This document is a hazardous materials inspection report for the NH-95 FIRE PROTECTION REPAIRS project at the Naval Support Activity Hampton Roads in Norfolk, Virginia. The report identifies asbestos-containing materials found in Building NH95 including acoustical wall tile, floor tile and mastic in various colors, joint compound, and residual floor tile mastic and wall tile mastic. The inspection was conducted to identify hazardous materials ahead of planned renovations to replace sprinkler systems, standpipes, fire detection systems, doors, finishes, and fixtures as well as provide temporary office space. The solicitation number and agency for this opportunity are N4008523R2565 with the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
JA ML-23-32 Redacted.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Attachment Q- Second Site Visit Log.pdf PDF
Attachment P- Section 27 10 00.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Attachment N- NH95 FPR HAZMAT REPORT.pdf PDF
Attachment M- NH95 SITE VISIT LOG.pdf PDF
Amendment 0001.pdf PDF
N4008523R2565 Solicitation.pdf PDF
BLDG NH95-1687420-DWGS 3OF3.pdf PDF
BlDG NH95-1687420 Specifications.pdf PDF
BLDG NH95-1687420-DWGS 2OF3.pdf PDF
Attachment G - Individual Small Business Subcontracting Plan.docx DOCX document
Attachment E- Historical Small Business Utilization.docx DOCX document
Attachment J- NH95 SITE VISIT MAP.pdf PDF
BLDG NH95-1687420-DWGS 1OF3.pdf PDF
Attachment D- Construction Experience Project Data.docx DOCX document
Attachment K- Approved Identity Proofing Documents.pdf PDF
Attachment B- SECNAV 5512.pdf PDF
Attachment F- Small Business Participation Commitment.docx DOCX document
Attachment C- Past Performance Questionnaire.docx DOCX document
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment H- Price Proposal Form.pdf PDF
Attachment I - PIEE Vendor Access Instructions.pdf PDF
Attachment L- Criteria for Denying Access to Navy Installations.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fire Protection Repairs, Ops Center, Building NH95

NSA Norfolk, Virginia

GER 130-7939

Prepared for

Dills Architects 1432 North Great Neck Road, Suite 204

Virginia Beach, VA

Prepared by Brian T. Hyde

Virginia Asbestos Inspector # 3303002709

REPORT OF

HAZARDOUS MATERIALS

CONSULTING SERVICES

Southern Professional Center 1 2712 Southern Boulevard, Suite 101 Virginia Beach, Virginia 23452

(757) 463-3200 Fax (757) 463-3080 E-mail germail@geronline.com

August 4, 2022

Dills Architects 1432 North Great Neck Road, Suite 204 Virginia Beach, VA 23454

Attention: Mr. Fred Bishop

Subject: Hazardous Materials Inspection- 100% Report Fire Protection Repairs, Ops Center, Bldg. NH95 NSA Norfolk, VA

GER 130-7939

GeoEnvironmental Resources, Inc. has completed our hazardous materials sampling of the subject facility. This work was completed in accordance with the scope of work and fee outlined in GER proposal 130-7556R1 dated 18 August 2021 and proposal 130-7556MOD1 dated 18 April 2022. This report is relevant to the date of our field work and should not be relied upon for later dates.

We appreciate the opportunity of completing this work for Dills Architects. If there are any questions concerning this report, please contact us.

Sincerely, GeoEnvironmental Resources, Inc.

Brian T. Hyde H. Nelson Adcock, Jr., P.E.

Hazardous Materials Project Manager President Virginia Asbestos Inspector (#3303002709) Virginia Asbestos Inspector (#3303001776)

Attachments: (1) Hazardous Materials Report

(2) Laboratory Reports

(3) Sample Location Maps

(4) Licenses

(5) Previous Report

Southern Professional Center I 2712 Southern Boulevard, Suite 101 Virginia Beach, Virginia 23452

(757) 463-3200 Fax (757) 463-3080 E-mail germail@geronline.com

TABLE OF CONTENTS

Section 2 Bulk Sample Results/

Laboratory Sheets

Section 1 Report

Section 3 Sample Location Map

Section 4 Licenses

Section 5 Previous Asbestos Inspection

Report

ACRONYMS

AAS Atomic absorption spectroscopy ACBM Asbestos-containing building materials ACM Asbestos-containing materials ACT Acoustical ceiling tile ADA Americans with Disability Act AHERA Asbestos Hazard Emergency Response Act ASHARA Asbestos Schools Hazard Abatement Reauthorization Act ASTM American Society of Testing and Materials CMU Cement masonry unit CFC Chlorofluoro carbons CHMM Certified Hazardous Materials Manager CFR Code of Federal Regulation CMU Concrete masonry unit CSP Certified Safety Professional DEHP Di (2-ethylhexyl) phthalate DRO Diesel Range Organics ECD Electron capture detectors EA Each EPA U.S. Environmental Protection Agency FTM Floor tile and mastic GC Gas chromatography GRO Gasoline Range Organics GWB Gypsum wall board HBM Hazardous building material HID High intensity discharge HMIR Hazardous Materials Inspection Report HM Homogeneous material HUD U.S. Housing and Urban Development HVAC Heating Ventilation and Air Conditioning LBP Lead-based paint LCP Lead-containing paint LF Linear feet LS Lump sum MDL Minimum detection limit mg/cm2 Milligrams per square centimeter mg/kg Milligrams per kilogram mg/L Milligrams per Liter ND none detected NVLAP National Voluntary Laboratory Accreditation Program OSHA Occupational Safety and Health Administration PCB Polychlorinated biphenyl PLM Polarized light microscopy ppm Parts per million RCRA Resource Conservation and Recovery Act RL Reporting Limit SAP Sample and Analysis Plan SF Square Feet TCLP Toxicity characteristic leaching procedure TPH Total Petroleum Hydrocarbons TSI Thermal System Insulation VAC Virginia Administration Code VOC Volatile Organic Compound WH Warehouse XRF X-Ray Fluorescence

SECTION 1

Report

PROJECT DESCRIPTION

Project information is per the Statement of Architect-Engineer Services (SAES) dated 1 July 2021 provided by Dills Architects (Dills).

