20-0022 SOW Phase 3 REV A.pdf

PDF 439 KB Posted

Attached to
TRAINING ROAD REPAIRS AND DEBRIS REMOVAL, PHASE III
Solicitation number
N4008520R4044
Issued by

View the file

Other files

File Type Posted
19-0161 DWG REV A.pdf PDF
Amnd 0002 20R4044 FINAL.pdf PDF
19-0178 DWG REV A.pdf PDF
19-0169 GE REV A.xlsx XLSX spreadsheet
CLNC 02 82 30 RE-ESTABLISH VEGETATION.pdf PDF
20-0022 SITE MAP.pdf PDF
31 05 19 GEOTEXTILE.pdf PDF
19-0177 DWG REV.pdf PDF
19-0158 DWG REV A.pdf PDF
19-0169 SOW REV A.pdf PDF
19-0179 DWG REV A.pdf PDF
19-0179 GE REV A.xlsx XLSX spreadsheet
PRICE PROPOSAL FORM.pdf PDF
Waiver.pdf PDF
Amnd 0001 20R4044 FINAL.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
RFP Training Road Repairs Phase 3.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project # 20-0022

Scope of Work Gravel Road Repair Phase 3

General Description:

This contract will repair gravel training roads located on Marine Corps Base Camp Lejeune. All roads listed in this scope require the addition of ABC to raise the elevation of the road surface. Additionally, some of the roads require full depth repair and/or the addition of geotextile.

Total Number of Roads: 7 Total Mileage of Roads: 11.62 Total ABC Minimum Required Tonnage: 47,416 Total #4 Stone Minimum Required Tonnage: 1,748

General Notes:

1. The listed minimum required tonnage of ABC is to be met for each site. More tonnage may be required to meet the identified required thickness of ABC.

2. The listed minimum required tonnage of #4 stone is to be met for sites identified as requiring full depth repair. More tonnage may be required to meet full depth repair requirements.

3. #4 stone and ABC shall be installed in no more than 6 inch lifts. All gravel shall be roll compacted with no less than 2 passes.

4. All site work shall be coordinated with Range Control prior to performing work. Roads may not be accessible during certain range operations.

5. Contractor shall coordinate site lay down areas with Range Operations and Training personnel.

6. Use of side range gates for purposes of stone delivery may be possible with Range Control permission and coordination with the Construction Manager.

7. Some existing road widths are larger than 20 feet. Newly established road surfaces are to be placed along the centerline of existing roads with widths as identified below.

8. Contractor shall field verify all measurements.

9. Contractor shall locate all utilities prior to any excavation activities in work areas. Caution shall be taken when working around existing utilities. Contractor is responsible to repair any damage to existing utilities.

10. Any disturbed vegetation during construction shall be seeded and strawed in order to revegetate the disturbed area.

11. The Contractor shall provide to the Government Project Quality Control Manager all crushed stone delivery tickets at the end of each working day to track the weight of all crushed stone delivered to each site.

Specifications:

1. #4 stone and ABC shall meet NCDOT Standard Specifications 1005 and 1010.

2. Geotextile shall be non-woven and meet Specifications Section 31 05 19, Geotextile.

Detailed Requirements:

Site 1: Lot 201 Road

Distance: 0.33mi

ABC Minimum Required Tonnage: 1,226

From 34.6921 / -77.3242, to 34.6914 / -77.3300, install, spread, grade, and roll compact 6 inches of ABC in six inch lifts to maintain a 20 foot wide road.

The contractor shall grade the entire section of road. The road shall be sloped or crowned so that to provide positive drainage from road surface.

Site 2: TLZ Osprey Road

Distance: 2.7mi

ABC Minimum Required Tonnage: 11,520

#4 Minimum Required Tonnage: 576

Geotextile Required Mileage: 0.4

Provide full depth road repair to existing wash outs, low points, and soft areas in road. Road repair shall include installing, spreading, grading, and roll compacting #4 stone in these low areas to reestablish sub-base to match existing grade.

From 34.6103 / -77.3013, to 34.5823 / -77.2949, install, spread, grade, and roll compact 6 inches of ABC in six inch lifts to maintain a 20 foot wide road.

From 34.5823 / -77.2949, to 34.5762 / -77.2945, install, spread, grade, and roll compact 12 inches of

ABC in six inch lifts to maintain a 20 foot wide road.

From 34.5823 / -77.2949, to 34.5762 / -77.2945, install non-woven geotextile on top of existing earth road prior to installing gravel.

The contractor shall grade the entire section of road. The road shall be sloped or crowned so that to provide positive drainage from road surface.

Site 3: GP-17 Road

Distance: 1.54mi

ABC Minimum Required Tonnage: 8,472

#4 Minimum Required Tonnage: 424

Geotextile Require Mileage: 0.74

Provide full depth road repair to existing wash outs, low points, and soft areas in road. Road repair shall include installing, spreading, grading, and roll compacting #4 stone in these low areas to reestablish sub-base to match existing grade.

From 34.5848 / -77.2882, to 34.5816 / -77.3011, install, spread, grade, and roll compact 6 inches of ABC in six inch lifts to maintain a 20 foot wide road.

From 34.5816 / -77.3011, to 34.5748 / -77.3103, install, spread, grade, and roll compact 12 inches of

ABC in six inch lifts to maintain a 20 foot wide road.

From 34.5816 / -77.3011, to 34.5748 / -77.3103, install non-woven geotextile on top of existing earth road prior to installing gravel.

The contractor shall grade the entire section of road. The road shall be sloped or crowned so that to provide positive drainage from road surface.

Site 4: GP-16 Road

Distance: 0.8mi

ABC Minimum Required Tonnage: 2,973

From 34.6003 / -77.2884, to 34.5999 / -77.3025, install, spread, grade, and roll compact 6 inches of ABC in six inch lifts to maintain a 20 foot wide road.

The contractor shall grade the entire section of road. The road shall be sloped or crowned so that to provide positive drainage from road surface.

Site 5: TLZ Dodo Road

Distance: 2.83mi

ABC Minimum Required Tonnage: 10,516

#4 Minimum Required Tonnage: 526

Provide full depth road repair to existing wash outs, low points, and soft areas in road. Road repair shall include installing, spreading, grading, and roll compacting #4 stone in these low areas to reestablish sub-base to match existing grade.

From 34.6005 / -77.3026, to 34.5822 / -77.3367, install, spread, grade, and roll compact 6 inches of ABC in six inch lifts to maintain a 20 foot wide road.

The contractor shall grade the entire section of road. The road shall be sloped or crowned so that to

Site 6: Hog Pen Pond Road

Distance: 1.2mi

ABC Minimum Required Tonnage: 4,459

#4 Minimum Required Tonnage: 223

Provide full depth road repair to existing wash outs, low points, and soft areas in road. Road repair shall include installing, spreading, grading, and roll compacting #4 stone in these low areas to reestablish sub-base to match existing grade.

From 34.5922 / -77.3052, to 34.5895 / -77.3236, install, spread, grade, and roll compact 6 inches of ABC in six inch lifts to maintain a 20 foot wide road.

The contractor shall grade the entire section of road. The road shall be sloped or crowned so that to provide positive drainage from road surface.

Site 7: TLZ Dove Road

Distance: 2.22mi

ABC Minimum Required Tonnage: 8,250

From 34.6005 / -77.3385, to 34.5769 / -77.3184, install, spread, grade, and roll compact 6 inches of ABC in six inch lifts to maintain a 20 foot wide road.

The contractor shall grade the entire section of road. The road shall be sloped or crowned so that to