1576521_SP-254_DWGS_2of2.pdf

PDF 8 MB Posted

Attached to
8A MACC, DB/DBB General Construction - HR AOR Federal contract opportunity
Solicitation number
N4008522R2627
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This solicitation is for an 8A MACC, DB/DBB General Construction contract in the Hampton Roads Area of Responsibility. The contract will result in multiple awards for construction services including demolition, repair, replacement, modification, new construction, and renovation of buildings, systems and infrastructure at various Navy and NASA facilities. Work will include projects such as building envelope, fire protection, plumbing, mechanical and electrical renovations, as well as elevators, waterfront structures, and tanks. The contract will require management of concurrent task orders across the Hampton Roads area. The Contractor shall provide all labor, materials, equipment and transportation to perform the services described in task order plans and specifications.

View the file

Other files for this federal contract opportunity

Other files attached to 8A MACC, DB/DBB General Construction - HR AOR, newest first.
File Type Posted
Amendment 0014.pdf PDF
Amendment 0013.pdf PDF
22R2627 0012 Factor 1.pdf PDF
22R2627 0011 PPI Responses.pdf PDF
22R2627 0010.pdf PDF
1576521_SP-254_Supplementary Instructions to Offerors.pdf PDF
157541_SP-254_As-Builts.pdf PDF
22R2627 0009 Addendum B.pdf PDF
22R2627 0008 PPI Responses.pdf PDF
22R2627 0007 Proposal Due Date.pdf PDF
22R2627 0006 Site Visit Log.pdf PDF
22R2627 0005 Proposal Due Date.pdf PDF
22R2627 0004 Proposal Due Date.pdf PDF
22R2627 0003 Site Visit.pdf PDF
22R2627 0002 Site Visit Cancel.pdf PDF
22R2627 0001 Site Visit.pdf PDF
ODP Badge Access Request.xls XLS spreadsheet
SECNAV 5512.pdf PDF
1576521_SP-254_DWGS_1of2.pdf PDF
1576521_SP-254_SPECS.pdf PDF
1576521_SP-254_SUPPLEMENTARY INSTRUCTIONS TO OFFERORS.pdf PDF
1576521_SP-254_Completed Environmental Checklist.pdf PDF
Attachment C - PPI Inquiry Log.doc DOC document
Attachment B Past Performance Questionnaire (PPQ).pdf PDF
Attachment A - Construction and Design Experience Project Data Sheet 10-12.docx DOCX document
Attachment D PIEE Vendor Access Instructions.pdf PDF
N4008522R2627 RFP.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOOR NUMBER

(REFER TO DOOR SCHEDULE)

DOOR TAG

ARCHITECTURAL SYMBOLS

ROOM

A1 A-301

- - - - - - - - - - - - - - - - - - - - - - - - - - - - ROOM TAG

DETAIL NUMBER

SHEET WHERE DRAWN

DETAIL TAG

ROOM NAME

ROOM NUMBER

EXTERIOR ELEVATION

TAG

ELEVATION NUMBER

DIRECTION OF VIEW

SHEET WHERE DRAWN

A1 A-301

WALL / PARTIAL

BUILDING SECTION

TAG

SECTION NUMBER

SHEET WHERE DRAWN

NEW WORK

KEYNOTE TAG

KEYNOTE NUMBER

DEMO

KEYNOTE TAG

KEYNOTE NUMBER

A-501

1 1

CJ

EJ

MASONRY

CONTROL JOINT

BUILDING

EXPANSION JOINT

JOINT TAG ±(10'-0") CEILING HEIGHT

KEYNOTE TAG

CEILING HEIGHT TAG

MATERIALS LEGEND

CONCRETE MASONRY UNIT

CAST-IN-PLACE CONCRETE

STEEL

BATT/LOOSE FILL INSULATION

RIGID INSULATION

WOOD - ROUGH

WOOD BLOCKING

SECTION ELEVATION

BRICK - NEW WORK

GLAZING

SPANDREL GLAZING / STEEL PANEL

CONCRETE FOUNDATION

EARTH / COMPACT FILL

POROUS FILL / GRAVEL

ALUMINUM

BRICK

GYPSUM BOARD

PLYWOOD

SAND / MORTAR / PLASTER

ACOUSTICAL TILE CEILING

CERAMIC TILE

FINISHED WOOD

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

PW

D

N O

R

FO

LK

A-001

B U

IL

D

IN

G

S P

-2

AR

CH

IT

EC

TU

RA

L

NO

TE

S

AN

D

SY

M

BO

LS

LAB

12,820,992

SAR SAR

02/15/21

MICHAEL COMPTON, CNATTU

EX

TE

RI

O

R

RE

PA

IR

S

RO

O

F

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1576521

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

S. M. SWEENEY, P.E.

1 ALL WOOD BLOCKING AND MISCELLANEOUS STEEL SHOWN IN DETAILS AND

SECTIONS MUST BE CONTINUOUS UNLESS SPECIFICALLY NOTED

OTHERWISE.

2 VERIFY ALL FIELD CONDITIONS AND DIMENSIONS PRIOR TO PROCEEDING

WITH THE WORK. DIMENSIONS FOR EXISTING WORK ARE INDICATED AS "±".

ALL DISCREPANCIES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF

THE CONTRACTING OFFICER IN WRITING.

3 DEMOLITION OF CIVIL, STRUCTURAL, FIRE PROTECTION, AND ELECTRICAL

ITEMS INDICATED ON THE ARCHITECTURAL DRAWINGS ARE NOT INTENDED

TO INCLUDE ALL NECESSARY DEMOLITION WORK FOR THESE ITEMS. REFER

TO CIVIL, STRUCTURAL, AND ELECTRICAL DEMOLITION DRAWINGS FOR

ADDITIONAL INFORMATION.

4 DIMENSIONS INDICATED FOR NEW WORK ARE TO FACE OF STUD, FACE OF

MASONRY OR FACE OF EXISTING SURFACES UNLESS OTHERWISE NOTED.

5 ALL MATERIALS/PRODUCTS MUST BE INSTALLED PER MANUFACTURER'S

INSTALLATION REQUIREMENTS.

6 NO FINISH MATERIALS MUST BE SUBSTITUTED DUE TO ORDERING LEAD

TIMES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ORDER ALL MATERIALS

IN A TIMELY FASHON TO AVOID DELAYS.

7 REFER TO GENERAL PROJECT NOTES ON SHEET G-002 FOR ADDITIONAL

INFORMATION.

SF SQUARE FOOT

SH SHINGLES / SINGLE HUNG

SIM SIMILAR

SPC SUSPENDED PLASTER CEILING

SPEC SPECIFICATION

SQ SQUARE

STD STANDARD

STOR STORAGE

STR STRAIGHT STRIKE / STRINGERS

SUSP SUSPENDED

T&B TOP AND BOTTOM

TEL TELEPHONE

THRES THRESHOLD

THRU THROUGH

TOJ TOP OF JOIST

TOS TOP OF SLAB / STEEL

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

V VOLT

VAR VARIATION

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VENT VENTILATION / VENTILATOR

VERT VERTICAL

VEST VESTIBULE

VS VENT STACK

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W WASTE / WATT / WEST / WIDE

W/ WITH

W/O WITHOUT

WC WATER CLOSET / WALL COVERING

WD WOOD

WH WATER HEATER

WP WATERPROOFING / WEATHERPROOF / WORKING

POINT

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

XRMR TRANSFORMER

NTS NOT TO SCALE

OA OUTSIDE AIR

OC ON CENTER

OD OUTSIDE DIAMETER / DIMENSION

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPT OPTIONAL

PCT PERCENT

PEJ PREMOLDED EXPANSION JOINT

PL PROPERTY LINE

PLAS PLASTER / PLASTIC

PLYWD PLYWOOD

PNL PANEL

PRELIM PRELIMINARY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT

PV PIPE VENT

QT QUARRY TILE

R RADUIS / RISER

RA RETURN AIR

RAD RETURN AIR DUCT

RB RESILIENT BASE

RD ROOF DRAIN / ROAD

REFL REFLECT

REFR REFRIGERATION

REINF REINFORCE

REQD REQUIRED

REV REVISION

RF RESILIENT FLOORING

RL ROOF LEADER

RM ROOM

RND ROUND

RO ROUGH OPENING

RS ROUGH SAWN

RT RIGHT

S SOUTH

SAPC SUSPENDED ACOUSTICAL PANEL CEILING

SCHED SCHEDULE

SECT SECTION

GALV GALVANIZED

GFCI GOVERNMENT FURNISHED CONTRACTOR INSTALLED

GL GLASS / GROUND LEVEL

GR GROSS

GSU GLAZED STRUCTURAL UNIT

GV GRAVITY VENTILATOR

GWB GYPSUM WALLBOARD

GYP GYPSUM

H HIGH

HB HOSE BIB

HDW HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HT HEIGHT

HVY HEAVY

ID INSIDE DIAMETER

INSUL INSULATION / INSULATED

INT INTERIOR

J-BOX JUNCTION BOX

JAN JANITOR CLOSET

LAV LAVATORY

LB POUND

LF LINEAR FEET

LT LIGHT

MACH MACHINE

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFG MANUFACTURING

MIN MINIMUM / MINUTE

MISC MISCELLANEOUS

ML MATCH LINE

MO MASONRY OPENING / MOTOR OPERATED

MTD MOUNTED

MTG MOUNTING / MEETING

MTL METAL

MWP MEMBRANE WATERPROOFING

N NORTH

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

CT CERAMIC TILE

CTR CENTER

D DEPTH / DEEP

DEG DEGREE

DEMO DEMOLITION

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DR DRAIN

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

E EAST

EA EACH

EF EXHAUST FAN

EIFS EXTERIOR INSULATION & FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC / ELECTRICAL

