0200000 J Management and Administration.pdf

PDF 706 KB Posted

Attached to
Fire Protection Services Beaufort, SC Federal contract opportunity
Solicitation number
N4008522R2695
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Fire Protection Services Beaufort, SC, newest first.
File Type Posted
Amendment 7.pdf PDF
Attachment J-1502000-14.xlsx XLSX spreadsheet
Amendment 6.pdf PDF
Amendment 5.pdf PDF
Amendment 4.pdf PDF
Site Visit 3.14.23_Redacted.pdf PDF
Amendment 3.pdf PDF
J-0200000-19_PPQ.pdf PDF
J-0200000-18 Corporate Experience.pdf PDF
J-0200000-15 OSD Annual AFFF Release and Response Reporting.xlsx XLSX spreadsheet
J-0200000-12 Local Population ID Card-Base Access Pass Registration Form.pdf PDF
1502000 C Facility Investment.pdf PDF
Amendment 2.pdf PDF
WD Construction.pdf PDF
WD 2015-4451.pdf PDF
J-1502000-07 King Fisher Daily Reading Log.pdf PDF
J-0200000-09 ASSET INFORMATION_.xlsx XLSX spreadsheet
1502000 J Facility Investment.xlsx XLSX spreadsheet
0200000 C Management and Administration.pdf PDF
J-0200000-20 Contractor Self-Performance Certification.pdf PDF
J-1502000-11 Procedures For Flightline AFFF Fire Suppression Systems.pdf PDF
J-0200000-17 Fire Protection ELINS.xlsx XLSX spreadsheet
J-0200000-14 OSD 24 Hour AFFF Release and Response Reporting.xlsx XLSX spreadsheet
J-0200000-08 SERVICE PROVIDER INFORMATION_.xlsx XLSX spreadsheet
J-0200000-05-06 Leak Rate Calculation Information.pdf PDF
0100000 C General Information.pdf PDF
N4008522R2695 Amendment 0001 with map.pdf PDF
N4008522R2695 Fire Protection-Beaufort.pdf PDF
Section C.zip ZIP file
1502000 J Facility Invest Upd.xlsx XLSX spreadsheet
Section J.zip ZIP file
J-0200000-15 Fire Protection ELINS.xlsx XLSX spreadsheet
J-0200000-09 ASSET INFORMATION.xlsx XLSX spreadsheet
J-0200000-08 SERVICE PROVIDER INFORMATION.xlsx XLSX spreadsheet
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J – 0200000

MANAGEMENT AND ADMINISTRATION

Attachment Number Attachment Title

J-0200000-01 *Definitions and Acronyms

J-0200000-02 *Wage Determinations

J-0200000-03 *Directives, Instructions, and References

J-0200000-04 *Invoice Form

J-0200000-05 *Forms

J-0200000-06 *Government-Furnished Property

J-0200000-07 *Government-Furnished Facilities

J-0200000-08 *Service Provider Information

J-0200000-09 *Asset Information

J-0200000-10 *USMCMax Data Reporting

J-0200000-11 *USMCMax System Access Procedures

J-0200000-12 *DON Local Population ID Card/Base Access Pass Registration Form

J-0200000-13 *Installation Spill Prevention, Control, and Countermeasure Plan

J-0200000-14 24 Hour AFFF Release and Response Reporting

J-0200000-15 Annual AFFF Release and Response Reporting

J-0200000-16 *Contractor Hazardous Material Inventory Log

J-0200000-17 *Exhibit Line Item Numbers (ELINs)

J-0200000-18 Corporate Experience Project Data Sheet

J-0200000-19 Past Performance Questionnaire

J-0200000-20 Contractor’s Self Performance Certification

ATTACHMENT J-0200000-01

DEFINITIONS AND ACRONYMS

Definition Description

Assessment A general term referring to either a survey or inspection of a facility to determine condition.

Asset A general term used to refer to an item, such as a component, system, building or facility, which is managed by an automated data management program.

Competent Person A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.

One who can identify existing and predictable hazards in the working environment or working conditions that are dangerous to personnel and who has authorization to take prompt corrective measures to eliminate them.

Component Inventory

Management Unit

(CIMU)

An organization of like-kind real property into manageable maintenance units. CIMU is a building component, group of components or component assemblies, serving a specific purpose in a facility that can be expected to follow a common and predictable lifecycle behavior. This class of non-equipment will include items such as exterior walls, exterior windows, interior finish, and roofs. This class of equipment will include items such as fan coil units, air handling units, lighting, and water closets. CIMUs can include one or more items of installed equipment typically subject to routine scheduled maintenance.

Confined Work Space A space that is large enough and so configured that a person may bodily enter a space

(such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.

Construction Equipment Construction equipment refers to specialized heavy machinery that covers one industry and is specifically designed for executing construction work. Construction equipment requirements shall include a list of equipment establishing the size, quality, number of units, and unit prices. Construction equipment prices provided by the Contractor shall be the lowest price available considering the availability of equipment and the time constraints of the job. The direct equipment price shall be adjusted by all discounts and rebates that accrue to the Contractor.

