19-0179 GE REV A.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
TRAINING ROAD REPAIRS AND DEBRIS REMOVAL, PHASE III
Solicitation number
N4008520R4044
Issued by

View the file

Other files

File Type Posted
19-0161 DWG REV A.pdf PDF
Amnd 0002 20R4044 FINAL.pdf PDF
19-0178 DWG REV A.pdf PDF
19-0169 GE REV A.xlsx XLSX spreadsheet
20-0022 SOW Phase 3 REV A.pdf PDF
CLNC 02 82 30 RE-ESTABLISH VEGETATION.pdf PDF
20-0022 SITE MAP.pdf PDF
31 05 19 GEOTEXTILE.pdf PDF
19-0177 DWG REV.pdf PDF
19-0158 DWG REV A.pdf PDF
19-0169 SOW REV A.pdf PDF
19-0179 DWG REV A.pdf PDF
PRICE PROPOSAL FORM.pdf PDF
Waiver.pdf PDF
Amnd 0001 20R4044 FINAL.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
RFP Training Road Repairs Phase 3.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

REPAIR EROSION WILSON BLVD OVERPASS
19-0179
Prepared by Doug Zimbelman
UNIT COSTSTOTAL COSTS
ITEM DESCRIPTIONQTYUNIT OF MEASUREMATERIALLABOREQUIPMENTMATERIALLABOREQUIPMENTTOTAL
DEMO
ABANDON SEWER LINE0SF$ 12.65$ 6.50$0.00$0.00$0.00
DISPOSAL1LS$ 6,600.00$ 2,450.00$6,600.00$2,450.00$9,050.00
INSTALL
PED BRIDGES0SF$ 43.75$ 15.75$ 11.40$0.00$0.00$0.00$0.00
CONCRETE0CY$ 210.00$ 147.00$ 12.30$0.00$0.00$0.00$0.00
BACKFILL14640LCY$ 24.00$ 8.50$ 10.20$351,360.00$124,440.00$149,328.00$625,128.00
ABC0TON$ 39.00$ 14.50$ 12.00$0.00$0.00$0.00$0.00
RIP RAP0TON$ 83.00$ 18.00$ 7.00$0.00$0.00$0.00$0.00
ASPHALT0TON$ 98.00$ 32.00$ 14.40$0.00$0.00$0.00$0.00
CULVERT PIPE0LF$ 285.00$ 52.00$ 23.50$0.00$0.00$0.00$0.00
ORDINANCE TECH0EA$ 1,200.00$0.00$0.00$0.00$0.00
CLEARING0ACRE$ 7,975.00$ 10,425.00$ 18,400.00$0.00$0.00$0.00$0.00
SEEDING18.2ACRE$ 1,650.00$ 1,320.00$ 605.00$30,030.00$24,024.00$11,011.00$65,065.00
CONCRETE MAT0SF$ 75.00$ 25.00$ 15.00$0.00$0.00$0.00$0.00
HEADWALL0EA$ 12,000.00$ 52.00$ 23.50$0.00$0.00$0.00$0.00
Total Direct Costs$381,390.00$155,064.00$162,789.00
100$381,390.00
72$111,646.08
100$162,789.00
5$19,069.50
Sales Tax (%)0$0.00
Contingencies (%)0$0.00$0.00$0.00
Adjusted Total Direct Costs$400,459.50$111,646.08$162,789.00
Installing Contractor Markups
Material Handling (%)0$0.00
Equipment Handling (%)0$0.00
Worker's Comp Insurance(%)0$0.00
Fixed Overhead (%)0$0.00
Variable Overhead (%)12$13,397.53
Profit (%)30$120,137.85$37,513.08$48,836.70
Installing Contractor Total Costs$520,597.35$162,556.69$211,625.70
Installing Contractor Total Project Cost$894,779.74
General Contractor Markups
Overhead and Profit (%)20.0$178,955.95
Bond (%)1.0$10,737.36
General Contractor Total Project Cost$1,084,473.05

Measurements

ItemLength (FT)Width (FT)Depth (FT)SQ FTSQ YDCU YDTonnageAcreage
ABC10270.52703059.50.01
BACKFILL1027627030601140.01
AGGREGATE BASE205011000111.111111111137.03703703770.37037037040.02
8 IN BINDER COURSE00000000.00
4 IN BINDER COURSE00000000.00
2 IN ASPHALT10270.1667270301.6673.16730.01
CONCRETE4444161.777777777826.074074074149.54074074070.0003681546
SUM1826202.8888888889129.7781111111246.57841111110.0420156466

File details come from the government source that posted it. Updated .