EPDM ETHLENE PROPYLENE DIEN MONOMER

EQ EQUAL

EQUIP EQUIPMENT

EW EACH WAY

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION / EXPOSED / EXPAND

EXT EXTERIOR

FD FLOOR DRAIN

FDTN FOUNDATION

FF FINISH FACE

FG FIGURE

FHC FIRE HOUSE CABINET

FIN FLR FINISHED FLOOR

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUB / FACE OF SLAB

FR FRAME / FIRE RATING / FIRE RESISTANT

FT FOOT, FEET

FTG FOOTING

GA GAUGE

AB ANCHOR BOLT

ACS PNL ACCESS PANEL

ADJ ADJUST

ALT ALTERNATE, ALTITUDE

ALUM ALUMINUM

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECT

ASPH ASPHALT

ATC ACOUSTICAL TILE CEILING

BD BOARD

BLDG BUILDING

BLW BELOW

BM BEAM

BOS BOTTOM OF SLAB / STEEL

BOT BOTTOM

BRG BEARING

BSMT BASEMENT

BTWN BETWEEN

C TO C CENTER TO CENTER

CAB CABINET

CEM CEMENT

CER CERAMIC

CI CAST IRON

CIP CAST IRON PIPE

CJ CONTROL / CONSTRUCTION JOINT

CLG CEILING

CLG REG CEILING REGISTER

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CND CONDUIT

CNDS CONDENSATE

CNSTR CONSTRUCTION

CNTR CNTR

CO CLEANOUT

COL COLUMN

CONC CONCRETE

CONN CONNECT

CONT CONTINUE / CONTINUOUS

CORR CORRIDOR

CPT CARPET / COMMON PATH OF TRAVEL

ARCHITECTURAL ABBREVIATIONS

GENERAL ARCHITECTURAL NOTES

SY

M

DE

S C

RI

PT

I O N

DA

TE

AP

PR

UP

UP

UP

K

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2423

J

H

G

F

E

D

C

B

A

MA

TC

HL

IN

E -A

RE

A

'A

MA

TC

HL

IN

E -A

RE

A

'B

B1

AD201

C1

AD202

A1

AD202

A1

AD301

6 6

2 3 2 3

2 3

6 6

1'-7 1/8" ± 60'-9" ± 9'-1 1/2" ± 17'-2 1/4" ± 9'-1 1/2" ± 60'-9" ± 23'-9 5/8" ± 7'-8" ±

340'-0" ±

'-2

1'- 2 1

/8"

1'-7 1/8" ± 65'-9 3/4" ± 25'-4" ±

65'-9" ± 1'-4" ± 30'-1" ±

3'-

1'-

0 1 /2"

2'- 6 7

/8"

2'- 6 7

/8"

1'- 0 5

/8"

22'-3" ±

11 11

11 11

11 11

D2

AD203

C3

AD203

C4

AD203

C5

AD203

D1

AD203

B1

AD203 3 3

ABOVE

BELOW

ABOVE

BELOW

ABOVE

BELOW

ABOVE

BELOW

'-0

3/ 4"

4'-2" ±

1 2 2 2

2 2

5 5

15 15

15 15

191919

12 12

A2

AD301

A4

AD301

A3

AD301

A1

AD301

- - - - - - - - - - - - - - - - - - - - - - - - - - - - A1

AD302

A2

AD302

AD102

C1

K

20 21 22 2423 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

J

H

G

F

E

D

C

B

A

MA

TC

HL

IN

E -A

RE

A

'A

MA

TC

HL

IN

E -A

RE

A

'B

C1

AD201

A1

AD201

B1

AD202

2 3

6 6

2 3

2 3

6 6

2 3

'-2

62'-5 1/8" ± 25'-3 3/4" ± 60'-9" ± 1'-7 1/8" ±

340'-0" ±

8'- 6"

1'- 0 7

/8"

55'-8 1/4" ± 9'-1 1/2" ± 17'-2 1/4" ± 9'-1 1/2" ± 55'-8 1/4" ± 1'-7 1/8" ±

8'- 6 5

/8"

2'- 6 1

/4"

2'- 6 1

/4"

1'- 1 1

/8"

1'-7 1/8" ±

11 11

11 11 11 11 11

D4

AD203

D5

AD203

C1

AD203

D3

AD203

C2

AD203

ABOVE

BELOW

ABOVE

BELOW

ABOVE

BELOW

ABOVE

BELOW

1'-8 3/8" ±

2 2

5 5

15 15

19191919

19191919

20 21

12 12

A2

AD301

A3

AD301

A1

AD301

A1

AD301

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

PW

D

N O

R

FO

LK

AD101

B U

IL

D

IN

G

S P

-2

FI

RS

T

FL

O O

R

PL

AN

DE

M

O

LI

TI

O

N

LAB

12,820,993

SAR SAR

02/15/21

MICHAEL COMPTON, CNATTU

EX

TE

RI

O

R

RE

PA

IR

S

RO

O

F

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1576521

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

S. M. SWEENEY, P.E.

0 4' 8' 16'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PARTIAL FIRST FLOOR DEMOLITION PLAN - AREA 'A'

0 4' 8' 16'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PARTIAL FIRST FLOOR DEMOLITION PLAN - AREA 'B'

1 REFER TO OTHER PORTIONS OF THE CONTRACT DOCUMENTS FOR

ADDITIONAL INFORMATION AND INSTRUCTIONS.

2 REFER TO SHEET AD102 FOR DEMOLITION KEYNOTES SCHEDULE.

3 EXISTING FAN COIL UNITS TO REMAIN. PROTECT UNITS THROUGHOUT

DEMOLITION AND RENOVATION WORK.

GENERAL SHEET NOTES

SY

M

DE

S C

RI

PT

I O N

DA

TE

SE

E

ST

RU

C T . D

RA

W

IN

GS

8" ± T

O 1'-

4"

REMOVE EXTERIOR BRICK

VENEER WALL COMPLETE.

EXISTING INTERIOR CMU

WALL TO REMAIN

REMOVE DAMAGED AND

CRACKED INTERIOR CMU WALL

FULL HEIGHT TO EXTENTS

SHOWN TO ALLOW FOR

INSTALLATION OF 1" EXPANSION

JOINT - SEE STRUCTURAL

DRAWINGS.

EXISTING INTERIOR CMU

WALL TO REMAIN

AIR GAP

STEEL COLUMN AND METAL

COLUMN COVER TO REMAIN

REMOVE PRECAST CONCRETE

WINDOW SILL

REMOVE PLASTIC

LAMINATE WINDOW SILL

CONSTRUCTION

COMPLETE

REMOVE ALUMINUM

WINDOW SYSTEM

COMPLETE AND SALVAGE

FOR REINSTALLATION

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

PW

D

N O

R

FO

LK

AD102

B U

IL

D

IN

G

S P

-2

FI

RS

T

FL

O O

R

PL

AN

DE

M

O

LI

TI

O

N -K

EY

NO

TE

S

LAB

12,820,994

SAR SAR

02/15/21

MICHAEL COMPTON, CNATTU

EX

TE

RI

O

R

RE

PA

IR

S

RO

O

F

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1576521

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

S. M. SWEENEY, P.E.

1 EXISTING BRICK VENEER EXTERIOR WALL TO REMAIN.

2 REMOVE EXTERIOR BRICK VENEER WALL COMPLETE. EXISTING INTERIOR

CMU WALL TO REMAIN (FOR BIDDING PURPOSES ASSUME 9,979 SF TOTAL

EXTERIOR BRICK VENEER PER PROJECT).

3 REMOVE PRECAST CONCRETE WINDOW SILL COMPLETE (FOR BIDDING

PURPOSES ASSUME 1,073 LF TOTAL PRECAST CONCRETE WINDOW SILL PER

PROJECT).

4 REMOVE ALUMINUM STOREFRONT ENTRY SYSTEM COMPLETE AND SALVAGE

FOR REINSTALLATION (FOR BIDDING PURPOSES ASSUME 432 SF TOTAL

ALUMINUM STOREFRONT ENTRY SYSTEM PER PROJECT).

5 REMOVE PLANTER COMPLETE. REMOVE BRICK VENEER, CONCRETE CAP,

AND ALL ASSOCIATED COMPONENTS (FOR BIDDING PURPOSES ASSUME 159

SF TOTAL BRICK VENEER PLANTERS PER PROJECT).

6 REMOVE CONCRETE CANOPY AND ALL ASSOCIATED COMPONENTS

COMPLETE, INCLUDING TAPERED INSULATION, WOOD BLOCKING, METAL

COUNTERFLASHING, AND METAL GRAVEL STOP (FOR BIDDING PURPOSES

ASSUME 26.98 CY OF CONCRETE, 133 LF OF METAL GRAVEL STOP, 133 LF OF

WOOD BLOCKING, 86 LF OF METAL COUNTERFLASHING, 517 SF OF TAPERED

INSULATION, AND 517 SF OF BALLASTED ROOF GRAVEL TOTAL FOR

CONCRETE CANOPIES PER PROJECT).

7 EXISTING CONCRETE PAD TO REMAIN.

8 REMOVE EXTERIOR STAIR, RAILING, STEEL SUPPORT COLUMNS, FOOTINGS,

AND ALL ASSOCIATED COMPONENTS COMPLETE (FOR BIDDING PURPOSES

ASSUME 1 STAIR TOTAL PER PROJECT) - SEE STRUCTURAL DRAWINGS.

9 EXISTING HVAC UNIT TO REMAIN. PROTECT UNIT THROUGHOUT DURATION

OF CONSTRUCTION. DISCONNECT AND RECONNECT UNIT AS REQUIRED TO

COMPLETE RENOVATION WORK – SEE ELECTRICAL DRAWINGS. COORDINATE

HVAC DISCONNECTIONS AND RECONNECTIONS WITH COMMAND.

10 EXISTING NATURAL GAS METER TO REMAIN. PROTECT UNIT THROUGHOUT

DURATION OF CONSTRUCTION WORK. DISCONNECT AND RECONNECT UNIT

AS REQUIRED TO COMPLETE RENOVATION WORK. COORDINATE UTILITY

DISCONNECTIONS AND RECONNECTIONS WITH COMMAND.

11 REMOVE PLASTIC LAMINATE WINDOW SILL CONSTRUCTION COMPLETE.

PREPARE SURFACE FOR INSTALLATION OF NEW WINDOW SILL

CONSTRUCTION (FOR BIDDING PURPOSES, ASSUME 928 LF TOTAL OF

PLASTIC LAMINATE WINDOW SILL PER PROJECT).

12 REMOVE BUSHES AND ASSOCIATED PLANTER COMPLETE - SEE CIVIL

DRAWINGS.

13 REMOVE CONCRETE SLAB CONSTRUCTION TO EXTENTS SHOWN - SEE

STRUCTURAL DRAWINGS.

14 REMOVE CONCRETE SIDEWALK TO EXTENTS SHOWN - SEE CIVIL DRAWINGS.

15 REMOVE SURFACE MOUNTED ELECTRICAL AND TELECOMMUNICATIONS

WIREWAY AND RECEPTACLES COMPLETE AND SALVAGE FOR

REINSTALLATION. REMOVE AND SALVAGE EXISTING POWER AND DATA

WIRING - SEE ELECTRICAL DRAWINGS.

