View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
Amendment 0004 - NAVFAC BCI-2022Q3.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004 - P1066 MACC General Requirements-Rev.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003 - PPI 89 BEAP Cherry Point 021721.pdf PDF
Amendment 0003 - Attachment 6 - REV - P1066_Statement of Work for ECI Contractor.pdf PDF
Amendment 0002 - Site Visit Log P1066.pdf PDF
Attachment H - Access Letter Template.docx DOCX document
22R2811 Amendment 0001.pdf PDF
Attachment I - FRC EAST INFORMATION BROCHURE.pdf PDF
Attachment F - Rev - 5100-82_PRETRAVEL_QUESTIONNAIRE-FILLABLE-6.21.22.pdf PDF
Attachment 5 - 220516_P-1066 CH-53K Gearbox Facility_BOD 50pct.pdf PDF
Attachment 4 - P-1066 CH-53K Gearbox Facility 50 percent.pdf PDF
Attachment 3b - P-1066 H-53K Gearbox Facility-Geotech Report.pdf PDF
Attachment G - DD-3150-CONTRACTOR_VISITOR_CERT-OF-VACCINATION.pdf PDF
Attachment 1 - 220331 P1066 Final Charrette Report.pdf PDF
Attachment 3c - P-1066 H-53K Gearbox Facility-Geotech Report.pdf PDF
Attachment 3e - P-1066 H-53K Gearbox Facility-Geotech Report.pdf PDF
Attachment 2 - P-1066 Certified 1391.pdf PDF
P1066 MACC General Requirements.pdf PDF
Attachment F - 5100_82.pdf PDF
Attachment E - PIEE Vendor Access Instructions.pdf PDF
Attachment 6 - P1066_ATT 24-Statement of Work for ECI Contractor.pdf PDF
Attachment 3d - P-1066 H-53K Gearbox Facility-Geotech Report.pdf PDF
Attachment D - Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
Attachment 3a - P-1066 H-53K Gearbox Facility-Geotech Report.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0002 11/07/2022

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

NAVFACSYSCOM

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N40085-22-R-2811

9B. DATED (SEE ITEM 11)

10/17/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N40085-22-R-2811, DESIGN-BID-BUILD, BUILDING P-1066, CH-53K GEARBOX & TEST FACILITY, MARINE CORPS

AIR STATION, CHERRY POINT, NORTH CAROLINA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Contract POC: Brittany Cristelli; Email: brittany.n.cristelli.civ@us.navy.mil; Phone: 757-341-1978

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA mailto:brittany.n.cristelli.civ@us.navy.mil

N40085-22-R-2811

SF 30 BLOCK 14 CONTINUATION PAGE

The purpose of this amendment is to provide the following:

1. Site Visit Sign-In Sheet

2. Pre-Proposal Inquiry’s (PPI’s) Responses

3. Extend proposal due date from 17 November 2022 to 01 December 2022

Question

Date

Submitted

Reference Question Government Response

Page Section Paragraph

1 10/27/22 9 P1066 MACC

General requirements, Mailed Hard

Copies

1 Can the Government remove the requirement for a Mailed Hard Copy of the proposal?

Propose to RFP.

2 10/27/22 9 P1066 MACC

General requirements, Electronic

Copies

1 Can the Government upload this project into

PIEE? I have tried to find it and it seems it has not be uploaded yet.

Project is currently uploaded to PIEE.

3 10/27/22 IF101A

& B

FF&E Can the Government confirm all items listed on this drawing is included in the FF&E?

Items shown indicate the best information to date at the time of the 50% drawing submittal and was based on

NAVFAC/Activity input. Additional equipment clarifications and information is still anticipated which would affect the items for the

FF&E package. Items shown are only for general coordination purposes. Refer to the

General Notes on these sheets. CN/MET

4 10/27/22 30 Attachment 5 -

220516_P-1066

CH-53K

Gearbox

Facility 50pct

E. Interior

Telecommu nications and Other

Related

Special

Systems

Can the Government confirm we are to provide a complete

Telecommunication System

, CATV System & Outside

Plant to the building? If not, can the Government provide an updated SOW of what is to be provided by the prime contractor.

The contractor will provide a complete telecommunications system for the interior of the building. The

Government will provide rack mounted, active head-end equipment. and the contractor will provide patch panels. CATV outlets, horizontal pathway and cabling will be provided by the contractor. CATV active head-end equipment and outside plant cabling to the building will be provided by the service provider. Outside plant telecommunications to the building will be provided by the contractor.

5 10/27/22 31 Attachment 5 -

220516_P-1066

CH-53K

Gearbox

Facility 50pct

E. Interior

Telecommu nications and Other

Related

Special

Systems

Can the Government confirm we are to provide a complete Security System

(access controls, IDS, CCTV, etc.) for the

Building? If not, can the

Government provide an updated SOW of what is to be provided by the prime contractor.

Pathway and infrastructure for

Security System (access controls, IDS) will be provided by the contractor. Head-end equipment will be provided by the

Government. Some horizontal cabling will be required by the contractor and will be further detailed after the

50% submittal. CCTV will be provided with the test stand equipment.

6 10/27/22 13 Attachment 5 -

220516_P-1066

CH-53K

Gearbox

Facility 50pct

M.

Environmen tal Permits

Can the Government confirm all permits (erosion control, storm water, sewer, water, etc..) are provided by the DOR and/or

Government?

The DOR and /or

Government will provide the erosion control and storm water permits. Depending on the final design, the new water and sewer may be consided connections and a permit will not be needed.

7 11/01/22 8 P1066 MACC

General

Requirements

Pre-

Proposal

Inquiries

(PPIs)

Can the Government extend the RFI due date from

11/03/22 to 11/11/22? Due the amount of information

Per the RFP, PPI cutoff is 14 days prior to proposal due date.

that is required to review, more time is needed to provide a good review of the RFP documents.

8 11/01/22 9 P1066 MACC

General

Requirements

Proposal

Due Date

Can the Government extend the proposal due date from

11/17/22 to 12/01/22? Due the amount of information that is required to review, more time is needed to provide a good review of the RFP documents.

Proposal due date has been extended to

12/01/2022 per

Amendment 0002.