This document is an amendment to Solicitation N4008524R2531 for the design-bid-build of the P-226 Maintenance Facility and Marine Air Group Headquarters at Marine Corps Air Station, Cherry Point, North Carolina.
The key details are:
- The proposal due date has been extended from November 19, 2024 to November 22, 2024 by 2:00 PM EST.
- The amendment provides responses to various pre-proposal inquiries related to topics such as HVAC systems, cranes, plumbing, RF-shielding requirements, cabling, and testing.
- The solicitation is for the construction of a maintenance facility, headquarters building, and supporting site work. The total contract value is not specified.
- The procuring agency is the Department of the Navy, Naval Facilities Engineering Command.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT J 1 7
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0006 15-Nov-2024
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFAC MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N4008524R2531
9B. DATED (SEE ITEM 11)
30-Aug-2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SOLICITATION NO. N4008524R2531 DESIGN-BID-BUILD, P-226 MAINTENANCE FACILITY & MARINE AIR GROUP
HEADQUARTERS, MARINE CORPS AIR STATION, CHERRY POINT, NORTH CAROLINA
The proposal due date has been extended to 22 November 2024 NLT than 1400 (EST)..
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Contract POC: Brittany Cristelli; Email: brittany.n.cristelli.civ@us.navy.mil; Phone: 757-341-1978
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA mailto:brittany.n.cristelli.civ@us.navy.mil
N4008524R2531
SF 30 BLOCK 14 CONTINUATION PAGE
The purpose of this amendment is to provide the following:
1. Extend proposal due date to 22 November 2024 NLT 2:00PM EST.
2. Responses to Pre-Proposal Inquiries (PPI’s)
Pre-Proposal Inquiry Responses:
Question # Reference
Question Government Response Page Section Paragraph
MH101
A4/M70
MALS 14. MH101 and
A4/M708. EF-5 serves Hazmat
Room 140. There is no motorized damper shown in the duct on
MH101. EF-5 is included with four other EFs in the sequence and points lists in A4/M708 including references to interlocks with AHUs, shut down, and damper closure in response to
ATFP ESS operation. Inclusion of EF-5 with those other four EFs does not seem appropriate?
Should EF-5 have a motorized damper? Does it run constantly even when ATFP ESS has been activated?
PENDING RESPONSE
41 22
13.15 41 22 13.15
Equipment-41 22 13.15-
Specification 41 22 13.15 has no mention of anti-spark requirements. Please confirm all bridge cranes do not need to meet the requirements of minimum or maximum anti-spark.
Add the minimum anti-spark requirement to the crane spec included in the contract documents
BLDG
3916, CU101
BLDG
3916, CU101
Keynote 2 calls for a sanitary sewer packaged pump station of like kind and size with PVC gravity. Please provide details for the pump station and a pipe size for the PVC gravity line.
PENDING RESPONSE
74 CSP CSP
Security-CSP-Please confirm the
CSP only applies to the MAG HQ building and site.
Confirmed.
84 A-B-101 A-B-101
Civil-A-B-101-On plan B-101, the geotechnical report summary refers to the final geotechnical engineering report dated February
10, 2023, as prepared by
AECOM. Refer to final geotechnical engineering report for additional information. Please provide the final geotechnical engineering report dated February
Geotechnical Report and
Addendum provided with
Amendment 0006.
10, 2023, as prepared by
AECOM.
01 57 19
- 1.5, 01
14 00 -
1.2
01 57 19 -
1.5, 01 14
00 - 1.2
General-01 57 19 - 1.5, 01 14 00 -
1.2-Specification 13 47 00
Section 2.1 states the Radiant
Barrier Foil is to achieve 67 dB across the frequency range of
100MHz to 10GHz. Please confirm this applies to the material only and not the RF-shield system as a whole.
PENDING RESPONSE
126 13 47 00 13 47 00
Architectural-13 47 00-
Specification 13 47 00 Section
3.2 calls for 100 meters of free space over the frequency range of
30 MHz to 6 GHz. Please clarify how much isolation (measured in decibels) is required across this frequency range. The current design has many points of failure that prevent isolation (measured in decibels) from being guaranteed across that frequency range. Please confirm that the current design does not require the contractor to guarantee RF-shielding performance.