16 REMOVE ALUMINUM WINDOW SYSTEM COMPLETE AND SALVAGE FOR

REINSTALLATION. EXISTING STEEL STRUCTURE CONCEALED BY WINDOW

MULLIONS IS EXISTING TO REMAIN (FOR BIDDING PURPOSES ASSUME 7,290

SF TOTAL ALUMINUM WINDOW SYSTEM PER PROJECT).

17 REMOVE PAINT AND PREPARE SURFACE FOR NEW PAINT - SEE SHEETS

HM101 AND A-101.

18 REMOVE HOLLOW METAL FRAME AND DOOR SYSTEM COMPLETE (FOR

BIDDING PURPOSES ASSUME 5 HOLLOW METAL FRAME AND DOOR SYSTEMS

TOTAL PER PROJECT).

19 REMOVE CARPET AND WALL BASE COMPLETE. REMEDIATE EXPOSED

ASBESTOS TILE AND MASTIC - SEE SHEET HM101.

20 REMOVE 1/2" GWB OVER METAL FURRING WALL COMPLETE (FOR BIDDING

PURPOSES ASSUME 149 SF TOTAL WALL PER PROJECT).

21 REMOVE SURFACE MOUNTED RECEPTACLES AND ASSOCIATED CONDUITS,

SURFACE MOUNTED HVAC UNIT DISCONNECTS, AND CABLE TROUGH AND

SALVAGE FOR REINSTALLATION. PROVIDE TEMPORARY POWER FOR SERVER

ROOM HVAC UNITS AND SERVER EQUIPMENT THROUGHOUT DURATION OF

RENOVATION WORK. COORDINATE POWER DISCONNECTIONS AND

RECONNECTIONS WITH COMMAND - SEE ELEC. DWGS.

22 REMOVE DAMAGED AND CRACKED INTERIOR CMU WALL FULL HEIGHT TO

EXTENTS SHOWN TO ALLOW FOR INSTALLATION OF 1" EXPANSION JOINT

(FOR BIDDING PURPOSES, ASSUME 33 SF OF CMU WALL) - SEE STRUCTURAL

DRAWINGS.

23 REMOVE ABANDONED OVERHEAD DOORS COMPLETE (FOR BIDDING

PURPOSES ASSUME 2 TOTAL ABANDONED OVERHEAD DOORS PER

PROJECT).

24 TOOTH-OUT AND REMOVE EXISTING CUT INTERIOR CMU ADJACENT TO

ABANDONED OVERHEAD DOOR FRAME TO BE REMOVED.

DEMOLITION KEYNOTES

0 4" 8" 1'-4"SCALE: 1 1/2" = 1'-0" (AD101)

PLAN DETAIL - MECH. ROOM CORNER WALL - DEMOLITIONC1

SY

M

DE

S C

RI

PT

I O N

DA

TE

K

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2423

J

H

G

F

E

D

C

B

A

MA

TC

HL

IN

E -A

RE

A

'A

MA

TC

HL

IN

E -A

RE

A

'B

±(8'-6")±(8'-6")

±(8'-6") ±(8'-6")±(8'-6")±(8'-6")

±(8'-6")±(8'-6")

±(8'-6")

2 2 2 1 2

211 1 1 1 2

3 3

3 3

2 2

66666

4'-9" ±

2'- 0"

± 6'-3 1/2" ±

2'- 0"

4'-9" ±

2'- 0"

2'- 0"

±(10'-0") ±(10'-0")

±(10'-0")

±(7'-6")

±(8'-0")

±(10'-0")

±(7'-6") ±(7'-6")

K

20 21 22 2423 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

J

H

G

F

E

D

C

B

A

MA

TC

HL

IN

E -A

RE

A

'A

MA

TC

HL

IN

E -A

RE

A

'B

±(8'-6")

±(8'-6")

±(10'-0")

±(8'-6")

±(8'-6")

±(8'-6")±(8'-6")

±(8'-6")

21 1

3 3

2 2 2

66666

2'- 0"

4'-9" ±

2'- 0"

6'-3 1/2" ±

2'- 0"

2'- 0"

4'-9" ±

'-3

5/ 8"

±(7'-6")

±(7'-6")

±(8'-0")

±(10'-0")

±(10'-0")

±(10'-0")

±(10'-0")

±(8'-6")

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

PW

D

N O

R

FO

LK

AD103

B U

IL

D

IN

G

S P

-2

FI

RS

T

FL

O O

R

RE

FL

EC

TE

D

CE

IL

IN

G

P

LA

N -D

EM

O

LI

TI

O N

LAB

12,820,995

SAR SAR

02/15/21

MICHAEL COMPTON, CNATTU

EX

TE

RI

O

R

RE

PA

IR

S

RO

O

F

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1576521

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

S. M. SWEENEY, P.E.

0 4' 8' 16'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PARTIAL FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - AREA 'A'

0 4' 8' 16'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PARTIAL FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - AREA 'B'

GENERAL SHEET NOTES

DEMOLITION KEYNOTES

1 EXISTING ACOUSTICAL CEILING TILE GRID TO REMAIN.

2 REFER TO OTHER PORTIONS OF THE CONTRACT DOCUMENTS FOR

ADDITIONAL INFORMATION AND INSTRUCTIONS.

1 REMOVE 2' X 2' ACOUSTICAL CEILING TILE AS INDICATED (FOR BIDDING

PURPOSES ASSUME 132 SF TOTAL OF ACT PER PROJECT).

2 REMOVE GWB OVER PLASTER AND ACOUSTICAL PANEL CEILING TO EXTENTS

INDICATED - SEE SHEETS HM101 AND A-102 (FOR BIDDING PURPOSES

ASSUME 834 SF TOTAL GWB CEILING SURFACES PER PROJECT).

3 REMOVE ALUMINUM WINDOW SYSTEM COMPLETE AND SALVAGE FOR

REINSTALLATION. EXISTING STEEL STRUCTURE CONCEALED BY WINDOW

MULLIONS IS EXISTING TO REMAIN (FOR BIDDING PURPOSES ASSUME 7,290

SF TOTAL ALUMINUM WINDOW SYSTEM PER PROJECT).

4 REMOVE CONCRETE CANOPY AND ALL ASSOCIATED COMPONENTS

COMPLETE, INCLUDING TAPERED INSULATION, WOOD BLOCKING, METAL

COUNTERFLASHING, AND METAL GRAVEL STOP.

5 REMOVE PAINT AND PREPARE SURFACE FOR NEW PAINT - SEE SHEETS

HM101 AND A-101.

6 REMOVE WINDOW SHADES AND ALL ASSOCIATED COMPONENTS COMPLETE

(FOR BIDDING PURPOSES ASSUME 928 LF TOTAL PER PROJECT).

7 REMOVE 1' X 1' ACOUSTICAL CEILING TILE AS INDICATED (FOR BIDDING

PURPOSES ASSUME 217 SF TOTAL OF ACT PER PROJECT).

8 REMOVE ALUMINUM STOREFRONT ENTRY SYSTEM COMPLETE AND SALVAGE

FOR REINSTALLATION (FOR BIDDING PURPOSES ASSUME 432 SF TOTAL

ALUMINUM STOREFRONT ENTRY SYSTEM PER PROJECT).

SY

M

DE

S C

RI

PT

I O N

DA

TE

DN

DN

DN

K

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2423

J

H

G

F

E

D

C

B

A

MA

TC

HL

IN

E -A

RE

A

'A

MA

TC

HL

IN

E -A

RE

A

'B

A1

AD301

22'-3" ±

3 2

340'-0" ± 1'-7 1/8" ± 60'-9" ± 9'-1 1/2" ± 17'-2 1/4" ± 9'-1 1/2" ± 60'-10 3/4" ± 31'-3 7/8" ±

'-2

1'- 2 1

/8"

1'-7 1/8" ± 65'-9 3/4" ± 25'-4" ±

67'-1 1/8" ± 30'-1" ±

3'-

1'-

0 1 /2"

1'-7 1/8" ±

1'-8 1/8" ±

6 7

2 ABOVE

BELOW2 ABOVE

BELOW

2 ABOVE

BELOW 2 ABOVE

BELOW 2 ABOVE

BELOW

4'-2" ±

'-0

3/ 4"

3 4

4 4 4 411 11 11

A2

AD301

A4

AD301

A3

AD301

A1

AD301

- - - - - - - - - - - - - - - - - - - - - - - - - - - - A1

AD302

A2

AD302

A1

AD501

AD102

C1

K

20 21 22 2423 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

J

H

G

F

E

D

C

B

A

MA

TC

HL

IN

E -A

RE

A

'A

MA

TC

HL

IN

E -A

RE

A

'B

2 3 3

32 4

340'-0" ±

8'- 6 5

/8"

1'-7 1/8" ± 55'-8 1/4" ± 9'-1 1/2" ± 17'-2 1/4" ± 9'-1 1/2" ± 55'-8 1/4" ± 1'-7 1/8" ±

1'- 1 1

/8"

2'- 6 1

/4"

2'- 6 1

/4"

8'- 6"

'-2

1'-8 1/8" ± 60'-9" 25'-3 3/4" ± 60'-9" ± 1'-7 1/8" ±

1'- 0 7

/8"

7 7 7

2 ABOVE

BELOW 2 ABOVE

BELOW 2 ABOVE

BELOW

2 ABOVE

BELOW2 ABOVE

BELOW

4 5

2 2

4 4 4 411 11 11

A2

AD301

- - - - - - - - - - - - - - - - - - - - - - - - - - - - A3

AD301

A1

AD301

A1

AD301

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

PW

D

N O

R

FO

LK

AD104

B U

IL

D

IN

G

S P

-2

SE

CO

ND

F

LO

O

R

PL

AN

DE

M

O

LI

TI

O

N

LAB

12,820,996

SAR SAR

02/15/21

MICHAEL COMPTON, CNATTU

EX

TE

RI

O

R

RE

PA

IR

S

RO

O

F

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1576521

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

S. M. SWEENEY, P.E.

0 4' 8' 16'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PARTIAL SECOND FLOOR DEMOLITION PLAN - AREA 'A'

0 4' 8' 16'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PARTIAL SECOND FLOOR DEMOLITION PLAN - AREA 'B'

GENERAL SHEET NOTES

DEMOLITION KEYNOTES

1 REFER TO OTHER PORTION OF THE CONTRACT DOCUMENTS FOR ADDITIONAL

INFORMATION AND INSTRUCTIONS.

