Amendment 0014.pdf

PDF 213 KB Posted

Attached to
8A MACC, DB/DBB General Construction - HR AOR Federal contract opportunity
Solicitation number
N4008522R2627
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This amendment modifies a solicitation for an 8(a) Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) to provide general construction services primarily in the Hampton Roads area of Virginia.

The amendment revises the experience requirements under Factor 1 for the proposed Designer of Record by clarifying that relevant projects must demonstrate experience with new construction, building additions, or renovation that includes repairs to multiple building systems. It also incorporates the current applicable Davis-Bacon wage determination. Construction projects performed under the MACC will require management of concurrent task orders and encompass a wide range of design-build and design-bid-build projects such as demolition, repair, replacement, modification, and renovation of various facility types. The contract will support sustainment, maintenance, and minor construction programs.

View the file

Other files for this federal contract opportunity

Other files attached to 8A MACC, DB/DBB General Construction - HR AOR, newest first.
File Type Posted
Amendment 0013.pdf PDF
22R2627 0012 Factor 1.pdf PDF
22R2627 0011 PPI Responses.pdf PDF
22R2627 0010.pdf PDF
157541_SP-254_As-Builts.pdf PDF
1576521_SP-254_Supplementary Instructions to Offerors.pdf PDF
22R2627 0008 PPI Responses.pdf PDF
22R2627 0009 Addendum B.pdf PDF
22R2627 0007 Proposal Due Date.pdf PDF
22R2627 0006 Site Visit Log.pdf PDF
22R2627 0005 Proposal Due Date.pdf PDF
22R2627 0004 Proposal Due Date.pdf PDF
22R2627 0003 Site Visit.pdf PDF
22R2627 0002 Site Visit Cancel.pdf PDF
ODP Badge Access Request.xls XLS spreadsheet
SECNAV 5512.pdf PDF
22R2627 0001 Site Visit.pdf PDF
1576521_SP-254_DWGS_1of2.pdf PDF
1576521_SP-254_DWGS_2of2.pdf PDF
1576521_SP-254_Completed Environmental Checklist.pdf PDF
1576521_SP-254_SPECS.pdf PDF
1576521_SP-254_SUPPLEMENTARY INSTRUCTIONS TO OFFERORS.pdf PDF
Attachment C - PPI Inquiry Log.doc DOC document
Attachment B Past Performance Questionnaire (PPQ).pdf PDF
Attachment A - Construction and Design Experience Project Data Sheet 10-12.docx DOCX document
Attachment D PIEE Vendor Access Instructions.pdf PDF
N4008522R2627 RFP.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N4008522R2627 8(a) Indefinite Delivery, Indefinite Quantity (IDIQ) Design-Bid/Design-Bid-Build (DB/DBB) Multiple Aw ard Construction Contract (MACC) For General Construction, Primarily In the Hampton Roads Area of Responsibility, Virginia.

The Purpose of this Amendment is to provide a revision to Factor 1, Experience and to incorporate the current Wage Decision. (See Continuation pages) Contract Specialist: Philip J. Cole (757)341-1970 Email: philip.j.cole@navy.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Jan-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008522R2627

X 9B. DATED (SEE ITEM 11)

02-May-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jan-2023

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008522R2627

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0014

Non-Price Factor 1 is hereby changed as follows:

FROM

(2) Design Experience:

Both design-build and design-bid-build projects may be contemplated under this MACC. Therefore, the Offeror is required to address the design firm proposed to be utilized on anticipated future projects.

Offerors shall clearly state the Architect-Engineer firm that is proposed to be utilized as the Designer of Record (DOR) for future task orders under this MACC. Provide the full name of the firm, address, Unique Entity ID Number, and CAGE code. The awardees will be required to use the designated firm as the DOR on future design-build task orders under the resulting MACC, unless a substitution is approved by the Contracting Officer for the proposed task order. The Offeror must provide a supporting signed joint venture agreement, partnership agreement, teaming agreement, or letter of commitment demonstrating the agreement for the duration of this MACC with the Architect-Engineer firm that is proposed to be utilized as the Designed of Record (DOR).

Offerors shall submit a minimum of three (3) up to a maximum of five (5) relevant projects as the designer of record that best demonstrate your experience in a diverse range of design tasks similar in size, scope and complexity to the projects proposed for this MACC.

For purposes of this evaluation, a relevant project is further defined as follows:

Size: A final construction cost of $500,000 or greater. At least one (1) project must have a final construction cost of $2,000,000 or greater.

