Project Number: P1066Project Title: H-53K Gearbox Facility
FY:2023
Date: 14-APR-21
UIC: M00146
Location: CHERRY POINT MCAS, NORTH CAROLINA
Prepared By:
Cover Sheet/Team List for:
MCAS CHERRY POINT NC
Completed: Working:XA. Team Check List:
B. Team Meeting:
X
20 -22 January 2021
On-Site:
Date:
VTC: Conference Call:
Name Position Command Phone Number Alisa Parker
Allen Mcdonald
Amy Ballard
Angela Jones
Bimal Shrestha
Brian A. Turner
Brian Snyder
Bruce Spiro
Chase Beshore
Christopher T. Aebel
Courtney Barrett
Damion Deringer
John Noel
Justin Urquhart
Lara Patton
Lewis Hutchins
Marshall Crow
Melodi E. Terhune
Mingfan Li
Peter Allen
Ralph Foster
Richard B. Alpert
Ron T. Keller
Sam Estep
Thomas Dalton
Tracy Spellman Powell
William Castelvecchi
Mechanical
Project Manager
Civil
Environ. Specialist
Design Manager/Struct.
Mechanical
Project Manager
Geotechnical
Senior Architect
Civil
Civil
Cost Estimating
Cost Engineer
Electrical
Geotechnical
Civil
Architecture
Interior Design
Architecture
Structural
Fire Protection
Fire Protection
Electrical
Managing Principal
Landscape
Project Manager
Mechanical
NAVFAC MIDLANT
NAVFAC MIDLANT
NAVFAC MIDLANT
NAVFAC MIDLANT
NAVFAC MIDLANT
Clark Nexsen
Clark Nexsen
GET Solutions Inc.
Clark Nexsen
Clark Nexsen
Clark Nexsen
Crawford
Consulting
NAVFAC MIDLANT
NAVFAC MIDLANT
NAVFAC MIDLANT
Clark Nexsen
NAVFAC MIDLANT
Clark Nexsen
Clark Nexsen
Clark Nexsen
NAVFAC MIDLANT
Clark Nexsen
Clark Nexsen
Clark Nexsen
Clark Nexsen
FRC East
Clark Nexsen
757-341-2072
757-642-7561
757-589-4863
757 510-2983
757-341-0339
757-961-7991
757-961-7778
757-518-1703
757-961-7707
757-351-1176
757-961-7715
412-823-0400 x253
757-937-2804
757-341-0356
517-518-0691
757-961-7750
757-341-0343
757-961-7748
757-961-7725
757-961-7878
803-528-1373
757-351-1201
757-351-1201
757-961-7892
757-961-7939
252-464-5018
757-961-7783
C. Team Members:
MILCON CHECKLIST
Economic Analysis
Site Plan
Facility Planning Document(s)/P-80
Calculations
R19 (Bachelor Housing Survey)
Notice of Violation (NOV)
Other
X
X
X
X
E. Required Attachments:D. Remarks:
37020
Project Cost ($000)
Project Number: P1066Project Title: H-53K Gearbox Facility
FY:2023
Date: 14-APR-21
UIC: M00146
Location: CHERRY POINT MCAS, NORTH CAROLINA
Prepared By:
Cover Sheet/Team List for:
MCAS CHERRY POINT NC
Brooks Gould
Eric Allen
NAVFAC Cost Engineer
NAVFAC FEC CIBL / Chief Engineer
14-APR-21
14-APR-21
Signature Position Date F. Sign Offs:
PHOTOGRAPHS
BFR_P1066_POM23_20210330.pdf
EQUIP LIST_P1066_POM23_20210330.pdf
I_CEBKUP_P1066_POM23_20210330.pdf
15 Design_P1066_POM23_20210330.pdf
ENV_P1066_POM23_20210225.pdf
REQT STUDY_P1066_POM23_20210330.pdf
FY23_P1066_CSRA_Program Final.pdf
PRI#2_Checklist_P1066_POM23_2021033
0.pdf
X
X
X
X
X
X
X
X
E. Required Attachments:
Comments:
Comments: None
FY 23 Program--Cost Certified by Brooks Taylor Gould on 04/14/2021 at
$37.20M
3. Installation(SA) and Location/UIC:
MILITARY CONSTRUCTION PROGRAM
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 1DD Form
1 Dec 76
8. Project Cost ($000)
14 APR 2021
37,02021134
H-53K Gearbox Facility
NAVY
2023FY
M00146(CP)
MCAS CHERRY POINT NC
CHERRY POINT MCAS, NORTH CAROLINA
P1066
(CHERRY POINT NA DEPOT)
Level: CERTIFIED_FINAL Draft: POM23 19-APR-21
Project Details ID: 199277
H-53K GEARBOX REPAIR &
TEST FACILITY
7,071.88 2938 m2 2938 m2 1.0000 7,071.88
Cat
Code
OSD
Guid.