2 EXISTING FAN COIL UNITS TO REMAIN. PROTECT UNITS THROUGHOUT

DEMOLITION AND RENOVATION WORK.

1 EXISTING BRICK VENEER EXTERIOR WALL TO REMAIN.

2 REMOVE EXTERIOR BRICK VENEER WALL COMPLETE. EXISTING INTERIOR

CMU WALL TO REMAIN (FOR BIDDING PURPOSES ASSUME 9,979 SF TOTAL

EXTERIOR BRICK VENEER PER PROJECT).

3 REMOVE PRECAST CONCRETE WINDOW SILL COMPLETE (FOR BIDDING

PURPOSES ASSUME 1,073 LF TOTAL PRECAST CONCRETE WINDOW SILL PER

PROJECT).

4 REMOVE ALUMINUM WINDOW SYSTEM COMPLETE AND SALVAGE FOR

REINSTALLATION. EXISTING STEEL STRUCTURE CONCEALED BY WINDOW

MULLIONS IS EXISTING TO REMAIN (FOR BIDDING PURPOSES ASSUME 7,290

SF TOTAL ALUMINUM WINDOW SYSTEM PER PROJECT).

5 REMOVE CONCRETE CANOPY AND ALL ASSOCIATED COMPONENTS

COMPLETE, INCLUDING TAPERED INSULATION, WOOD BLOCKING, METAL

COUNTERFLASHING, AND METAL GRAVEL STOP (FOR BIDDING PURPOSES

ASSUME 26.98 CY OF CONCRETE, 133 LF OF METAL GRAVEL STOP, 133 LF OF

WOOD BLOCKING, 86 LF OF METAL COUNTERFLASHING, 517 SF OF TAPERED

INSULATION, AND 517 SF OF BALLASTED ROOF GRAVEL TOTAL FOR

CONCRETE CANOPIES PER PROJECT).

6 REMOVE PLASTIC LAMINATE WINDOW SILL CONSTRUCTION COMPLETE.

PREPARE SURFACE FOR INSTALLATION OF NEW WINDOW SILL

CONSTRUCTION (FOR BIDDING PURPOSES, ASSUME 928 LF TOTAL OF

PLASTIC LAMINATE WINDOW SILL PER PROJECT).

7 REMOVE SURFACE MOUNTED ELECTRICAL AND TELECOMMUNICATIONS

WIREWAY AND RECEPTACLES COMPLETE AND SALVAGE FOR

REINSTALLATION. REMOVE AND SALVAGE EXISTING POWER AND DATA

WIRING - SEE ELECTRICAL DRAWINGS.

8 REMOVE EXTERIOR STAIR, RAILING, STEEL SUPPORT COLUMNS, FOOTINGS,

AND ALL ASSOCIATED COMPONENTS COMPLETE (FOR BIDDING PURPOSES

ASSUME 1 STAIR TOTAL PER PROJECT) - SEE STRUCTURAL DRAWINGS.

9 REMOVE PAINT AND PREPARE SURFACE FOR NEW PAINT - SEE SHEETS

HM101 AND A-101.

10 REMOVE CARPET COMPLETE. REMEDIATE EXPOSED ASBESTOS TILE AND

MASTIC - SEE SHEET HM101.

11 REMOVE EXTERIOR BRICK VENEER INFILL WALL.

12 REMOVE EXISTING ROOF ACCESS LADDER COMPLETE.

13 REMOVE DAMAGED AND CRACKED INTERIOR CMU WALL FULL HEIGHT TO

EXTENTS SHOWN TO ALLOW FOR INSTALLATION OF 1" EXPANSION JOINT

(FOR BIDDING PURPOSES, ASSUME 33 SF OF CMU WALL) - SEE STRUCTURAL

DRAWINGS.

14 REMOVE HOLLOW METAL FRAME AND DOOR SYSTEM COMPLETE (FOR

BIDDING PURPOSES ASSUME 5 HOLLOW METAL FRAME AND DOOR SYSTEMS

TOTAL PER PROJECT).

SY

M

DE

S C

RI

PT

I O N

DA

TE

K

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2423

J

H

G

F

E

D

C

B

A

MA

TC

HL

IN

E -A

RE

A

'A

MA

TC

HL

IN

E -A

RE

A

'B

2 2

2 2

2 2

2 2 2 2 2

1 1

±(8'-6")

±(8'-6")

±(8'-6")

±(8'-6")

±(10'-0")

±(8'-6")

±(10'-0") ±(10'-0")±(10'-0")

±(8'-6")

±(8'-6")

±(8'-6")

5 5

5 5

4'-9" ±

2'- 0"

± 5'-8" ±

2'- 0"

4'-9" ±

2'- 0"

4'-9" ±

2'- 0"

8 9

15 14

±(8'-6") ±(8'-6")

K

20 21 22 2423

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

J

H

G

F

E

D

C

B

A

MA

TC

HL

IN

E -A

RE

A

'A

MA

TC

HL

IN

E -A

RE

A

'B ' 2 2 2 2 2 2 2

2 2 2 2

2 21

±(8'-6")

±(8'-6")

±(8'-6")

±(8'-6")

±(10'-0") ±(10'-0")

±(10'-0")

±(10'-0")

±(8'-6") ±(8'-6") ±(8'-6")

±(8'-6")

±(8'-6")

±(8'-6")

±(8'-6")

5 5

5 5 5

5 5

4'-9" ±

2'- 0"

± 5'-8" ±

2'- 0"

4'-9" ±

2'- 0"

4'-9" ±

2'- 0"

±(8'-6")

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

PW

D

N O

R

FO

LK

AD105

B U

IL

D

IN

G

S P

-2

SE

CO

ND

F

LO

O

R

RE

FL

EC

TE

D

CE

IL

IN

G

P

LA

N -D

EM

O

LI

TI

O N

LAB

12,820,997

SAR SAR

02/15/21

MICHAEL COMPTON, CNATTU

EX

TE

RI

O

R

RE

PA

IR

S

RO

O

F

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1576521

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

S. M. SWEENEY, P.E.

0 4' 8' 16'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PARTIAL SECOND FLOOR REFLECTED CEILING DEMOLITION PLAN - AREA 'A'

0 4' 8' 16'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PARTIAL SECOND FLOOR REFLECTED CEILING DEMOLITION PLAN - AREA 'B'

GENERAL SHEET NOTES

DEMOLITION KEYNOTES

1 EXISTING ACOUSTICAL CEILING TILE GRID TO REMAIN.

2 REFER TO OTHER PORTIONS OF THE CONTRACT DOCUMENTS FOR

ADDITIONAL INFORMATION AND INSTRUCTIONS.

1 REMOVE 2' X 2' ACOUSTICAL CEILING TILE AS INDICATED (FOR BIDDING

PURPOSES ASSUME 350 SF TOTAL OF ACT PER PROJECT).

2 REMOVE GWB OVER PLASTER AND ACOUSTICAL PANEL CEILING TO EXTENTS

INDICATED - SEE SHEETS HM101 AND A-101 (FOR BIDDING PURPOSES

ASSUME 834 SF TOTAL GWB CEILING SURFACES PER PROJECT).

3 REMOVE ALUMINUM WINDOW SYSTEM COMPLETE AND SALVAGE FOR

REINSTALLATION. EXISTING STEEL STRUCTURE CONCEALED BY WINDOW

MULLIONS IS EXISTING TO REMAIN (FOR BIDDING PURPOSES ASSUME 7,290

SF TOTAL ALUMINUM WINDOW SYSTEM PER PROJECT).

4 REMOVE EXISTING PAINT AND PREPARE SURFACE FOR NEW PAINT - SEE

SHEETS HM101 AND A-101.

5 REMOVE WINDOW SHADES AND ALL ASSOCIATED COMPONENTS COMPLETE

(FOR BIDDING PURPOSES ASSUME 928 LF TOTAL PER PROJECT).

6 REMOVE TOP 3 CMU COURSES OF INTERIOR CMU WALL COMPLETE IN

PREPARATION FOR REMOVAL OF STEEL JOISTS.

7 REMOVED ABANDONED 6" DIA. PIPE RUN WITHIN ROOM COMPLETE. CAP AT

END THAT LEAVES THE ROOM.

8 CONTRACTOR TO REMOVE PIPING OR DUCTING THAT IS SUPPORTED BY OR

PENETRATING ROOF STRUCTURE THAT IS DETERMINED TO BE ABANDONED.

9 TEMPORARILY SUPPORT ACTIVE EXISTING PIPING, CABLING, OR DUCTING TO

REMAIN THAT IS SUPPORTED BY ROOF STRUCTURE AS REQUIRED DURING

DEMOLITION OF ROOF. PIPING MUST BE RE-SUPPORTED FROM ROOF

STRUCTURE AFTER NEW WORK IS COMPLETE.

10 REMOVE EXHAUST FAN COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK

ON SECOND FLOOR AND DOWN TO FIRST FLOOR (ASSUME 24 X 24

DUCTWORK FOR BIDDING PURPOSES).

11 DISCONNECT AND TEMPORARILY REMOVE PIPING LINES RUNNING THROUGH

JOISTS TO BE REPLACED. PREPARE FOR REINSTALLATION OF LINES AFTER

JOISTS REPLACEMENT HAS BEEN COMPLETED.

12 REMOVE EXHAUST FAN COMPLETE.

13 REMOVE EXISTING PLASTER CEILING ATTACHED TO STEEL JOIST

STRUCTURE COMPLETE. EXISTING SPRINKLER SYSTEM TO REMAIN.

14 REMOVE EXISTING LIGHTING FIXTURES COMPLETE - SEE ELECTRICAL

DRAWINGS.

15 REMOVE EXISTING STEEL JOISTS COMPLETE - SEE STRUCTURAL DRAWINGS.

16 REMOVE AND SALVAGE EXISTING LIGHTING FIXTURES - SEE ELECTRICAL

DRAWINGS.

