standards as outlined in the NSN DDC Standards document. This includes but is not limited to, Alarm priority’s, Alarm message text, Graphics page configuration and naming, UI equipment definition configuration and naming, Complete UI configuration of relationships between equipment and equipment serving spaces, and updating overview graphics pages as they relate to this project.

All new installations and renovations at any of the Naval War College buildings shall have every

DDC component under the Navy War College authorization category.

Provide two separate communication busses, each with its own supervisory controller/engine:

(one) MS/TP and (one) BACnet. All JCI secondary controllers shall be on the MS/TP bus with a dedicated SNE (Series of Network Engines). All third party and BACnet devices (chillers, boilers, VFDs, any terminal unit with factory controls and BACnet connection, etc.) shall be on a dedicated bus separate from the MS/TP bus and have its own dedicated SNE.

COORDINATION MEETINGS: A series of special coordination meetings are required prior to DDC programming. The purpose of these meetings is to at a minimum (1) ensure the DOR’s intent is met, (2) ensure written sequences match the actual programming, (3) provide an opportunity for the DDC subcontractor to make recommendations for minor sequence changes to NAVFAC and the DOR for discussion. The intent is to collaborate as early as possible to avoid problematic mechanical acceptance testing at the end of the project. Specifically, the aim is to refine the language in the sequences of operation to ensure equipment is programmed effectively and efficiently and in keeping with the engineer’s intent. Prior to formal submission of the DDC submittal package, a meeting or meetings will be held to review the DDC design requirements and sequences of operation. Then, after submission of DDC submittal package and prior to any

DDC programming, additional meetings shall occur to review the content of the DDC submittal to ensure that all parties agree moving forward. The DDC subcontractor (JCI's system engineer, and others as required) and the Prime contractor shall attend these meeting which will also include the NAVFAC mechanical engineer, the NAVFAC DDC technician, the Designer of Record mechanical engineer. In addition, as required, the Prime contractor shall direct any manufacturer who has third party BACnet controls (e.g. chiller manufacturer, etc.) to attend the appropriate parts of these meetings. Expect minor modifications to be made to the sequence of operation language – this, and the resulting adjustments to how systems will be programmed, will be done at no additional cost to the government. Expect the total hours of these coordination meetings not to exceed 16 hours. (Note: These meetings are solely for discussion of sequences of operation and DDC drawing submittal. DDC attendance at other typical coordination meetings with the Prime contractor, for TAB and Commissioning support, etc., shall also be provided). All programming shall exactly reflect the narrative language in the written sequence of operation in the DDC submittal. After approval of the DDC submittal, any changes to the sequences or programming shall be RFI’d (Request for Information) by the DDC subcontractor to the Government as soon as possible.

DDC requirements for Performance Verification Testing (PVT): In addition to the various requirements in the specifications for PVT (such as 23 09 00, 3.6 PERFORMANCE VERIFICATION

TESTING, and other sections), the following is required. In general, the PVT shall be performed in 2 phases: pre-functional (normally not Government-witnessed) and functional (Government-witnessed). The functional PVT shall be a demonstration BY the Contractor TO the Government that all systems are working properly, efficiently, and in accordance with the contract documents, and approved DDC submittal. Functional PVT shall show that all aspects of the controls (graphics, programming, sequences, point-to-point operation, alarms, schedules, trends, BACnet connections, etc.) have been pre-checked, vetted, proven, etc. PRIOR TO the functional PVT demonstration to the Government. The functional PVT shall NOT be a troubleshooting session. If, during functional PVT, it becomes apparent that systems have not been pre-verified, and a significant amount of real-time troubleshooting is required, the

Government reserves the unilateral right to terminate the PVT session and the Contractor shall attend to all issues and reschedule functional PVT at no additional cost to the Government.

