This is a request for proposal for an indefinite delivery/indefinite quantity multiple award construction contract to provide general construction services at various facilities in the Hampton Roads area of responsibility in Virginia. The contract will result in the award of approximately eight firm-fixed-price IDIQ contracts for a one-year base period and four one-year options. Construction projects will primarily consist of general building projects ranging from $75,000 to $5,000,000 and may involve new construction, demolition, repair, alteration, and renovation. Services will include design-build and design-bid-build projects for facilities such as administrative buildings, industrial buildings, warehouses, hangars, maintenance buildings, and more. The selected contractors will compete for individual task orders that will have separate evaluation criteria and completion dates. The intent is for all contractors to submit proposals for each task order RFP. The initial project awarded with the contracts will be building repairs and renovations at a facility in Norfolk, Virginia.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN-BUILD/DESIGN-BID-BUILD, INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) FIRM FIXED PRICE (FFP) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR FACILITIES PRIMARILY IN THE HAMPTON ROADS AREA OF RESPONSIBILITY (AOR).
THIS PROCUREMENT IS BEING SOLICITED AS AN 8(a) SET-ASIDE.
DEMETRICE JENKINS
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
02-May-2022
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT
CALLS) 757-341-1973
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________01 Jun 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N4008522R2627 59
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N4008522R2627
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 249,000,000
FFP
Design-Build (DB)/Design-Bid-Build (DBB), Indefinite Delivery/Indefinite Quantity (IDIQ) Firm Fixed Price (FFP) Multiple Award Construction Contract (MACC) for Facilities Primarily In The Hampton Roads Area of Responsibility
(AOR).
FOB: Destination
NET AMT
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
Section 00 21 13 - Instructions to Bidders
INSTRUCTIONS TO BIDDERS
INSTRUCTIONS TO OFFERORS
TABLE OF CONTENTS
1. GENERAL
1.1 NOTICE TO OFFERORS
1.2 GENERAL OVERVIEW OF PROCUREMENT PROCESS
1.3 GENERAL OVERVIEW OF CONTRACT
2. GENERAL OVERVIEW OF THE SEED PROJECT
3. BASIS FOR AWARD
4. EVALUATION FACTORS FOR AWARD
5. PROPOSAL REQUIREMENTS
5.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT
5.2 PROPOSAL SUBMISSION INSTRUCTIONS
5.4 SAM.GOV
5.5 INCORPORATION OF TECHNICAL PROPOSALS
6. ATTACHMENTS
6.1 ATTACHMENT A – CONSTRUCTION EXPERIENCE PROJECT DATA SHEET
6.2 ATTACHMENT B – PAST PERFORMANCE QUESTIONNAIRE
6.3 ATTACHMENT C – PPI LOG TEMPLATE
6.4 ATTACHMENT D – PIEE INSTRUCTIONS
1. GENERAL
1.1 NOTICE TO OFFERORS
1.1.1 THIS SOLICITATION IS BEING ISSUED AS AN 8(A) SET-ASIDE IN ACCORDANCE WITH 13 CFR §
124.507. THE NAICS CODE FOR THIS PROCUREMENT IS 236220 AND THE SIZE STANDARD IS $39.5M.
1.2 GENERAL OVERVIEW OF PROCUREMENT PROCESS
1.2.1 This solicitation is formatted as a Request for Proposal (RFP) in accordance with the requirements designated by sections of the FAR 15.203. This method permits evaluation of proposals based on price competition, technical merit and other factors; permits impartial and comprehensive evaluation of offerors' proposals; permits discussions if necessary; and ensures selection of the source whose performance provides the best value to the Government. This acquisition will be solicited as a competitively negotiated procurement as a total small business set-aside.