This project is titled “Fire Protection Repairs, Ops Center, Bldg. NH95.” The project is described in the SAES as follows:

Replace existing sprinkler heads throughout older sections of NH95 to include finish repairs.

Repair/replace standpipes, risers and pump systems.

Un-sprinkled areas provide sprinkler system or other fire suppression systems to include making repairs to substrates and finishes.

Repair fire detection system and provide new detection system, link Giant Voice to system annunciation with new panels and software. All repairs shall include testing and monitoring Repair lighting at Mechanical Rooms.

Replace exterior and interior doors and frames to include personnel and overhead.

Repair all common spaces and egresses to include hallways, stairwells, lobby areas finishes and support elements (railings, treads, lighting, etc.)

Replace all interior common space finishes to include floors, walls and ceilings. Replace common spaces doors.

Repair all Common Space Toilets, to include fixtures, finishes and systems support (to include lighting, HVAC, exhaust, etc.

Provide temporary office space during construction.

Space includes rentals, modifications to space or swing space, support of COOP or other options that can be developed during project development.

Pave existing vacant lot (former NH5 site) for temporary modular office units. Provide utilities to units.

Repair personnel gate turnstile at perimeter fence for easy access to off-base parking that is adjacent to NH5 site.

Prior to the renovation work, hazardous materials must be identified in order to protect workers and the environment.

SAMPLING METHODOLOGIES

Suspect Asbestos-Containing Materials

(ACM)

The AHERA regulation, 40 Code of Federal Regulations (CFR) 763, is the primary governing regulation when performing asbestos surveys. This regulation was originally enacted for school buildings, but has since been applied to public and commercial buildings by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA) in 1994 and by the Occupational Safety and Health Administration’s (OSHA) worker protection regulations in 1995, specifically 29 CFR 1926.1101(k). The demolition of structures is also subject to 40 CFR Part 61 “National Emission Standards for Hazardous Air Pollutants” (NESHAPs).

ACM is specifically addressed in 40 CFR 61 Subpart M “National Emission Standard for Asbestos.”

ACM is generally divided into three primary classifications as follows: (a) Surfacing Material, (b) Thermal System Insulation, and (c) Miscellaneous Material. These classifications are defined in 40 CFR

763.83 as provided below.

Miscellaneous material means interior building on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.

Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.

Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.

The sampling methodologies generally employed to address the ACM categories described above are as follows.

Surfacing material – An accredited inspector shall collect, in a statistically random manner that is representative of the homogeneous area, bulk samples from each homogeneous area of friable surfacing material that is not assumed to be ACM, and shall collect the samples as follows:

FIRE PROTECTION REPAIRS, BLDG. NH95 GER 130-7939 Page 3

GER

(1) At least three bulk samples shall be collected from each homogeneous area that is 1,000 SF or less.

(2) At least five bulk samples shall be collected from each homogeneous area that is greater than or equal to 1,000 SF but less than or equal to 5,000

SF.

(3) At least seven bulk samples shall be collected from each homogeneous area that is greater than 5,000 SF.

Thermal system insulation - An accredited inspector shall collect the samples as follows:

(1) At least three bulk samples, in a random distributed manner from each homogeneous area of thermal system insulation that is not assumed to be ACM.

(2) Collect at least one bulk sample from each homogeneous area of patched thermal system insulation that is not assumed to be ACM if the patched section is less than 6 linear or square feet.

(3) In a manner sufficient to determine whether the material is ACM or not ACM, collect bulk samples from each insulated mechanical system that is not assumed to be ACM where cement or plaster is used on fittings such as tees, elbows, or valves.

(4) Bulk samples are not required to be collected from any homogeneous area where the accredited inspector has determined that the thermal system insulation is fiberglass, foam glass, rubber, or other non-ACBM.

Miscellaneous material - An accredited inspector shall collect the samples as follows:

(1) In a manner sufficient to determine whether material is ACM or not ACM from each homogeneous area of friable miscellaneous material that is not assumed to be ACM.

Non friable suspected ACBM - An accredited inspector shall collect the samples as follows:

If any homogeneous area of non friable suspected ACBM is not assumed to be ACM, then an accredited inspector shall collect, in a manner sufficient to determine whether the material is ACM or not ACM, bulk samples from the homogeneous are of non friable suspected ACBM that is not assumed to be ACM.

Lead, Cadmium and Chromium Paint Testing of painted surfaces for lead, cadmium and chromium was conducted by collecting bulk paint chip samples from various painted surfaces. The inspection was generally conducted using methodology recommended by the U.S.

Department of Housing and Urban Development (HUD). Modifications were made where appropriate for this project. It is important to note that this inspection was not a comprehensive, surface-by-surface evaluation, but rather a screening inspection of major painted components, which may contain lead, cadmium and chromium.

ANALYTICAL METHODS

Suspect Asbestos-Containing Materials

(ACM)

Suspect ACM samples were analyzed using polarized light microscopy (PLM) and dispersion staining techniques. The analytical method was conducted in accordance with Method EPA-600/M4-82-020 and/or EPA 600/R-93/116. In some cases additional analysis was performed using Transmission Electron Microscopy (TEM) with gravimetric reduction. Analysis was performed by EMSL Analytical, Inc., Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA-LAP, LLC-IHLAP Lab 100194, NYS ELAP 10872, NJ DEP 03036.

Paint Analysis Paint chip samples were analyzed for lead, cadmium and chromium using inductively coupled plasma (ICP) emission spectroscopy (SW-846, 6010C). Analysis was performed by EMSL Analytical, Inc. Cinnaminson, NJ NELAP Certifications: 10896, PA 68-00367, AIHA-LAP, LLC

ELLAP 100194, A2LA 2845.01

SITE DESCRIPTION

Building NH-95 was constructed in the 1950s.

There have been various additions to the building over the years. The building has concrete and structural steel framing with exterior masonry walls, flat built-up roof, and a pile supported crawl space foundation. Interior walls in common areas and hallways are CMU block and gypsum wallboard in Ops spaces. Flooring is mostly vinyl floor tile in common areas and hallways. Ops spaces have carpeted floors and raised floors over vinyl floor tile. Acoustic drop ceilings are found throughout the building.