During the functional phase of PVT, in addition to the JCI 'system technician' attending, the JCI

'system engineer' shall also attend. “

P1 NWC B686 Conolly Hall Upgrades – PPIs response

NAVFAC response to PPI #40 – Add Partial system manhole and online diagrams 1A and 1B dated 07/09/2024

3. Provide Wage Determination.

"General Decision Number: RI20240001 07/05/2024

Superseded General Decision Number: RI20230001

State: Rhode Island

Construction Types: Building, Heavy (Heavy and Marine) and

Highway

Counties: Rhode Island Statewide.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) HEAVY, HIGHWAY AND MARINE

CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 |

|into on or after January 30, | generally applies to the |

|2022, or the contract is | contract. |

|renewed or extended (e.g., an |. The contractor must pay |

|option is exercised) on or | all covered workers at |

|after January 30, 2022: | least $17.20 per hour (or |

| | the applicable wage rate |

| | listed on this wage |

| | determination, if it is |

| | higher) for all hours |

| | spent performing on the |

| | contract in 2024. |

|If the contract was awarded on|. Executive Order 13658 |

|or between January 1, 2015 and| generally applies to the |

|January 29, 2022, and the | contract. |

|contract is not renewed or |. The contractor must pay all|

|extended on or after January | covered workers at least |

|30, 2022: | $12.90 per hour (or the |

| | applicable wage rate listed|

| | on this wage determination,|

| | if it is higher) for all |

| | hours spent performing on |

| | that contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the

Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/05/2024

1 01/12/2024

2 02/23/2024

3 03/08/2024

4 03/22/2024

5 04/05/2024

6 05/24/2024

7 05/31/2024

8 06/14/2024

9 06/21/2024

10 07/05/2024

ASBE0006-006 09/01/2023

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging

& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 48.15 34.84

ASBE0006-008 09/01/2023

Asbestos Worker/Insulator

Includes application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems.$ 48.15 34.84

BOIL0029-001 01/01/2021

BOILERMAKER......................$ 45.87 29.02

BRRI0003-001 06/01/2022

Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 46.86 29.14

BRRI0003-002 09/01/2022

Marble Setter, Terrazzo

Worker & Tile Setter.............$ 46.54 30.34

BRRI0003-003 09/01/2022

Marble, Tile & Terrazzo

Finisher.........................$ 38.78 29.61

CARP0330-001 01/01/2024

CARPENTER (Includes Soft

Floor Layer).....................$ 43.63 30.25

Diver Tender.....................$ 44.88 30.25

DIVER............................$ 57.03 30.25

Piledriver.......................$ 41.53 29.35

WELDER...........................$ 44.88 30.25

FOOTNOTES:

When not diving or tending the diver, the diver and diver tender shall receive the piledriver rate. Diver tenders shall receive $1.00 per hour above the pile driver rate when tending the diver.

Work on free-standing stacks, concrete silos & public utility electrical power houses, which are over 35 ft. in height when constructed: $.50 per hour additional.

Work on exterior concrete shear wall gang forms, 45 ft. or more above ground elevation or on setback: $.50 per hour additional.

The designated piledriver, known as the ""monkey"": $1.00 per hour additional.

CARP1121-002 01/02/2023

MILLWRIGHT.......................$ 41.54 30.73

ELEC0099-002 06/01/2023

ELECTRICIAN......................$ 48.61 50.44%

Teledata System Installer........$ 36.46 11.59%+15.31

Work of a hazardous nature, or where the work height is 30

ft. or more from the floor, except when working

OSHA-approved lifts: 20% per hour additional.

Work in tunnels below ground level in combined sewer outfall:

20% per hour additional.

ELEV0039-001 01/01/2024

ELEVATOR MECHANIC................$ 61.88 37.885+a+b

a. PAID HOLIDAYS: New Years Day; Memorial Day; Independence

Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

b. Employer contributes 8% basic hourly rate for 5 years or more of service of 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.

* ENGI0057-001 06/01/2024

Operating Engineer: (power plants, sewer treatment plants, pumping stations, tunnels, caissons, piers, docks, bridges, wind turbines, subterranean & other marine and heavy construction work)

GROUP 1.....................$ 48.05 29.90

GROUP 10....................$ 41.75 29.90

GROUP 2.....................$ 46.05 29.90

GROUP 3.....................$ 41.67 29.90

GROUP 4.....................$ 38.82 29.90

GROUP 5.....................$ 45.10 29.90

GROUP 6.....................$ 35.90 29.90

GROUP 7.....................$ 29.90 29.90

GROUP 8.....................$ 29.90 29.90

GROUP 9.....................$ 41.75 29.90

a. BOOM LENGTHS, INCLUDING JIBS:

150 feet and over + $ 2.00

180 feet and over + $ 3.00

210 feet and over + $ 4.00

240 feet and over + $ 5.00

270 feet and over + $ 7.00

300 feet and over + $ 8.00

350 feet and over + $ 9.00

400 feet and over + $10.00

a. PAID HOLIDAYS:

New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day. a: Any employee who works

3 days in the week in which a holiday falls shall be paid for the holiday.

a. FOOTNOTES:

Hazmat work: $2.00 per hour additional.