1.2.2 The Government reserves the right to reject any or all proposals at any time prior to award; to negotiate with any or all offerors; to award the contracts to other than the offeror submitting the lowest total price; to award to other than the offeror submitting the highest technically rated proposal; and to award to the offeror submitting the proposal determined by the Government to be the most advantageous (best value) to the Government. OFFERORS
ARE ADVISED THAT AWARD MAY BE MADE WITHOUT DISCUSSION OR ANY CONTACT
CONCERNING THE PROPOSALS RECEIVED. Therefore, proposals should be submitted initially on the most favorable price and technical terms. Offerors should not assume that they will be contacted or afforded an opportunity to qualify, discuss, or revise their proposals. However, the Government reserves the right to clarify certain aspects of proposals or conduct discussions providing an opportunity for the offeror to revise its proposal.
1.3 GENERAL OVERVIEW OF CONTRACT
1.3.1. This acquisition will result in the award of approximately eight (8), Firm Fixed Price (FFP) Indefinite- Delivery/Indefinite Quantity (IDIQ), Design-Build/Design-Bid-Build Multiple Award Construction Contracts (MACCs) for facilities primarily in the Hampton Roads Area of Responsibility (AOR). The Hampton Roads AOR includes the following locations: NAS Oceana and Dam Neck Annex, JEB Little Creek-Fort Story, NASA Wallops Island, NAVSTA Norfolk, NSA Hampton Roads, Norfolk Naval Shipyard, NWS Yorktown and Cheatham Annex, and NSGA Sugar Grove. The Government intends to award approximately eight (8) contracts resulting from this solicitation to the responsible offerors whose proposals represent the best value after evaluation in accordance with the factors in the solicitation.
1.3.2. Construction projects to be performed under this MACC will primarily consist of general building projects and may be either design-bid-build or design-build. General construction of DB and DBB projects include, but are not limited to, new construction, demolition, repair, alteration, and renovation of buildings, systems and infrastructure, and may include architectural, civil, structural, mechanical, electrical, fire protection, and/or communication systems. Types of facilities may include administrative, industrial, maintenance, warehouses, hangars, communications, personnel support, recreation, lodging, dormitory, medical, training, ranges, roads, etc., in support of Naval Facilities Engineering Command, Mid-Atlantic, Various Facilities in the Hampton Roads Area of Responsibility, Virginia
1.3.3 The completion date for the basic contract is one (1) year from the date of contract award with four (4) one-year option periods, not to exceed 60 months. The total five-year (base and four one-year options) estimated construction cost for all contracts is not to exceed $249,000,000.00 for the life of the contract. Projects for the MACC have an estimated construction cost between $75,000, and $5,000,000; however, smaller and larger dollar value projects may be considered at the discretion of the Contracting Officer. The Government guarantees an award amount of $5,000.00 to each successful offeror over the full term of the contract, including option years.
1.3.4 After award of the initial contracts and “seed” project, the successful IDIQ contractors will compete for task orders based on best value, using the tradeoff process or lowest price technically acceptable (to include lowest price). Only the successful IDIQ contractors will compete for task orders. Should an IDIQ contractor with a guaranteed minimum be unable to competitively secure a task order to meet the $5,000 minimum guarantee, the Government reserves the right to negotiate a task order directly with that contractor.
1.3.5 The intent of this contract is that all IDIQ Contractors participate in pre-proposal conferences and site-visits and submit proposals on each task order. Contract awardees will be expected to submit a proposal for all Task Order Requests for Proposal (RFP) received from the Government. However, in the event a MACC awardee is unable to submit a proposal on a particular RFP, the contractor is required to notify, in writing, the Contracting Officer who issued the RFP and the ACO for the basic contract within five (5) working days from receipt of the RFP. A MACC awardee can only elect to withdraw from submitting a proposal on three (3) task order RFPs during the course of each year of the contract (base plus four options). Additional withdrawal requests, in excess of three per year, may result in the Government choosing not to exercise remaining option terms.
1.3.6 Each task order will contain project specific evaluation factors that will vary depending on the unique requirements for each task order. Additionally, each task order will cite a specific completion date and associated liquidated damages.