All indirect cost associated with construction equipment, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job

(field) overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance, general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the construction equipment price since the cost for these items were included in the labor hour unit price bid. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements shall not be included.

Contracting Officer (KO) That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

Contracting Officer’s

Representative (COR)

The individual appointed by the KO responsible for monitoring the Contractor’s technical compliance and progress, relative to assigned contract(s)/orders(s), based on the contract requirements specified in the PWS and in accordance with the PAP. The

COR performs a variety of contract administration duties that includes oversight of PA, documenting and rating Contractor performance, reviewing invoices, and acceptance of work. Assignment as a COR is a collateral duty typically performed by the FSCM or

SPAR.

Contractor That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.

Contractor Representative That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.

Crane, Category 1 Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes (YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), http://en.wikipedia.org/wiki/Vehicle http://en.wikipedia.org/wiki/Construction

Definition Description including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.

Crane, Category 2 & 3 Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are

Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.

Crane, Category 4 Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below

2,000 pounds capacity for administrative purposes.

Direct Material Costs The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include sales tax and transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of direct materials, direct material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.

All other cost such as sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment, mobilization, demobilization, time for job preparation, safety standby personnel, payroll burdens and fringes, overtime, job (field) overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance, general and administrative

(home office) overhead, profit, and all other associated markups shall not be included in the direct material price since the cost for these items are included in the UPL Hour unit price bid.

Electronic Operation And

Maintenance And

Support Information

(eOMSI)

A set of consultant-prepared data and document files that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle.

Generally, it is prepared during construction and submitted upon completion of a new facility or major facility upgrade. eOMSI’s typically include asset information, staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data. eOMSI data and document files are provided in electronic formats.

Equipment Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable.

Facility A building or structure designed and created to serve a particular function.

Fixed Burden Rate (FBR) The additional costs (expressed in percent of direct material cost) for ordering, handling, and stockpiling materials and repair parts. For example, if the offeror's Fixed Burden

Rate for materials in the Base Period is 10% then:

$100,000.00 + ($100,000.00 x 10%) = $110,000.00

The Government will compensate the Contractor for the required parts and materials and not the total amount shown in Schedule of Indefinite Delivery Indefinite Quantity Work.

Frequency Of Service Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.

Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.

Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.

Definition Description

Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.

Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.

Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.

Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.

Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.

Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.

Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.

Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.

Government Furnished

Property (GFP)

Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification. Government furnished property also includes contractor acquired property if the contractor acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

Hazardous Material (HM) A material that because of its quality, concentration, physical, chemical or infectious nature may pose a threat to human health or the environment if released or spilled into the environment or any material designated by the Department of Transportation (DOT) or any materials that require a SDS form as posing a potential threat while being transported. Hazardous materials are listed in 49 CFR Part 172.

Hazardous Waste (HW) Any discarded solid waste (liquid, semi-solid, solid, or gaseous) that meets the definition of a hazardous waste by USEPA, state authorities, or the Navy. In accordance with

RCRA, a solid waste is a listed hazardous waste if it is specifically listed, or it is a characteristic hazardous waste if it exhibits the characteristics of ignitability, corrosivity, reactivity, or toxicity.

Hazardous Waste

Management Plan

In accordance with OPNAVINST 5090.1, every Navy shore activity that generates HW shall develop and use a Hazardous Waste Management Plan or a Hazardous Waste management component in its P2 Plan and EMS. A Hazardous Waste Management Plan shall:

Identify applicable federal, state, and local regulations pertaining to the generation and management of hazardous waste.

Identify training requirements and describe procedures for obtaining training and maintaining training records.

Assign responsibilities for the generation, designation, handling, storage, treatment, disposal, and all documentation.

Describe all hazardous waste generation and management procedures.

Include or reference the hazardous waste minimization plan and goals.

Include or reference contingency plans and emergency response procedures.

The plan shall be kept up to date to include changes in hazardous waste generation and management procedures, as well as changes in applicable federal, state, and local hazardous waste regulations. The plan shall include or reference minimization procedures sufficient to achieve DOD minimization goals. Tenant activities are covered by the host CO's Hazardous Waste Management Plan.

Hazardous Waste

Manifest

A hazardous waste manifest as defined in 40 CFR 260 is required for the transport of hazardous waste. The installation commanding officer (ICO) or the ICO’s designated representative shall retain signature authority for hazardous waste manifests.

Inspection A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.

Integrated Maintenance

Program (IMP)

IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP

Definition Description encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the

Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service orders will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.

Job or Work Order An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation.

Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.

Less-than-90-day

Accumulation Areas or

Storage Facilities

Temporary HW storage areas where HW may be stored for up to 90 days without a RCRA permit.

Maintenance and Repair The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.

Monthly On-Site Labor

Report

A compilation of all Contractor and subcontractor employee-hours involved in delivering contract services on a Government property.