Tunnel/Shaft work: $5.00 per hour additional.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, lighters, boom trucks and derricks

GROUP 2: Digging machine, Ross Carrier, locomotive, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, graders, front end loader (3 yds.

and over), vibratory hammer & vacuum truck, roadheaders, forklifts, economobile type equipment, tunnel boring machines, concrete pump and on site concrete plants.

GROUP 3: Oilers on cranes.

GROUP 4: Oiler on crawler backhoe.

GROUP 5: Bulldozer, bobcats, skid steer loader, tractor, scraper, combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile-powered sweeper (3-yd. capacity), 8-ft. sweeper minimum 65 HP).

GROUP 6: Well-point installation crew.

GROUP 7: Utility Engineers and Signal Persons

GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator and light plant, gas and electric driven pump and air compressor.

GROUP 9: Boat & tug operator.

ENGI0057-002 11/01/2023

Power Equipment Operator

(highway construction projects; water and sewerline projects which are incidental to highway construction projects; and bridge projects that do not span water)

GROUP 1....................$ 41.95 29.75

GROUP 2....................$ 39.95 29.75

GROUP 3....................$ 35.23 29.75

GROUP 4....................$ 38.93 29.75

GROUP 5....................$ 38.93 29.75

GROUP 6....................$ 34.65 29.75

GROUP 7....................$ 28.65 29.75

GROUP 8....................$ 34.20 29.75

GROUP 9....................$ 34.28 29.75

a. FOOTNOTE: a. Any employee who works three days in the week in which a holiday falls shall be paid for the holiday.

a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial

Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Crane, piledriver, lighter, boom truck, hoists, derrick

GROUP 1A: Digging machine, locomotive, John Henry's, directional drilling machine, cold planer, reclaimer, paver, spreader, grader, front end loader (3 yds. and over), vacuum truck, test boring machine operator, veemere saw, water blaster, hydro-demolition robot, forklift, economobile, Ross Carrier, concrete pump operator and boats

GROUP 2: Well point installation crew

GROUP 3: Utlity engineers and signal persons

GROUP 4: Oiler on cranes

GROUP 5: Combination loader backhoe, front end loader (less than 3 yds.), forklift, bulldozers & scrapers and boats

GROUP 6: Roller,skid steer loaders, street sweeper

GROUP 7: Gas and electric drive heater, concrete mixer, light plant, welding machine, pump & compressor

GROUP 8: Stone crusher

GROUP 9: Mechanic & welder

ENGI0057-003 06/01/2024

BUILDING CONSTRUCTION

Power Equipment Operator

GROUP 1....................$ 47.32 29.90

GROUP 2....................$ 45.32 29.90

GROUP 3....................$ 45.10 29.90

GROUP 4....................$ 41.10 29.90

GROUP 5....................$ 37.50 29.90

GROUP 6....................$ 38.25 29.90

GROUP 7....................$ 43.97 29.90

GROUP 8....................$ 41.29 29.90

a.BOOM LENTHS, INCLUDING JIBS:

150 ft. and over: + $ 2.00

180 ft. and over: + $ 3.00

210 ft. and over: + $ 4.00

240 ft. and over: + $ 5.00

270 ft. and over: + $ 7.00

300 ft. and over: + $ 8.00

350 ft. and over: + $ 9.00

400 ft. and over: + $10.00

a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial

Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.

a. FOOTNOTE: Hazmat work: $2.00 per hour additional.

Tunnel/Shaft work: $5.00 per hour additional.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, lighters, boom trucks and derricks.

