This document is Amendment 0007 to Solicitation N4008524R2531 for the P-226 Maintenance Facility and Marine Air Group Headquarters project at Marine Corps Air Station Cherry Point, North Carolina.
The amendment extends the proposal due date to December 4, 2024 at 2:00 PM EST. It provides a revised Attachment G - P226 Price Schedule and responses to pre-proposal inquiries regarding topics such as ventilation, pump station details, RF shielding requirements, and the project schedule submission process. The overall project constructs a maintenance facility, Marine Air Group headquarters, and renovates an existing shop. Site work includes reconfiguring and upgrading an existing support van pad with electrical distribution upgrades. The solicitation is issued by the Department of the Navy, Naval Facilities Engineering Command.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT J 1 4
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0007 20-Nov-2024
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFAC MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N4008524R2531
9B. DATED (SEE ITEM 11)
30-Aug-2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SOLICITATION NO. N4008524R2531 DESIGN-BID-BUILD, P-226 MAINTENANCE FACILITY & MARINE AIR GROUP
HEADQUARTERS, MARINE CORPS AIR STATION, CHERRY POINT, NORTH CAROLINA
The proposal due date has been extended to 04 December 2024 NLT than 1400 (EST)..
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Contract POC: Brittany Cristelli; Email: brittany.n.cristelli.civ@us.navy.mil; Phone: 757-341-1978
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA mailto:brittany.n.cristelli.civ@us.navy.mil
N4008524R2531
SF 30 BLOCK 14 CONTINUATION PAGE
The purpose of this amendment is to provide the following:
1. Extend proposal due date to 04 December 2024 NLT 2:00PM EST.
2. Provide revised Attachment G – P226 Price Schedule Rev3
3. Responses to Pre-Proposal Inquiries (PPI’s)
Pre-Proposal Inquiry Responses:
Question # Reference
Question Government Response Page Section Paragraph
MH101
A4/M70
MALS 14. MH101 and
A4/M708. EF-5 serves Hazmat
Room 140. There is no motorized damper shown in the duct on
MH101. EF-5 is included with four other EFs in the sequence and points lists in A4/M708 including references to interlocks with AHUs, shut down, and damper closure in response to
ATFP ESS operation. Inclusion of EF-5 with those other four EFs does not seem appropriate?
Should EF-5 have a motorized damper? Does it run constantly even when ATFP ESS has been activated?
PENDING RESPONSE
BLDG
3916, CU101
BLDG
3916, CU101
Keynote 2 calls for a sanitary sewer packaged pump station of like kind and size with PVC gravity. Please provide details for the pump station and a pipe size for the PVC gravity line.
Details provided as a part of
Amendment 0005.
01 57 19
- 1.5, 01
14 00 -
1.2
01 57 19 -
1.5, 01 14
00 - 1.2
General-01 57 19 - 1.5, 01 14 00 -
1.2-Specification 13 47 00
Section 2.1 states the Radiant
Barrier Foil is to achieve 67 dB across the frequency range of
100MHz to 10GHz. Please confirm this applies to the material only and not the RF-shield system as a whole.
PENDING RESPONSE
126 13 47 00 13 47 00
Architectural-13 47 00-
Specification 13 47 00 Section
3.2 calls for 100 meters of free space over the frequency range of
30 MHz to 6 GHz. Please clarify how much isolation (measured in decibels) is required across this frequency range. The current design has many points of failure that prevent isolation (measured in decibels) from being guaranteed across that frequency
PENDING RESPONSE
range. Please confirm that the current design does not require the contractor to guarantee RF-shielding performance.
127 13 47 00 13 47 00
Architectural-13 47 00-
Specification 13 47 00 Section
3.2 calls for 100 meters of free space over the frequency range of
30 MHz to 6 GHz. Please clarify how much isolation (measured in decibels) is required across this frequency range. The current design has many points of failure that prevent isolation (measured in decibels) from being guaranteed across that frequency range. Please confirm that the current design does not require the contractor to guarantee RF-shielding performance.
PENDING RESPONSE
132 Factor 2
General-Factor 2-The RFP requires the proposal to be uploaded via PIEE. Factor 2 requires a copy of the Project
Schedule Source File. The
Project Schedule Source File, ".xer" from Primavera P6 is not a recognized file by PIEE and cannot be uploaded. Please confirm only the Schedule Source
File can be emailed directly the
Contract Specialist by the proposal due date and time.
Submit the Project Schedule
Source File .xer directly to the
Contract Specialist via email @ brittany.n.cristelli.civ@us.navy.
mil by the proposal due date and time as required by the
RFP.
150 T-505 T-505
Electrical-T-505-The rack layouts on T-505 show a fiber enclosure in each secure cabinet whereas the riser diagram only shows a single fiber connection. Do you require a 24-strand fiber for each of the secure cabinets?
PENDING RESPONSE
25 05 11 Please verify Risk Management
Framework (RMF) is not required for Cyber Security. It does not appear to be required per the specification provided as this is normally in UFGS 25 08 11.00
20.
PENDING RESPONSE
25 05 11 25 05 11: please verify Risk
Management Framework (RMF) is not required for Cyber Security.
It does not appear to be required per the specification provided as this is normally in UFGS 25 08
11.00 20.
PENDING RESPONSE
MALS-
14 B-
CU103
Key Note 11 calls for a 2.5"
TYPE K COPPER W/ 8" X 4"
TEE AND 4" TO 2.5"
INSULATED
ADAPTER/REDUCER. Note 11
Drawings provided as a part of
Amendment 0005.
appears to be pointing to a parking space on the left side of the plan. Please confirm the location and length of piping required.
MAG-14
A-A-301
A-A-504
Sheet A-A-301 for the MAG-14 building only shows the CMU walls along Gridlines 2 and 9 extending to deck above. All other interior partitions look to terminate at 12'-8". Sheet A-A-
501 Wall Types notes for multiple walls to "extend wall construction to underside of metal deck. Please clarify which walls are to extend to metal deck. To meet STC and fire rating requirements, please confirm that a hard lid attached to the underside of the trusses will suffice. This will allow the walls to extend 12'-8"H instead of
30+'H to deck in some areas.
If confirmed, please provide a detail for the desired hard lid system.
The walls they are referencing are restroom walls, which were specifically requested to extend to the underside of the deck.
An STC cap detail (B5/A-507) is provided for other instances where a gypsum cap is indicated on the reflected ceiling plan.
Price
Schedule
CLIN 003 Option Item No. 2 – requires “Total of Price for the entire work for Vanpad in accordance with the RFP…”. The
B package MALS-14 site drawings do not delineate what work falls under this option. We will proceed with the understanding that the Vanpad electrical, lighting, and comms upgrades throughout the paved area depicted on B package
MALS-14 sheet ES101 will fall under Option 02, and that the new pavement doweled in to match the existing Vanpad along the
MALS-14 south elevation depicted on B package MALS-14 sheet CS106 will fall in the Base
Price to provide a complete pavement section along the
Vanpad to the new building.
Please advise if this is not correct.
Vanpad electrical, lighting, and comms upgrades throughout the paved area depicted on B package MALS-14 sheet ES101 will fall under Option 02, and the new pavement doweled in to match the existing Vanpad along the MALS-14 south elevation depicted on B package MALS-14 sheet
CS106 will fall in the Base
Price to provide a complete pavement section along the
Vanpad to the new building.
Revised Attachment G provided with Amendment
0007.
ATTACHMENTS:
1. Amendment 0007 – Attachment G - P226 Price Schedule Rev3
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 22-Nov-2024 02:00 PM to 04-Dec-2024 02:00 PM.
(End of Sumary of Changes)