1.3.7 Contractor Performance Information: Contractor’s performance will be evaluated using the respective contractor performance evaluation report entry system located on the website http://www.cpars.gov/. Prior to commencement of work the contractor is required to provide the government with the name, phone number and e-mail address of the “Contractor’s Representative” that will be responsible for receipt and review of draft performance evaluations prepared by the government in the appropriate system. It is the contractor’s responsibility to keep this contact information current.
2. GENERAL OVERVIEW OF THE SEED PROJECT
2.1 The initial project to be awarded as the first task order along with the basic contract will be Building SP-254, Repairs & Renovations, NSN Hampton Roads, Norfolk, VA.
* Solicitation Section 01 00 00 will include the General Requirements for the seed project.
2.2 Pursuant to FAR 52.232-18, Availability of Funds, the Government's obligation under this solicitation, or any task order or contract that might result from the solicitation is entirely subject to, and contingent upon, the availability of appropriated funds. Should the Government be unable to award the seed project, the Government guarantees an award in the amount of $5,000.00 to each successful offeror upon award of the Multiple Award Construction Contracts. This minimum guarantee is over the full term of the contract, including option years. No legal liability on the part of the Government shall arise until funds are made available to the Contracting Officer and a task order or contract is awarded by the Contracting Officer. Any offeror proposing on this solicitation does so at its own cost and with the full knowledge that a task order for the seed project, might not result from this solicitation.
3. BASIS FOR AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contracts; to negotiate with offerors in the competitive range; and to award the contracts to the offerors submitting the proposals determined to represent the best value—the proposals most advantageous to the Government, cost/price and other factors considered.
2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
4. As stated in the solicitation, the relative order of importance of the non-price evaluation factors is that the technical factors (Factors 1,2,3) are of equal importance to each other and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment (Factor 4). When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-price evaluation factors) are of approximately equal importance to price. In the event proposals are considered essentially equal in terms of the non-price factors, the importance of price will increase.
5. Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions. Proposals may be found to have either a Significant Weakness or multiple Weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified Weakness(s) and the associated risk to successful contract performance resulting from the Weakness(s). This assessment must provide the rationale for proceeding to award without discussions.
4. EVALUATION FACTORS FOR AWARD
Instructions to Offerors:
1. The solicitation requires the evaluation of price and the following non-cost/price factors:
Factor 1 – Experience Factor 2 – Safety
Factor 3 – Management Approach Factor 4 – Past Performance
The distinction between Experience and Past Performance is that Experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. The relative order of importance of the non-cost/price evaluation factors is the technical factors are of equal importance to each other and when combined are equal importance to the past performance confidence assessment (Factor 4 - Past Performance). When the proposal is evaluated as a whole, the technical factors and past performance/performance assessment, combined (i.e., the non-cost/price evaluation factors) are approximately equal in importance to price.
The importance of price will increase if the Offerors’ non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
3. Basic of Evaluation and Submittal Requirements for Each Factor.
(a) Price
(1) Solicitation Submittal Requirements:
Price shall be submitted on the Price Proposal Form included in the solicitation. The offeror shall submit one (1) electronic copy marked original via PIEE, one (1) hard copy marked copy and one (1) CD of the solicitation submittal requirements identified below. In case of variation, the original electronic copy proposal takes precedence over hard copies. Also, price information included in the non-price/technical proposal will not be considered.
Likewise, nonprice/technical information included in the price proposal will not be considered.
(i) Executed SF1442. Offeror shall insert its company name and address in Block #14, telephone number in Block #15, acknowledge all amendments in Block #19 (if applicable), name and title of person authorized to sign in Block #20A, signature in Block #20B, and offer date in Block #20C of the SF1442. In addition, Offeror shall provide its Unique Entity ID Number, CAGE code, and Federal Tax ID number with its proposal.
(ii) Completed Price Proposal Form for the SEED Project.
(iii) Bid Bond (SF-24). Offeror shall submit a bid bond (SF-24) in the amount of 20% of total project bid price for the seed project or $3M, whichever amount is less. The bid bond shall be in the name of the offeror identified on the SF1442. In addition, the offeror shall provide a letter from its bonding company confirming that it has an aggregate bonding capacity of at least $10,000,000.
