Revised Section F 1503050 Grounds Maintenance and Landscaping.pdf

PDF 217 KB Posted

Attached to
GROUNDS MAINTENANCE AND LANDSCAPING SERVICES AT NORFOLK NAVAL STATION NORFOLK, VIRGINIA
Solicitation number
N4008523R2569
Issued by

About this file

This document is a Deliverables Section from a federal contract opportunity for Grounds Maintenance and Landscaping Services at Norfolk Naval Station, Norfolk, Virginia. The contractor is required to provide a variety of deliverables related to grounds maintenance and landscaping, such as herbicide use sheets, pest management reports, soil analysis, maintenance schedules, inventory reports, and other plans. Most deliverables must be submitted within 15 calendar days after contract award and then annually or monthly as required. The document specifies the required submission dates, distribution frequency, and number of copies for each deliverable. The related federal contract opportunity is Solicitation Number N4008523R2569, which is for grounds maintenance and landscaping services at Norfolk Naval Station and the Craney Island Fuel Depot.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1503050 – Grounds Maintenance and Landscaping

SECTION F: DELIVERIES OR PERFORMANCE

Section F – 1503050 Grounds Maintenance and Landscaping

DELIVERABLES

Spec Item

Form Attachment

Number Deliverable

Title Date (s) of

Submission

Distribution

Frequency Original

Copies (including original)

2.3.2.1 N/A Herbicide Use

Sheets including Herbicide Labels and Safety Data Sheets (SDS)

Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.

KO, COR,

PPMC

3 Annually for each herbicide, as required

2.3.2.6 N/A Pest

Management Operations Report

Electronically by the 15th of the following month (Example: July data must be submitted by August 15) on the format approved by PMC.

KO, COR,

PPMC

2 Monthly

3 N/A SDS sheets, catalog cut sheets, samples of all proposed fertilizers, grass seeds, and mulch

Prior to bringing on-board installation and prior to use

KO/COR 2 As Required

3.1 N/A Soil Analysis Within 15 days

after receipt of the test results by the Contractor

KO/COR 2 As Required

3.1.1.1 N/A Mowing and

Trimming Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.1.1.2 N/A Edging

Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, Item

Form Attachment

Number Deliverable

Title Date (s) of

Submission

Distribution

Frequency Original

Copies (including original) and As Required

3.1.1.3 N/A Lawn

Maintenance Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.1.2 N/A Control of

Undesired Vegetation Schedule

Within 15 calendar days after award / Annually

KO/COR 2 As Specified

3.1.4 N/A Debris Removal

Schedule

Within 15 calendar days after award / Annually

KO/COR 2 As Specified

3.1.5 N/A Shrub and

Hedge Maintenance Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.1.6 N/A Plant

Maintenance Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.1.6 N/A Monthly

Inventory of Plant Replacement and Location Report

First work day of each month

KO/COR 2 Monthly

3.1.7 N/A Plant Bed

Maintenance Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

Item

Form Attachment

Number Deliverable

Title Date (s) of

Submission

Distribution

Frequency Original

Copies (including original)

3.1.7 N/A Total Monthly

Amount of Mulch Purchased Report

First work day of each month

KO/COR 2 Monthly

3.1.7 N/A Total Monthly

Square Footage of Areas Mulched Report

First work day of each month

KO/COR 2 Monthly

3.1.8 N/A Tree

Maintenance Schedule

With 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.1.9 N/A Artificial Turf

Maintenance Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.1.10 N/A Xeriscape Area

Maintenance Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.1.11.3 N/A Filterra®

Maintenance Plan Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.1.12 N/A Parking Lot

Vegetation Maintenance Plan

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing the schedule, Item

Form Attachment

Number Deliverable

Title Date (s) of

Submission

Distribution

Frequency Original

Copies (including original) and As Required

3.2 N/A Planned Road

Sweeping Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.3.1 N/A Grounds Care

Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.3.2 N/A Tree Control

Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.3.3 N/A Control

Undesired Vegetation Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.3.4 N/A Plan for

Maintaining Wet, Low, Lying, and Swampy Areas

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.3.4.3 N/A Filterra®

Maintenance Plan Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing

Item

Form Attachment

Number Deliverable

Title Date (s) of

Submission

Distribution

Frequency Original

Copies (including original) the schedule, and As Required

3.3.5 N/A Parking Lot

Vegetation Maintenance Plan

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.4.1 N/A Control of

Undesired Vegetation Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

3.4.2 N/A Tree Control

Schedule

Within 15 calendar days after award / Annually

KO/COR 2 Annually, five calendar days prior to implementing any changes to the schedule, and As Required

File details come from the government source that posted it. Updated .