Non-RCRA Regulated

Waste

Waste that is not regulated as a hazardous waste under RCRA; however, is waste may be regulated by other federal, state or local regulations including but not limited to TSCA, Clean Air Act, Clean Water Act or other regulations and statues. Examples include

Used Oil, Universal Waste, Oily Water, antifreeze, etc.

Non-RCRA regulated waste (while not meeting the definition of a Hazardous Waste) must be managed according to its applicable regulations and may not be discarded into the general trash.

Non-Regulated Solid

Waste (Debris and

Rubbish)

Waste not associated with an industrial process such as refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food. Non-hazardous construction and demolition wastes such as dimension and non-dimension lumber, plywood, chipboard, and hardboard are included.

Partnering The terms “partnering” and “partnership” used herein shall mean a relationship of open communication and close cooperation that involves both Government and Contractor personnel working together for the purpose of establishing a mutually beneficial, proactive, cooperative environment within which to achieve contract objectives and resolve issues and implementing actions as required.

Performance Assessment A method used by the Government to provide some measure of control over the quality of purchased goods and services received.

Performance Assessment

Representative (PAR)

The individual(s) assigned as a Technical Point of Contact (TPOC) / Subject Matter

Expert (SME) to the COR to perform duties as the on-site representative who assesses

Contractor performance. The PAR periodically observes Contractor performance, reviews delivered services, reviews quality management corrective actions, periodically assesses and documents Contractor performance on PAWs and the MPAS, and communicates findings as necessary with the Contractor, SPAR, and COR.

Pre-Expended Bin

Materials And Supplies

The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less.

Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.

Property Administrator An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract

Property Management

Program

A Government program established for the purpose of reviewing and approving the

Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor.

Quality Assurance (QA) The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.

Definition Description

Quality Control (QC) The observation techniques and activities used to fulfill requirements for quality.

R. S. Means A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average.

An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as "Means".

Real Property Land and improvements to land (i.e., facilities). It includes equipment affixed and built into the facility as an integral part of the facility (such as heating systems), but not movable equipment (e.g., plant equipment, industrial equipment, buoys).

Real Property Inventory

Equipment (RPIE)

A Government owned or leased individual pieces of equipment, apparatus, or fixture that are essential to the function of the real property (i.e. plumbing, electrical, heating, cooling and elevators). It is physically attached to, integrated into, and built in or on the property.

Individual RPIE’s can be combined to make a CIMU to facilitate facilities management.

An individual RPIE can also be a CIMU if the equipment is complex enough to require its own management planning.

Regulated Waste Any hazardous, non-hazardous, industrial process waste (aka special waste), e-waste, and/or off-specification HM, which because of its physical characteristics, chemical make-up or biological nature requires either special handling procedures and permitting, or poses an unusual threat to human health, equipment, property, or the environment.

Examples include (but are not limited to) liquid sludge, pastes, and/or filter cakes, chemical compounds and/or petroleum products, fine powders or highly dusty materials, spent blast media and/or grit, demolition wastes from industrial facilities, debris and/or residues from spill cleanup work, underground storage tank remediation materials, pollution control wastes, ash from fires, furnaces, boilers or incinerators, off-specification products, other materials that have the potential to be a hazardous waste.

All RW may be used or unused excess hazardous materials. Laboratory analysis may be required to verify the waste is not a RCRA-regulated hazardous waste.

Response Time The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.

Restoration Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.

Satellite Accumulation

Areas

Designated approved areas, at or near the point of generation and under the control of the operator generating the waste, where no more than 55 gallons (cumulative total) of all types of HW or 1 quart of acutely HW may be accumulated. The 55-gallon limit does not include non RCRA regulated waste, universal waste and used oil etc.

Spill Prevention Control and Countermeasure

(SPCC) Plan

The SPCC Plan establishes engineering controls including procedures, methods, equipment and other requirements to prevent the discharge of oil into or upon navigable waters. The Plan includes procedures for oil spill prevention, measures to contain spills and an established spill drill exercises to ensure effective countermeasures in the event of oil spill.

Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in

“normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.

System An assemblage of mechanically and/or electrically interlocked parts, equipment and/or components forming a unitary whole.

Unit Priced Labor (UPL)

Hour

The fully burdened unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit priced labor hour price shall include all indirect and direct costs associated with performing work, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, wage determinations, union agreements, crew sizes, hand tools, equipment, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and

Definition Description insurance, general and administrative (home office) overhead, profit, and all other associated markups. Any indirect cost or additional markups not allowed in the definition of direct materials shall be included in the UPL price. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.

Uniformat Classification A standard classification of building components established by the National Institute of

Standards and Technology.

United States Marine

Corps MAXIMO

(USMCmax)

A specially configured software version of MAXIMO®, a commercially available computerized maintenance management system (CMMS), adopted by United States

Marine Corps for enterprise facility asset data management. The terms “MAXIMO”, “USMCmax” or “Government’s MAXIMO” shall be used interchangeably in the document.

