This document is a 126-page Submittal Register for a federal construction contract opportunity to construct a maintenance facility and Marine Air Group Headquarters at Marine Corps Air Station, Cherry Point, North Carolina. The project includes an engine maintenance shop facility, headquarters administration facility, renovations, site improvements, and demolition of three buildings.

The Submittal Register details the various submittals required from the contractor throughout the construction process, such as plans, product data, samples, design data, test reports, certificates, and operation and maintenance data. Key submittals include the demolition and deconstruction plans, sustainability documentation, quality control plan, schedules, safety plans, as-built drawings, equipment data, and facility data workbooks. The submittals must be provided by the specified dates for review and approval by the government. The contract opportunity is being solicited by the Department of the Navy, Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
AMENDMENT 0012.pdf PDF
AMENDMENT 0011.pdf PDF
AMENDMENT 0010.pdf PDF
Amendment 0009 - JA ML-25-15 P226 Interior Finishes Redacted.pdf PDF
Amendment 0009 - JA ML-25-14 P226 Network Switches Redacted.pdf PDF
Amendment 0009 - JA ML-25-13 P226 Fire Protection Redacted.pdf PDF
AMENDMENT 0009.pdf PDF
AMENDMENT 0008.pdf PDF
AMENDMENT 0007.pdf PDF
Amendment 0007 - Attachment G - P226 Price Schedule_Rev3.docx DOCX document
Amendment 0006 - P226_F35 MCAS Cherry Point_HazMat Rpt.pdf PDF
AMENDMENT 0006.pdf PDF
Amendment 0006 - P226 F35 MCAS Cherry Point Geotech Report.pdf PDF
AMENDMENT 0005.pdf PDF
Amendment 0005 - 1712284 SPEC Rev.pdf PDF
Amendment 0005 - Attachment G - P226 Price Schedule_Rev2.docx DOCX document
AMENDMENT 0004.pdf PDF
AMENDMENT 0003.pdf PDF
Amendment 0002 - 1712284 SPEC.pdf PDF
AMENDMENT 0002.pdf PDF
AMENDMENT 0001.pdf PDF
Amendment 0001 - Site Visit Sign-In Sheet.pdf PDF
Amendment 0001 - Attachment G - P226 Price Schedule_Rev1.docx DOCX document
Attachment E - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment B - Construction Experience Data Sheet.docx DOCX document
Attachment A - Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
1737342spc01of01.pdf PDF
Attachment G - P226 Price Schedule.docx DOCX document
Attachment D - Historical Small Business Utilization.docx DOCX document
N4008524R2531.pdf PDF
Attachment H - PIEE Vendor Access Instructions.pdf PDF
Attachment F - SBSP.docx DOCX document
Attachment C - Past Performance Questionnaire (PPQ).docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 126 PAGES

P226

01 11 00 SD-01 Preconstruction Submittals

1.6 GSalvage Plan

01 14 00 SD-01 Preconstruction Submittals

1.3.1.1List of Contact Personnel

1.2Health And Safety Plan for Work in Land Use Control (LUC) Areas

01 20 00 SD-01 Preconstruction Submittals

1.3 GEarned Value Report

01 30 00 SD-01 Preconstruction Submittals

1.3View Location Map

1.4Progress and Completion

Pictures

01 30 02.00 22 SD-02 Shop Drawings

1.5.3 GPreliminary (Pre-Final) AV

Package

G, DC44

1.5.9 GFinal AV Package

1.6 GBest Value Determination

SD-07 Certificates

1.4.1 GContractor's AV Designer's

Qualifications

G, DC44

01 31 23.13 20 SD-01 Preconstruction Submittals

1.4.2 GList of Contractor's Personnel

01 32 17.00 20 SD-01 Preconstruction Submittals

1.2.2 GBaseline NAS

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

AMENDED

13 September 2024

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 126 PAGES

01 32 17.00 20 1.9 GDesignated Project Scheduler

SD-07 Certificates

1.3 GThree-Week Look Ahead

Schedule

1.4.1 GMonthly Network Analysis

Updates

SD-11 Closeout Submittals

1.4.2 GAs-Built Schedule

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.2 GPreliminary High Performance