(iv) SAM registration. Offeror shall ensure current registration on the SAM Website, www.sam.gov, including Annual Representations and Certifications are complete and updated for this procurement. If a Representation or Certification required by Section 00600 of the RFP is not provided in SAM, include the representation or certification in your price proposal.
(v) FAPIIS Certification. Offeror shall ensure Federal Awardee Performance and Integrity Information System (FAPIIS) Certification as required by FAR 52.209-7, Information Regarding Responsibility Matters.
(vi) VETS-4212 registration. Offeror shall ensure a current VETS-4212 report has been submitted to the Department of Labor (DOL) website, http://www.dol.gov/vets/vets4212.htm, if the Offeror is required to submit. An email confirmation of submission can be requested and received by the Offeror from the DOL website and submitted in the price proposal. If the Offeror is not required to submit a report to VETS-4212, include a brief statement and justification explaining why the Offeror is not required to submit a report. Visit the VETS-4212 website for details concerning if your company is required to submit a VETS-4212 report and to request an email confirmation of submission.
ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:
1. One (1) Signed Bank Reference demonstrating adequate financial resources. If offeror’s firm has a line of credit
– provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required.
2. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization.
Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror. Offerors are not required to submit financial information as detailed in the price submission instructions via PIEE. However, if this is the case, the submitted copies in the hard copy proposal must be received no later than the established due date and time.
3. Description of offeror’s facilities and equipment.
4. Other offeror’s work presently under contract.
Although required to be submitted with offeror’s price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm’s responsibility determination should your firm be considered for award. Proposal packages from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.
(2) Basis of Evaluation: The Government will evaluate price based on the total pricefor the seed project. Total price consists of the basic requirements and all option and planned modification items. The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGCE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.”
(b) Non-cost/price Factors:
Non-price binder: The offeror shall submit one (1) electronic copy marked “Original” via PIEE, one hard copy marked “copy” in a separate three-ring binder (1.5 inch.
maximum), and one electronic copy on CD with the following characteristics:
Text pages 8 ½ x 11 format Drawings 11x17 inches and folded down to 8-1/2 x 11 inches Minimum 11 point font, Times New Roman One – CD ROM with one complete electronic copy of the technical proposal factors as a single
.pdf searchable file with Section bookmarks. CD-ROM shall be include with the hard copy technical submission. If there are any conflicts between hard copies and/or electronic copies, the “Original” electronic submission will govern.
Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, Unique Entity ID Number, Cage Code, Point of Contact, Title, phone number, and email address.
In case of variation, the original electronic proposal takes precedence over hard copies.
Also, price information included in the non-price/technical proposal will not be considered. Likewise, non-price/technical information included in the price proposal will not be considered.
Factor 1 – Experience
(a) Solicitation Submittal Requirements:
The Offeror shall submit the following information:
(1) Construction Experience:
Offerors shall submit a minimum of three (3) up to a maximum of five (5) relevant construction projects as the prime contractor that best demonstrate the Offeror’s experience on projects that are similar in size, scope, and complexity to the projects proposed for this MACC.
For purposes of this evaluation, a relevant project is further defined as follows:
Size: A final construction cost of $500,000 or greater. At least one (1) project must have a final construction cost of $2,000,000 or greater.
Scope and Complexity: Individual projects shall demonstrate experience with at least one of the following:
New Construction or Building Addition of commercial and institutional buildings Interior and exterior alteration or renovation of a building that includes repairs to multiple building systems and infrastructures
Additional requirements: Relevant Projects, cumulatively, must demonstrate the following characteristics:
Acted as the Prime contractor on all submitted projects. Subcontractor experience will not considered.
Experience with design-build projects (at least one (1) project) Experience with new construction or building addition (at least one (1) project) Experience with renovation or alteration (at least one (1) project)
Note: Projects submitted that only include horizontal or civil site work will not be considered.