Universal Equipment Universal equipment refers to equipment that can cover two or more industries and is commercially employed in execution of operation, maintenance, and repair work, such as: Aerial Work Platforms, Backhoes, Cranes, Dump Trucks, Excavators, Generators, Graders, Lifts, Loaders, Man Lifts, Monitoring and Test Equipment, Pumps, Tractors, Trailers, etc.

Universal Waste (UW) Universal Waste (UW) (defined in 40 CFR Part 273) means batteries, fluorescent lamps, some pesticides, and mercury-containing equipment formally classified as a HW, but that are now subject to less stringent regulations, when recycled if recycling is available.

Utility Infrastructure

Condition Assessment

Program (UICAP)

A comprehensive assessment processes for planning, managing, and executing Navy utility infrastructure inspections.

Acronym Title

ACO Administrative Contracting Officer

AFFF Aqueous Film Forming Foam

BFR Basic Facility Requirements

BW Biweekly

CBMM Condition Based Maintenance Management Program

CDR Contract Discrepancy Report

CIA Controlled Industrial Area

CIMU Component Inventory Management Unit

CMMS Computerized Maintenance Management System

CNSSI Committee on National Security Systems Instruction

COR Contracting Officer Representative

COR Condition of Readiness

DBH Diameter at Breast Height

DCR Direct Condition Rating

DoD Department of Defense

DoDI Department of Defense Instruction

DoN Department of Navy

DRMO Defense Reutilization Management Office

EMS Environmental Management System

EPA Environmental Protection Agency

EPCRA Emergency Planning and Community Right-to-Know Act

FAR Federal Acquisition Regulation

FFP Firm Fixed Price

FIFRA Federal Insecticide, Fungicide, and Rodenticide Act

FSC Facility Support Contract

FSCM Facility Support Contract Manager

GIS Geospatial Information System

GFE Government-furnished Equipment

GFF Government-furnished Facilities

GFM Government-furnished Materials

HCA Head Contracting Agency

ICP Integrated Contingency Plan

IDIQ Indefinite Delivery Indefinite Quantity iNFADS Internet Navy Facilities Asst Data Store

IPM Integrated Pest Management

IPMIS Integrated Pest Management Information System

IPMP Integrated Pest Management Plan

KO Contracting Officer

LAN Local Area Network

M Monthly

MAP Maintenance Action Plan

MDI Mission Dependency Index

MEP Mechanical, Electrical and Plumbing

MILCON Military Construction

MPAS Monthly Performance Assessment Summary

MRI Mission Readiness Index

NAVFAC Naval Facilities Engineering Command

NIST National Institute of Standards and Technology

NIST SP National Institute of Standards and Technology Special Publication

NMCI Navy Marine Corps Intranet

NOSC Navy-On-Scene Coordinator

PAP Performance Assessment Plan

PAR Performance Assessment Representative

PAW Performance Assessment Worksheet

PEO Program Executive Officer

PM Project Manager

PM Planned Maintenance or Preventative Maintenance

POAM Plan of Action and Milestones

PRCSP Permit Required Confined Space Program

Acronym Title

PWS Performance Work Statement

PWO Public Works Officer

Q Quarterly

QC Quality Control

RSIP Regional Shore Infrastructure Plan

RPIE Real Property Inventory Equipment

RSL Remaining Service Life

SC Security Clearances

SDS Safety Data Sheets

SM Semimonthly

SPAR Senior Performance Assessment Representative

TE Technical Exhibit

VIQ Variation in Quantity

WBS Work Breakdown Structure

ATTACHMENT J-0200000-02

WAGE DETERMINATIONS

SEE SEPARATE ATTACHMENT

ATTACHMENT J-0200000-03

DIRECTIVES, INSTRUCTIONS, AND REFERENCES

Reference Title

29 CFR 1910 Occupational Safety And Health Standards

29 CFR 1915 Occupational Safety And Health Standards For Shipyard Employment

29 CFR 1926 Safety And Health Regulations For Construction

29 CFR 1910.120 Hazardous Waste Operations And Emergency Response

29 CFR 1926.59 Hazard Communication

29 CFR 1910.1025 Toxic And Hazardous Substances

29 CFR 1926.62 Occupational Health And Environmental Controls

29 CFR 1910.134 Respiratory Protection

29 CFR 1904 Recording And Reporting Occupational Injuries And Illness

40 CFR 82 Protection Of Stratospheric Ozone

40 CFR 247 Comprehensive Procurement Guideline For Products Containing Recovered Materials

ANSI Z359.1 Fall Protection Code

ANSI/ISEA 107 Standard For High-Visibility Safety Apparel And Headwear

CNSSI 1253 Security Categorization and Control Selection for National Security Systems

Code of Federal

Regulations (CFR) 40

Environmental Protection Regulations

COMNAVREGMIDLAN

T HRINST 11320.11

Fire Prevention and Protection Regulations

Current The Joint Commission Standards

DFARS Clause 252.223-

Drug-Free Work Force

DoD Directive 5200.2 DoD Personnel Security Program (PSP)