FIRE PROTECTION REPAIRS, BLDG. NH95 GER 130-7939 Page 4

PREVIOUS HAZARDOUS MATERIAL REPORTS

The Government did provide a previous asbestos report. The Survey Report dated 10 July 1990 was performed by Harmon Engineering Associates, Inc.

The asbestos results summary page identified the following ACM in building NH95:

1. Vinyl floor tile and mastic

2. Ceiling tile 1’x1’

3. Steam pipe insulation

4. Pipe fittings

5. Pipe lagging

6. Duct insulation.

No lead paint sampling was included in the survey report.

A copy of the previous asbestos survey report is provided in Section 5 of this report.

According to NAVFAC renovations were performed in 2010 in areas 3 and 4 on the first and second floors of the building. Renovations were also performed in area 6 on the first floor. During the renovations, all ACM was removed in these areas.

ASBESTOS BULK SAMPLING AND ANALYSIS

In September, October, and November of 2021, a total of two hundred (200) bulk samples of suspect ACM were collected from NH95 to support the planned renovation project. In January and February of 2022, an additional fourteen (14) bulk samples of suspect ACM were collected. Two (2) additional samples were collected in May of 2022.

Samples were collected by Brian T. Hyde, a Virginia Licensed Asbestos Inspector.

The attached Table 1 is a summary of the sample materials, sample location, and laboratory results.

Laboratory results are contained in Section 2 of this report. Drawings showing the approximate sample locations, are contained in Section 3.

Destructive activities such as breaking into walls, ceilings, or floors were not performed in order to obtain samples. Therefore, if during the demolition process suspect hazardous materials are uncovered, they must be properly addressed.

As the sample results indicate, the following materials were determined to contain asbestos:

1’x1’ Acoustical wall tile 12” tan floor tile/mastic under raised floor Residual floor tile mastic under raised floor 12” white floor tile/mastic Joint compound Tan floor tile/mastic under rubber flooring 12” tan floor tile/mastic (bottom layer) 12” green floor tile/mastic (bottom layer) 12” tan/brown speckled floor tile/mastic Residual acoustical wall tile mastic

(trace) 9” brown floor tile/mastic under raised floor Residual floor tile mastic under raised floor Acoustical wall tile mastic Tan floor tile/mastic (bottom layer) Residual floor tile mastic under carpet Tan floor tile/mastic under carpet 9” grey floor tile/mastic under raised floor 9” green floor tile/mastic under 12” grey floor tile

ASBESTOS DISCUSSION

The EPA defines ACM as any material which contains greater than 1% asbestos by weight. The following categories of ACM were identified in the renovation areas in Building NH95:

Friable ACM Acoustical wall tile - (Tile 2%-3% Amosite)

Located in rooms A237C, A237D, 240 and 1126. This material may exist behind gypsum walls in other spaces throughout the building.

This material was previously identified in the 1990 survey report. (see photograph on page 427 of report attached in section 5) This material is classified as Friable ACM and was in good condition at the time of the survey.

Non-Friable ACM 12” tan floor tile/mastic under raised floor - (Tile 2%-4% Chrysotile, Mastic 5%-7%

FIRE PROTECTION REPAIRS, BLDG. NH95 GER 130-7939 Page 5

Chrysotile) Located in room A237D. This material is assumed to exist under raised floors in other spaces throughout the building. This material is classified as Category I Non Friable ACM and was in good condition at the time of the survey.

Residual floor tile mastic under raised floor - (6%-8% Chrysotile) Located in room 251 and room 1115. This material is assumed to exist under raised floors in other spaces throughout the building. This material is classified as Category I Non Friable ACM and was in good condition at the time of the survey.

12” white floor tile/mastic - (Mastic 5%-7% Chrysotile) Located in hallways on second floor of the building. This material is classified as Category I Non Friable ACM and was in good condition at the time of the survey.

Joint compound - (3% Chrysotile) Located in hallway on first floor of the building. This material is classified as Category II Non Friable ACM and was in good condition at the time of the survey.

Tan floor tile/mastic under rubber flooring - (Tile 8% Chrysotile, Mastic 5% Chrysotile) Located in hallways on first floor of the building. This material is assumed to exist under rubber flooring throughout hallways in the building. This material is classified as Category I Non Friable ACM and was in good condition at the time of the survey.

12” tan floor tile/mastic (bottom layer) - (Tile 4%-5% Chrysotile, Mastic 3%-5% Chrysotile) Located in hallways on first floor of the building. This material is classified as Category I Non Friable ACM and was in good condition at the time of the survey.

12” green floor tile/mastic (bottom layer)

- (Tile 3%-5% Chrysotile, Mastic 5% Chrysotile) Located in hallways on first floor of the building. This material is classified as Category I Non Friable ACM and was in good condition at the time of the survey.

12” tan/brown speckled floor tile/mastic)

- (Mastic 2%-5% Chrysotile) Located in hallways on first floor of the building. This material is classified as Category I Non Friable

ACM and was in good condition at the time of the survey.

Residual acoustic wall tile mastic - (<1%-3% Chrysotile) Located in room 240.

This material may exist behind gypsum walls in other spaces throughout the building. This material is classified as Category I Non Friable ACM and was in good condition at the time of the survey.

9” brown floor tile/mastic under raised floor - (Tile 4% Chrysotile, Mastic 4% Chrysotile) Located in room 218. This material is assumed to exist under raised floors in other spaces throughout the building. This material is classified as Category I Non Friable ACM and was in good condition at the time of the survey.

Residual floor tile mastic under carpet - (4% Chrysotile) Located in room 1214 and hallways on second floor of the building. This material is assumed to exist under carpeted spaces and hallways throughout the building.

This material is classified as Category I Non Friable ACM and was in good condition at the time of the survey.

Tan floor tile/mastic under carpet - (Tile 4% Chrysotile, Mastic 5% Chrysotile) Located in hallways on second floor of the building. This material is assumed to exist under carpeted spaces and hallways throughout the building.

This material is classified as Category I Non Friable ACM and was in good condition at the time of the survey.

9” grey floor tile/mastic under raised flooring - (Tile 5%-6% Chrysotile) Located in room A125. This material is assumed to exist under raised floors in other spaces throughout the building. This material is classified as Category I Non Friable ACM and was in good condition at the time of the survey.

9” green floor tile/mastic (bottom layer) - (Tile 2% Chrysotile) Located in room A151.