Scope & Complexity: Individual projects shall demonstrate experience with at least one of the following:

− New construction or building addition of commercial and institutional buildings − Interior and exterior alteration or renovation of a building that includes repairs to multiple building systems and infrastructures

Additional requirements: Relevant Projects, cumulatively, must demonstrate the following characteristics:

− Experience with design-build projects (at least one (1) project) − Experience with new construction or building addition (at least one (1) project) − Experience with renovation or alteration (at least one (1) project)

Note: Projects submitted that only include horizontal or civil site work will not be considered relevant.

Ensure that the project description clearly identifies whether or not the project is new construction or renovation, the final construction cost, and addresses how the project meets the scope/complexity requirements. The absence of any such information may result in the Project being considered Not Relevant, which could result in a rating of UNACCEPTABLE for this Factor. The absence of one project that has a $2,000,000 or greater final construction cost that also meets the scope and complexity requirements will result in a rating of UNACCEPTABLE for this Factor. The absence of one relevant design-build project will result in the rating of UNACCEPTABLE for this Factor.

Projects submitted for the DOR shall have been completed within the previous five (5) years of the issuance date for this RFP. Submitted Projects that were not completed within this timeframe will be considered “Not Relevant”. For design-build projects, the design portion of the contract shall have been completed within the previous five (5) years of the issuance date of this RFP. The design completion date shall be clearly stated on the Construction & Design Experience Project Data Sheet (Attachment C). The project will be considered “Not Relevant” if the design completion date is not clearly provided.

Clearly define role in project and services provided. The absence of define role and services may result in the Project being considered Not Relevant, which could result in a rating of UNACCEPTABLE for this Factor.

A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project and will not be considered, rather Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design or the Government reserves the right not to consider the project. Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider submissions via any other medium. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages). Information beyond this page limit will not be considered.

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. The Offeror shall provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract. If meaningful involvement is not demonstrated, experience of the affiliate/subsidiary/parent firm will not be considered, and will be deemed “Not Relevant”.

The Offeror may utilize experience of a design subcontractor as the Designer of Record in order to demonstrate design experience under this evaluation factor. The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor. If the agreement/letter is not provided or meaningful involvement is not demonstrated, experience of the proposed designer will not be considered.

TO

(2) Design Experience:

Both design-build and design-bid-build projects may be contemplated under this MACC. Therefore, the Offeror is required to address the design firm proposed to be utilized on anticipated future projects.

Offerors shall clearly state the Architect-Engineer firm that is proposed to be utilized as the Designer of

Record (DOR) for future task orders under this MACC. Provide the full name of the firm, address, Unique Entity ID Number, and CAGE code. The awardees will be required to use the designated firm as the DOR on future design-build task orders under the resulting MACC, unless a substitution is approved by the Contracting Officer for the proposed task order. The Offeror must provide a supporting signed joint venture agreement, partnership agreement, teaming agreement, or letter of commitment demonstrating the agreement for the duration of this MACC with the Architect-Engineer firm that is proposed to be utilized as the Designed of Record (DOR).

Offerors shall submit a minimum of three (3) up to a maximum of five (5) relevant projects as the designer of record that best demonstrate your experience in a diverse range of design tasks similar in size, scope and complexity to the projects proposed for this MACC.

For purposes of this evaluation, a relevant project is further defined as follows:

Size: A final construction cost of $500,000 or greater. At least one (1) project must have a final construction cost of $2,000,000 or greater.

Scope & Complexity: Individual projects shall demonstrate experience with at least one of the following:

− New construction or building addition of commercial and institutional buildings;

or

− Renovation of a building that includes repairs to multiple building systems and infrastructures (e.g. Mechanical, Electrical, Architecture, Fire protection).

Additional requirements: Relevant Projects, cumulatively, must demonstrate the following characteristics:

− Experience with design-build projects (at least one (1) project) − Experience with new construction or building addition (at least one (1) project) − Experience with renovation or alteration that contains multiple building systems (at least one (1) project)

Note: The Offeror must clearly state which building systems the renovation project includes within their narrative. The board may assign a rating of Not Relevant if unable to determine which building systems were performed. Additionally, work ancillary to a main system will not be considered as multiple systems (e.g. electrical work ancillary to mechanical installation).

Note: Projects submitted that only include horizontal or civil site work will not be considered relevant.

Ensure that the project description clearly identifies whether or not the project is new construction or renovation, the final construction cost, and addresses how the project meets the scope/complexity requirements. The absence of any such information may result in the Project being considered Not Relevant, which could result in a rating of UNACCEPTABLE for this Factor. The absence of one project that has a $2,000,000 or greater final construction cost that also meets the scope and complexity requirements will result in a rating of UNACCEPTABLE for this Factor. The absence of one relevant design-build project will result in the rating of UNACCEPTABLE for this Factor.