DoD Memorandum

20220407

Response and Reporting of Aqueous Film Forming Foam Usage, and Accidental

Releases/Spills on Military Installations and National Guard Facilities

DoDI 8582.01 Security of Unclassified DoD Information on Non-DoD Information Systems

DODD 6055.9 DoD Explosives Safety Management and the DoD Explosives Safety Board

EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements

EPCRA Emergency Planning and Community Right to Know Act (EPCRA) of 1986

FAR Clause 52.232-36 Payment By Third Party

FAR 52.228-5 Insurance – Work On A Government Installation

FAR 52.237-2 Protection Of Government Buildings, Equipment, And Vegetation

FAR 52.237-3 Continuity Of Services

FAR 52.246-4 Inspection Of Services – Fixed Price

FAR 52.243 The "CHANGES" Clause, Section I

MARADMIN 585/20 Aqueous Film Forming Foam (AFFF) Usage and Spill Reporting

NAVFACINST 4161.1 Accountability, Tracking, and Management of Government-Furnished Property

NAVFACINST 11010.45 Regional Planning Instruction (Site Approval Process)

NAVFAC P-78 Real Property Inventory Procedures Manual

NFPA 10 Standard For Portable Fire Extinguishers

NFPA 70 National Electrical Code

NFPA 70E Standard For Electrical Safety In The Workplace

NFPA 99 Health Care Facilities Code

NFPA 110 Standard For Emergency And Standby Power Systems

NICET National Institute for Certification in Engineering Technologies

NIST SP 800-171

Revision 1

Protecting Controlled Unclassified Information in Nonfederal Information Systems and

Organizations

NIST SP 800-53 Security and Privacy Controls for Federal Information Systems and Organizations

OPNAVINST 11000.16 Command Responsibility for Shore Activity Land and Facilities

OPNAVINST 11010.20 Navy Facilities Projects

OPNAVINST 11011.10 Utilization of Navy Real Property

OPNAVINST 5100.23F Navy Occupational Safety and Health Program Manual

OSHA 29 CFR Occupational Safety and Health Regulations

P.L. 91-190 National Environmental Policy Act (NEPA) pf 1969

P.L. 91-596 Occupational Safety and Health Act

SECNAVINST 11011.47 Acquisition, Management, and Disposal of Real Property and Real Property Interests by the Department of the Navy

UFC 2-000-5N Facility Planning Criteria for Navy/Marine Corps Shore Installations

UFC 3-601-02 Operations and Maintenance: Inspection, Testing, and Maintenance of Fire Protection

Systems

UFC 3-560-01 Operation and Maintenance: Electrical Safety

ATTACHMENT J-0200000-04

INVOICE FORM

TO BE INSERTED BY CONTRACT SPECIALIST

ATTACHMENT J-0200000-05

FORMS

ATTACHMENT J-0200000-05-01

CRANE OPERATING CHECKLIST FOR CRITICAL LIFTS

ATTACHMENT "A"

CONTRACTOR CRANE OPERATING CHECKLIST FOR CRITICAL LIFTS YES NO

1 Does the operator know the weight of the load to be lifted?

Is the load to be lifted within the crane manufacturer's rated capacity in its present configuration?

3 Is the crane level and on firm ground?

4 Are outriggers required?

5 If so, are outriggers fully extended and down, and the load off the wheels.

6 If blocking is required, is the entire surface of the outrigger pad supported, and is the blocking material of sufficient strength to safely support the loaded outrigger pad?

If outriggers are not used, is the crane rated for on-rubber lifts by the manufacturer's load chart?

Is the swing radius of the crane counterweight clear of people, obstructions, and accessible areas within the swing area barricaded to prevent injury, damage and unplanned encroachment?

Has the hook been centered over the load in such a manner to prevent swing (deflection, side loading, load-moment)?

Is the load well secured and balanced in the sling or lifting device before it is lifted (free and clear) more than a few inches?

11 Is the lift swing path clear of obstructions?

12 If rotation of the load being lifted is hazardous, is tag line or restraint line being used?

13 Are personnel prevented from standing or passing under a suspended load?

14 Are personnel prevented from entering the load fall zone?

15 Is the crane operator's attention diverted?

16 Are proper signals being used at all times?

17 If radio communications are used, is the frequency isolated to the crane team.

18 Do the operations ensure that side and tip loading is prohibited?

Are start and stop motions in a smooth fluid motion (no sudden acceleration or deceleration)?

If operating near electric power lines, are the rules and guidelines understood and adhered to as specified in NAVFAC P-307?

21 Is the lift a critical lift?

If so, are critical lift regulations understood, check-off sheets initialed and signed off, and was there an interactive brief conducted with associated personnel?