This material is under 12” grey floor tile. This material is classified as Category I Non Friable ACM and was in good condition at the time of the survey.

Assumed ACM Fire Doors - The doors in the building were not destructively sampled for ACM for safety

FIRE PROTECTION REPAIRS, BLDG. NH95 GER 130-7939 Page 6 reasons. Therefore, all doors to be removed are classified as ACM. All doors should be inspected prior to disposal.

The following asbestos-containing materials are anticipated to be disturbed or removed during the fire protection repairs:

1. ACM floor tile under Non ACM flooring to include carpet, rubber flooring and tile in found in common areas and corridors. (Estimated quantity to be disturbed - 16,050 SF)

3. Cove base/mastic containing asbestos joint compound found on gypsum walls in corridors.

(Estimated quantity to be disturbed - 2,500 LF)

3. ACM floor tile & residual mastic under raised under raised flooring in OPS spaces. This material is not anticipated to be disturbed during the fire protection work.

4. ACM fire doors (assumed) found in corridors and common areas. (Estimated quantity to be disturbed - 21 Each) All Asbestos-Containing Materials must be removed prior disturbance due to renovation. Therefore the acoustical wall tile and mastic, floor tile and mastic, and fire doors must be removed by a Virginia licensed asbestos abatement contractor prior to disturbance due to renovation.

All asbestos abatement work, if required, shall be performed in accordance with local, Djibouti and US Federal regulations including but not limited to:

29CFR1926.1101 - Asbestos 40CFR61 - National Emission Standards for Hazardous Air Pollutants 9VAC 20-81 - Virginia Solid Waste Management Regulations 18VAC 15-20 - Virginia Asbestos Licensing Regulations

PAINT SAMPLING AND ANALYSIS

In October of 2021, a total of nine (9) paint chip samples were collected to support the planned renovation project. The paint samples were collected from representative paints observed in the project area and expected to be disturbed during the project. The attached Table 3 summarizes the samples collected and the laboratory analytical results. The laboratory analytical results are contained in Section 2. The purpose of our sampling was to obtain representative data on the concentrations of lead, cadmium and chromium in the existing painted surfaces scheduled to be disturbed by the work.

Our inspection services were not intended to meet the requirements of HUD sampling protocols for lead containing paint. Paint samples were analyzed using inductively coupled plasma emission spectroscopy (ICP). The analytical method was conducted in accordance with the NIOSH 7082 Method by Analytics Corporation, a National Lead Laboratory Accreditation Program (NLLAP) approved participant.

PAINT DISCUSSION

There are two frequently used standards to define lead-based paint, the Consumer Product and Safety Commission (CPSC) and the Department of Housing and Urban Development (HUD). In 1978, the CPSC, acting under the authority of the Consumer Product Safety Act, banned the sale of paint containing more than 0.06% lead by weight to consumers. The Consumer Product Safety Improvement Act of 2008 lowered the concentration of lead in paint that is permissible from 0.06% (600 ppm) to the new limit of 0.009% (90ppm), for specific paints and products. Paint which contains more than 0.009% lead by weight is defined as lead containing paint (LCP).

The Department of Housing and Urban Development (HUD) defines Lead-based paint (LBP) as any paint, varnish, shellac, or other coating that contains lead equal to or greater than

1.0 mg/cm2 as measured by X-ray fluorescence (XRF) analyzer or laboratory analysis, or 0.5% by weight as measured by laboratory analysis.

The Occupational Safety and Health Administration (OSHA) Lead in Construction Standard (29 CFR 1926.62) does not define lead-based paint.

However, to comply with OSHA, all painted surfaces with a lead concentration at or above the laboratory’s reporting limit (RL) should be considered lead containing.

Compliance with this standard is required even for paints with less than 0.5% or 0.009% lead by weight. Therefore, painted surfaces exceeding the MDL should not be disturbed without taking the appropriate precautions when performing certain

FIRE PROTECTION REPAIRS, BLDG. NH95 GER 130-7939 Page 7 high risk tasks. Activities such as scraping, sanding, welding/torching and disturbance of painted surfaces could potentially release leaded dust. OSHA has categorized the following high risks tasks into three groups:

Group 1: manual demolition manual scraping heat-gun applications power tool cleaning with dust collection system spray paint with lead-based paints

Group 2: lead burning using lead-containing mortar power tool cleaning without dust collection system rivet blasting cleanup activities where dry expendable abrasives are used movement and removal of abrasive blasting enclosures

Group 3: abrasive blasting welding, cutting and burning on steel structures

Analytical results for lead paint indicate that eight out of nine samples collected and analyzed resulted in a lead concentration above the RL. One paint sample was determined to be Lead Based Paint (LBP).

Therefore, all existing painted surfaces in the project area scheduled for renovation/demolition should be considered lead containing for the purposes of complying with 29 CFR 1926.62 in order to protect workers and the environment.

Paints containing cadmium and chromium are often found as protective coatings on structural steel or exterior coatings on metal surfaces. These paints tend to be red, yellow or orange and are typically the first layer. All of the bulk paint chip samples collected were also tested for cadmium and chromium.

Analytical results for cadmium indicate that one out of nine samples collected and analyzed resulted in a concentration above the RL.

Analytical results for chromium indicate that eight out of nine samples collected and analyzed resulted in a concentration above the RL.

The National Institute for Occupational Safety and Health (NIOSH) identifies chromium as a confirmed carcinogen and cadmium as a suspect carcinogen.

Construction Standards established by OSHA for lead, cadmium and chromium are:

Lead 29 CFR 1926.62 Cadmium 29 CFR 1926.1127 Chromium 29 CRF 1926.1126

The permissible exposure limits (PEL) established by OSHA are 5 ug/m3 for cadmium, 5 ug/m3 for chromium (chromates) and 50 ug/m3 for lead.

The PEL is an airborne measurement to address worker exposure. There is no direct correlation between lead, cadmium, and chromium concentrations in paint and worker exposure. Only when these concentrations are below the laboratory’s MDL, is worker exposure not an issue.

All painted surfaces should be assumed to be lead, cadmium and chromium containing for renovation purposes. Appropriate precautions should be taken during the disturbance of all painted surfaces to ensure protection of workers and the environment.