and Sustainable Building Checklist

1.4.1 GSustainability Action Plan

1.5.3.2 GPreliminary Sustainability

eNotebook

SD-06 Test Reports

1.5.3.2 GThird Party Certification Design

Compliance Report

SD-11 Closeout Submittals

1.5.3.2 GFinal High Performance and

Sustainable Building Checklist

1.5.3.2 GFinal Sustainability eNotebook

1.5.3.2 GAmended Final Sustainability

eNotebook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 126 PAGES

01 33 29 1.5.3.2 GAmended Final High

Performance and Sustainable

Building Checklist

3.2 GThird Party Certification

Certificate, Assessment, or

Validation and Compliance Report

01 35 26 SD-01 Preconstruction Submittals

1.8 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4 GMonthly Exposure Reports

1.13Notifications and Reports

1.13.2 GAccident Reports

1.13.3LHE Inspection Reports

SD-07 Certificates

1.5Contractor Safety Self-Evaluation

Checklist

1.7.1.4Crane Operators/Riggers

1.8.3.2 GStandard Lift Plan

1.8.3.3 GCritical Lift Plan

1.9 GActivity Hazard Analysis (AHA)

1.10.1Confined Space Entry Permit

1.10.1Hot Work Permit

1.13.4Certificate of Compliance

01 45 00 SD-01 Preconstruction Submittals

1.5.2 GContractor Quality Control (CQC)

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 126 PAGES

01 45 00 SD-06 Test Reports

1.12.3Verification Statement

SD-07 Certificates

1.6.4.1 GCertificate Of Readiness

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

3.1.1 GProject Manual

3.1.1Written NDT Practices

3.1.3Written NDT Practices

SD-06 Test Reports

3.1.1Daily Reports

3.1.3Daily Reports

3.1.1Biweekly Reports

3.1.2Biweekly Reports

SD-07 Certificates

2.1AISC Certified Steel Fabricator

2.1Steel Joist Institute Membership

2.1Certificate of Compliance

1.5.9 GSpecial Inspector of Record

1.5 GSpecial Inspector

3.1.1Qualification Records

3.1.3Qualification Records

SD-11 Closeout Submittals

3.1.1 GInterim Report

3.1.3 GInterim Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 126 PAGES

01 45 35 3.1.1 GComprehensive Final Report

3.1.3 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.3.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

1.6.1.4 GContractor Computer

Cybersecurity Compliance

Statements

1.6.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

SD-06 Test Reports

3.4 GBackflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

1.6.2 GRegulatory Notifications

1.6.4 GEnvironmental Manager

Qualifications

1.6.5 GEmployee Training Records

1.7 GEnvironmental Protection Plan

1.7.9.1 GDirt and Dust Control Plan

1.10 GSolid Waste Management Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 126 PAGES

01 57 19 3.2.1.1 GStormwater Pollution Prevention

Plan

3.2.1.2 GStormwater Notice of Intent

3.15.2 GSpill Prevention Control And

Countermeasure (SPCC) Plan

1.5.1.1.1.3GWaste Management And

Sampling Plan

1.5.1.1.1.1GDewatering Management Plan

SD-06 Test Reports

1.10.1 GMonthly Solid Waste Disposal

Report

3.2.1.3Inspection Reports

3.7.1.1.2 GLaboratory Analysis

SD-07 Certificates

1.4.1.2 GECATTS Certificate Of

Completion

1.6.5 GEmployee Training Records

1.6.5 GErosion and Sediment Control

Inspector

SD-11 Closeout Submittals

1.6.2 GRegulatory Notifications

1.6.5 GAssembled Employee Training

Records

1.10 GSolid Waste Management Permit

3.2.1.4 GStormwater Pollution Prevention

Plan Compliance Notebook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 126 PAGES

01 57 19 3.2.1.5 GStormwater Notice of Termination

3.2.1.5As-Built Topographic Survey

3.7.1 GWaste Determination

Documentation

3.7.2.1 GProject Solid Waste Disposal

Documentation Report

3.7.2.1 GSales Documentation

3.7.2.1Contractor Certification

3.7.3.1 GHazardous Waste/Debris

Management

3.8.1 GContractor Hazardous Material

Inventory Log

3.8.1 GContractor Hazardous Material

Inventory Log

01 58 00 SD-02 Shop Drawings

1.4.1 GPreliminary Drawing Indicating

Layout And Text Content

SD-04 Samples

1.3.1 GFacility Recognition Plaque

01 74 19 SD-01 Preconstruction Submittals

1.6 GConstruction Waste Management

Plan

SD-11 Closeout Submittals

1.8 SFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 126 PAGES

01 78 00 1.5.1Warranty Management Plan

1.5.4Warranty Tags

3.3Final Cleaning

1.4Spare Parts Data

SD-08 Manufacturer’s Instructions

1.5.1Instructions

SD-10 Operation and Maintenance

Data

3.2 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

1.5.1As-Built Record of Equipment and Materials

2.1 GCertification of EPA Designated

Items

2.2 GCertification Of USDA Designated

Items

3.4.1 GInterim DD FORM 1354

3.4.2 GChecklist for DD FORM 1354

3.4.2 GHigh Performance and

Sustainable Building (HPSB)

Checklist

01 78 23 SD-10 Operation and Maintenance

Data

1.4 GFacility Data Workbook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 126 PAGES

01 78 23 3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

3.2.1 GOperation And Maintenance

Manual, Progress Submittal

3.2.2 GOperation And Maintenance

Manual, Prefinal Submittal

3.2.3 GOperation And Maintenance

Manual, Final Submittal

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

3.1.1 GTraining Plan

1.6.6.7 GRecord Drawings And Utility

Systems

01 78 24.00 20 SD-11 Closeout Submittals

1.3.1 GFacility Data Workbook (FDW), Progress Submittal

1.3.2 GFacility Data Workbook (FDW), Prefinal Submittal

1.3.3 GFacility Data Workbook (FDW), Final Submittal

01 78 30.00 22 SD-11 Closeout Submittals

1.3.7GIS Data Deliverables

01 91 00.15 SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 126 PAGES

01 91 00.15 3.5 GCompleted Construction

Observation Checklists

SD-10 Operation and Maintenance

Data

3.8 GSystems Manual

01 91 19 SD-01 Preconstruction Submittals

1.12.2.1 GBuilding Enclosure

Commissioning Specialist

Qualifications

1.8 GBuilding Enclosure Testing Work

Plan

SD-03 Product Data

2.3 GThermal Imaging Camera

2.1 GTest Equipment

SD-05 Design Data

3.8.2 GEnvelope Surface Area

Calculations

SD-06 Test Reports

3.8.5 GPressure Test Procedures

1.12.3 GAir Leakage Test Report

3.8.5.8 GAir Leakage Test Report

1.12.3 GDiagnostic Test Report

3.8.6.6 GDiagnostic Test Report

SD-07 Certificates

1.12.2.2Pressure Test Agency

1.12.2.3Thermographer Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 126 PAGES

