1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0005 11/28/2022
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N40085-22-R-2811
9B. DATED (SEE ITEM 11)
10/17/2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N40085-22-R-2811, DESIGN-BID-BUILD, BUILDING P-1066, CH-53K GEARBOX & TEST FACILITY, MARINE CORPS
AIR STATION, CHERRY POINT, NORTH CAROLINA
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Contract POC: Brittany Cristelli; Email: brittany.n.cristelli.civ@us.navy.mil; Phone: 757-341-1978
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA mailto:brittany.n.cristelli.civ@us.navy.mil
N40085-22-R-2811
SF 30 BLOCK 14 CONTINUATION PAGE
The purpose of this amendment is to provide the following:
1. Pre-Proposal Inquiry’s (PPI’s) Responses
Question
Reference Question Government Response
Page Section Paragraph
Attachment G
DD3150
Contractor
Visitor
Certification of
Vaccination
The RFP included Attachment
G with is a Contractor
Personnel and Visitor
Certification of Vaccination.
There is a section, Consequences of Failure to
Provide Information that states, the information is voluntary however, failure to provide will be treated as not fully vaccinated with the potential for denied access to DoD
Facilities.
In regards to Attachment G, because of the shortage of manpower in Eastern Carolina and the competitive, non federal, markets. Contractor fear subcontractors will not pursue this work or will not execute a subcontract if successful. Therefore, contractor is requesting this attachment be deleted from the
RFP.
Attachment G, DD3150 is required for FRCE access. However, FRCE will not deny access based soley on vaccination status.
ES
Construction
Note 1 & 7
Can the Government provide an allowance due to the lack of information and the possible complexity of the electrical work involve in these notes?
This would help with the proposal to provide a fair and reasonable proposal.
An allowance will not be provided.
119 2
Attachment
1_1066 Final
Charette Report
Environmen tal Summary
Please confirm that Clark
Nexsen will be preparing, submitting, and providing all correspondence with MCAS
Cherry Point EAD and
NCDEQ for review and approvals and that the contractor should assume that these permits will be approved prior to the start of construction.
The DOR and /or Government will provide all design dependent permits.
120 4
Attachment
1_1066 Final
Charette Report
Water
Connection
Bullet point suggests a possible requirement for an agreement for a connection with the City of Havelock to provide service to P1066 and a tee for future connections. Please confirm that this agreement, its criteria, and timeline will be finalized prior to issuance of the construction schedule
This agreement is no longer being considered.
121 4
Attachment
1_1066 Final
Charette Report
Sanitary
Sewer
Connection
Bullet point states that this project will demolish the pump station and replace it with a pump station of larger capacity.
Please confirm that the required larger capacity is what is shown in the 50% documents.
The required capacity is as shown in the 50% documents.
122 EP702
Site One-Line
Diagram Key Note 3
On Sheet EP702 of the drawings keynote 3 states
"Install New Pad Mount S&C
Vista 624 SW3". Please confirm this sectionalized switch is to be GFCI not CFCI.
Sectionalizing switch will be contractor furnished. Contractor installed.
123 AE601 Architectural Note C
Sheet AE601 on the plans have note C stating “acoustical door
& frame assembly sound transmission class rating minimum level to be equal to wall sound attenuation rating unless otherwise noted”. Do all
Interior doors/frames need to meet the minimum partition rating of STC45 or are the doors not indicated on Door schedule sheet AE601 to be
Acoustic rated per Door
Schedule Comment 3 able to be
Standard Interior HM construction?
Doors on AE601 noted as sound rated are (at minimum, UON) to be rated equal to the partition/wall assembly. Doors not noted as sound rated are standard door/frame
124 12 BOD 50% K
Paragraph K, Stormwater
Management refers to a pond beyond the eastern limits of
Hancock Village that is "likely" to need rehabilitation prior to construction. Please confirm that this rehabilitation is not within the scope of work for this project.
Rehabilitation of the pond is still under consideration and may be added to the scope of work for this project.
125 ES103 Telecom
Sheet ES103 indicates that an
RFI has been submitted by the
AE regarding the POC for copper and fiber service connections. Please confirm that for the Initial Target Price the contractor is to assume that the POC is as shown on ES103, Note 4.
New ductbank for telcom will be as shown on sheet ES103. Copper and fiber cabling POC will be at existing building 4841.
126 12 Piaseki Aircraft
Report 2.7.1.3
The Piasecki report mentions that the Option One building design anticipated a liner panel ceiling. There is no mention of liner panels being required in other documents, or in the 50%
DD drawings. Please confirm that no liner panel will be required at the ceiling.
No liner panel is intended at this stage in design
127 3
Wave
Engineering
Report
Please confirm that the 50%
DD Drawings mechanical design has incorporated and shows the means of meeting the NC requirements for Noise and Vibration Control, as described in the Wave
Engineering report (reference pdf page 261 of 300 for location in the 50% BOD.
Design will meet the requirement outlined in the BOD, however the design has not progressed to incorporate all elements of acoustic mitigation.
128 5
Wave
Engineering
Report
Please confirm that items listed in the Wave Engineering report, such as acoustical roof deck, wall treatments, wall panels, banners, etc. are not required if they have not been incorporated into the 50% DD set.
This information will not be finalized until after the test stand procurement is completed. If the equipment sound generation requires additional acoustic treatments, that will be evaluated at that time. For purposes of the ECI process, plan to account for what is currently indicated in the design documents
AE104
/AE10
50% plan set
Outline specifications (page
296 of 300 in BOD) have sections 05 51 33 for metal ladders, and 05 52 00 for metal railings. Please confirm that no catwalks, ladders or railings are required for access to service cranes or testing equipment.
This is included as we anticipate there being ladders & guardrails when the pits are added when the test cell requirements are provided
130 297 50% BOD
Outline specifications are in the
BOD for wire mesh partitions
(10 22 13). Please confirm there are no wire mesh partitions required.
At this stage of design, we did not include metal mesh partitions
131 297 50% BOD
Outline specifications are in the
BOD for Demountable and
Movable Partitions, Accordion
Partitions, Coiling Partition, Folding Panel Partitions, or
Sliding Partitions. Please confirm that none of these partitions are anticipated for inclusion into future DD sets.
At this stage of design, we did not include demountable or operable partitions
132 299 50% BOD
Specification section 32 14
13.13 Interlocking Precast
Concrete Unit Paving is included in the Outline
Specifications for the project.
Please confirm that no
Interlocking Precast Concrete
Unit Paving is included in the scope of work.
No Interlocking Precast Concrete
Unit Paving is included in the scope of work.
133 299 50% BOD
Outline specification 33 32 16 is included in the Outline
Specifications for the project.
Please confirm that no
Packaged Utility Wastewater
Pumping Stations are included in the scope of work.
The replacement pump station is currently shown to be a Packaged
Utility Wastewater Pumping
Stations.
134 page 1 Charette, Meeting Minutes
The Charette meeting minutes indicated that a determination had not yet been made as to whether a mechanical or electrical type of regenerative test cell would be provided.
Mention was made that the selection could make a significant impact on the design of the electrical system. Please confirm that the contractor should provide an ITP on the design as shown in the 50%
DD drawings.
This information will not be available until after the test stand procurement is completed.
page
40 of
Charette
Gearbox Test
Stands
Please confirm that all maintenance/testing equipment and test stands are GFGI.
The test cell systems are GFGI, the
MILCON will provide infrastructure to support their installation (ie, conduits, power, etc)
Amendment
Various PPI responses refer to
Revised General Requirements provided with Amendment
0003; however, our team was unable to locate this document.
Please provide.
Revised General Requiremetns posted with Amendment 0004.
(End of Summary Changes)