Guid.
Cost
Guid.
Size
Project
Scope
Size
Fctr
Area
Cost
Fctr Unit Cost
Guidance Unit Cost Analysis
9. COST ESTIMATES
Item UM Quantity Unit Cost Cost($000)
H-53K GEARBOX FACILITY (31,624SF)
H-53K GEARBOX REPAIR & TEST FACILITY
CC21134 (31,624SF)
CYBERSECURITY FEATURES
BUILT-IN EQUIPMENT
SPECIAL COSTS
OPERATION & MAINTENANCE SUPP INFO (OMSI)
SUPPORTING FACILITIES
SPECIAL CONSTRUCTION FEATURES
SITE PREPARATIONS
SPECIAL FOUNDATION FEATURES
PAVING AND SITE IMPROVEMENTS
ELECTRICAL UTILITIES
MECHANICAL UTILITIES
SUBTOTAL
CONTINGENCY (5%)
TOTAL CONTRACT COST
SIOH (5.7%)
SUBTOTAL
TOTAL REQUEST ROUNDED
TOTAL REQUEST
EQUIPMENT FROM OTHER APPROPRIATIONS (NON ADD)
m2 m2
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
2,938
2,938 7,071.88
26,470
(20,780)
(250)
(4,170)
(880)
(390)
6,880
(220)
(1,070)
(790)
(1,180)
(1,920)
(1,700)
33,350
1,670
35,020
2,000
37,020
37,020
37,020
(36,941)
A cost estimate was developed for the project by Crawford Consulting Services in February
2021. The estimate was prepared in MII Version 4.4 from Costbook line items and common assemblies and escalated to the midpoint of construction (Dec 2023). Cost sources were the
2016 Costbook for materials and equipment and current Davis Bacon rates in Norfolk, VA for labor. Escalation was applied from base year January 2016 (5175) to Oct. 2024 (6591)
The estimate for this project is considered a Class 4 estimate as defined by AACE 56R-08
Cost Estimate Classification System. This determination is based on the maturity of the design deliverables at this time.
1.000 1.000000000
Esc. Factor
Room
Size
Fctr
21134
Facility
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 2DD Form
1 Dec 76 1391C
8. Project Cost ($000)
14 APR 2021
37,02021134
H-53K Gearbox Facility
NAVY
2023FY
M00146(CP)
MCAS CHERRY POINT NC
CHERRY POINT MCAS, NORTH CAROLINA
P1066
(CHERRY POINT NA DEPOT)
Level: CERTIFIED_FINAL Draft: POM23 19-APR-21
Project Details ID: 199277
Constructs a H-53K Gearbox Repair and Test Facility consisting of a single story high bay building. Construction shall be reinforced masonry walls and steel columns supporting a steel frame, and standing seam metal roof. A deep foundation system is included to support the building superstructure.
This facility will include a disassembly area, parts kitting area, production control/clean parts area, assembly area for the main rotor gearbox, assembly area for the intermediate, nose, and tail rotor gearboxes, flushing room and integrated quality team area, main rotor gearbox test cell, nose gearbox test cell, and tail rotor/intermediate gearbox test cell. Sound attenuation will be provided in the test cells.
Facility-related control systems include cybersecurity features in accordance with current
Department of Defense criteria.
This project will provide Antiterrorism (AT) features and comply with applicable service and Geographic Combatant Commander policies and directive per UFC 4-010-01 DoD Minimum
Antiterrorism Standards for Buildings.
Built-in equipment includes air compressors, overhead bridge cranes (5-ton) to support the main gearbox maintenance, and overhead bridge cranes (2-ton) to support the nose and intermediate gearbox maintenance.
Special costs include Post Construction Contract Award Services (PCAS) and cybersecurity commissioning. The cybersecurity commissioning cost is to cover the contractor's submittals, administrative actions and compliance with the Department of the Navy's (DON) cybersecurity requirements as well as DON's in-house costs to review contractor submittals and to implement steps necessary for obtaining Authority to Operate.
Operations and Maintenance Support Information (OMSI) is included in this project.
Department of Defense and Department of Navy principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development will be included in the design and construction of this project as appropriate.
Special construction features include gearbox test stand isolation foundation.
Site preparation includes clearing, excavation, imported fill, and grading.
Special foundation features include pile foundations.
Paving and site improvements include roadways and parking for approximately 15 building
10. Description of Proposed Construction:
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 3DD Form
1 Dec 76 1391C
8. Project Cost ($000)
14 APR 2021
37,02021134
H-53K Gearbox Facility
NAVY
2023FY
M00146(CP)
MCAS CHERRY POINT NC
CHERRY POINT MCAS, NORTH CAROLINA
P1066
(CHERRY POINT NA DEPOT)
Level: CERTIFIED_FINAL Draft: POM23 19-APR-21
Project Details ID: 199277 users and 10 visitor spaces, site lighting, landscaping, pedestrian paving, screen wall, and security fencing (chain link, 3.3 m high, and 316 m long).
Electrical utilities include a sectionalizing switch, overhead electric, electrical manhole, telecommunications duct bank, electrical duct bank, and a grounding system.
Mechanical utilities include water supply lines, fire protection water supply, sanitary sewer lines, a pump station, and gas distribution piping.
Facilities will be designed to meet or exceed the useful service life specified in DoD
Unified Facility Criteria (UFC). Facilities will incorporate features that provide the lowest practical life cycle cost solutions satisfying the facility requirements with the goal of maximizing energy efficiency.
FACILITY PLANNING DATA:
Category Code Requirement UM Adequate Substandard Inadequate
Deficit/
Surplus 21134 2938 m2DYNAMIC COMPONENTS SHOP
(NAVAIR DEPOT)
This project will construct a 31,627-SF H-53K gearbox repair and test facility and will include a disassembly area, kitting area, production control/clean parts area, assembly area for the main rotor gearbox, assembly area for the intermediate and tail rotor gearboxes, flushing room and integrated quality team area, main rotor gearbox test cell, nose gearbox test cell, and intermediate/tail rotor gearbox test cell.
NOTES:
The H-53K is a New Mission Requirement for which depot-level repair & testing has been designated to the Fleet Readiness Center East (FRC-E) Cherry Point. There are NO EXISTING
FACILITIES that can be used for the H-53K gearbox repair. FRC-East shows a facility deficit of 143,816 SF for Dynamic Component repair and has no other space that can be used. Host station MCAS Cherry Point also has nothing that can be used as an H-53K gearbox repair & test facility.
The special requirements of gearbox repair work include isolation pad foundations approximately 2' thick concrete floors to support test stands and gearboxes with a 40-foot clear height above test stands. The H-53K is a new mission requirement and no other DOD service is capable of Gearbox repair. The Secretary of Defense has designated the H-53K to be a core system under U.S.C. Title 10, which requires that a U.S. government depot be fully capable of depot-level repair and test. The Original Equipment Manufacturer, Sikorsky Aircraft Corp., does not have the capacity to test both new production aircraft gearboxes and the full schedule of depot-level overhauls, making this facility essential to Fleet Readiness.
SCOPE:
11. Requirement: 2938 m2 Adequate: Substandard:
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 4DD Form
1 Dec 76 1391C
8. Project Cost ($000)
14 APR 2021
37,02021134
H-53K Gearbox Facility
NAVY
2023FY
M00146(CP)
MCAS CHERRY POINT NC
CHERRY POINT MCAS, NORTH CAROLINA
P1066
(CHERRY POINT NA DEPOT)
Level: CERTIFIED_FINAL Draft: POM23 19-APR-21
Project Details ID: 199277
Existing facilities are inadequately sized and configured to support H-53K Gearbox overhaul and test requirements and cannot be reconfigured to accommodate the required repairs and testing of jigs and equipment. FRC-East shows a facility deficit of 143,816
SF for Dynamic Component repair and has no other space that can be used. Host station MCAS
Cherry Point also has nothing that can be used as an H-53K gearbox repair & test facility.
Without this facility, FRC-E will not be able to perform the required depot-level maintenance and repairs on the H-53K gearboxes. There will be no facility to accomodate the peculiar support equipment being procured and planned for 2023 delivery. FRC East
Cherry Point will violate Title 10 requirements, and per the 2017 USMC Aviation Plan, CH-
53K fleet transition begins in FY-19. Thus, CH-53K fleet aircraft will have been flying in a deployable status for 7+ years prior to depot stand up; the OEM may not have the capacity to test overhauled gear boxes due to current aircraft production schedules. This will result in USMC squadrons without adequate numbers of mission ready aircraft.
Additionally, the H-53K Fleet will be entirely dependent upon the original equipment manufacturer (OEM) for all gearbox repairs and the OEM cannot be expected to test overhauled gear boxes due to current aircraft production schedules.
Facility of adequate size and configuration to support depot maintenance needs. Organic capability is required in FY23. FRC-E requires up to four years to establish a capability for gearbox repairs and overhaul to construct and outfit this facility, and to stand up training and maintenance programs. A POM23 project start will result in a capability declaration in FY26, three years late for the requirement.
Mission Need Date: 02/05/2026
IMPACT IF NOT PROVIDED:
CURRENT SITUATION:
REQUIREMENT:
ADDITIONAL: Economic Alternatives Considered:
C. Lease:
Renovation alternative is non-viable due to the current SF Deficit at FRCE, and non-availability of facilities at MCAS CP.
B. Renovation/Modernization:
This is a new mission requirement for which the assigned DSOR FRC-E, does not have the facilities available to establish capability on the H-53K Gearbox.
A. Status Quo:
PROJECT:
(New Mission)
Constructs a depot-level H-53K gearbox repair and test facility at Fleet Readiness Center
East (FRC-E) at Marine Corps Air Station (MCAS), Cherry Point, NC. FRC-E is the assigned
DOD Depot Source of Repair (DSOR) for depot level maintenance for H-53K gearbox systems.
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 5DD Form
1 Dec 76 1391C
8. Project Cost ($000)
14 APR 2021
37,02021134
H-53K Gearbox Facility
NAVY
2023FY
M00146(CP)
MCAS CHERRY POINT NC
CHERRY POINT MCAS, NORTH CAROLINA
P1066
(CHERRY POINT NA DEPOT)
Level: CERTIFIED_FINAL Draft: POM23 19-APR-21
Project Details ID: 199277
There are no facilities in the area that meet the unique repair requirement therefore the leasing scenario involves the construction of a contractor-built facility at an off-base site which would meet the Government's requirements for future CH-53K Gearbox Test workload. A contractual agreement would be put in place in which the contractor would then lease the facility back to the government. This is a viable alternative.
The New Construction alternative has a lower total NPV ($29,848,467) as compared to the
Leasing alternative ($55,376,863), and becomes the cheaper alternative (in terms of cumulative NPV) within 16 years of project completion.
F. Analysis Results:
New Construction provides for a H-53K gearbox repair and test facility at MCAS CP that constructs a 31,624-SF repair/overhaul shop and test cells to perform depot-level gearbox maintenance events. This is a viable alternative..
D. New Construction:
Depot Repair at OEM - Use of the OEM, Sikorsky Aircraft Company (SAC) as the sole depot-level repair site for the life of the H-53K is a violation of Public Law U.S.C. Title 10.
The alternative is not in keeping with the intent of Congress to have a ready and controlled source of repair for core-designated platforms. Additionally, the OEM does not have the capacity to test both new production gearboxes and the depot-level overhaul requirement as they are currently maximized in their facilities to meet production schedule for new aircraft and component systems. It was observed by a combined FRC
East/PMA-261 team that SAC is already working two shifts to meet production schedules, and would have to add facilities if they became the sole provider of depot repair. However, assuming the OEM were somehow able to attain the required capacity level to become the sole provider of depot repair, the project team worked with PMA-261 to project the delta in cost per repair between the scenario where depot repairs were performed at FRC-E, and the scenario where they were required to be performed at the OEM. For purposes of establishing a comparison, this analysis assumes repair capability, and required capacity, could be established at the OEM. This is a viable alternative.
E. Other Alternatives:
Issues (If yes, please provide discussion under issue):
Yes No
DDESB, AICUZ, Airfield, EMR, or wetlands
Endangered species/sensitive habitat
12. Supplemental Data:
X 03/2021Yes, obtained date:
No, expected date:
Site Approval:
Site Plan and NEPA approved for current site.
X
X
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 6DD Form
1 Dec 76 1391C
8. Project Cost ($000)
14 APR 2021
37,02021134
H-53K Gearbox Facility
NAVY
2023FY
M00146(CP)
MCAS CHERRY POINT NC
CHERRY POINT MCAS, NORTH CAROLINA
P1066
(CHERRY POINT NA DEPOT)
Level: CERTIFIED_FINAL Draft: POM23 19-APR-21
Project Details ID: 199277
Air quality
Cultural/archeological resources
Clearing of trees
Known contamination at selected site
Operational problems
Traffic patterns impact
Existing utilities upgrade
Ordnance sweep required prior to Construction
Mitigation Issues:
Level of NEPA:
NEPA Documentation:
Project Issues:
Host Nation Approval:
Planning (If no, please provide an explanation):
N/A
National Capital Region Approval: N/A
X
X
X
X
X
X
X
X
X
Yes No
Consistent w/ Master Plan or Base/Regional Dev.
Yes No
Per Marine Corps Air Station Cherry Point Environmental Affairs Division (EAD), a full
Decision Memorandum (DM) and FONSI will be signed only after reviewing project designs. As of this point, a draft DM has been provided to FRC East showing the project is anticipated to have a Categorical Exclusion (CATEX) from further NEPA review.
X Complete
Yes No
NEPA review completed by local MCAS Cherry Point EAD office. Provides this project with a CATEX from further NEPA documentation. Draft DM attached, signed DM being processed by EAD.
X
X
X
X
Categorical Exclusion
Environmental Assessment(EA)
Environmental Impact Statement(EIS)
Memorandum of Negative Decision
Yes No
X
X
X
X
Wetlands replacement/enhancement
Hazardous waste
Contaminated soil/water
Other
Environmental Cleanup: N/A
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 7DD Form
1 Dec 76 1391C
8. Project Cost ($000)
14 APR 2021
37,02021134
H-53K Gearbox Facility
NAVY
2023FY
M00146(CP)
MCAS CHERRY POINT NC
CHERRY POINT MCAS, NORTH CAROLINA
P1066
(CHERRY POINT NA DEPOT)
Level: CERTIFIED_FINAL Draft: POM23 19-APR-21
Project Details ID: 199277
Special Construction Features:
OTHER COSTS (other Primary Facility items)
SPECIAL COSTS
OPERATION & MAINTENANCE SUPP INFO (OMSI)
LS
LS
LS
248,116
880,654
386,253
CYBERSECURITY FEATURES
PCAS
Cybersecurity Commissioning
Mechanical Acceptance
Mechanical Commissioning
OMSI
LS
EA
EA
LS
LS
EA
.01
.005
.015
248,115.82
32,627,716.45
26,055,301.66
95,000.00
329,100.00
25,750,208.10
248,116
326,277
130,277
95,000
329,100
386,253
Item UM Quantity Unit Cost Total Cost
100 HP Air Compressor
5 Ton Ovehead Bridge Crane
2 Ton Overhead Bridge Crane
EA
EA
EA
14.00
3.00
2.00
7,129.60
949,268.21
611,456.65
99,814
2,847,805
1,222,913
BUILT-IN EQUIPMENT LS 4,170,532
BUDGET ESTIMATE SUMMARY SHEET:
Shielding
SCIF
Fencing
IDS
Other Type:
X
Project may require alteration of MCAS Cherry Point perimeter fenceline in newly developed industrial area of installation.
Yes No
X
X
X
X
X
X
X
X
X
X
X
X
System safety
Soils - foundation and seismic conditions
Construction/operational permits
Local air quality/wastewater permits
Complies with Final Governing Standard (Environmental standard for Spain, Italy &
Greece)
Land Acquisition (i.e. location, quantity)
Technical Operating Manuals
Feasibility/Constructibility in FY
Historical Preservation
Does the facility have an overhead crane requirement?
Navy Crane Center contacted to assist with dev. of crane estimate (lifting capacity < 10-tons)?
Navy Crane Center contacted to coord. procurement and timelines (lifting capacity
>= 10-tons)?
Yes No
X Physical Security:
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 8DD Form
1 Dec 76 1391C
8. Project Cost ($000)
14 APR 2021
37,02021134
H-53K Gearbox Facility
NAVY
2023FY
M00146(CP)
MCAS CHERRY POINT NC
CHERRY POINT MCAS, NORTH CAROLINA
P1066
(CHERRY POINT NA DEPOT)
Level: CERTIFIED_FINAL Draft: POM23 19-APR-21
Project Details ID: 199277
A. Estimated Design Data:
1. Status:
2. Basis:
Utilities and Site Improvements:
SPECIAL CONSTRUCTION FEATURES
Gearbox Test Stand Isolation Foundation
SITE PREPARATIONS
Site Clearing
Excavation
Imported Fill
Grading
SPECIAL FOUNDATION FEATURES
Pile Foundation
PAVING AND SITE IMPROVEMENTS
Raodways / Parking
Site Lighting
Landscaping
Pedestrian Paving
Screen Wall
Security Fence
ELECTRICAL UTILITIES
Sectionalizing Switch
Overhead Electrical
Electrical Manhole
Telecommunications Duct Bank
Electrical Duct Bank
Grounding System
MECHANICAL UTILITIES
Water Supply
Fire Protection Water Supply
Sanity Sewer
Pump Station
Gas Distribution
LS
EA
LS
ha m3 m3 m2
LS
vm
LS
m2
EA
m2 m2 m m
LS
EA
m
EA
m m m
LS
m m m
EA
m
1.29
8891.77
12851.28
2313.46
74,621.98
91,636.07
94.50
75.74
2.41
339.45
138.64
12,169.13
17.48