Projects submitted for the DOR shall have been completed within the previous five (5) years of the issuance date for this RFP. Submitted Projects that were not completed within this timeframe will be considered “Not Relevant”. For design-build projects, the design portion of the contract shall have been completed within the previous five (5) years of the issuance date of this RFP. The design completion date shall be clearly stated on the Construction & Design Experience Project Data Sheet (Attachment C). The project will be considered “Not Relevant” if the design completion date is not clearly provided.

Clearly define role in project and services provided. The absence of define role and services may result in the Project being considered Not Relevant, which could result in a rating of UNACCEPTABLE for this Factor.

A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project and will not be considered, rather Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design or the Government reserves the right not to consider the project. Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider submissions via any other medium. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages). Information beyond this page limit will not be considered.

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. The Offeror shall provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract. If meaningful involvement is not demonstrated, experience of the affiliate/subsidiary/parent firm will not be considered, and will be deemed “Not Relevant”.

The Offeror may utilize experience of a design subcontractor as the Designer of Record in order to demonstrate design experience under this evaluation factor. The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor. If the agreement/letter is not provided or meaningful involvement is not demonstrated, experience of the proposed designer will not be considered.

The following Wage Decision is hereby incoporated into this Solicitation:

"General Decision Number: VA20230160 01/06/2023

Superseded General Decision Number: VA20220160

State: Virginia

Construction Type: Building

County: Norfolk* County in Virginia.

* INDEPENDENT CITY OF NORFOLK

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2023

ASBE0024-006 04/01/2021

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 39.27 18.67+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

BOIL0045-003 01/01/2021

Rates Fringes

BOILERMAKER......................$ 42.62 24.81

BRVA0008-001 05/01/2022

Rates Fringes

BRICKLAYER.......................$ 22.44 10.23

ELEC0080-010 12/01/2021

Rates Fringes

ELECTRICIAN (Includes Low Voltage Wiring and Alarm Installation)....................$ 30.55 11.51

a. Workmen shall take off 1 hour with pay, at the discretion of the employer, on State and National Election days;

Tuesday following the first Monday in November, provided they are qualified and vote.

ELEV0052-005 01/01/2022

Rates Fringes

ELEVATOR MECHANIC................$ 45.66 36.885+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate for all hours worked.

ENGI0147-019 05/01/2022

Rates Fringes

POWER EQUIPMENT OPERATOR

Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100

ft. above ground............$ 34.17 15.21 Cranes under 90 tons........$ 33.26 15.12

IRON0079-012 05/01/2022

Rates Fringes

IRONWORKER, STRUCTURAL AND

ORNAMENTAL.......................$ 28.87 11%+14.24

IRON0079-013 05/01/2022

Rates Fringes

IRONWORKER, RIGGER...............$ 28.87 11%+14.24

PLUM0110-008 11/01/2022

Rates Fringes

PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 31.77 17.40

PLUMBER..........................$ 31.77 17.40

SUVA2013-043 01/11/2016

Rates Fringes

CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 19.80 3.98

CAULKER..........................$ 18.49 1.33

CEMENT MASON/CONCRETE FINISHER...$ 20.02 2.00

GLAZIER..........................$ 19.36 4.68

IRONWORKER, REINFORCING..........$ 27.18 4.13

LABORER: Mason Tender - Brick...$ 14.82 ** 3.34

LABORER: Mason Tender - Cement/Concrete..................$ 12.96 ** 3.12

LABORER: Pipelayer..............$ 12.40 ** 1.86

LABORER: Common or General, Including Demolition.............$ 11.28 ** 1.89

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 18.57 1.19

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03

OPERATOR: Bulldozer.............$ 18.07 3.50

OPERATOR: Forklift..............$ 19.40 7.00

OPERATOR: Loader................$ 21.28 3.17

OPERATOR: Roller................$ 16.25 4.88

PAINTER (Brush and Roller).......$ 16.92 0.00

PAINTER: Spray..................$ 18.10 5.43

ROOFER...........................$ 18.40 2.31

SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 20.98 2.62

SPRINKLER FITTER (Fire Sprinklers)......................$ 18.91 4.67

TILE FINISHER....................$ 23.40 0.00

TILE SETTER......................$ 27.80 10.25

TRUCK DRIVER: Dump Truck........$ 15.50 ** 0.75

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

“END OF GENERAL DECISION"

(End of Summary of Changes)