SY

M

DE

S C

RI

PT

I O N

DA

TE

MA

TC

HL

IN

E -A

RE

A

'A

MA

TC

HL

IN

E -A

RE

A

'B

1 23

3 35

9 4

3 35

9 4 9

3 35 3 35

9 4

EF

EF

PV PV

PV

3 3

11 TYP

4 TYP

1 2

1 2 1 2

6 6

6 12

A1

AD502

A4

AD502

A1

AD502

10" ± 61'-6" ± 35'-6" ± 92'-2" ± 10" ±

'-0

8'- 6"

17'-3" ±

25'-4" ±

6'- 0"

28'-4 1/2" ±

6'- 0"

2'-

6"

3 3

16TYP

SIM

A4

AD502

A4

AD502

A4

AD502

EF

EF

GV GV GV GV

MA

TC

HL

IN

E -A

RE

A

'A

MA

TC

HL

IN

E -A

RE

A

'B

9 5 3

1 2 1 2

3 5

PV PV

4 4 4

3 5 3 5 3

1 2 1 2

6 6

6 12

6 12

6 6

6 6

A1

AD502

A1

AD502

A4

AD502

8'- 6"

10" ± 56'-5" ± 35'-6" ± 56'-5" ± 10" ±

17'-2" ±

6'- 0"

2'-

6"

'-0

6'- 0"

25'-4" ±

A1

AD502

A4

AD502

A4

AD502

A4

AD502

C1

AD503

A1

AD503

EF

EF

GVGVGV

EF

GV

/A1 AD501

/C4 AD501 /B4 AD501

/B2 AD501

/A4 AD501

/B1 AD502

/B4 AD502

/A2 AD501

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

PW

D

N O

R

FO

LK

AD106

B U

IL

D

IN

G

S P

-2

RO

O

F

PL

AN

DE

M

O

LI

TI

O

N

LAB

12,820,998

SAR SAR

02/15/21

MICHAEL COMPTON, CNATTU

EX

TE

RI

O

R

RE

PA

IR

S

RO

O

F

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1576521

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

S. M. SWEENEY, P.E.

0 4' 8' 16'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PARTIAL ROOF DEMOLITION PLAN - AREA 'A'

0 4' 8' 16'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PARTIAL ROOF DEMOLITION PLAN - AREA 'B'

GENERAL SHEET NOTES CONT.

DEMOLITION KEYNOTES

6 THE EXISTING ROOF VENT PIPE PENETRATIONS ACTUAL DIAMETERS VARY.

ASSUME 4” DIAMETER FOR PROJECT.

7 THE EXISTING EXHAUST FANS AND TOWER VENTILATORS ACTUAL

DIMENSIONS VARY. ASSUME 3’-6” SQUARE FOR PROJECT.

8 ALL EXISTING RAINLEADER PIPING MUST REMAIN.

9 THE EXISTING MECHANICAL EQUIPMENT ALONG WITH ITS ASSOCIATED

DUCTWORK, PIPING, ELECTRICAL CONDUIT AND STRUCTURAL STEEL

SUPPORT FRAMING, MUST REMAIN IN PLACE DURING CONSTRUCTION.

1 REFER TO OTHER PORTION OF THE CONTRACT DOCUMENTS FOR

ADDITIONAL INFORMATION AND INSTRUCTIONS.

2 THE CONTRACTOR MUST MAINTAIN THE WATERTIGHT INTEGRITY OF THE

ROOF AT ALL TIMES.

3 THE EXISTING ROOF STRUCTURE CONSISTS OF A 1 1/2” METAL DECK ON

STEEL JOISTS.

4 ALL EXISTING ROOF DRAINS ARE ASSUMED TO BE 4” DIAMETER.

5 THE EXISTING ROOF VENT PIPE PENETRATIONS ACTUAL HEIGHT VARIES.

ASSUME 1’-6” ABOVE EXISTING DECK FOR PROJECT HEIGHT.

1 REMOVE ALL LOOSE BALLASTED ROOF GRAVEL COMPLETE (FOR BIDDING

PURPOSES ASSUME 14,213 SF TOTAL BALLASTED GRAVEL PER PROJECT).

2 REMOVE BUILT-UP ROOFING SYSTEM AND ALL ASSOCIATED COMPONENTS

COMPLETE (FOR BIDDING PURPOSES ASSUME 14,213 SF TOTAL BUILT-UP

ROOFING SYSTEM PER PROJECT).

3 REMOVE BUILT-UP ROOF CRICKETS COMPLETE.

4 REMOVE WALK-WAY PADS COMPLETE.

5 REMOVE ROOF DRAIN DOME COMPLETE. EXISTING ROOF DRAIN AND RAIN

LEADER SYSTEM CONSTRUCTION TO REMAIN -

SEE DETAIL (FOR BIDDING PURPOSES ASSUME 9 ROOF DRAIN

DOMES TOTAL PER PROJECT).

6 REMOVE METAL GRAVEL STOP CONSTRUCTION COMPLETE (FOR BIDDING

PURPOSES ASSUME 655 LF TOTAL METAL GRAVEL STOP PER PROJECT).

7 REMOVE PARAPET COPING CONSTRUCTION COMPLETE (FOR BIDDING

PURPOSES ASSUME 143 LF TOTAL OF PARAPET COPING PER PROJECT).

8 EXHAUST FANS TO REMAIN.

9 REMOVE GRAVITY VENTILATOR COMPLETE. ROOF CURB TO REMAIN.

PREPARE CURB FOR INSTALLATION OF NEW GRAVITY VENTILATOR TO

MATCH EXISTING - SEE DETAIL (FOR BIDDING PURPOSES

ASSUME 8 GRAVITY VENTILATORS TOTAL PER PROJECT).

10 MECHANICAL ROOFTOP UNIT TO REMAIN.

11 MECHANICAL ROOFTOP UNIT SUPPORT STEEL STRUCTURE TO REMAIN - SEE

STRUCTURAL DRAWINGS.

12 REMOVE MECHANICAL UNIT CONDENSATION PIPING LINE COMPLETE (FOR

BIDDING PURPOSES ASSUME 55 LF TOTAL OF PIPE PER PROJECT).

13 REMOVE ROOFTOP HATCH AND CURB COMPLETE -

SEE DETAIL (FOR BIDDING PURPOSES ASSUME 1 ROOFTOP

HATCH TOTAL PER PROJECT).

14 REMOVE ROOF EXPANSION JOINT CLOSURE MEMBRANE CONSTRUCTION

COMPLETE (FOR BIDDING PURPOSES ASSUME 32 LF OF ROOF EXPANSION

JOINT TOTAL PER PROJECT).

15 PIPE VENTS TO REMAIN. REMOVE ADJACENT PIPE VENT ROOF AND

FLASHING CONSTRUCTION - SEE DETAILS & .

16 ROOF PENETRATION COVER TO REMAIN. REMOVE ADJACENT PIPE VENT

ROOF AND FLASHING CONSTRUCTION - SEE DETAIL .

17 REMOVE STEEL STRUCTURE PENETRATION METAL COVER AND ADJACENT

CURB - SEE DETAIL .

18 REMOVE EXHAUST FAN COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK

ON SECOND FLOOR AND DOWN TO FIRST FLOOR - SEE DETAIL

(ASSUME 24 x 24 DUCTWORK FOR BIDDING PURPOSES).

GENERAL SHEET NOTES

SY

M

DE

S C

RI

PT

I O N

DA

TE

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

9'-1 1/2" ±17'-2 1/4" ±9'-1 1/2" ±

211910 3 8 TYP 9

3 9 3 11 8 TYP 10

15 2

6148 TYP11311416112017324118 TYP14

AD203

A2

1'-7 1/8" ± 55'-8 1/4" ± 35'-5 1/4" ± 55'-8 1/4" ± 1'-7 1/8" ± 31'-5 5/8" ±

3 3

TYP

A4

AD301

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

1'-7 1/8" ±60'-9" ±35'-3 1/4" ±60'-11" ±

9'-1 1/2" ±17'-2 1/4" ±8'-11 1/2" ±

211 9 103 8 TYP 93 11 8 TYP17

4 1411

11 9 3 1

218 TYP11 3 3 11

3 3

23232323

24 24

TYP

2 11

A2

AD301

A3

AD301

308 TYP

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

7 7 7

12 14

1 13

42'-2" ±

/A4 AD501

/A2 AD501

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

PW

D

N O

R

FO

LK

AD201

B U

IL

D

IN

G

S P

-2

NO

RT

H

AN

D

EA

ST

E

XT

ER

IO

R

EL

EV

AT

IO

NS

DE

M

O

LI

TI

O

N

LAB

12,820,999

SAR SAR

02/15/21

MICHAEL COMPTON, CNATTU

EX

TE

RI

O

R

RE

PA

IR

S

RO

O

F

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1576521

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

S. M. SWEENEY, P.E.

0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

PARTIAL EXTERIOR NORTH ELEVATION - DEMOLITIONC1

0 9" 1'-6" 3'SCALE: 1/8" = 1'-0" (AD101)

PARTIAL EXTERIOR NORTH ELEVATION - DEMOLITIONB1

0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

EXTERIOR EAST ELEVATION - DEMOLITIONA1

20 HVAC UNIT TO REMAIN. PROTECT UNIT THROUGHOUT DURATION OF

CONSTRUCTION. DISCONNECT AND RECONNECT UNIT AS REQUIRED TO

COMPLETE RENOVATION WORK – SEE ELECTRICAL DRAWINGS. COORDINATE

WORK WITH COMMAND.

21 REMOVE ELECTRICAL CONDUIT – SEE ELECTRICAL DRAWINGS.

22 REMOVE METAL COVERS COMPLETE.

23 REMOVE GRAVITY VENTILATOR COMPLETE. ROOF CURB TO REMAIN.

PREPARE CURB FOR INSTALLATION OF NEW GRAVITY VENTILATOR TO

MATCH EXISTING - SEE DETAIL (FOR BIDDING PURPOSES

ASSUME 8 GRAVITY VENTILATORS TOTAL PER PROJECT).

24 REMOVE CONDENSATION PVC PIPES FOR THRU-WALL HVAC UNITS FROM

GROUND LEVEL TO EXISTING BRICK VENEER WALL COMPLETE. PREPARE

EXISTING PVC PIPE CONNECTIONS FOR INSTALLATION OF NEW METAL PIPE.

25 CABLE PENETRATION TO REMAIN. PROTECT THROUGHOUT DURATION OF

RENOIVATION WORK.

26 REMOVE EXTERIOR STAIR, RAILING, STEEL SUPPORT COLUMNS, FOOTINGS,

AND ALL ASSOCIATED COMPONENTS COMPLETE (FOR BIDDING PURPOSES

ASSUME 1 STAIR TOTAL PER PROJECT) - SEE STRUCTURAL DRAWINGS.