Ensure that the project description clearly identifies whether or not the project is new construction or renovation, the final construction cost, and addresses how the project meets the scope/complexity requirements.
Projects submitted for the Offeror shall be completed within the past five (5) years of the date of issuance of this
RFP.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project and will not be considered.
The attached Construction Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design or the Government reserves the right not to consider the project. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages). Information beyond this page limit will not be considered.
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture itself does not have experience, projects should be submitted for each Joint Venture member. Offerors who fail to submit experience for all Joint Venture members may be rated lower.
Offerors are still limited to a total of five (5) projects combined. If an Offeror is proposing as a mentor-protégé 8a JV, a signed, SBA approved JV agreement and a signed SBA Approval letter must be submitted within this factor.
Additionally, the Offeror must identify the percentage of work to be performed by each partner.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.
Experience of proposed subcontractors will not be considered.
(2) Design Experience:
Both design-build and design-bid-build projects may be contemplated under this MACC. Therefore, the Offeror is required to address the design firm proposed to be utilized on anticipated future projects. Offerors shall clearly state the Architect-Engineer firm that is proposed to be utilized as the Designer of Record (DOR) for future task orders under this MACC. Provide the full name of the firm, address, Unique Entity ID Number, and CAGE code. The awardees will be required to use the designated firm as the DOR on future design-build task orders under the resulting MACC, unless a substitution is approved by the Contracting Officer for the proposed task order. The Offeror must provide a supporting signed joint venture agreement, partnership agreement, teaming agreement, or letter of commitment demonstrating the agreement for the duration of this MACC with the Architect-Engineer firm that is proposed to be utilized as the Designed of Record (DOR).
Offerors shall submit a minimum of three (3) up to a maximum of five (5) relevant projects as the designer of record that best demonstrate your experience in a diverse range of design tasks similar in size, scope and complexity to the projects proposed for this MACC.
For purposes of this evaluation, a relevant project is further defined as follows:
Size: A final construction cost of $500,000 or greater. At least one (1) project must have a final construction cost of $2,000,000 or greater.
Scope & Complexity: Individual projects shall demonstrate experience with at least one of the following:
New construction or building addition of commercial and institutional buildings Interior and exterior alteration or renovation of a building that includes repairs to multiple building systems and infrastructures
Additional requirements: Relevant Projects, cumulatively, must demonstrate the following characteristics:
Experience with design-build projects (at least one (1) project) Experience with new construction or building addition (at least one (1) project) Experience with renovation or alteration (at least one (1) project)
Note: Projects submitted that only include horizontal or civil site work will not be considered relevant.
Ensure that the project description clearly identifies whether or not the project is new construction or renovation, the final construction cost, and addresses how the project meets the scope/complexity requirements. The absence of any such information may result in the Project being considered Not Relevant, which could result in a rating of UNACCEPTABLE for this Factor. The absence of one project that has a $2,000,000 or greater final construction cost that also meets the scope and complexity requirements will result in a rating of UNACCEPTABLE for this Factor. The absence of one relevant design-build project will result in the rating of UNACCEPTABLE for this Factor.
Projects submitted for the DOR shall have been completed within the previous five (5) years of the issuance date for this RFP. Submitted Projects that were not completed within this timeframe will be considered “Not Relevant”. For design-build projects, the design portion of the contract shall have been completed within the previous five (5) years of the issuance date of this RFP. The design completion date shall be clearly stated on the Construction & Design Experience Project Data Sheet (Attachment A). The project will be considered “Not Relevant” if the design completion date is not clearly provided.
Clearly define role in project and services provided. The absence of define role and services may result in the Project being considered Not Relevant, which could result in a rating of UNACCEPTABLE for this Factor.
A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project and will not be considered, rather Offerors shall submit the work performed under a task order as a project. The attached Construction & Design Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design or the Government reserves the right not to consider the project. Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider submissions via any other medium. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages). Information beyond this page limit will not be considered.
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. The Offeror shall provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract. If meanful involvement is not demonstrated, experience of the affiliate/subsidiary/parent firm will not be considered, and will be deemed “Not Relevant”.
The Offeror may utilize experience of a design subcontractor as the Designer of Record in order to demonstrate design experience under this evaluation factor. The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor. If the agreement/letter is not provided or meaningful involvement is not demonstrated, experience of the proposed designer will not be considered.
(ii) Basis of Evaluation:
The basis of evaluation will consider the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review the first five (5) projects submitted for construction experience and the first five (5) projects submitted for design experience. Additional submitted projects will not be considered.
Offerors submitting relevant projects where the Offeror and the proposed design firm(s) have previously worked together may receive a higher rating than offerors that have not previously worked with its proposed design team.
Relevant projects that demonstrate the ability to perform multiple projects simultaneously may be considered more favorably than those who do not have experience performing multiple simultaneous projects.
Offerors that demonstrate experience with sustainable features may receive a higher rating than those that do not demonstrate experience with sustainable features.
Factor 2 – Safety
(i) Solicitation Submittal Requirements:
The Offeror shall submit the following information:
The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative, as described below.
If Offeror is a partnership or joint venture, the Offeror shall submit separate DART and TCR rates for the specified five (5) CY for each contractor who is part of the partnership/joint venture; however, only one safety narrative is required.
Any fatalities experienced within this 5-year timeframe listed below must be explained in detail, to include root cause and corrective actions.
NOTE: DART and TCR shall not be submitted for subcontractors.
1. DART Rate: Submit DART Rate data for five (5) previous complete calendar years’ [CY2017, CY2018, CY2019, CY2020, and CY2021] worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why. Should negative trend occur above moderate risk levels, an acceptable/detailed explanation is required, that includes any corrective actions taken for improvement.
a. DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.
b. Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked.
DART RATE = Number of DART Incidents x 200,000 Total Number of Employee Labor Hours Worked
2. TCR Rate: Submit TCR rate for five (5) previous complete calendar years’ [CY2017, CY2018, CY2019, CY2020 and CY2021] worth of data (not an overall average). If the Offeror has no TCR rate, for any year, affirmatively state so and explain why. Should negative trend occur above moderate risk levels, an acceptable/detailed explanation is required, that includes any corrective actions taken for improvement.
a. TCR cases include injuries or illnesses resulting in death, day away from work, restricted work or transfer to another job days beyond the day of injury/illness, medical treatment beyond first aid, or loss of consciousness.
b. Calculation of TCR rate: Multiply the total number of TCR incidents by 200,000, and then divide by the number of employee labor hours worked.
TRC RATE = Number of TRC Incidents x 200,000 Total Number of Employee Labor Hours Worked
3. Technical Approach to Safety: Submit a narrative that addresses the following:
a. Describe the Offeror’ s approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.
b. Describes the evaluation process used to select potential subcontractors.
c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).
d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page. Information beyond the referenced page limit will not be considered.
4. The Government reserves the right to review other available sources (public/Government internal) of information.
These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.
(ii) Basis of Evaluation
The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.
1. DART Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.
a. Missing data without an explanation is considered a Deficiency.
b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) may be considered a Strength.
c. An increasing DART rate trend could be considered a Weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk HER)) if an acceptable explanation is not provided for any trends that rise above Moderate.
d. This chart correlates the DART rate to the level of risk:
Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0
2. TCR Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.
a. Missing data without an explanation is considered a Deficiency.
b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) may be considered a Strength.
c. An increasing DART rate trend could be considered a Weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk HER)) if an acceptable explanation is not provided for any trends that rise above Moderate.
d. This chart correlates the TCR rate to the level of risk:
Risk TCR Rate Very Low Risk Less Than 2.49 Low Risk From 2.5 to 3.49 Moderate Risk From 3.5 to 4.49 High Risk From 4.5 to 5.99 Extremely High Risk Greater than 6.0
3. The Technical Approach to Safety Narrative. The board will evaluate the submitted narrative to determine the degree to which the Offeror:
a. Describes a viable SMS that addresses elements; such as Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.
b. Describes a methodical process of evaluating subcontractor’s safety performance in their selection process.
c. Describes a logical management plan to hold themselves and their subcontractors accountable for adhering to the safety requirements of the contract.
d. The Technical Approach to Safety shall be limited to two (2) single-sided pages or one (1) double-sided page.