01 91 19 1.14Certificate of Readiness

SD-10 Operation and Maintenance

Data

3.9 GTraining

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.2.1.4 GDeconstruction Plan

1.11Existing Conditions

SD-07 Certificates

1.7 GNotification

02 41 01 SD-01 Preconstruction Submittals

1.2.2 GDeconstruction Plan

1.8Existing Conditions

SD-07 Certificates

1.6 GNotification

02 82 00 SD-03 Product Data

1.2.2 GAmended Water

1.3.9 GSafety Data Sheets (SDS) for All

Materials

2.1 GEncapsulants

3.1.2.1 GRespirators

3.1.7 GLocal Exhaust Equipment

3.1.7 GPressure Differential Automatic

Recording Instrument

3.1.8 GVacuums

3.1.10 GGlovebags

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 126 PAGES

02 82 00 SD-06 Test Reports

1.5.5 GAir Sampling Results

1.5.6 GPressure Differential Recordings

for Local Exhaust System

3.2.13.5 GClearance Sampling

3.3.3.2 GAsbestos Disposal Quantity

Report

SD-07 Certificates

1.3.4 GEmployee Training

1.3.5 GNotifications

1.3.7 GRespiratory Protection Program

1.3.10 GAsbestos Hazard Abatement Plan

1.3.11 GTesting Laboratory

1.3.12 GLandfill Approval

1.3.12 GDelivery Tickets

1.3.12 GWaste Shipment Records

1.3.13 GTransporter Certification

1.3.14 GMedical Certification

1.5.1 GPrivate Qualified Person

Documentation

1.5.2 GDesignated Competent Person

1.5.3 GWorker's License

1.5.4 GContractor's License

1.5.9 GFederal, State or Local Citations

on Previous Projects

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 126 PAGES

02 82 00 3.1 GEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3 GWater Filtration Equipment

3.1.8 GVacuums

3.1.8 GVentilation Systems

SD-11 Closeout Submittals

1.3.5 GPermits and Licenses

1.3.5 GNotifications

1.3.7.1 GRespirator Program Records

1.5.7 GProtective Clothing

Decontamination Quality Control

Records

1.5.8 GProtective Clothing

Decontamination Facility

Notification

1.7.1 GRental Equipment

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.4Medical Examinations

1.5.2.8 GLead, Cadmium, Chromium

Waste Management Plan

1.5.4 GNotifications

1.5.5 GOccupant Protection Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 126 PAGES

02 83 00 1.5.2.2 GLead, Cadmium, Chromium

Compliance Plan

3.1.1.6 GLead, Cadmium, Chromium

Compliance Plan

3.4.1.1 GInitial Sample Results

3.5.2.1 GWritten Evidence of TSD

Approval

SD-03 Product Data

1.6.1Respirators

1.6.4Vacuum Filters

1.6.7Negative Air Pressure System

2.1Materials and Equipment

2.1.1Expendable Supplies

3.1.1.5Local Exhaust Equipment

3.1.1.5Pressure Differential Automatic

Recording Instrument

3.1.1.6Pressure Differential Log

SD-06 Test Reports

1.3.3Sampling and Analysis

1.5.2.3Occupational and Environmental

Assessment Data Report

1.5.2.3Sampling Results

1.5.3Pressure Differential Recordings

For Local Exhaust System

SD-07 Certificates

1.5.1.3Testing Laboratory

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 126 PAGES

02 83 00 1.5.1.4 GThird Party Consultant

Qualifications

3.1.1.1 GOccupant Notification

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 GHazardous Waste Manifest

3.5.2.1 GTurn-In Documents or Weight

Tickets

02 84 16 SD-07 Certificates

1.8.1 GQualifications of CIH

1.8.1 GTraining Certification

1.8.2PCB and Lamp Removal Work

Plan

1.8.3PCB and Lamp Disposal Plan

SD-11 Closeout Submittals

3.5.2 GTransporter Certification

3.2.4Certification of Decontamination

3.5.2.1Certificate of Disposal and/or recycling

3.5.3.2DD Form 1348-1

3.3.1Testing Results

02 84 33 SD-07 Certificates

1.7.1 GTraining certification

1.7.2 GQualifications of CIH

1.7.3 GPCB Removal Work Plan

1.7.4 GPCB Disposal Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 126 PAGES

02 84 33 1.7.5Notification

3.8Transporter Certification

3.5.4Certification of Decontamination

3.5.5Post Cleanup Sampling

3.8.1 GCertificate of Disposal

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.5 GQuality Control Plan

1.6.6 GQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation

3.3.9Maturity Method Data

SD-02 Shop Drawings

1.6.2.1Reinforcing Steel

SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.1Formwork Materials

2.3.3.3Recycled Aggregate Materials

2.3.1Cementitious Materials

2.4.6Vapor Retarder

2.4.1Concrete Curing Materials

2.6Reinforcement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 126 PAGES

03 30 00 2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

2.2.2Waterstops

2.2.3Biodegradable Form Release

Agent

1.6.3.2Pumping Concrete

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.10.2.1Tolerance Report

3.14.3.3 GCompressive Strength Tests

3.14.3.5Unit Weight of Structural

Concrete

3.14.3.4Air Content

3.14.3.1Slump Tests

2.3.2Water

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 126 PAGES

03 30 00 2.6.1Reinforcing Bars

1.8Welder Qualifications

1.6.3.3VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.4Safety Data Sheets