PENDING RESPONSE
127 13 47 00 13 47 00
Architectural-13 47 00-
Specification 13 47 00 Section
3.2 calls for 100 meters of free space over the frequency range of
30 MHz to 6 GHz. Please clarify how much isolation (measured in decibels) is required across this frequency range. The current design has many points of failure that prevent isolation (measured in decibels) from being guaranteed across that frequency range. Please confirm that the current design does not require the contractor to guarantee RF-shielding performance.
PENDING RESPONSE
128 13 47 00 13 47 00
Architectural-13 47 00-Please confirm that RF-filters are not required for all copper conductors penetrating the RF-shield?
All non-fiber optic cabling exiting the Inspectable Space must use an approved isolation or filtering device. If not, it will require copper conductors if penetrating the RF-shield
129 13 47 00 13 47 00
Architectural-13 47 00-
Specifications do not appear to provide a process to validate the performance criteria for RF-shielding. Please provide the desired process to validate performance criteria.
IEEE-299 is the process to validate the performance.
130 13 47 00 13 47 00
Architectural-13 47 00-Please confirm if the contractor is expected to perform field RF-shield performance validation in accordance with IEEE-299?
Contractor is expected to perform field RF-shield performance validation in accordance with IEEE-299
132 Factor 2
General-Factor 2-The RFP requires the proposal to be uploaded via PIEE. Factor 2 requires a copy of the Project
Schedule Source File. The
Project Schedule Source File, ".xer" from Primavera P6 is not a recognized file by PIEE and cannot be uploaded. Please confirm only the Schedule Source
File can be emailed directly the
Contract Specialist by the proposal due date and time.
PENDING RESPONSE
13 47 00
- 1.5
13 47 00 -
1.5
Architectural-13 47 00 - 1.5-13
47 00, 1.5 Work Plan calls for a
“shielding expert.” Please confirm this “expert” can be employed by the shielding contractor hired to furnish and install the shielding products in
13 47 00. Also please verify who or what agency verifies this person as an “expert.” Is it a certain number of years of experience working with the product, a certain accreditation, etc.?
Expert can be employed by the shielding contractor that is hired to furnish and install the shielding. Tempest testing experience, CTP 1 or CTP 2 experience is preferred but not required.
13 40 00
- 1.5
13 40 00 -
1.5
Architectural-13 40 00 - 1.5-13
40 00, 1.5 Work Plan calls for an independent, third-party testing consultant for assembly testing.
1.1 References refers to IEEE 299
Methods for Measuring the
Effectiveness of EM Shielding
Enclosures. IEEE 299 contains many different ranges and amplitudes to test a shielded space to (Hz/DB). Please provide minimum performance levels need.
CTTA recommends testing to the baseline frequencies of the
RF product that is being installed
13 40 00
- 1.5
13 40 00 -
1.5
Architectural-13 40 00 - 1.5-13
40 00, 1.5 Work Plan calls for an independent, third-party testing consultant for assembly testing.
1.1 References refers to IEEE 299
Methods for Measuring the
Effectiveness of EM Shielding
Enclosures. From past experiences and consulting with numerous RF Shielding contractors, testing a 4-sided box, that utilizes the metal roof deck and floor slab as the fifth and sixth side of the box will yield many local failure points in the
Expect the contractors to perform the testing and provide the results confidentially to the
Government.
IEEE 299 testing tables. What has been acceptable on other projects with an “Open Storage” level of classification is to perform the testing and provide the results confidentially to the
Gov’t. This will show and identify the isolated points of weakness for information only.
However, building a shielded space that would pass all of the tables in IEEE 299, on all six sides is an extremely expensive, and incredibly sensitive and time-consuming endeavor (if not impossible). We just want to verify that the Gov’t is aware of and acceptable to the fact that the
4-sided box will yield local shielding failure points, and those will be tested and pointed out in the reports, but those won’t be able to be remedied in the field.
Please confirm the Gov’t acknowledges and is acceptable to this.
146 T-505 T-505
Electrical-T-505-Please provide a specification or manufacturers part number for the cabinets to be installed in Room 155?