27 REMOVE CONCRETE PAD COMPLETE.

28 EXHAUST FANS TO REMAIN.

29 MECHANICAL ROOFTOP UNIT TO REMAIN.

30 REMOVE EXTERIOR WINDOW MULLION COVER PANELS COMPLETE (FOR

BIDDING PURPOSES, ASSUME 192 EXTERIOR WINDOW MULLION COVER

PANELS TOTAL PER PROJECT).

31 REMOVE EXHAUST FAN COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK

ON SECOND FLOOR AND DOWN TO FIRST FLOOR - SEE DETAIL

(ASSUME 24 x 24 DUCTWORK FOR BIDDING PURPOSES).

32 EXISTING WALL MOUNTED LIGHTING FIXTURE TO REMAIN.

6 REMOVE HOLLOW METAL FRAME AND DOOR SYSTEM COMPLETE (FOR

BIDDING PURPOSES ASSUME 5 HOLLOW METAL FRAME AND DOOR SYSTEMS

TOTAL PER PROJECT).

7 REMOVE METAL LOUVER COMPLETE. PREPARE OPENING FOR EXTERIOR

WALL BRICK VENEER AND INTERIOR CMU INFILL (FOR BIDDING PURPOSES

ASSUME 7 METAL LOUVERS TOTAL PER PROJECT).

8 REMOVE OUTSIDE AIR INTAKE LOUVER AND COVER COMPLETE. PREPARE

OPENING FOR INSTALLATION OF NEW LOUVER. EXISTING WALL THROUGH

LOUVER DUCT TO REMAIN (FOR BIDDING PURPOSES ASSUME 46 AIR INTAKE

LOUVERS TOTAL PER PROJECT).

9 REMOVE METAL GRAVEL STOP CONSTRUCTION COMPLETE (FOR BIDDING

PURPOSES ASSUME 655 LF TOTAL METAL GRAVEL STOP PER PROJECT).

10 REMOVE PARAPET COPING CONSTRUCTION COMPLETE (FOR BIDDING

PURPOSES ASSUME 143 LF TOTAL OF PARAPET COPING PER PROJECT).

11 REMOVE PRECAST CONCRETE WINDOW SILL COMPLETE (FOR BIDDING

PURPOSES ASSUME 1,073 LF TOTAL PRECAST CONCRETE WINDOW SILL PER

PROJECT).

12 EXTERIOR DOOR TO REMAIN.

13 EXTERIOR METAL STAIR AND ASSOCIATED ELEMENTS TO REMAIN.

14 CONCRETE PAD TO REMAIN - SEE STRUCTURAL DRAWINGS.

15 REMOVE ROOFTOP HVAC UNIT CONDENSATION PVC LINE COMPLETE.

16 REMOVE BUILDING SIGN AND SALVAGE FOR REINSTALLATION.

17 CONDENSATION PVC PIPES FOR THRU-WALL HVAC UNITS TO REMAIN.

PREPARE PVC LINE FOR INSTALLATION OF DOWNSPOUT NOZZLE.

18 GROUNDING CABLE TO REMAIN – SEE ELECTRICAL DRAWINGS.

19 REMOVE BUILDING SIGN. PREPARE SURFACE FOR INSTALLATION OF NEW

BUILDING SIGN.

1 EXISTING EXTERIOR BRICK VENEER TO REMAIN.

2 REMOVE EXTERIOR BRICK VENEER WALL COMPLETE. EXISTING INTERIOR

CMU WALL TO REMAIN (FOR BIDDING PURPOSES ASSUME 9,979 SF TOTAL

EXTERIOR BRICK VENEER PER PROJECT).

3 REMOVE ALUMINUM WINDOW SYSTEM COMPLETE AND SALVAGE FOR

REINSTALLATION. EXISTING STEEL STRUCTURE CONCEALED BY WINDOW

MULLIONS IS EXISTING TO REMAIN (FOR BIDDING PURPOSES ASSUME 7,290

SF TOTAL ALUMINUM WINDOW SYSTEM PER PROJECT).

4 REMOVE ALUMINUM STOREFRONT ENTRY SYSTEM COMPLETE AND SALVAGE

FOR REINSTALLATION (FOR BIDDING PURPOSES ASSUME 432 SF TOTAL

ALUMINUM STOREFRONT ENTRY SYSTEM PER PROJECT).

5 REMOVE CONCRETE CANOPY AND ALL ASSOCIATED COMPONENTS

COMPLETE, INCLUDING TAPERED INSULATION, WOOD BLOCKING, METAL

COUNTERFLASHING, AND METAL GRAVEL STOP (FOR BIDDING PURPOSES

ASSUME 26.98 CY OF CONCRETE, 133 LF OF METAL GRAVEL STOP, 133 LF OF

WOOD BLOCKING, 86 LF OF METAL COUNTERFLASHING, 517 SF OF TAPERED

INSULATION, AND 517 SF OF BALLASTED ROOF GRAVEL TOTAL FOR

CONCRETE CANOPIES PER PROJECT).

DEMOLITION KEYNOTESGENERAL SHEET NOTES

1 REFER TO HAZARDOUS MATERIALS, STRUCTURAL, CIVIL, ELECTRICAL, AND

FIRE PROTECTION DRAWINGS FOR ADDITIONAL INFORMATION AND

INSTRUCTIONS.

2 ALL ELEVATION VIEW TITLES REFER TO PLAN NORTH ORIENTATION.

DEMOLITION KEYNOTES

SY

M

DE

S C

RI

PT

I O N

DA

TE

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

A1

AD301

11910 3 8 TYP 9 3 11 8 TYP

15 8 TYP113423118 TYP14

1'-7 1/8" ± 65'-9 3/4" ± 25'-4" ± 67'-1 1/8" ± 30'-1" ±

AD203

B2

2 2

22 22 2223

A2

AD302

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

211 9 103 8 TYP 9 118 TYP

9 3 1

8 TYP11 3 3 11

8 TYP

1'-7 1/8" ±60'-9" ±25'-3 3/4" ±62'-5 1/8" ±

21212

2 146

22 22 22

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

7 7 7

27 12 27

7 10

1'-5 3/4" 7'-4 5/8" 42'-2"

A1

AD302

/A4 AD501

/A2 AD501

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

PW

D

N O

R

FO

LK

AD202

B U

IL

D

IN

G

S P

-2

SO

UT

H

AN

D W

ES

T

EX

TE

RI

O

R

EL

EV

AT

IO

NS

DE

M O

LI

TI

O N

LAB

12,821,000

SAR SAR

02/15/21

MICHAEL COMPTON, CNATTU

EX

TE

RI

O

R

RE

PA

IR

S

RO

O

F

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1576521

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

S. M. SWEENEY, P.E.

0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

PARTIAL EXTERIOR SOUTH ELEVATION - DEMOLITIONC1

0 9" 1'-6" 3'SCALE: 1/8" = 1'-0" (AD101)

PARTIAL EXTERIOR SOUTH ELEVATION - DEMOLITIONB1

0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

EXTERIOR WEST ELEVATION - DEMOLITIONA1

DEMOLITION KEYNOTESGENERAL SHEET NOTES

1 REFER TO HAZARDOUS MATERIALS, STRUCTURAL, CIVIL, ELECTRICAL, AND

FIRE PROTECTION DRAWINGS FOR ADDITIONAL INFORMATION AND

INSTRUCTIONS.

2 ALL ELEVATION VIEW TITLES REFER TO PLAN NORTH ORIENTATION.

21 REMOVE CONDENSATION PVC PIPES FOR THRU-WALL HVAC UNITS FROM

GROUND LEVEL TO EXISTING BRICK VENEER WALL COMPLETE. PREPARE

EXISTING PVC PIPE CONNECTIONS FOR INSTALLATION OF NEW METAL PIPE.

22 REMOVE GRAVITY VENTILATOR COMPLETE. ROOF CURB TO REMAIN.

PREPARE CURB FOR INSTALLATION OF NEW GRAVITY VENTILATOR TO

MATCH EXISTING - SEE DETAIL (FOR BIDDING PURPOSES

ASSUME 8 GRAVITY VENTILATORS TOTAL PER PROJECT).

23 EXISTING EXHAUST FANS TO REMAIN.

24 EXISTING MECHANICAL ROOFTOP UNIT TO REMAIN.

25 REMOVE EXTERIOR WINDOW MULLION COVER PANELS COMPLETE (FOR

BIDDING PURPOSES, ASSUME 192 EXTERIOR WINDOW MULLION COVER

PANELS TOTAL PER PROJECT).

26 REMOVE EXHAUST FAN COMPLETE INCLUDING ALL ASSOCIATED DUCTWORK

ON SECOND FLOOR AND DOWN TO FIRST FLOOR - SEE DETAIL

(ASSUME 24 x 24 DUCTWORK FOR BIDDING PURPOSES).

27 REMOVE ABANDONED OVERHEAD DOORS COMPLETE. TOOTH-OUT AND

REMOVE EXISTING CUT BRICK AT OPENING PERIMETER (FOR BIDDING

PURPOSES ASSUME 2 TOTAL ABANDONED OVERHEAD DOORS PER

PROJECT).

28 REMOVE WALL MOUNTED LIGHTING FIXTURE - SEE ELECTRICAL DRAWINGS

(FOR BIDDING PURPOSES ASSUME 1 WALL MOUNTED LIGHTING FIXTURE

TOTAL PER PROJECT).

7 REMOVE METAL LOUVER AND OPENING SUPPORT STEEL ANGLES

COMPLETE. PREPARE OPENING FOR EXTERIOR WALL BRICK VENEER AND

INTERIOR CMU INFILL (FOR BIDDING PURPOSES ASSUME 7 METAL LOUVERS

TOTAL PER PROJECT).

8 REMOVE OUTSIDE AIR INTAKE LOUVER COMPLETE AND SALVAGE FOR

REINSTALLATION. EXISTING THRU-WALL LOUVER DUCT TO REMAIN (FOR

BIDDING PURPOSES ASSUME 58 AIR INTAKE LOUVERS TOTAL PER PROJECT).

9 REMOVE METAL GRAVEL STOP CONSTRUCTION COMPLETE (FOR BIDDING

PURPOSES ASSUME 655 LF TOTAL METAL GRAVEL STOP PER PROJECT).

10 REMOVE PARAPET COPING CONSTRUCTION COMPLETE (FOR BIDDING

PURPOSES ASSUME 143 LF TOTAL OF PARAPET COPING PER PROJECT).

11 REMOVE PRECAST CONCRETE WINDOW SILL COMPLETE (FOR BIDDING

PURPOSES ASSUME 1,073 LF TOTAL PRECAST CONCRETE WINDOW SILL PER

PROJECT).