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.5Joint Sealants

2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.4.1.1 GDetail Drawings

3.3.1.5Masonry Wall Control Joint

Layout

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2 GClay or Shale Brick

2.4.1.1 GCementitious Materials

SD-04 Samples

1.3.1.1 GMock-Up Panel

2.2.2 GClay or Shale Brick

2.2.3.2 GConcrete Masonry Units (CMU)

2.4.1.4 GAdmixtures for Masonry Mortar

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 126 PAGES

04 20 00 2.6.2 GAnchors, Ties, and Bar

Positioners

2.6.3 GJoint Reinforcement

2.6.5 GClay Masonry Expansion-Joint

Materials

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

2.2.3.3Fire-Rated Concrete Masonry

Units

3.2.4 GBracing Calculations

SD-06 Test Reports

2.2.2.1.4Efflorescence Test

2.2.3.3Fire-Rated Concrete Masonry

Units

3.6.1.1Field Testing of Grout

SD-07 Certificates

1.3.2Special Masonry Inspector

Qualifications

2.2.2Clay or Shale Brick

2.2.3.2Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 126 PAGES

04 20 00 2.6.7Insulation

SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.1.3 SClay Units

2.2.3.2.1 SRecycled Content

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.3Tension Control Bolts

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

2.2.3 SRecycled Content for Steel Pipe

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 126 PAGES

05 12 00 SD-05 Design Data

1.4.3 GDesign Calculations for Steel

Connections

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

3.7.4Embrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3AISC Structural Steel Fabricator

Quality Certification

1.3AISC Structural Steel Erector

Quality Certification

1.4.4.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 126 PAGES

05 12 00 1.4.4.2Overhead, Top Running Crane

Rail Beam

05 21 00 SD-01 Preconstruction Submittals

1.3.2Welder Qualification

SD-02 Shop Drawings

1.3.1 GSteel Joist Framing

SD-03 Product Data

2.3 SRecycled Content Of Steel

Products

SD-05 Design Data

2.2 GDesign Calculations

SD-06 Test Reports

3.4Erection Inspection

3.4Welding Inspections

SD-07 Certificates

1.3.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.2.16Mechanical Fasteners

2.1.4Touch-Up Paint

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 126 PAGES

05 30 00 2.1 SRecycled Content of Steel

Products

SD-04 Samples

2.2.4Flexible Closure Strips

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

2.2.11Stud Manufacture's Certification

2.2.11Stud Manufacture's Test Reports

05 40 00 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists

2.1Recycled Content of Steel

Products

SD-05 Design Data

1.6.2 GMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 126 PAGES

05 40 00 3.2.1Welds

05 50 13 SD-02 Shop Drawings

2.4 GBollards/Pipe Guards

2.7 GRoof Hatches

2.7 GRoof Hatches

2.5 GDownspout Terminations

2.1 SRecycled Content

05 51 00 SD-02 Shop Drawings

2.1 GIron and Steel Hardware

2.1 GSteel Shapes, Plates, Bars, and

Strips

2.2.1 GMetal Stair System

SD-03 Product Data

2.4.1 GStructural Steel Plates, Shapes, and Bars

2.4.2 GStructural Steel Tubing

2.4.5 GHot-Rolled Carbon Steel Sheets

and Strips

2.4.4 GCold-Finished Steel Bars

2.4.3 GHot-Rolled Carbon Steel Bars

2.4.6 GCold-Rolled Carbon Steel Sheets

2.4.7 GGalvanized Carbon Steel Sheets

2.4.8 GCold-Drawn Steel Tubing

2.4.9 GGray Iron Castings

2.4.10 GMalleable Iron Castings

2.3.2 GMasonry Anchorage Devices

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 126 PAGES

05 51 00 2.2.3 GProtective Coating

2.2.2 GSteel Pan Stairs

2.3.1 GSteel Stairs

SD-07 Certificates

1.3.1 GWelding Procedures

1.3.1 GWelder Qualification

SD-08 Manufacturer’s Instructions

2.4.1 GStructural Steel Plates, Shapes, and Bars

2.4.2 GStructural Steel Tubing

2.4.5 GHot-Rolled Carbon Steel Sheets

and Strips

2.4.4 GCold-Finished Steel Bars

2.4.3 GHot-Rolled Carbon Steel Bars

2.4.6 GCold-Rolled Carbon Steel Sheets

2.4.7 GGalvanized Carbon Steel Sheets

2.4.8 GCold-Drawn Steel Tubing

2.4.9 GGray Iron Castings

2.4.10 GMalleable Iron Castings

2.2.3 GProtective Coating

2.3.2 GMasonry Anchorage Devices

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

2.3.2Ladder Safety Devices

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 126 PAGES

05 51 33 SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1 GStructural-Steel Plates, Shapes, and Bars

2.2.2 GStructural-Steel Tubing

2.2.4 GCold-Finished Steel Bars

2.2.3 GHot-Rolled Carbon Steel Bars

2.2.5 GCold-Drawn Steel Tubing

2.2.7 GConcrete Inserts

2.2.8 GMasonry Anchorage Devices

2.1.2 GProtective Coating

2.2.10 GSteel Railings and Handrails

SD-07 Certificates

1.3.1 GWelding Procedures

1.3.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 10 00 SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 126 PAGES