Recommend using /
Manufacture Hoffman
Enclosers INC Cat #
PS1S21610B or equivalent.
They need to be able to be secured, of note they require a special outlet to be installed in order to plug them in.
147 T-505 T-505
Electrical-T-505-Do you require the cabinets to be secured to the floor beneath the raised floor?
No, the cabinets can be secured to the raised floor.
T-505
Note 1
T-505 Note
Electrical-T-505 Note 1-Note 1 states all cabling in the secure area is required to be shielded.
Please confirm NIPR cabling is to be shielded.
NIPR requires shielded cables and shield tips. (recommend
Cat 6 Shielded cable and tips /
Also this will be the same for
JWICS)
T-505
Note 1
T-505 Note
Electrical-T-505 Note 1-Note 1 states all cabling in the secure area is required to be shielded.
Please confirm SIPR cabling is to be shielded.
SIPR is requires shielded cables and shield tips. (recommend
Cat 6 Shielded cable and tips /
Also this will be the same for
JWICS)
150 T-505 T-505
Electrical-T-505-The rack layouts on T-505 show a fiber enclosure in each secure cabinet whereas the riser diagram only shows a single fiber connection. Do you require a 24-strand fiber for each of the secure cabinets?
PENDING RESPONSE
25 05 11 Please verify Risk Management
Framework (RMF) is not required for Cyber Security. It does not appear to be required per the specification provided as this is normally in UFGS 25 08 11.00
20.
PENDING RESPONSE
25 05 11 25 05 11: please verify Risk
Management Framework (RMF) is not required for Cyber Security.
It does not appear to be required per the specification provided as this is normally in UFGS 25 08
11.00 20.
PENDING RESPONSE
MALS-
14 B-
CU103
Key Note 11 calls for a 2.5"
TYPE K COPPER W/ 8" X 4"
TEE AND 4" TO 2.5"
INSULATED
ADAPTER/REDUCER. Note 11 appears to be pointing to a parking space on the left side of the plan. Please confirm the location and length of piping required.
PENDING RESPONSE
MAG-14
A-A-301
A-A-504
Sheet A-A-301 for the MAG-14 building only shows the CMU walls along Gridlines 2 and 9 extending to deck above. All other interior partitions look to terminate at 12'-8". Sheet A-A-
501 Wall Types notes for multiple walls to "extend wall construction to underside of metal deck. Please clarify which walls are to extend to metal deck. To meet STC and fire rating requirements, please confirm that a hard lid attached to the underside of the trusses will suffice. This will allow the walls to extend 12'-8"H instead of
30+'H to deck in some areas.
If confirmed, please provide a detail for the desired hard lid system.
PENDING RESPONSE
00 21 00 Specification 00 21 00 requires that we submit Confirmation of filing of Veterans' Employment and Training (VETS-4212) for the 2023 filing cycle. Please confirm that this is to be the 2023 filing cycle, and not the 2024 filing cycle.
Propose per RFP.
Price
Schedule
CLIN 003 Option Item No. 2 – requires “Total of Price for the entire work for Vanpad in accordance with the RFP…”. The
B package MALS-14 site drawings do not delineate what work falls under this option. We
PENDING RESPONSE
will proceed with the understanding that the Vanpad electrical, lighting, and comms upgrades throughout the paved area depicted on B package
MALS-14 sheet ES101 will fall under Option 02, and that the new pavement doweled in to match the existing Vanpad along the
MALS-14 south elevation depicted on B package MALS-14 sheet CS106 will fall in the Base
Price to provide a complete pavement section along the
Vanpad to the new building.
Please advise if this is not correct.
ATTACHMENTS:
1. Amendment 0006 – P226 F35 MCAS Cherry Point Geotech Report_02102023Signed
2. Amendment 0006 – P226_F35 MCAS Cherry Point HazMat Rpt_Fnl_013023
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 19-Nov-2024 02:00 PM to 22-Nov-2024 02:00 PM.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
CLAUSES INCORPORATED BY REFERENCE
52.223-23 Sustainable Products and Services MAY 2024
CLAUSES INCORPORATED BY FULL TEXT
The following have been added by full text:
52.236-1 Performance of Work by the Contractor (APR 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least 15 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
(End of clause)