12 REMOVE HOLLOW METAL FRAME AND DOOR SYSTEM COMPLETE (FOR

BIDDING PURPOSES ASSUME 3 HOLLOW METAL FRAME AND DOOR SYSTEMS

TOTAL PER PROJECT).

13 EXTERIOR METAL STAIR AND ASSOCIATED ELEMENTS TO REMAIN.

14 CONCRETE PAD TO REMAIN.

15 ELECTRICAL CONDUIT TO REMAIN – SEE ELECTRICAL DRAWINGS.

16 REMOVE AND SALVAGE BUILDING SIGN AND SALVAGE FOR REINSTALLATION.

17 REMOVE BUILDING SIGN. PREPARE SURFACE FOR INSTALLATION OF NEW

BUILDING SIGN.

18 GROUNDING CABLE TO REMAIN – SEE ELECTRICAL DRAWINGS.

19 REMOVE EXTERIOR STAIR, RAILING, STEEL SUPPORT COLUMNS, FOOTINGS,

AND ALL ASSOCIATED COMPONENTS COMPLETE.

20 CONDENSATION PVC PIPES FOR THRU-WALL HVAC UNITS TO REMAIN.

PREPARE PVC LINE FOR INSTALLATION OF DOWNSPOUT NOZZLE.

1 EXISTING BRICK VENEER EXTERIOR WALL TO REMAIN.

2 REMOVE EXTERIOR BRICK VENEER WALL COMPLETE. EXISTING INTERIOR

CMU WALL TO REMAIN (FOR BIDDING PURPOSES ASSUME 9,979 SF TOTAL

EXTERIOR BRICK VENEER PER PROJECT).

3 REMOVE ALUMINUM WINDOW SYSTEM COMPLETE AND SALVAGE FOR

REINSTALLATION. EXISTING STEEL STRUCTURE CONCEALED BY WINDOW

MULLIONS IS EXISTING TO REMAIN (FOR BIDDING PURPOSES ASSUME 7,290

SF TOTAL ALUMINUM WINDOW SYSTEM PER PROJECT).

4 REMOVE ALUMINUM STOREFRONT ENTRY SYSTEM COMPLETE AND SALVAGE

FOR REINSTALLATION (FOR BIDDING PURPOSES ASSUME 432 SF TOTAL

ALUMINUM STOREFRONT ENTRY SYSTEM PER PROJECT).

5 REMOVE CONCRETE CANOPY AND ALL ASSOCIATED COMPONENTS

COMPLETE, INCLUDING TAPERED INSULATION, WOOD BLOCKING, METAL

COUNTERFLASHING, AND METAL GRAVEL STOP (FOR BIDDING PURPOSES

ASSUME 26.98 CY OF CONCRETE, 133 LF OF METAL GRAVEL STOP, 133 LF OF

WOOD BLOCKING, 86 LF OF METAL COUNTERFLASHING, 517 SF OF TAPERED

INSULATION, AND 517 SF OF BALLASTED ROOF GRAVEL TOTAL FOR

CONCRETE CANOPIES PER PROJECT).

6 REMOVE CONCRETE PAD COMPLETE - SEE STRUCTURAL DRAWINGS.

DEMOLITION KEYNOTES

SY

M

DE

S C

RI

PT

I O N

DA

TE

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

1'-6 1/2" ±

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

1'-7" ±

1 ±

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

1'-7" ±

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

3'-0" ±

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

8'-11" ±

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

3'-0" ±

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

8'-6 1/2" ±

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

3'-1" ±

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

3'-1" ±

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

1'-6 1/2" ±

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

1'-8" ±

FIRST FLOOR

0"

FIRST FLOOR

0"

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

PW

D

N O

R

FO

LK

AD203

B U

IL

D

IN

G

S P

-2

EX

TE

RI

O

R

EL

EV

AT

IO

NS

DE

M O

LI

TI

O N

LAB

12,821,001

SAR SAR

02/15/21

MICHAEL COMPTON, CNATTU

EX

TE

RI

O

R

RE

PA

IR

S

RO

O

F

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1576521

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

S. M. SWEENEY, P.E.

0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

EXT. ELEVATION - DEMO.D2 0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

EXT. ELEVATION - DEMO.D4 0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

EXT. ELEVATION - DEMO.D5

0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

EXT. ELEVATION - DEMO.C1

0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

EXT. ELEVATION - DEMO.D3

0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

EXT. ELEVATION - DEMO.C2 0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

EXT. ELEVATION - DEMO.C3 0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

EXT. ELEVATION - DEMO.C4 0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

EXT. ELEVATION - DEMO.C5

0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

EXT. ELEVATION - DEMO.D1

0 4' 8' 16'SCALE: 1/8" = 1'-0" (AD101)

EXT. ELEVATION - DEMO.B1 0 2' 4' 8'SCALE: 1/4" = 1'-0" (AD202)

ENLARGED EXTERIOR ELEVATION - DEMOLITIONB2

0 2' 4' 8'SCALE: 1/4" = 1'-0" (AD201)

ENLARGED EXTERIOR ELEVATION - DEMOLITIONA2

DEMOLITION KEYNOTES CONT.GENERAL SHEET NOTES

DEMOLITION KEYNOTES

14 HOSE BIB TO REMAIN. PROTECT UNIT THROUGHOUT DURATION OF

CONSTRUCTION WORK.

15 REMOVE EXISTING SPRINKLER ALARM COMPLETE AND SALVAGE FOR

REINSTALLATION.

16 REMOVE EXISTING EXHAUST PIPE CAPS COMPLETE AND SALVAGE FOR

REINSTALLATION. EXISTING PIPE THRU WALL PENETRATIONS TO REMAIN.

PROTECT UNITS THROUGHOUT DURATION OF CONSTRUCTION.

17 REMOVE EXISTING WALL MOUNTED HVAC UNIT AND SALVAGE FOR

REINSTALLATION. COORDINATE WORK WITH COMMAND - SEE ELECTRICAL

DRAWINGS.

18 REMOVE EXISTING WALL MOUNTED HVAC UNIT DISCONNECT SWITCH AND

SALVAGE FOR REINSTALLATION. COORDINATE WORK WITH COMMAND - SEE

ELECTRICAL DRAWINGS.

19 REMOVE ABANDONED CONDUITS AND JUNCTION BOX COMPLETE - SEE

ELECTRICAL DRAWINGS.

20 REMOVE ELECTRICAL METER AND SALVAGE FOR REINSTALLATION.

COORDINATE WORK WITH COMMAND - SEE ELECTRICAL DRAWINGS.

21 REMOVE EXISTING HVAC UNIT REFRIGERANT LINE AND SLEEVE AND

SALVAGE FOR REINSTALLATION. COORDINATE WORK WITH COMMAND.

22 REMOVE EXISTING ANTENNA AND ASSOCIATED ELEMENTS AND SALVAGE

FOR REINSTALLATION. COORDINATE WORK WITH COMMAND - SEE

ELECTRICAL DRAWINGS.

23 REMOVE CONDENSATION PVC PIPES FOR EXISTING WALL THRU-WALL UNITS

FROM GROUND LEVEL TO EXISTING BRICK VENEER WALL COMPLETE.

PREPARE EXISTING PVC PIPE CONNECTIONS FOR INSTALLATION OF NEW

METAL PIPE.

24 HVAC UNIT TO REMAIN. PROTECT UNIT THROUGHOUT DURATION OF

CONSTRUCTION. DISCONNECT AND RECONNECT UNIT AS REQUIRED TO

COMPLETE RENOVATION WORK - SEE ELECTRICAL DRAWINGS. COORDINATE

HVAC DISCONNECTIONS AND RECONNECTIONS WITH COMMAND.

25 REMOVE EXISTING CONCRETE PAD COMPLETE.

1 EXISTING BRICK VENEER EXTERIOR WALL TO REMAIN.

2 REMOVE EXTERIOR BRICK VENEER WALL COMPLETE. EXISTING INTERIOR

CMU WALL TO REMAIN (FOR BIDDING PURPOSES ASSUME 9,979 SF TOTAL

EXTERIOR BRICK VENEER PER PROJECT).

3 REMOVE METAL LOUVER COMPLETE. PREPARE OPENING FOR INSTALLATION

OF NEW METAL LOUVER (FOR BIDDING PURPOSES ASSUME 7 METAL

LOUVERS TOTAL PER PROJECT).

4 REMOVE METAL GRAVEL STOP CONSTRUCTION COMPLETE (FOR BIDDING

PURPOSES ASSUME 655 LF TOTAL METAL GRAVEL STOP PER PROJECT).

5 REMOVE HOLLOW METAL FRAME AND DOOR SYSTEM AND SALVAGE FOR

REINSTALLATION (FOR BIDDING PURPOSES ASSUME 2 HOLLOW METAL

FRAME AND DOOR SYSTEMS TOTAL PER PROJECT).

6 REMOVE EXISTING CONCRETE CANOPY AND ALL ASSOCIATED COMPONENTS

COMPLETE, INCLUDING TAPERED INSULATION, WOOD BLOCKING, METAL

COUNTERFLASHING, AND METAL GRAVEL STOP.

7 EXISTING CONCRETE PAD TO REMAIN.

8 REMOVE EXTERIOR STAIR, RAILING, STEEL SUPPORT COLUMNS, FOOTINGS,

AND ALL ASSOCIATED COMPONENTS COMPLETE (FOR BIDDING PURPOSES

ASSUME 1 STAIR TOTAL PER PROJECT).

9 EXISTING EXTERIOR METAL STAIR AND ASSOCIATED ELEMENTS TO REMAIN.

10 REMOVE EXISTING STANDPIPE CONNECTION CAP AND SALVAGE FOR

REINSTALLATION. PROTECT UNITS THROUGHOUT DURATION OF

CONSTRUCTION.

11 EXISTING NATURAL GAS METER TO REMAIN. PROTECT UNIT THROUGHOUT

DURATION OF CONSTRUCTION WORK. DISCONNECT AND RECONNECT UNIT

AS REQUIRED TO COMPLETE RENOVATION WORK. COORDINATE UTILITY

DISCONNECTIONS AND RECONNECTIONS WITH COMMAND.

12 EXISTING SURFACE MOUNTED JUNCTION BOX TO REMAIN - SEE ELECTRICAL

DRAWINGS.

13 DISCHARGE PIPE SPOUTS AND WALL PENETRATIONS TO REMAIN. PROTECT

UNIT THROUGHOUT DURATION OF CONSTRUCTION WORK.