23 Is Attachment "A" current, filled out completely, and posted in the crane?

Contractor Name (Print Legibly):

Contractor Name (Signature):

Location: Date:

ATTACHMENT J-0200000-05-02

CRANE AND RIGGING GEAR

CRANE AND RIGGING GEAR ACCIDENT REPORT

Accident Category: Crane Accident Rigging Gear Accident

From:

UIC:

To: Navy Crane Center Bldg. 491 NNSY Portsmouth, VA 23709 Fax: 757-967-3808

Activity:

Report No:

Crane No:

Category:

Accident Date:

Time: hrs:

Category of Service: SPS GPS Crane Type:

Crane Manufacturer:

Was Crane/Rigging Gear Being Used in SPS: Yes No Was Crane/Rigging Gear Being Used in a Complex Lift/Critical

Non-Crane Rigging Operation: Yes No

Location:

Weather:

Crane Capacity:

Hook Capacity:

Weight of Load on hook:

Fatality or Permanent Disability? Yes No

Material/Property Cost Estimate:

Reported to NAVSAFECEN? Yes No

Accident Type:

Personal Injury Overload Derail Damaged Rigging Gear

Load Collision Two Blocked Dropped Load Damaged Crane

Crane Collision Damaged Load Other: Specify

Cause of Accident:

Improper Operation Equipment Failure Inadequate Visibility

Improper Rigging Switch Alignment inadequate Communication

Track Condition Procedural Failure Other: Specify

Chargeable to:

Crane Walker Rigger Operator

Maintenance Management/Supervision Other: Specify

Crane Function:

Travel Hoist Rotate Luffing Telescoping Other N/A

Is this accident indicative of a recurring problem? Yes No

If yes, list Accident Report Nos.:

ATTACH COMPLETE AND CONCISE SITUATION DESCRIPTION AND CORRECTIVE/PREVENTIVE ACTIONS TAKEN AS ENCLOSURE (1). Include probable cause and contributing factors. Assess damages and define responsibility. For equipment malfunction or failure, include specific description of the component and the resulting effect or problem caused by the malfunction or failure. List immediate and long term corrective/preventive actions assigned and respective codes.

Preparer:

Phone:

E-mail:

Code:

Date:

Concurrences: (Include Code, Signature and Date)

Certifying Official (Crane Accident Only):

CRANE AND RIGGING GEAR ACCIDENT REPORT INSTRUCTIONS

This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is m_nfsh_ncc_accident@navy.mil. The fax number is (757) 967-

3808.

1. Accident Category: Indicate either crane accident or rigging gear accident.

2. From: The naval activity that is responsible for reporting the accident and UIC number.

3. Activity: The naval activity where the accident took place.

4. Report No.: The activity assigned accident number (e.g., 95-001).

5. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.

6. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.

7. Accident Date: The date the accident occurred.

8. Time: The time (24 hour clock) the accident occurred (e.g., 1300).

9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).

10. Crane Type: The type of crane involved in the accident (e.g., mobile, bridge), if applicable.

11. Crane Manufacturer: The manufacturer of the crane (e.g., Dravo, Grove, P&H), if applicable.

12. SPS: Was the crane or rigging gear being used in an SPS lift?

13. Complex lift: Was the crane or rigging gear being used in a complex lift?

14. Location: The detailed location where the accident took place (e.g., building 213, dry dock 5).

15. Weather: The weather conditions at time of accident (e.g., wind, rain, cold).

16. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.

17. Hook Capacity: The capacity of the hook involved in the accident at the max radius of the operation, if applicable.

18. Weight of Load on Hook: If applicable, the weight of the load on the hook.

19. Fatality or Permanent Disability?: Check yes or no.

20. Material/Property Cost Estimate: Estimate total cost of damage resulting from the accident.

21. Reported to NAVSAFECEN?: Self-explanatory.

22. Accident Type: Check all that apply.

23. Cause of Accident: Check all that apply.

24. Chargeable to: Check all that apply.

25. Crane Function: Check all functions in operation at time of accident. Check N/A if a rigging gear accident.

26. Is this a recurring problem?: Check yes or no. Identify any other similar accidents.

27. Situation Description/Corrective Actions: Self-explanatory.

28. Preparer: Self-explanatory.

29. Concurrences: Self-explanatory.

30. Certifying Official (Crane Accidents Only): Self-explanatory.

31. Brief Description: No more than one paragraph summarizing the resultant incident.

32. Background and Detailed Description: Provide the relevant background in a descriptive timeline of preconditions leading up to the event, as well as a detailed description of the event.

33. Corrective Actions: List all short term and long term corrective actions that are taken to prevent recurrence of the incident. Short Term

Corrective Actions are those actions taken that will allow return to work in short time frame. Long Term actions are more ‘programmatic’ in nature and typically include process revision, changes in training, ‘mistake proofing’, etc.