GROUP 2: Digging machine, Ross carrier, locomotive, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, front end loader (3 yds. and over), vibratory hammer and vacuum truck

GROUP 3: Telehandler equipment, forklift, concrete pump & on-site concrete plant

GROUP 4: Fireman & oiler on cranes

GROUP 5: Oiler on crawler backhoe

GROUP 6: Bulldozer,skid steer loaders,bobcats, tractor, grader, scraper,combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile powered sweeper (3 yds. capacity), 8-ft. sweeper (minimum 65 hp)

GROUP 7: Well point installation crew

GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator for light plant, gas and electric driven pump & air compressor

IRON0037-001 09/16/2023

IRONWORKER.......................$ 40.00 32.58

LABO0271-001 12/03/2023

LABORER

GROUP 1.....................$ 37.00 26.90

GROUP 2.....................$ 37.00 26.90

GROUP 3.....................$ 37.00 26.90

GROUP 4.....................$ 37.00 26.90

GROUP 5.....................$ 39.00 26.90

LABORERS CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement

Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos

Removal [Non-Mechanical Systems]

GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail

Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone

Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree

Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder Operator

GROUP 3: Pre-Cast Floor & Roof Plank Erectors

GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered

Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster

GROUP 5: Toxic Waste Remover

LABORERS CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement

Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems]

GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail

Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone

Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder

Operator

GROUP 3: Pre-Cast Floor & Roof Plank Erectors

GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered

Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster

GROUP 5: Toxic Waste Remover

LABO0271-002 11/27/2022

HEAVY AND HIGHWAY CONSTRUCTION

LABORER

COMPRESSED AIR

Group 1....................$ 55.40 24.15

Group 2....................$ 52.93 24.15

Group 3....................$ 42.45 24.15

FREE AIR

Group 1....................$ 46.00 24.15

Group 2....................$ 45.00 24.15

Group 3....................$ 42.45 24.15

LABORER

Group 1....................$ 33.05 24.05

Group 2....................$ 35.75 24.85

Group 3....................$ 36.50 24.85

Group 4....................$ 29.00 24.85

Group 5....................$ 37.50 24.85

OPEN AIR CAISSON,

UNDERPINNING WORK AND

BORING CREW

Bottom Man.................$ 41.50 24.15

Top Man & Laborer..........$ 35.60 24.15

TEST BORING

Driller....................$ 41.95 24.15

Laborer....................$ 41.95 24.15

LABORER CLASSIFICATIONS

GROUP 1: Laborer; Carpenter tender; Cement finisher tender;

Wrecking laborer; Asbestos removers [non-mechanical systems];

Plant laborer; Driller in quarries

GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper;

Chain saw operators; Concrete and power buggy operator;

Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator;

Mechanical grinder operator; Mason tender; Mortar mixer;

Pneumatic tool operator; Riprap and dry stonewall builder;

Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator; Pipelayer; Pipe trench bracer

GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster

GROUP 4: Flagger & signaler

GROUP 5: Toxic waste remover

LABORER - COMPRESSED AIR CLASSIFICATIONS

GROUP 1: Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air

GROUP 2: Change house attendant, powder watchperson, top person on iron

GROUP 3: Hazardous waste work within the ""HOT"" zone

LABORER - FREE AIR CLASSIFICATIONS

GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator

GROUP 2: Change house attendant, powder watchperson

LABORER CLASSIFICATIONS

GROUP 1: Laborer; Carpenter tender; Cement finisher tender;

Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries

GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder; Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator;

Pipelayer; Pipe trench bracer

GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster

GROUP 4: Flagger & signaler

GROUP 5: Toxic waste remover

LABORER - COMPRESSED AIR CLASSIFICATIONS

GROUP 1: Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air

GROUP 2: Change house attendant, powder watchperson, top person on iron

LABORER - FREE AIR CLASSIFICATIONS

GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator

GROUP 2: Change house attendant, powder watchperson

PAIN0011-005 06/01/2023

PAINTER

Brush and Roller............$ 37.62 22.85

Epoxy, Tanks, Towers, Swing Stage & Structural

Steel.......................$ 39.62 22.85

Spray, Sand & Water

Blasting....................$ 40.62 22.85

Taper.......................$ 38.37 22.85

Wall Coverer................$ 38.12 22.85

PAIN0011-006 06/01/2022

GLAZIER..........................$ 40.78 23.40

SWING STAGE: $1.00 per hour additional.

PAID HOLIDAYS: Labor Day & Christmas Day.

PAIN0011-011 06/01/2023

Painter (Bridge Work)...........$ 56.25 23.45

PAIN0035-008 06/01/2011

Sign Painter.....................$ 24.79 13.72

PLAS0040-001 01/01/2024

CEMENT MASON/CONCRETE FINISHER...$ 43.00 29.10

FOOTNOTE: Cement Mason: Work on free swinging scaffolds under

3 planks width and which is 20 or more feet above ground and any offset structure: $.30 per hour additional.

PLAS0040-002 01/01/2024

CEMENT MASON/CONCRETE FINISHER...$ 38.45 25.30

PLAS0040-003 01/01/2024

PLASTERER........................$ 43.65 29.43

PLUM0051-002 08/28/2023

Plumbers and Pipefitters.........$ 50.59 32.75

ROOF0033-004 06/01/2024

ROOFER...........................$ 44.80 30.76

SFRI0669-001 04/01/2024

SPRINKLER FITTER.................$ 49.98 32.85

SHEE0017-002 01/01/2024

Sheet Metal Worker...............$ 42.09 36.36

TEAM0251-001 05/01/2024

TRUCK DRIVER

GROUP 1....................$ 30.71 36.9125+A+B

GROUP 2....................$ 30.86 36.9125+A+B

GROUP 3....................$ 30.91 36.9125+A+B

GROUP 4....................$ 30.96 36.9125+A+B

GROUP 5....................$ 31.06 36.9125+A+B

GROUP 6....................$ 31.46 36.9125+A+B

GROUP 7....................$ 31.66 36.9125+A+B

GROUP 8....................$ 31.16 36.9125+A+B

GROUP 9....................$ 31.41 36.9125+A+B

GROUP 10....................$ 31.21 36.9125+A+B

A. Paid Holidays: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day and Christmas Day, plus

Presidents' Day, Columbus Day, Veteran's Day & V-J Day, providing the employee has worked at least one day in the calendar week in which the holiday falls.

B. Employee who has been on the payroll for 1 year or more but less than 5 years and has worked 150 Days during the last year of employment shall receive 1 week's paid vacation; 5 to 10 years - 2 weeks' paid vacation; 10 or more years - 3 week's paid vacation.

C. Employees on the seniority list shall be paid a one hundred dollar ($100.00) bonus for every four hundred (400) hours worked, up to a maximum of five hundred dollars

($500.00)

All drivers working on a defined hazard material job site shall be paid a premium of $2.00 per hour over applicable rate.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Pick-up trucks, station wagons, & panel trucks

GROUP 2: Two-axle on low beds

GROUP 3: Two-axle dump truck

GROUP 4: Three-axle dump truck

GROUP 5: Four- and five-axle equipment

GROUP 6: Low-bed or boom trailer.

GROUP 7: Trailers when used on a double hook up (pulling 2 trailers)

GROUP 8: Special earth-moving equipment, under 35 tons

GROUP 9: Special earth-moving equipment, 35 tons or over

GROUP 10: Tractor trailer

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

State Adopted Rate Identifiers

Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R �1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

4. Provide PPI responses.

PPI# Page Section Paragraph Package Question Responses

1 01 14 00 1.1 2

The solicitation has advertised prevailing wage rates for the project. Since PLA has to be used on the project, union

A project labor agreement (PLA) is a pre-hire collective bargaining agreement with one or more labor organizations rates would apply. Will the government allow for an equitable adjustment of pricing should union rates go up during the performance of the contract. (Union rates change periodically and can change during the course of the project vs. davis bacon which applies to the entire project duration).

that establishes the terms and conditions of employment for a specific construction project.

As such, a request for equitable adjustment pertaining to a PLA will not be entertained for this procurement.

1 01 14 00 2

Specifications indicate the transformers that serve the modular buildings are government furnished, contractor installed. Are these transformers currently in the government's possession or do they need to be procured along with the other gear?

Transformers are located on Naval Station Newport, contractor to include costs to transport transformers within 10 miles, to location as noted on the contract documents.

Package

EP501/EP502

Do the existing transformers have any load connected to them?