All lead, cadmium and chromium paint work shall be performed in accordance with all local, Djibouti and US Federal regulations to protect workers and the environment, including but not limited to:

29CFR 1926.62 - Lead 29CFR 1926.1126 - Chromium 29CFR 1926.1127 - Cadmium 9VAC 20-60 - Virginia Hazardous Waste Management Regulations 9VAC 20-81 - Virginia Solid Waste Management Regulations 18VAC 15-30 - Virginia Lead-Based Paint Activity Regulations

WASTE CLASSIFICATION FOR PAINTED

BUILDING COMPONENTS

Building components and demolition waste streams which are painted must be properly characterized prior to disposal. The EPA Resource Conservation and Recovery Act (RCRA) regulations establish the limits for RCRA leachable metals (lead, cadmium, chromium, etc.). Leachable metals means the

FIRE PROTECTION REPAIRS, BLDG. NH95 GER 130-7939 Page 8 amount of metals likely to leach from the waste into the surrounding soil/groundwater system of a landfill. The leachable concentration of chemicals in a waste stream is determined by an analytical method called the toxicity characteristic leaching procedure (TCLP). Waste stream TCLP concentrations that equal or exceed the RCRA limits must be transported to a hazardous waste treatment, storage, or disposal facility. Precautions should be implemented to prevent the storage of any hazardous waste for more the 90 days. Specific permits are necessary to store hazardous waste in excess of 90 days.

POLYCHLORINATED BIPHENYLS (PCBS) &

MERCURY LAMPS

On January 1, 1979, the Environmental Protection Agency (EPA) banned the manufacturing of light ballasts which contain PCB’s and phased out most PCB uses. Therefore, all light ballasts manufactured prior to January 1, 1979 without “Non-PCB” markings must be considered PCB containing. The EPA’s actions subjects all substances containing more than 50 ppm PCBs to regulatory control (with the exception of PCB-contaminated waste oil which is prohibited at any level).

Our field investigation of existing light fixtures indicated that the fixtures were newer T-8 fluorescent fixtures with electronic ballasts or LED light fixtures which do not contain ballast.

All ballast are assumed to be non PCB containing.

All fluorescent light tubes should be considered to be mercury containing and disposed of as universal waste.

Our estimate for handling incidential PCB containing ballasts and mercury tubes that may become damaged is 1,000 light tubes and 50 PCB ballasts.

PCBs must be managed and disposed of in accordance with the Toxic Substance Control Act of 1976 (TSCA) and any applicable state and local regulations. Contractors managing PCB waste should be properly trained and licensed or certified as required by Federal, state and local regulations.

All PCB and mercury work shall be performed in accordance with all local and US Federal regulations to protect workers and the environment, including but not limited to:

40CFR761 - Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution In Commerce, and Use Prohibitions 40CFR273 - Standards for Universal Waste Management

LIMITATIONS

This report has been prepared for the exclusive use of Dills Architects and/or their agents. This service was performed in accordance with generally accepted environmental practices. No other warranty, expressed or implied, is made. Our conclusions and recommendations are based, in part, upon information provided to us by others and our site observations. We have not verified the completeness or accuracy of the information provided by others, unless otherwise noted. Our observations and recommendations are based upon conditions readily visible at the time of our site visit, and upon current industry standards. During our inspection, accessible areas were visually inspected. The findings at these locations are assumed to be representative throughout the impacted areas of the building. Inaccessible areas were not visually inspected. Areas inspected for the above-referenced materials were limited to those designated by the client. The inspection did include the entire building and was limited to the areas described in the report.

Under this scope of services, GER assumes no responsibility regarding response actions (e.g. O&M Plans, Remediation, Notifications, etc.) initiated as a result of these findings. GER assumes no liability for the duties and responsibilities of the Client with respect to compliance with local, state and Federal regulations. Compliance with regulations and response actions are the sole responsibility of the Client and should be conducted in accordance with local, state and Federal regulations and should be performed by appropriately licensed personnel, as warranted.