Information on pages beyond this will not be considered.
4. The Government may consider information from other available sources (public/Government internal) of information in determining a rating for the factor. These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.
Factor 3 - Management Approach:
(i) Solicitation Submittal Requirements:
Offeror shall submit a detailed Management Approach describing how the offeror intends to successfully complete the work awarded under this MACC. The narrative plan shall not exceed five (5) singled-spaced pages (information beyond the five (5) page limit will not be considered with the exception of the organizational chart) and, at a minimum, must address the following:
• Offeror’s strategy for successful execution of work award under resulting contract, managing multiple concurrent projects, and managing the geographic coverage of the contract requirements.
• Offeror’s plan for accomplishing the varied scope of work (Design-Build and Design-Bid-Build (fully designed)) for general construction
• The offeror shall provide the roles, responsibilities, and contractual relationships between the various firms that will perform with under this contract. The narrative shall also include a simple organizational chart that clearly identifies the lines of authority between the entities. (The organizational chart is not part of the page limitation).
(ii) Basic of Evaluation:
The narrative will be evaluated to determine whether the offeror’s management approach will contribute to successful performance for this contract. Proposals providing greater detail and demonstrating a greater understanding of the requirements, as outlined above, may be rated higher. Failure to address all elements set out above will render the proposal unacceptable.
Factor 4 - Past Performance:
(i) Solicitation Submittal Requirements:
If a completed a Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 for Construction Experience. If a completed a CPARS is available, it shall be submitted with the proposal for each project included in Factor 1 for Design Experience. If there is not a completed CPARS evaluation then the offeror shall submit Past Performance Questionnaires (Attachment F) for each project included in Factor 1 for both Construction Experience and Design Experience. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal.
Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. Offerors are permitted to provide copies of previously completed Past Performance Questionnaires (PPQs) in their proposal.
However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which must provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Demetrice Jenkins, demetrice.jenkins2.civ@us.navy.mil.
Offerors are strongly encouraged to provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Experience. Offerors are also strongly encouraged to address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total. Information provided beyond this page limitation will not be considered.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the offeror’s references or the references’ unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
Performance awards or additional information submitted will not be considered.
(ii) Basis of Evaluation:
This evaluation focuses on how well the Offeror performed on the relevant projects submitted under Factor 1 – Experience and past performance on other projects currently documented in known sources. More emphasis will be placed on more relevant projects. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/ Unique Entity ID numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance.
This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s past performance will be used as a means of evaluating the Offeror’s probability to successfully meet the requirements of the RFP.
Offerors lacking relevant past performance history will not be evaluated favorably or unfavorably in past performance and will receive an Unknown Confidence rating.
5. PROPOSAL REQUIREMENTS
5.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT
Information for the Site Visit pertaining to the seed project will be issued via Amendment once the final date/location has been determined.
5.2 PROPOSAL SUBMISSION INSTRUCTIONS
In response to this request for proposal, the complete proposal shall include both the Price Proposal and the Non- Price Factors Proposal, submitted in accordance with the above Basis of Evaluation and Submittal Requirements for Each Factor and as follows:
The Proposal shall be submitted through PIEE in accordance with the instructions in Attachment D as well as mailed hard copies below
5.2.1 Mailed Hard Copies:
One (1) original, one (1) CD-ROM, and one (1) copy of the hard copy proposal shall be delivered by mail on the date and time listed below, respectively, unless those dates are changed via Solicitation Amendement Any pricing information included in the Non-Cost/Price Factors proposal will not be considered.
This is the start of the file's text. The full file is on GovTribe.