ATTACHMENT J-0200000-05-03

CONTRACTOR INCIDENT REPORT SYSTEM (CIRS)

INITIAL REPORT FOLLOW-UP REPORT FINAL REPORT

Date / _/ _

1. Contract Information Incident Information

Prime Contractor: Cage Code:

Contract Number: Installation of Incident:

Task Order #: Contracting Activity/ROICC Office:

Contractor Contact Information

Name (Last, First): Phone #:

Email Address: Date Notified:

2. Incident Type (Please Check/Bold All That Apply)

Assault/Violent Act Extreme Environmental Exposure Man over the side (No water entry)

Diving Falls, slip, trip, or bodily exertion Man Overboard - Water Entry

Electrical Shock/Burns Fires - All Types Material Handling Equipment

Equipment

Installation/Repair Hazardous Material (any type) Ordnance-Related (Explosive)

Explosion, Non-Ordnance Industrial

Vehicle (Government or Private) (Select Additional Below)

Industrial Incident Additional Information (Please Check/Bold All That Apply)

Confined Space Hand and Power Tools Work Platforms and Scaffolding

Demolition/Renovation Rigging Underground Construction, Shafts, and

Caissons

Trenching/Entrapment Cranes and Hoisting Equipment Concrete, Masonry, Steel Erection and

Residential Construction

Traffic Control Floating Plant and Marine Activities Tree Maintenance and Removal

Welding and Cutting Pressurized Equipment and System Airfield and Aircraft Operations

Control of Hazardous Energy Fall Protection

3. General Information Incident Information

Date of Accident: Time of Accident:

Describe the accident in detail in your words: (Use the back of page if you need additional space)

Exact Location of Accident:

Were Hazardous Material(s) Involved Yes No

If Yes, Explain What Hazardous Materials Were Involved and Why:

Who Provided Clean-up? Onsite Base Public

Activity of the injured person at the time of incident:

Personal Protective Equipment: (Check/Bold Response)

Available and used Available and not used Not Required

Not related to Mishap Wrong PPE for job

List PPE Used:

4. Fully Explain What Allowed or Caused the Incident: Incident Information

Direct Cause:

Indirect Cause:

Additional Action Taken: (Please Include a Begin Date and Est. End Date in Description)

Additional Action Taken: (Please Include a Begin Date and Est. End Date in Description) (Use the back of page if you need additional space)

5. Contributing Factors:

Was Visibility Restricted? Yes No Distance Visibility was restricted:

Unit of Measure (Check/Bold): Feet Yards Meters Miles Nautical Miles

Visibility Restricted By: (Check/Bold all that apply)

Fog Smoke Rain Sleet Snow

Mist Dust Sandstorm Unknown Object Other:

Lighting Conditions at Site of Mishap:

(Please Check)

Adequate Inadequate Unknown

Was Noise Level a Factor:

(Please Check)

Yes No Unknown

Was Carbon Monoxide (CO) a

Factor:(Please Check)

Yes No

If Yes CO Alarm Manufacturer:

5. Contributing Factors: Continued Incident Information

Other Contributing Factors:

6. Attached Documents

Attached Documents/Files Name/Description:

Date Added:

Uploaded By:

1. Injured Data (if applicable) Person #

Age: Gender:

(Check/Bold)

Male Female

Prime Contractor Company Name: Subcontractor Company Name:

2. General Information

Drug or Alcohol Involved: (Check/Bold all that apply)

None Unknown Alcohol Drugs Alcohol and Drugs

Who Provided First Aid? Onsite Base Public

Was Ergonomics a Factor: (Check/Bold) Yes No

Type of Ergonomic Injury: (Check/Bold All That Apply)

Lifting Positioning Bending Equipment Placement Office

Equipment Placement Industrial Repetitive Motion Impact Strain

3. Injury Illness/Fatality Information

Severity of Injury/Illness: (Check/Bold)

Fatality Lost Workday Case Involving Days Away From Work

Temporary Disability Recordable Workday Case Involving Restricted Duty

Permanent Total Disability Other Recordable Case Recordable First Aid Case

Permanent Partial Disability Non-Recordable Case No Injury

Where There Days Lost:

(Check/Bold)

Yes No

Where There Days Hospitalized:

(Check/Bold)

Yes No

Where There Days Restricted Duty:

(Check/Bold)

Yes No

Part of Body Affected:

Nature of Injury or Illness:

Event or Exposure:

Source of Injury or Illness:

General Location Description:

Injury Activity Code:

4. License (if applicable) Person #

Are Appropriate License and Certification/Medical Current: (Check/Bold) Yes No

Describe or Explain:

Attach Image of License or Certification

5. Training

Was all the contract-required training provided to the employee: (Check/Bold) Yes No

Explain:

6. Attached Documents

Attached Documents

1. Involved Person Data (if applicable) Property Damage

Age: Gender:

Male Female

Contractor: Contractor:

2. Attached Documents

Attached Documents

3. Property Damaged

Was Anyone Injured: Yes No Was A Government Motor Vehicle Involved: Yes No

Property Type

Property ID #

Detailed Description

Property

Owned By

Estimated

Cost USD

Lost

Use

Days

4. License (if applicable) Property Damage

Are Appropriate License and Certification/Medical Current: (Check/Bold) Yes No

Describe or Explain:

Attach Image of License or Certification

5. Training

Was all the contract-required training provided to the employee? (Check/Bold) Yes No

Explain:

CONTRACTOR INCIDENT REPORT SYSTEM (CIRS)

INSTRUCTIONS Complete Only Sections Appropriate to Incident

(Rev. 03/11).

NOTE: THE ATTACHED CIRS FORM IS TO BE USED BY CONTRACTORS TO RECORD THE RESULTS OF

THEIR ACCIDENT/INCIDENTS INVESTIGATIONS AND SHALL BE PROVIDED TO THE CONTRACTING

OFFICER WITHIN THE REQUIRED TIMEFRAMES.

GENERAL. Complete a separate report for each person who was injured in the accident pages 5-6. A report needs to be completed for all OSHA recordable accidents and property damage cases. Please type or print legibly. Appropriate items shall be Checked/Bolded, non-applicable sections shall be marked “N/A”. If additional space is needed, provide the information on a separate sheet of paper and attach to the completed form.

Mark the report: (Check/Bold)

Initial: If this form is being used as initial notification of a Fatality or High Visibility Mishap. The initial form is due within 4 hours of a serious accident. A form marked ‘Follow-up’ or ‘Final’ is required within 5 days.

Follow-Up: If you are providing additional information on a report previously submitted.

Final: If you are providing a completed report and expect no changes.

Incident Information Section 1 Contract Information – Incident Information

Prime Contractor: Name as it appears on contract documents.

Cage Code: If known.

Contract Number: Number as it appears on the contract documents.

Installation: Name of installation where incident occurred.

Task Order #: Insert number if applicable.

Contracting Activity/ROICC Office: Enter the name and address of the Contracting Office administering the contract under which the mishap took place (e.g. ROICC MCBH, ROICC NORFOLK, PWC GUAM, etc.).

Contractor Contact Information: (Contractor point of contact information for the individual responsible for completing the form) Self Explanatory

Section 2 Incident Type: Check/Bold most applicable category, if you select Industrial you must Check/Bold at least one additional category from the Industrial Incident Additional Information Section.

Section 3 General Information Incident Information

Date of Accident: Enter the month, day, and year of accident.

Time of Accident: Enter the local time of accident in military time. Example: 14:30 hrs (not 2:30 p.m.).

Describe the Accident in Detail in your words: Fully describe the accident in the space provided. If property damage involved, give estimated dollar amount of damage and/or repair costs involved. If additional space is needed continue on a separate sheet and attach to this report. Give the sequence of events that describe what happened leading up to and including the accident. Fully identify personnel and equipment involved and their role(s) in the accident. Ensure that relationships between personnel and equipment are clearly specified. Ensure questions below regarding direct cause(s), indirect cause(s), and actions taken are answered. NOTE! Review questions in Section 4 (Fully Explain What Allowed or Caused the Incident -

Incident Information) below before completing.

Exact Location of Accident: Enter facts needed to locate the accident scene (e.g. installation/project name, building/room number, street, direction and distance from closest landmark, etc.).

Were Hazardous Material(s) Involved Yes No

If Yes, Explain What Hazardous Materials Were Involved and Why: Check or Bold appropriate block and list name(s) and quantities of hazardous materials spilled/released during the mishap. List why the hazardous chemicals were being used.

Activity at the time of incident: What type of work/task was being performed by the injured when the injury took place or property damage occurred.

Personal Protective Equipment– Check/Bold appropriate items and list PPE which was being used by the injured person at the time of the accident (e.g. protective clothing, shoes, glasses, goggles, respirator, safety belt, harness, etc.)

Section 4 Fully Explain What Allowed or Caused the Incident - Incident Information

Direct Cause(s): The direct cause is that single factor which most directly lead to the accident. See examples below.

Indirect Cause(s): Indirect cause are those factors, which contributed to, but did not directly initiate the occurrence of the accident.

Examples for Direct and Indirect Cause:

1. Employee was dismantling scaffold and fell 12 feet from unguarded opening.

Direct cause: Failure to provide fall protection at elevation

Indirect causes: Failure to enforce safety requirements: improper training/motivation of employee (possibility that employee was not knowledgeable of fall protection requirements or was lax in his attitude toward safety); failure to ensure provision of positive fall protection whenever elevated; failure to address fall protection during scaffold dismantling in phase hazard analysis.

2. Private citizen had stopped his vehicle at intersection for red light when vehicle was struck in rear by contractor vehicle. (note contractor vehicles was in proper safe working condition.)

Direct cause: Failure of contractor driver to maintain control of and stop contractor vehicle within safe distance.

Indirect cause: Failure of employee to pay attention to driving (defensive driving).

Additional Action Taken: Fully describe all the actions taken, anticipated, and recommended to eliminate the cause(s) and prevent reoccurrence of similar accidents/illnesses. Continue in the additional box and or on additional sheets of paper if necessary to fully explain and attach to the completed report form.

Please Include a Begin Date and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .