View the file

Other files

File Type Posted
Amendment 0004 - NAVFAC BCI-2022Q3.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004 - P1066 MACC General Requirements-Rev.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003 - PPI 89 BEAP Cherry Point 021721.pdf PDF
Amendment 0003 - Attachment 6 - REV - P1066_Statement of Work for ECI Contractor.pdf PDF
Amendment 0002 - Site Visit Log P1066.pdf PDF
Amendment 0002.pdf PDF
Attachment H - Access Letter Template.docx DOCX document
22R2811 Amendment 0001.pdf PDF
Attachment I - FRC EAST INFORMATION BROCHURE.pdf PDF
Attachment F - Rev - 5100-82_PRETRAVEL_QUESTIONNAIRE-FILLABLE-6.21.22.pdf PDF
Attachment 5 - 220516_P-1066 CH-53K Gearbox Facility_BOD 50pct.pdf PDF
Attachment 4 - P-1066 CH-53K Gearbox Facility 50 percent.pdf PDF
Attachment 3b - P-1066 H-53K Gearbox Facility-Geotech Report.pdf PDF
Attachment G - DD-3150-CONTRACTOR_VISITOR_CERT-OF-VACCINATION.pdf PDF
Attachment 1 - 220331 P1066 Final Charrette Report.pdf PDF
Attachment 3c - P-1066 H-53K Gearbox Facility-Geotech Report.pdf PDF
Attachment 3e - P-1066 H-53K Gearbox Facility-Geotech Report.pdf PDF
Attachment 2 - P-1066 Certified 1391.pdf PDF
P1066 MACC General Requirements.pdf PDF
Attachment F - 5100_82.pdf PDF
Attachment E - PIEE Vendor Access Instructions.pdf PDF
Attachment 6 - P1066_ATT 24-Statement of Work for ECI Contractor.pdf PDF
Attachment 3d - P-1066 H-53K Gearbox Facility-Geotech Report.pdf PDF
Attachment D - Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
Attachment 3a - P-1066 H-53K Gearbox Facility-Geotech Report.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0005 11/28/2022

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N40085-22-R-2811

9B. DATED (SEE ITEM 11)

10/17/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N40085-22-R-2811, DESIGN-BID-BUILD, BUILDING P-1066, CH-53K GEARBOX & TEST FACILITY, MARINE CORPS

AIR STATION, CHERRY POINT, NORTH CAROLINA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Contract POC: Brittany Cristelli; Email: brittany.n.cristelli.civ@us.navy.mil; Phone: 757-341-1978

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA mailto:brittany.n.cristelli.civ@us.navy.mil

N40085-22-R-2811

SF 30 BLOCK 14 CONTINUATION PAGE

The purpose of this amendment is to provide the following:

1. Pre-Proposal Inquiry’s (PPI’s) Responses

Question

Reference Question Government Response

Page Section Paragraph

Attachment G

DD3150

Contractor

Visitor

Certification of

Vaccination

The RFP included Attachment

G with is a Contractor

Personnel and Visitor

Certification of Vaccination.

There is a section, Consequences of Failure to

Provide Information that states, the information is voluntary however, failure to provide will be treated as not fully vaccinated with the potential for denied access to DoD

Facilities.

In regards to Attachment G, because of the shortage of manpower in Eastern Carolina and the competitive, non federal, markets. Contractor fear subcontractors will not pursue this work or will not execute a subcontract if successful. Therefore, contractor is requesting this attachment be deleted from the

RFP.

Attachment G, DD3150 is required for FRCE access. However, FRCE will not deny access based soley on vaccination status.

ES

Construction

Note 1 & 7

Can the Government provide an allowance due to the lack of information and the possible complexity of the electrical work involve in these notes?

This would help with the proposal to provide a fair and reasonable proposal.

An allowance will not be provided.

119 2

Attachment

1_1066 Final

Charette Report

Environmen tal Summary

Please confirm that Clark

Nexsen will be preparing, submitting, and providing all correspondence with MCAS

Cherry Point EAD and

NCDEQ for review and approvals and that the contractor should assume that these permits will be approved prior to the start of construction.

The DOR and /or Government will provide all design dependent permits.

120 4

Attachment

1_1066 Final

Charette Report

Water

Connection

Bullet point suggests a possible requirement for an agreement for a connection with the City of Havelock to provide service to P1066 and a tee for future connections. Please confirm that this agreement, its criteria, and timeline will be finalized prior to issuance of the construction schedule

This agreement is no longer being considered.

121 4

Attachment

1_1066 Final

Charette Report

Sanitary

Sewer

Connection

Bullet point states that this project will demolish the pump station and replace it with a pump station of larger capacity.

Please confirm that the required larger capacity is what is shown in the 50% documents.

The required capacity is as shown in the 50% documents.

122 EP702

Site One-Line

Diagram Key Note 3

On Sheet EP702 of the drawings keynote 3 states

"Install New Pad Mount S&C

Vista 624 SW3". Please confirm this sectionalized switch is to be GFCI not CFCI.

Sectionalizing switch will be contractor furnished. Contractor installed.

123 AE601 Architectural Note C

Sheet AE601 on the plans have note C stating “acoustical door

& frame assembly sound transmission class rating minimum level to be equal to wall sound attenuation rating unless otherwise noted”. Do all

Interior doors/frames need to meet the minimum partition rating of STC45 or are the doors not indicated on Door schedule sheet AE601 to be

Acoustic rated per Door

Schedule Comment 3 able to be

Standard Interior HM construction?

Doors on AE601 noted as sound rated are (at minimum, UON) to be rated equal to the partition/wall assembly. Doors not noted as sound rated are standard door/frame

124 12 BOD 50% K

Paragraph K, Stormwater

Management refers to a pond beyond the eastern limits of

Hancock Village that is "likely" to need rehabilitation prior to construction. Please confirm that this rehabilitation is not within the scope of work for this project.

Rehabilitation of the pond is still under consideration and may be added to the scope of work for this project.

125 ES103 Telecom

Sheet ES103 indicates that an

RFI has been submitted by the

AE regarding the POC for copper and fiber service connections. Please confirm that for the Initial Target Price the contractor is to assume that the POC is as shown on ES103, Note 4.

New ductbank for telcom will be as shown on sheet ES103. Copper and fiber cabling POC will be at existing building 4841.

126 12 Piaseki Aircraft

Report 2.7.1.3

The Piasecki report mentions that the Option One building design anticipated a liner panel ceiling. There is no mention of liner panels being required in other documents, or in the 50%

DD drawings. Please confirm that no liner panel will be required at the ceiling.

No liner panel is intended at this stage in design

127 3

Wave

Engineering

Report

Please confirm that the 50%

DD Drawings mechanical design has incorporated and shows the means of meeting the NC requirements for Noise and Vibration Control, as described in the Wave

Engineering report (reference pdf page 261 of 300 for location in the 50% BOD.

Design will meet the requirement outlined in the BOD, however the design has not progressed to incorporate all elements of acoustic mitigation.

128 5

Wave

Engineering

Report

Please confirm that items listed in the Wave Engineering report, such as acoustical roof deck, wall treatments, wall panels, banners, etc. are not required if they have not been incorporated into the 50% DD set.

This information will not be finalized until after the test stand procurement is completed. If the equipment sound generation requires additional acoustic treatments, that will be evaluated at that time. For purposes of the ECI process, plan to account for what is currently indicated in the design documents

AE104

/AE10

50% plan set

Outline specifications (page

296 of 300 in BOD) have sections 05 51 33 for metal ladders, and 05 52 00 for metal railings. Please confirm that no catwalks, ladders or railings are required for access to service cranes or testing equipment.

This is included as we anticipate there being ladders & guardrails when the pits are added when the test cell requirements are provided

130 297 50% BOD

Outline specifications are in the

BOD for wire mesh partitions

(10 22 13). Please confirm there are no wire mesh partitions required.

At this stage of design, we did not include metal mesh partitions

131 297 50% BOD

Outline specifications are in the

BOD for Demountable and

Movable Partitions, Accordion

Partitions, Coiling Partition, Folding Panel Partitions, or

Sliding Partitions. Please confirm that none of these partitions are anticipated for inclusion into future DD sets.

At this stage of design, we did not include demountable or operable partitions

132 299 50% BOD

Specification section 32 14

13.13 Interlocking Precast

Concrete Unit Paving is included in the Outline

Specifications for the project.

Please confirm that no

Interlocking Precast Concrete

Unit Paving is included in the scope of work.

No Interlocking Precast Concrete

Unit Paving is included in the scope of work.

133 299 50% BOD

Outline specification 33 32 16 is included in the Outline

Specifications for the project.

Please confirm that no

Packaged Utility Wastewater

Pumping Stations are included in the scope of work.

The replacement pump station is currently shown to be a Packaged

Utility Wastewater Pumping

Stations.

134 page 1 Charette, Meeting Minutes

The Charette meeting minutes indicated that a determination had not yet been made as to whether a mechanical or electrical type of regenerative test cell would be provided.

Mention was made that the selection could make a significant impact on the design of the electrical system. Please confirm that the contractor should provide an ITP on the design as shown in the 50%

DD drawings.

This information will not be available until after the test stand procurement is completed.

page

40 of

Charette

Gearbox Test

Stands

Please confirm that all maintenance/testing equipment and test stands are GFGI.

The test cell systems are GFGI, the

MILCON will provide infrastructure to support their installation (ie, conduits, power, etc)

Amendment

Various PPI responses refer to

Revised General Requirements provided with Amendment

0003; however, our team was unable to locate this document.

Please provide.

Revised General Requiremetns posted with Amendment 0004.