FIRE PROTECTION REPAIRS, BLDG. NH95 GER 130-7939 Page 9

SECTION 2

Bulk Sample Results / Laboratory Analysis Sheets

Table 1 - Asbestos Sample Results

Table 2 - Paint Sample Results

NH 95 Fire Protection Ops Center GER 130-7939

NO. SAMPLE LOCATION SAMPLE MATERIAL % & TYPE OF ASBESTOS

1 A237C Residual floor tile mastic under raised floor None detected

2 A237C Residual floor tile mastic under raised floor None detected

3 A237C 2'x2' ceiling tile (crater) None detected

4 A237C 2'x2' ceiling tile (crater) None detected

5 A237C 12" Acoustical wall tile <1% Amosite

6 A237C 12" Acoustical wall tile 2% Amosite

7 A237C Acoustical wall tile mastic None detected

8 A237C Acoustical wall tile mastic None detected

9 A237C Mastic on fiberglass pipe insulation None detected

10 A237C Mastic on fiberglass pipe insulation None detected

11 A237C 12" tan floor tile/mastic None detected

12 A237C 12" tan floor tile/mastic None detected

13 A237D 2'x4' ceiling tile (worm) None detected

14 A237D 2'x4' ceiling tile (worm) None detected

15 A237D 12" Acoustical wall tile <1% Amosite

16 A237D 12" Acoustical wall tile 2% Amosite

17 A237D 12" tan floor tile/mastic under raised floor

Tile 4% Chrysotile, Mastic 7% Chrysotile

18 A237D 12" tan floor tile/mastic under raised floor

Tile 2% Chrysotile, Mastic 5% Chrysotile

19 A238 2'x2' ceiling tile (crater) None detected

20 A241 2'x4' ceiling tile (worm) None detected

21 A237B White duct insulation mastic None detected

22 A237B White duct insulation mastic None detected

23 A237B 2'x2' ceiling tile (pinhole) None detected

24 A237B 2'x2' ceiling tile (pinhole) None detected

Table 1 - Asbestos Bulk Sample Results

Table 1 - Asbestos Bulk Sample Results

25 A236 2'x4' ceiling tile (worm) None detected

26 A236 2'x4' ceiling tile (worm) None detected

27 A247 2'x2' ceiling tile (pinhole) None detected

28 Mechanical Room 12" Acoustical wall tile None detected

29 Mechanical Room 12" Acoustical wall tile None detected

30 2036A 2'x2' ceiling tile (worm) None detected

31 2036 2'x2' ceiling tile (worm) None detected

32 2036 Carpet mastic under raised floor None detected

33 2036 Carpet mastic under raised floor None detected

34 2036 Plaster ceiling above drop ceiling None detected

35 2036 Plaster ceiling above drop ceiling None detected

36 2036 Plaster ceiling above drop ceiling None detected

37 A218 2'x4' ceiling tile (worm) None detected

38 A216 2'x4' ceiling tile (worm) None detected

39 A228 2'x4' ceiling tile (worm) None detected

40 A231B 2'x4' ceiling tile (worm) None detected

41 271 2'x2' ceiling tile (worm) None detected

42 271 Floor stanchion mastic None detected

43 271 Floor stanchion mastic None detected

44 251 2'x2' ceiling tile (crater) None detected

45 251 2'x4' ceiling tile (worm) None detected

46 251 Residual floor tile mastic under raised floor 8% Chrysotile

47 Hallway 2'x2' ceiling tile (crater) None detected

48 Hallway 12" white floor tile/mastic Mastic 5% Chrysotile

Table 1 - Asbestos Bulk Sample Results

49 Hallway 12" white floor tile/mastic Mastic 7% Chrysotile

50 Hallway 4" black base cove/mastic None detected

51 Hallway 4" black base cove/mastic None detected

52 248 2'x4' ceiling tile (crater) None detected

53 248 2'x4' ceiling tile (crater) None detected

54 255 CMU block filler None detected

55 255 CMU block filler None detected

56 265 2'x2' ceiling tile (worm) None detected

57 226 2'x2' ceiling tile (crater) None detected

58 Hallway 2'x2' ceiling tile (worm) None detected

59 156 2'x2' decorative ceiling tile None detected

60 156 2'x2' decorative ceiling tile None detected

61 156 2'x2' ceiling tile (pinhole) None detected

62 156 2'x2' ceiling tile (pinhole) None detected

63 Hallway 12" tan/brown speckled floor tile/mastic None detected

64 Hallway 4" brown base cove/mastic None detected

65 Hallway CMU block filler None detected

66 Hallway CMU block filler None detected

67 Hallway Joint compound None detected

68 Hallway 12" tan/brown speckled floor tile/mastic None detected

69 Hallway 4" brown base cove/mastic None detected

70 Hallway 6" black base cove/mastic None detected

71 Hallway Joint compound 3% Chrysotile

72 Hallway 2'x2' ceiling tile (pinhole) None detected

Table 1 - Asbestos Bulk Sample Results

73 Hallway Tan floor tile/mastic under rubber flooring

Tile 8% Chrysotile, Mastic 5% Chrysotile

74 Hallway 6" black base cove/mastic None detected

75 Hallway 2'x2' ceiling tile (textured) None detected

76 Hallway 2'x2' ceiling tile (textured) None detected

77 Hallway CMU block filler None detected

78 Hallway 12" tan/grey floor tile/mastic (top layer) None detected

79 Hallway 12" floor tile (middle layer) None detected

80 Hallway 12" tan floor tile (bottom layer)

Tile 5% Chrysotile, Mastic 5% Chrysotile

81 Hallway 12" tan/grey floor tile/mastic (top layer) None detected

82 Hallway 12" tan floor tile (bottom layer) Mastic 3% Chrysotile

83 Hallway 2'x2' ceiling tile (worm) None detected

84 Hallway CMU block filler None detected

85 Hallway 2'x4' ceiling tile (worm) None detected

86 Hallway 2'x4' ceiling tile (worm) None detected

87 Hallway 2'x2' ceiling tile (crater) None detected

88 Hallway 12" tan/grey floor tile/mastic (top layer) None detected

89 Hallway 12" green floor tile (bottom layer)

Tile 5% Chrysotile, Mastic 5% Chrysotile

90 Hallway 12" grey white streaked floor tile/mastic (top layer) None detected

91 Hallway 12" green floor tile (bottom layer)

Tile 3% Chrysotile, Mastic 5% Chrysotile

92 Hallway 12" tan speckled floor tile/mastic None detected

93 Hallway 4" black base cove/mastic None detected

94 Hallway 12" tan/brown speckled floor tile/mastic Mastic 2% Chrysotile

95 Hallway 12" white floor tile/mastic None detected

96 Hallway 12" white floor tile/mastic None detected

Table 1 - Asbestos Bulk Sample Results

97 Hallway 2'x2' ceiling tile (worm) None detected

98 Hallway 4" black base cove/mastic None detected

99 Hallway 6" black base cove/mastic None detected

100 Men's room Sink mastic undercoat None detected

101 208 2'x2' ceiling tile (worm) None detected

102 208 Black duct insulation mastic None detected

103 215B 2'x2' ceiling tile (worm) None detected

104 Hallway Black duct insulation mastic None detected

105 240 Residual acoustical wall tile mastic <1% Chrysotile

106 226 2'x2' ceiling tile (crater) None detected

107 226 Drywall None detected

108 226 Drywall None detected

109 226A White duct insulation mastic None detected

110 232 White duct insulation mastic None detected