1 REFER TO HAZARDOUS MATERIALS, STRUCTURAL, CIVIL, ELECTRICAL, AND

FIRE PROTECTION DRAWINGS FOR ADDITIONAL INFORMATION AND

INSTRUCTIONS.

SY

M

DE

S C

RI

PT

I O N

DA

TE

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

K

EXISTING CONCRETE

FOUNDATION TO REMAIN

REMOVE EXTERIOR BRICK

VENEER

REMOVE MASONRY TIE

REMOVE PRECAST CONCRETE

WINDOW SILL

INTERIOR CMU WALL TO REMAIN

REMOVE ALUMINUM WINDOW

SYSTEM COMPLETE AND SALVAGE

FOR REINSTALLATION

REMOVE AND SALVAGE OR REMOVE AND

DEMOLISH OUTSIDE AIR INTAKE LOUVER

COMPLETE - SEE SHEETS AD201 & AD202

LOUVER DUCT TO REMAIN

REMOVE PLASTIC LAMINATE

WINDOW SILL CONSTRUCTION

COMPLETE

REMOVE SURFACE MOUNTED

RACEWAY

CUT BACK AND REMOVE EXISTING CEILING AS

REQUIRED FOR REINSTALLATION OF WINDOW

SYSTEM AND INSTALLATION OF STEEL

STRUCTURE

REMOVE STEEL SHELF ANGLE - SEE

STRUCTURAL DRAWINGS

FLOOR SLAB AND ASSOCIATED

STRUCTURAL ELEMENTS TO

REMAIN - SEE STRUCTURAL

DRAWINGS

REMOVE ALL LOOSE BALLASTED

ROOF GRAVEL COMPLETE

REMOVE ROOF CONSTRUCTION

COMPLETE

ROOF STRUCTURE TO REMAIN - SEE

STRUCTURAL DRAWINGS

REMOVE GRAVEL STOP AND

ASSOCIATED CONSTRUCTION

COMPLETE

8 B

RI

CK

S

1'-

B

RI

CK

S

7'- 4"

B

RI

CK

S

5'- 4"

B

RI

CK

S

7'- 4"

B

RI

CK

S

3'- 4"

B

RI

CK

S

2'- 8"

3 B R I

CK

S

8"

B

RI

CK

S

2'- 8"

B

RI

CK

S

2'- 8"

REMOVE INTERIOR CMU WALL AS

REQUIRED FOR INSTALLATION OF

STEEL STRUCTURE

CUT BACK AND REMOVE EXISTING CEILING

AS REQUIRED FOR REINSTALLATION OF

WINDOW SYSTEM AND INSTALLATION OF

STEEL STRUCTURE

REMOVE MASONRY TIES

REMOVE AND SALVAGE OR REMOVE AND

DEMOLISH OUTSIDE AIR INTAKE LOUVER

COMPLETE - SEE SHEETS AD201 & AD202

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

C

EXISTING CONCRETE

FOUNDATION TO

REMAIN

REMOVE ALUMINUM WINDOW SYSTEM

COMPLETE AND SALVAGE FOR REINSTALLATION

REMOVE PLASTIC LAMINATE WINDOW

SILL CONSTRUCTION COMPLETE

REMOVE SURFACE MOUNTED RACEWAY

REMOVE STEEL SHELF

ANGLE - SEE

STRUCTURAL

DRAWINGS

FLOOR SLAB AND ASSOCIATED STRUCTURAL

ELEMENTS TO REMAIN - SEE STRUCTURAL

DRAWINGS

REMOVE ALL LOOSE BALLASTED ROOF

GRAVEL COMPLETE

REMOVE ROOF CONSTRUCTION COMPLETE

ROOF STRUCTURE TO REMAIN - SEE STRUCTURAL

DRAWINGS

REMOVE GRAVEL STOP AND ASSOCIATED

CONSTRUCTION COMPLETE

REMOVE INTERIOR CMU WALL AS REQUIRED

FOR INSTALLATION OF STEEL STRUCTURE

CUT BACK AND REMOVE EXISTING CEILING AS

REQUIRED FOR REINSTALLATION OF WINDOW

SYSTEM AND INSTALLATION OF STEEL STRUCTURE

REMOVE ALUMINUM

STOREFRONT ENTRY

SYSTEM COMPLETE

AND SALVAGE FOR

REINSTALLATION

REMOVE CONCRETE CANOPY

AND ALL ASSOCIATED

COMPONENTS COMPLETE,

INCLUDING TAPERED

INSULATION, WOOD

BLOCKING, METAL

COUNTERFLASHING, AND

METAL GRAVEL STOP

REMOVE CONCRETE

SLAB CONSTRUCTION -

SEE STRUCTURAL

DRAWINGS

REMOVE CONCRETE

SIDEWALK - SEE CIVIL

DRAWINGS

REMOVE PRECAST CONCRETE WINDOW SILL

REMOVE MASONRY TIES

REMOVE AND SALVAGE OR REMOVE AND DEMOLISH

OUTSIDE AIR INTAKE LOUVER COMPLETE - SEE

SHEETS AD201 & AD202

B

RI

CK

S

'-0

9'-

4"

B

RI

CK

S

3'- 4"

8 B

RI

CK

S

1'-

B

RI

CK

S

2'- 8"

6'-

8"

B

RI

CK

S

B

RI

CK

S

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

D

EXISTING CONCRETE

FOUNDATION TO REMAIN

REMOVE STEEL SHELF ANGLE - SEE

STRUCTURAL DRAWINGS

FLOOR SLAB AND ASSOCIATED

STRUCTURAL ELEMENTS TO

REMAIN - SEE STRUCTURAL

DRAWINGS

REMOVE ALL LOOSE BALLASTED

ROOF GRAVEL COMPLETE

REMOVE ROOF CONSTRUCTION

COMPLETE

ROOF STRUCTURE TO REMAIN - SEE

STRUCTURAL DRAWINGS

REMOVE GRAVEL STOP AND

ASSOCIATED CONSTRUCTION

COMPLETE

REMOVE INTERIOR CMU WALL AS

REQUIRED FOR INSTALLATION OF

STEEL STRUCTURE

INTERIOR CMU WALL TO REMAIN

REMOVE EXTERIOR BRICK

VENEER

REMOVE MASONRY TIES

REMOVE HOLLOW METAL FRAME

AND DOOR SYSTEM COMPLETE

EXISTING CONCRETE

LANDING TO REMAIN - SEE

STRUCTURAL DRAWINGS

REMOVE AND SALVAGE OR

REMOVE AND DEMOLISH OUTSIDE

AIR INTAKE LOUVER COMPLETE -

SEE SHEETS AD201 & AD202

B

RI

CK

S

'-1

0"

B

RI

CK

S

2'- 8"

B

RI

CK

S

'-0

FIRST FLOOR

0"

SECOND FLOOR

12'-8"

T.O.J.

24'-6"

C

REMOVE ALUMINUM WINDOW

SYSTEM COMPLETE AND SALVAGE

FOR REINSTALLATION

REMOVE CERAMIC TILE WINDOW

SILL CONSTRUCTION COMPLETE

FLOOR SLAB AND ASSOCIATED

STRUCTURAL ELEMENTS TO REMAIN -

SEE STRUCTURAL DRAWINGS

REMOVE ALL LOOSE BALLASTED

ROOF GRAVEL COMPLETE

REMOVE ROOF CONSTRUCTION

COMPLETE

ROOF STRUCTURE TO REMAIN - SEE

STRUCTURAL DRAWINGS

REMOVE GRAVEL STOP AND

ASSOCIATED CONSTRUCTION

COMPLETE

REMOVE INTERIOR CMU WALL AS

REQUIRED FOR INSTALLATION OF

STEEL STRUCTURE

CUT BACK AND REMOVE EXISTING CEILING

AS REQUIRED FOR REINSTALLATION OF

WINDOW SYSTEM AND INSTALLATION OF

STEEL STRUCTURE

REMOVE PRECAST CONCRETE

WINDOW SILL

REMOVE MASONRY TIES

REMOVE INTERIOR CMU WALL AS

REQUIRED FOR INSTALLATION OF

STEEL STRUCTURE

REMOVE STEEL SHELF ANGLE -

SEE STRUCTURAL DRAWINGS

REMOVE ALUMINUM WINDOW

SYSTEM COMPLETE AND SALVAGE

FOR REINSTALLATION

REMOVE CERAMIC TILE WINDOW

SILL CONSTRUCTION COMPLETE

CUT BACK AND REMOVE EXISTING CEILING

AS REQUIRED FOR REINSTALLATION OF

WINDOW SYSTEM AND INSTALLATION OF

STEEL STRUCTURE

REMOVE PRECAST CONCRETE

WINDOW SILL

REMOVE EXTERIOR BRICK VENEER

REMOVE MASONRY TIES

REMOVE INTERIOR CMU WALL AS

REQUIRED FOR INSTALLATION OF

STEEL STRUCTURE

REMOVE EXTERIOR BRICK VENEER

INTERIOR CMU WALL TO REMAIN

EXISTING CONCRETE FOUNDATION

TO REMAIN

REMOVE AND SALVAGE OR REMOVE AND

DEMOLISH OUTSIDE AIR INTAKE LOUVER

COMPLETE - SEE SHEETS AD201 & AD202

B

RI

CK

S

6'- 8"

B

RI

CK

S

3'- 4"

B

RI

CK

S

9'- 4"

B

RI

CK

S

3'- 4"

4 B

RI

CK

S

1'-

B

RI

CK

S

6'- 8"

B

RI

CK

S

2'- 8"

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

PW

D

N O

R

FO

LK

AD301

B U

IL

D

IN

G

S P

-2

W

AL

L

SE

CT

IO

NS

DE

M

O

LI

TI

O

N

LAB

12,821,002

SAR SAR

02/15/21

MICHAEL COMPTON, CNATTU

EX

TE

RI

O

R

RE

PA

IR

S

RO

O

F

RE

NO

VA

TI

O

N

SEBASTIAN A. RAMOS, R.A.

1576521

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

S. M. SWEENEY, P.E.

0 9" 1'-6" 3'SCALE: 3/4" = 1'-0" (AD101)

WALL SECTION - DEMOLITIONA1 0 9" 1'-6" 3'SCALE: 3/4" = 1'-0" (AD101)

WALL SECTION - DEMOLITIONA2 0 9" 1'-6" 3'SCALE: 3/4" = 1'-0" (AD101)

W…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .