1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0002 11/07/2022
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFACSYSCOM
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N40085-22-R-2811
9B. DATED (SEE ITEM 11)
10/17/2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N40085-22-R-2811, DESIGN-BID-BUILD, BUILDING P-1066, CH-53K GEARBOX & TEST FACILITY, MARINE CORPS
AIR STATION, CHERRY POINT, NORTH CAROLINA
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Contract POC: Brittany Cristelli; Email: brittany.n.cristelli.civ@us.navy.mil; Phone: 757-341-1978
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA mailto:brittany.n.cristelli.civ@us.navy.mil
N40085-22-R-2811
SF 30 BLOCK 14 CONTINUATION PAGE
The purpose of this amendment is to provide the following:
1. Site Visit Sign-In Sheet
2. Pre-Proposal Inquiry’s (PPI’s) Responses
3. Extend proposal due date from 17 November 2022 to 01 December 2022
Question
Date
Submitted
Reference Question Government Response
Page Section Paragraph
1 10/27/22 9 P1066 MACC
General requirements, Mailed Hard
Copies
1 Can the Government remove the requirement for a Mailed Hard Copy of the proposal?
Propose to RFP.
2 10/27/22 9 P1066 MACC
General requirements, Electronic
Copies
1 Can the Government upload this project into
PIEE? I have tried to find it and it seems it has not be uploaded yet.
Project is currently uploaded to PIEE.
3 10/27/22 IF101A
& B
FF&E Can the Government confirm all items listed on this drawing is included in the FF&E?
Items shown indicate the best information to date at the time of the 50% drawing submittal and was based on
NAVFAC/Activity input. Additional equipment clarifications and information is still anticipated which would affect the items for the
FF&E package. Items shown are only for general coordination purposes. Refer to the
General Notes on these sheets. CN/MET
4 10/27/22 30 Attachment 5 -
220516_P-1066
CH-53K
Gearbox
Facility 50pct
E. Interior
Telecommu nications and Other
Related
Special
Systems
Can the Government confirm we are to provide a complete
Telecommunication System
, CATV System & Outside
Plant to the building? If not, can the Government provide an updated SOW of what is to be provided by the prime contractor.
The contractor will provide a complete telecommunications system for the interior of the building. The
Government will provide rack mounted, active head-end equipment. and the contractor will provide patch panels. CATV outlets, horizontal pathway and cabling will be provided by the contractor. CATV active head-end equipment and outside plant cabling to the building will be provided by the service provider. Outside plant telecommunications to the building will be provided by the contractor.
5 10/27/22 31 Attachment 5 -
220516_P-1066
CH-53K
Gearbox
Facility 50pct
E. Interior
Telecommu nications and Other
Related
Special
Systems
Can the Government confirm we are to provide a complete Security System
(access controls, IDS, CCTV, etc.) for the
Building? If not, can the
Government provide an updated SOW of what is to be provided by the prime contractor.
Pathway and infrastructure for
Security System (access controls, IDS) will be provided by the contractor. Head-end equipment will be provided by the
Government. Some horizontal cabling will be required by the contractor and will be further detailed after the
50% submittal. CCTV will be provided with the test stand equipment.
6 10/27/22 13 Attachment 5 -
220516_P-1066
CH-53K
Gearbox
Facility 50pct
M.
Environmen tal Permits
Can the Government confirm all permits (erosion control, storm water, sewer, water, etc..) are provided by the DOR and/or
Government?
The DOR and /or
Government will provide the erosion control and storm water permits. Depending on the final design, the new water and sewer may be consided connections and a permit will not be needed.
7 11/01/22 8 P1066 MACC
General
Requirements
Pre-
Proposal
Inquiries
(PPIs)
Can the Government extend the RFI due date from
11/03/22 to 11/11/22? Due the amount of information
Per the RFP, PPI cutoff is 14 days prior to proposal due date.
that is required to review, more time is needed to provide a good review of the RFP documents.
8 11/01/22 9 P1066 MACC
General
Requirements
Proposal
Due Date
Can the Government extend the proposal due date from
11/17/22 to 12/01/22? Due the amount of information that is required to review, more time is needed to provide a good review of the RFP documents.
Proposal due date has been extended to
12/01/2022 per
Amendment 0002.
(End of Summary Changes)