111 Hallway 2'x2' ceiling tile (crater) None detected

112 218 9" brown floor tile/mastic under raised floor

Tile 4% Chrysotile, Mastic 4% Chrysotile

113 268 2'x2' ceiling tile (worm) None detected

114 1237 2'x4' ceiling tile (worm) None detected

115 1235 2'x4' ceiling tile (worm) None detected

116 1231 Joint compound None detected

117 1231 Drywall None detected

118 1201 2'x2' ceiling tile (worm) None detected

119 Hallway 2'x2' ceiling tile (worm) None detected

120 Hallway Drywall None detected

Table 1 - Asbestos Bulk Sample Results

121 1228 2'x2' ceiling tile (worm) None detected

122 1209A Joint compound None detected

123 1239 2'x4' ceiling tile (worm) None detected

124 1152A Drywall ceiling None detected

125 1152A Drywall ceiling None detected

126 158A CMU block filler None detected

127 1152A CMU block filler None detected

128 1148 Drywall ceiling None detected

129 1150 Drywall ceiling None detected

130 028A Plaster ceiling above drop ceiling None detected

131 028A Plaster ceiling above drop ceiling None detected

132 1115 2'x2' ceiling tile (crater) None detected

133 1115 Fiberboard flooring under raised floor None detected

134 1115 Fiberboard flooring under raised floor None detected

135 1115 Residual floor tile mastic under raised floor 6% Chrysotile

136 1169 Acoustical wall tile mastic None detected

137 1169 Acoustical wall tile mastic None detected

138 202 Drywall None detected

139 202 Joint compound None detected

140 205 12" Acoustical wall tile None detected

141 1245 2'x2' ceiling tile (crater) None detected

142 1258 2'x2' ceiling tile (crater) None detected

143 1255 Drywall None detected

144 1255 Joint compound None detected

Table 1 - Asbestos Bulk Sample Results

145 1260B 2'x2' ceiling tile (crater) None detected

146 1257 Joint compound None detected

147 1256 2'x2' ceiling tile (worm) None detected

148 1240 2'x4' ceiling tile (worm) None detected

149 1128 Plaster wall None detected

150 1116 Plaster wall None detected

151 1137 2'x2' ceiling tile (worm) None detected

152 1125 2'x2' ceiling tile (pinhole) None detected

153 1125 Drywall None detected

154 1135 2'x2' ceiling tile (pinhole) None detected

155 1453 Drywall None detected

156 170A Drywall None detected

157 1126 Acoustical wall tile/mastic Tile 3% Amosite

158 1126 Acoustical wall tile/mastic Tile 3% Amosite

159 2030 Plaster ceiling None detected

160 2030 Plaster ceiling None detected

161 Hallway 12" tan/brown speckled floor tile/mastic None detected

162 Hallway 4" brown base cove/mastic None detected

163 Hallway 9" tan floor tile/mastic under rubber flooring None detected

164 Men's room CMU block filler None detected

165 Men's room Plaster ceiling above drop ceiling None detected

166 Men's room Plaster ceiling above drop ceiling None detected

167 Hallway 6" black base cove/mastic None detected

168 Hallway 12" tan speckled floor tile/mastic (top layer) None detected

Table 1 - Asbestos Bulk Sample Results

169 Hallway Tan floor tile/mastic (bottom layer)

Tile 4% Chrysotile, Mastic 5% Chrysotile

170 Hallway 6" black base cove/mastic None detected

171 Hallway Joint compound None detected

172 Hallway 2'x2' ceiling tile (pinhole) None detected

173 Hallway Residual floor tile mastic under carpet 4% Chrysotile

174 Hallway 4" brown base cove/mastic None detected

175 1214 Residual floor tile mastic under carpet 4% Chrysotile

176 Hallway Drywall None detected

177 Hallway Black floor tile/leveler under carpet None detected

178 Hallway Tan floor tile/mastic under carpet

Tile 4% Chrysotile, Mastic 4% Chrysotile

179 Hallway 2'x2' ceiling tile (crater) None detected

180 Hallway CMU block filler None detected

181 Hallway 12" tan/brown speckled floor tile/mastic Mastic 5% Chrysotile

182 Hallway 4" blue base cove/mastic None detected

183 Hallway 2'x2' ceiling tile (pinhole) None detected

184 Hallway 4" blue base cove/mastic None detected

185 Men's room Plaster ceiling above drop ceiling None detected

186 Men's room Plaster ceiling above drop ceiling None detected

187 1175 2'x2' ceiling tile (pinhole) None detected

188 1169 Drywall None detected

189 1175 Joint compound None detected

190 2026 2'x2' ceiling tile (worm) None detected

191 2035E Joint compound None detected

192 2036G Drywall None detected

Table 1 - Asbestos Bulk Sample Results

193 2036D 2'x2' ceiling tile (pinhole) None detected

194 2036B 2'x2' ceiling tile (textured) None detected

195 Men's room Plaster ceiling above drop ceiling None detected

196 1229 2'x2' ceiling tile (worm) None detected

197 230A 2'x4' ceiling tile (worm) None detected

198 1218B Joint compound None detected

199 1220 2'x2' ceiling tile (crater) None detected

200 A226 CMU block filler None detected

201 A141 Plaster Wall None detected

202 A141 Joint compound None detected

203 A125 9" grey floor tile/mastic under raised floor Tile 5% Chrysotile

204 A125 9" grey floor tile/mastic under raised floor Tile 6% Chrysotile

205 A151 9" green floor tile/mastic under 12" grey floor tile Green Tile 2% Chrysotile

206 A151 9" green floor tile/mastic under 12" grey floor tile Green Tile 2% Chrysotile

207 44 Drywall None detected

208 44 Joint compound None detected

209 122 Drywall None detected

210 122 2'x2' SACT Pinhole None detected

211 144 12" acoustical ceiling tile None detected

212 144 12" acoustical ceiling tile None detected

213 128 Acoustical ceiling tile mastic None detected

214 128 Acoustical ceiling tile mastic None detected

215 Stairwell Mastic under stair tread None detected

216 Stairwell Mastic under stair tread None detected

NO. SAMPLE LOCATION SAMPLE MATERIAL

LEAD

CHROMIUM

CADMIUM

P1 A237D, Door frame Tan paint 0.43 0.072 <0.00046

P2 A247, Roof joist Black paint 0.01 0.01 <0.00046

P3 A247, Concrete wall Blue paint <0.00031 <0.00031 <0.00031

P4 Hallway, CMU wall White paint 0.0065 0.00033 <0.00018

P5 Men's bathroom, concrete wall White paint 0.0026 0.00077 <0.00019

P6 226, Structural steel beam Red paint 9.2 0.011 0.0018

P7 1201, Concrete roof deck White paint 0.022 0.00028 <0.00016

P8 1259, Sprinkler pipe Red paint 0.04 0.23 <0.0016

P9 Men's bathroom, concrete wall Tan paint 0.16 0.0068 <0.00019

BOLD results indicate the sample is Lead Based Paint (LBP).

All YELLOW HIGHLIGHTED samples exceed the laboratory reporting limit (RL).

Table 2 - Paint Sample Results

OrderID: 412109332

OrderID: 412109333

OrderID: 412110311

OrderID: 412110587

OrderID: 412111346

EMSL Analytical, Inc.