Yes, T-663 serves an existing steam pit and local street lighting. At the existing T-663 transformer pad, intercept and redirect the existing 2-2" conduits to the proposed new transformer pad. Provide new secondary conductors and relocate associated disconnects and metering to refeed the two independent, existing loads (SL/ steam pit). As a worst case, assume that the existing secondary conductors are #1AWG to the adjacent steam pit and #6 for the street lights for each 3-phase circuit. The length per circuit is estimated to be less than 100LF. Provide all terminations. All conductors shall be copper.

Package

10 22 39 2.1.2.1 1

The drawings indicate the contractor is to remove existing transformers and replace with new transformers in a different location to serve the new modular buildings. Can the existing medium voltage conductors serving the existing transformers be re-

Provide new primary conductors for each transformer. The primary conductor requirements for both locations are: 3-1/C #2 AWG CU, EPR, 133% insulated, 15kV conductors with 1/0 CU ground. For transformer T- 663, there are two manhole and duct systems located used? Will the overcurrent devices on the MV switches need to be adjusted? If so, who will perform this adjustment?

between Burke 1268 and Sims

29. The one closest to Sims includes the feeder to T-663 suspected to be #2 EPR 15kV Primary with 133% insulation.

Remove the existing splices and provide new 15kV splices to serve the proposed new transformer. Refeed all existing secondary loads as stated in response to PPI#42.

For transformer T-662, delete the removal of this single phase transformer from the project. T-662 transformer shall remain. In-lieu of the demo work for T662, provide 3-15kV T-splices to the existing 15kV #2/0AWG circuit that is located in MH 2055 and serves T-971 Bldg1378.. Serve the proposed new government-furnished transformer as shown on sheet ES101 from these new splices in MH2055.

Refer to attached partial system manhole and one-line diagrams 1A and 1B noted in Amendment dated 7/10/2024.

In response to the questions relating to the existing MV switches, there are NO SETTINGS TO ADJUST on the existing switch ways that serve these transformers. At NAVSTA Newport, VFI protection is generally applied to the express feeders rather than transformers. All conductors shall be copper, all medium voltage splices shall be watertight taped and shall be installed by an NCSCB certified splicer with certification for hand-applied taped splicing.

Package

Specifications indicate several Fire Resistance Ratings such as Flame Spread Rating, Fuel Contribution Rating, and Smoke Generation. To meet these required resistive

The folding partition panels are not required to be fire rated.

ratings the Folding Partition would have to be a Custom Fire Rated Wall. (a.) Please confirm if the Folding Partition Panels are to be Fire-Rated. If wall panels are to be fire rated, the max STC is 52 with a 1 hour rated wall.

08 34 01 1.3 1

For the detail Per A2,C2,C4/SB501, note 1, the concrete masonry blocks may be dry stacked. The detail shows the piers to be fully grouted. Please confirm, which is required.

Provide and Install fully grouted concrete masonry blocks. Delete note 1.

A-602 Package

1(attachment J)

Part 1.3 – Quality Assurance, lists Door/Frame: C-117A as needing to meet these forced entry specs. We have not been able to find C-117A on the drawings or anywhere else which states Forced Entry Resistant Components are required. Can you please clarify where C-117A is located?

The table in 083401/1.3 should have the following two doors listed: C-102A (leading into Sec.

Open Office C-102A, See sheet A-103B) and C-204 (leading into Secure Classroom C-204, See Sheet A-104B)

A-602 Package

1(attachment J)

The door schedule shown on page A-602, indicates that doors C-107C & C-107D are to be provided with a 90-minute fire rating. Can you please confirm this is correct?

Doors C-107C and C-107C are not required to have a 90-Min rating.

28 31 76 Package

1(attachment k)

The door Schedule shown on page A-602, has multiple frames labeled FRM.NF(CW). I am assuming this is meaning these doors are to be installed in existing curtain wall. Can you please clarify the meaning of the frames labeled

FRM.NF(CW)?

Correct, doors listed as FRM.NF(CW) are new doors to be installed in an existing curtain wall or storefront system.

AE101

Package

2(attachment L)

Please provide the current fire alarm testing company or Company of Record? Who does the Navy call for Fire Alarm Service work.

RB Allen provides programming service of radio boxes.