06 10 00 1.8.1Certificates of Grade

06 41 16.00 10 SD-02 Shop Drawings

2.8Shop Drawings

3.1Installation

SD-03 Product Data

2.1Wood Materials

2.8.7.3Finish Schedule

1.5.2Certification

SD-04 Samples

2.2Plastic Laminates

2.4Cabinet Hardware

SD-07 Certificates

1.5Quality Assurance

3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

1.4.2 GDetail Drawings

3.1 GInstallation

SD-03 Product Data

2.1Solid Polymer Material

1.4.1Qualifications

2.3Fabrications

2.2.4 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 GMaterial

2.3.5 GCounter and Vanity Tops

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 126 PAGES

06 61 16 SD-06 Test Reports

2.1Solid Polymer Material

SD-07 Certificates

2.3Fabrications

1.4.1Qualifications

2.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

3.2Clean-up

06 82 14 SD-01 Preconstruction Submittals

1.3.1Qualifications of Manufacturer

SD-02 Shop Drawings

2.1.2Installation Drawings

SD-03 Product Data

2.1.3Anchorage Materials

2.1.3Adhesives

2.1.3Resins

2.1.3Hardeners

1.3.1Manufacturer's Sample Warranty

2.1.3FRP Wall Paneling

SD-06 Test Reports

2.1.4Ultraviolet Test Reports

2.1.4Thermal Expansion Test Reports

2.1.4Flame Spread Test Reports

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 126 PAGES

06 82 14 3.2.2Manufacturer's Instructions

SD-09 Manufacturer’s Field

Reports

3.1Manufacturer's Certification of

Installation

SD-11 Closeout Submittals

3.2.1Manufacturer's Warranty

07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-05 Design Data

3.2 GEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 GPressure Test Procedures

1.6.4 GAir Leakage Test Report

3.5.5 GAir Leakage Test Report

1.6.4 GDiagnostic Test Report

3.6.5 GDiagnostic Test Report

07 21 13 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 126 PAGES

07 21 13 1.3 GManufacturer's Standard Details

2.1 GBlock or Board Insulation

2.2 GAccessories

2.1.4 SRecycled Content for Block or

Board Insulation

SD-07 Certificates

2.1 GBlock or Board Insulation

1.4 GProtection Board

1.7 GSpecial Warranties

1.7 GSpecial Warranties

2.1.5 SIndoor Air Quality For Block Or

Board Insulation

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

2.2.1Adhesive

07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.2Blanket Insulation

2.1.2 SRecycled Content for Insulation

Materials

2.3Accessories

SD-07 Certificates

2.1.4 SIndoor Air Quality for Insulation

Materials

SD-08 Manufacturer’s Instructions

3.1.1Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 126 PAGES

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

SD-03 Product Data

2.1 GInsulation

2.2 GFasteners

2.1.2 SRecycled Content For Insulation

SD-07 Certificates

1.6 GInstaller Qualifications

2.1.3 SIndoor Air Quality For Insulation

SD-08 Manufacturer’s Instructions

2.2 GFasteners

2.1 GInsulation

07 27 10.00 10 SD-02 Shop Drawings

2.1 GAir Barrier System Shop

Drawings

SD-03 Product Data

2.1 GAir Barrier System Product Data

SD-04 Samples

2.1 GMaterial Samples For Air Barrier

System

SD-05 Design Data

1.8 GDesign Data And Calculations

For The Air Barrier System

SD-06 Test Reports

1.8 GDesign Review Report

3.1.2 GTesting and Inspection

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 126 PAGES

07 27 10.00 10 SD-07 Certificates

1.7 GAir Barrier Inspector

07 27 19.01 SD-01 Preconstruction Submittals

1.8.1 GQualifications of Manufacturer

1.8.2 GQualifications of Installer

SD-02 Shop Drawings

1.4 GSelf-adhering Air Barrier

SD-03 Product Data

1.4 GSelf-adhering Air Barrier

2.2 GPrimers, Adhesives, and Mastics

1.4.2 GSafety Data Sheets

SD-06 Test Reports

1.6 GField Peel Adhesion Test

1.4.3 GFlame Propagation of Wall

Assemblies

1.4.3 GFlame Spread and Smoke

Developed Index Ratings

3.4.1 GSite Inspections and Testing

SD-07 Certificates

1.4 GSelf-adhering Air Barrier

SD-08 Manufacturer’s Instructions

1.4 GSelf-adhering Air Barrier

2.2 GPrimers, Adhesives, and Mastics

07 27 26 SD-01 Preconstruction Submittals

1.9.1 GQualifications of Manufacturer

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 126 PAGES

07 27 26 1.4 GFluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.4 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

2.2 GPrimers, Adhesives, and Mastics

2.6 GReinforcement

1.4.2 GSafety Data Sheets

SD-06 Test Reports

1.6 GCapillary Moisture Test

1.4.3 GField Peel Adhesion Test

1.4.3 GFlame Propagation of Wall

Assemblies

1.4.3 GFlame Spread and Smoke

Developed Index Ratings

3.4.1 GSite Inspections

SD-07 Certificates

1.4 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

SD-08 Manufacturer’s Instructions

1.4 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

2.2 GPrimers, Adhesives, and Mastics

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 126 PAGES

07 27 36 SD-01 Preconstruction Submittals

1.11 GQuality Control Plan

1.11 GSafety Plan

1.9.1 GFire Prevention Plan

1.9.2 GRespirator Plan

SD-02 Shop Drawings

1.5Spray Foam Air Barrier

1.11 GFoam Air Barrier System

1.5.1 GFire-Rated Assemblies

SD-03 Product Data

2.1.2 GClosed Cell

2.2 GTransition Membrane

2.3 GPrimers, Adhesives, and Mastics

2.5 GSealants

1.5.2 GSafety Data Sheets

2.1.1 GIgnition Barrier Coatings

2.1.1 GAccessories

2.1.2 SRecycled Content for Closed Cell

Spray Foam Air Barrier

2.1.5Blowing Agent

SD-06 Test Reports

1.5.3 GField Peel Adhesion Test

3.4.5.1 GThermographic Test

1.8 GAir Barrier Test

1.5.3 GFire-Ratings Of Ignition Barrier

Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 126 PAGES

07 27 36 1.5.3 GFlame Spread And Smoke

Developed Index Ratings Of SPF

Products

1.5.3 GFlame Propagation Of Wall

Assemblies

3.4.1 GSite Inspections

SD-07 Certificates

2.1.2 GClosed cell

2.2 GTransition Membrane

2.1.5 SIndoor Air Quality for Spray Foam

Air Barrier

SD-08 Manufacturer’s Instructions

1.6.1 GSPF Handling, Storage, and

Spray Procedures

3.2.1 GSubstrate Preparation

1.5.1 GIgnition Barrier

2.2 GTransition Membrane

2.3 GPrimers, Adhesives, and Mastics

SD-09 Manufacturer’s Field

Reports

1.11Core Samples

3.3.4Daily Work Record

3.4.5Visual Inspection and Thermal

Scanning

07 42 13 SD-01 Preconstruction Submittals

1.5.3Qualification of Manufacturer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 126 PAGES

07 42 13 1.5.4Qualification of Installation

Contractor

1.8Warranty

SD-02 Shop Drawings

1.5.1.1Installation Drawings

SD-03 Product Data

2.1Recycled Content;

2.2.1Wall Panels

2.2.2Factory Color Finish

1.5.5Closure Materials

2.5.4.4Pressure Sensitive Tape

2.5.4.1Sealants and Caulking

1.5.3.1Galvanizing Repair Paint

1.5.3.1Enamel Repair Paint

1.5.5Accessories

2.5Accessories

SD-04 Samples

2.2.1Wall Panels

1.5.3.1Fasteners

2.5.3Metal Closure Strips

SD-05 Design Data

1.5.1.2Wind load design analysis

SD-06 Test Reports

3.7.2Leakage Tests

1.3.2Wind Load Tests

2.2.2.6Coating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 126 PAGES

07 42 13 2.2.2.6Chalking

SD-07 Certificates

1.5.3.1Coil Stock

1.5.3.1Fasteners

1.5.3.1Galvanizing Repair Paint

1.5.3.1Enamel Repair Paint

SD-08 Manufacturer’s Instructions

3.3Installation

SD-09 Manufacturer’s Field

Reports

3.8.1Manufacturer's Field Reports

SD-11 Closeout Submittals

1.8Warranty

1.5.6Maintenance Instructions

1.8.120 year 'No Dollar Limit' warranty for labor and material

07 52 00 SD-02 Shop Drawings

1.4.6 GRoof Plan

1.4.6Field Inspection and Existing

Conditions Report

SD-03 Product Data

2.2 GModified Bitumen Sheets

2.5Asphalt

2.6 GCold-Applied Membrane

Adhesive

2.8 GPrimer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 126 PAGES

07 52 00 2.9 GModified Bitumen Roof Cement

2.12Pre-Manufactured Accessories

2.11 GFasteners And Plates

1.8 GWarranty

SD-05 Design Data

1.4.5 GWind Uplift Calculations

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

1.4.3Qualification of Engineer of

Record

1.4.5 GWind Uplift Resistance

1.4.4 GFire Resistance

SD-08 Manufacturer’s Instructions

3.3.3 GModified Bitumen Membrane

Application

3.3.4Flashing

3.3.2.1 GCold Adhesive Applied Modified

Bitumen Membrane

2.8Primer

2.11.1Fasteners

1.6 GCold Weather Installation

SD-11 Closeout Submittals

1.8Warranty

3.7Information Card

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 126 PAGES

07 52 00 3.6Instructions To Government

Personnel

07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

3.1.13 GGutters

3.1.14 GDownspouts

3.1.15 GFlashing for Roof Drains

3.1.16 GScuppers

3.1.20 GCopings

3.1.12 GDrip Edges

3.1.17 GConductor Heads

2.1 SRecycled Content

SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 GCleaning and Maintenance

07 61 14.00 20 SD-02 Shop Drawings

1.2.5 GRoofing

SD-03 Product Data

2.1 GRoofing Panels

2.1.1 SRecycled Content for Steel

Roofing Product

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 126 PAGES

07 61 14.00 20 2.3Attachment Clips

2.4.1Closures

2.4Accessories

2.4.2Fasteners

2.4.3Sealants

1.7 GWarranty

SD-04 Samples

2.1 GRoofing Panels

2.4Accessories

2.4.3Sealants

2.2Intermediate Support

SD-05 Design Data

1.5Design Calculations

SD-06 Test Reports

3.6Field Inspection

1.3.3Structural Performance

1.6.6Finish

SD-07 Certificates

1.6.3Manufacturer's Technical

Representative

1.6.4Installer's Qualifications

SD-08…