10801 Southern Loop Blvd Pineville, NC 28134

Tel/Fax: (704) 525-2205 / (704) 525-2382 http://www.EMSL.com / charlottelab@emsl.com

412200967EMSL Order:

Customer ID: GEOE25

Customer PO: NH-95

Project ID:

Attention: Phone:Wyatt Pine (757) 463-3200

Fax:GeoEnvironmental Resources (757) 463-3080

Received Date:2712 Southern Blvd. 01/31/2022 9:15 AM

Analysis Date:Suite 101 02/01/2022

Collected Date:Virginia Beach, VA 23452 01/26/2022

Project: NH-95 / Fire Protection Ops Center

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

201-White Coat

412200967-0001

None DetectedCa Carbonate

Non-fibrous (Other)

15%

85%

White

Non-Fibrous

Homogeneous

A141 - Plaster Wall

201-Gray Coat

412200967-0001A

None DetectedQuartz

Non-fibrous (Other)

25%

75%

Gray

Non-Fibrous

Homogeneous

A141 - Plaster Wall

412200967-0002

None DetectedCa Carbonate

Non-fibrous (Other)

35%

65%

White

Non-Fibrous

Homogeneous

A141 - Joint

Compound

203-Floor Tile

412200967-0003

5% ChrysotileNon-fibrous (Other)95%Gray

Non-Fibrous

Homogeneous

A125 - Grey 9" FT &

M

203-Mastic

412200967-0003A

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

A125 - Grey 9" FT &

M

204-Floor Tile

412200967-0004

6% ChrysotileNon-fibrous (Other)94%Gray

Non-Fibrous

Homogeneous

A125 - Grey 9" FT &

M

204-Mastic

412200967-0004A

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

A125 - Grey 9" FT &

M

205-Gray Floor Tile

412200967-0005

None DetectedCa Carbonate

Non-fibrous (Other)

25%

75%

Gray

Non-Fibrous

Homogeneous

A151 - Grey 12" FT &

M

205-Mastic

412200967-0005A

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

A151 - Grey 12" FT &

M

205-Green Floor Tile

412200967-0005B

2% ChrysotileNon-fibrous (Other)98%Green

Non-Fibrous

Homogeneous

A151 - Grey 12" FT &

M

205-Mastic

412200967-0005C

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

A151 - Grey 12" FT &

M

206-Gray Floor Tile

412200967-0006

None DetectedCa Carbonate

Non-fibrous (Other)

30%

70%

Gray

Non-Fibrous

Homogeneous

A151 - Grey 12" FT &

M

206-Mastic

412200967-0006A

None DetectedCa Carbonate

Non-fibrous (Other)

5%

95%

Tan

Non-Fibrous

Homogeneous

A151 - Grey 12" FT &

M

206-Green Floor Tile

412200967-0006B

2% ChrysotileCa Carbonate

Non-fibrous (Other)

40%

58%

Green

Non-Fibrous

Homogeneous

A151 - Grey 12" FT &

M

206-Mastic

412200967-0006C

None DetectedNon-fibrous (Other)100%Cellulose<1%Tan

Non-Fibrous

Homogeneous

A151 - Grey 12" FT &

M

206-Leveler

412200967-0006D

None DetectedCa Carbonate

Non-fibrous (Other)

5%

95%

Gray

Non-Fibrous

Homogeneous

A151 - Grey 12" FT &

M

Initial report from: 02/01/2022 14:25:15

Page 1 of 2ASB_PLM_0008_0001 - 1.78 Printed: 2/1/2022 2:25 PM

Tel/Fax: (704) 525-2205 / (704) 525-2382 http://www.EMSL.com / charlottelab@emsl.com

412200967EMSL Order:

Customer ID: GEOE25

Customer PO: NH-95

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

412200967-0007

None DetectedNon-fibrous (Other)95%Cellulose5%Gray

Non-Fibrous

Homogeneous

44 - Drywall

412200967-0008

None DetectedCa Carbonate

Non-fibrous (Other)

35%

65%

White

Non-Fibrous

Homogeneous

44 - Joint Compound

412200967-0009

None DetectedNon-fibrous (Other)95%Cellulose5%Gray

Non-Fibrous

Homogeneous

122 - Drywall

412200967-0010

None DetectedPerlite

Non-fibrous (Other)

15%

10%

Cellulose

Min. Wool

60%

15%

Gray

Non-Fibrous

Homogeneous

122 - 2'x2' SACT

Pinhole

Analyst(s)

Brant Alyea (13)

Sarah Breneman (7)

Lee Plumley, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non- friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis . Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. Pineville, NC NVLAP Lab Code 200841-0, VA 3333 00312

Initial report from: 02/01/2022 14:25:15

Page 2 of 2ASB_PLM_0008_0001 - 1.78 Printed: 2/1/2022 2:25 PM

OrderID: 412200967

Tel/Fax: (704) 525-2205 / (704) 525-2382 http://www.EMSL.com / charlottelab@emsl.com

412201831EMSL Order:

Customer ID: GEOE25

Customer PO: 130-7939

Project ID:

Attention: Phone:Brian Hyde (757) 463-3200

Fax:GeoEnvironmental Resources (757) 463-3080

Received Date:2712 Southern Blvd. 02/18/2022 10:20 AM

Analysis Date:Suite 101 02/21/2022 - 02/22/2022

Collected Date:Virginia Beach, VA 23452 02/09/2022

Project: 130-7939

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

412201831-0001

None DetectedNon-fibrous (Other)10%Min. Wool90%Gray/White

Non-Fibrous

Homogeneous

Rm 144 - 12"

Acoustical Ceiling Tile

412201831-0002

None DetectedNon-fibrous (Other)10%Min. Wool90%Gray

Fibrous

Homogeneous

Rm 144 - 12"

Acoustical Ceiling Tile

412201831-0003

None DetectedNon-fibrous (Other)98%Min. Wool2%Brown

Non-Fibrous

Homogeneous

Rm 128 - Acoustical

Tile Mastic

412201831-0004

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Rm 128 - Acoustical

Tile Mastic

Analyst(s)

Ashley Hill (2)

Madeline Baldelli (2)

Lee Plumley, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government.