111.28
1,680.23
472.98
135,391.00
74.24
148,984.00
611.47
2,767.85
71.54
809.27
1,001.13
628.68
134,869.36
331.39
223,866
223,866
1,073,920
118,211
251,276
673,463
30,972
785,308
785,304
1,176,541
577,436
97,353
50,832
49,408
252,035
149,462
1,915,438
135,391
67,855
148,984
443,316
1,096,069
23,823
1,702,454
312,378
481,544
692,805
134,869
80,859
Item UM Quantity Unit Cost Total Cost
(A) Date design or Parametric Cost Estimate started 01/2021
(B) Date 35% Design or Parametric Cost Estimate complete 09/2021
(C) Date design completed
(D) Percent completed as of
04/2022
30%
(E) Percent completed as of 75%
(F) Type of design contract Design Bid Build
(G) Parametric Estimate used to develop cost
(H) Energy Study/Life Cycle Analysis performed
Yes
No
September 2021
January 2022
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 9DD Form
1 Dec 76 1391C
8. Project Cost ($000)
14 APR 2021
37,02021134
H-53K Gearbox Facility
NAVY
2023FY
M00146(CP)
MCAS CHERRY POINT NC
CHERRY POINT MCAS, NORTH CAROLINA
P1066
(CHERRY POINT NA DEPOT)
Level: CERTIFIED_FINAL Draft: POM23 19-APR-21
Project Details ID: 199277
(A) Standard or Definitive Design
(B) Where design was previously used
No
P-991 H-1 GEARBOX FACILITY
(A) Production of plans and specifications
(B) All other design costs
$2,000
$400
3. Total cost($000) (C) = (A) + (B) = (D) + (E):
(C) Total
(D) Contract
(E) In-house
$2,400
$2,000
$400
5. Construction start: 05/2023
03/2023 4. Contract award:
6. Construction complete: 08/2024
CERTIFYING OFFICIAL STATEMENT:
The Director Land Use and Military Construction Branch, Installations and Logistics
Department, Headquarters Marine Corps certifies that this project has been considered for joint use potential. Unilateral Construction is recommended. This Facility can be used by other components on an as available basis; however, the scope of the project is based on Navy requirements.
Major Equipment
Fund
Year
Funding
Source
Installation
Start-End
Mo/Yr
Shakedown
Start-End
Mo/Yr
IOC
Date
Mo/Yr Cost
BLDG. PHYSICAL
SECURITY EQUIPMENT
FF&E
H-53K GEARBOX SUPPORT
EQUIPMENT
MAIN ROTOR GEARBOX
TEST STAND
NOSE GEARBOX TEST
STAND
TAIL/INT. GEARBOX TEST
STAND
Test Stand Cooling
System
NWCF
O&MMC
APN
APN
APN
APN
APN
21,000
1,138,000
14,016,538
11,564,969
4,200,000
3,900,000
2,100,000
B. Equipment associated with this project which will be provided from other appropriations:
MILCON CHECKLIST
Economic Analysis
Site Plan
Attachments:
Tracy Spellman Powell 252-464-5018Activity POC: Phone No:
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 10DD Form
1 Dec 76 1391C
8. Project Cost ($000)
14 APR 2021
37,02021134
H-53K Gearbox Facility
NAVY
2023FY
M00146(CP)
MCAS CHERRY POINT NC
CHERRY POINT MCAS, NORTH CAROLINA
P1066
(CHERRY POINT NA DEPOT)
Level: CERTIFIED_FINAL Draft: POM23 19-APR-21
Project Details ID: 199277
Facility Planning Document(s)/P-80 Calculations
BFR_P1066_POM23_20210330.pdf
EQUIP LIST_P1066_POM23_20210330.pdf
I_CEBKUP_P1066_POM23_20210330.pdf
15 Design_P1066_POM23_20210330.pdf
ENV_P1066_POM23_20210225.pdf
REQT STUDY_P1066_POM23_20210330.pdf
FY23_P1066_CSRA_Program Final.pdf
PRI#2_Checklist_P1066_POM23_20210330.pdf
File details come from the government source that posted it. Updated .