19-0169 GE REV A.xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- N4008520R4044
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19-0161 DWG REV A.pdf | ||
| Amnd 0002 20R4044 FINAL.pdf | ||
| 19-0178 DWG REV A.pdf | ||
| 20-0022 SOW Phase 3 REV A.pdf | ||
| CLNC 02 82 30 RE-ESTABLISH VEGETATION.pdf | ||
| 20-0022 SITE MAP.pdf | ||
| 31 05 19 GEOTEXTILE.pdf | ||
| 19-0177 DWG REV.pdf | ||
| 19-0158 DWG REV A.pdf | ||
| 19-0169 SOW REV A.pdf | ||
| 19-0179 DWG REV A.pdf | ||
| 19-0179 GE REV A.xlsx | XLSX spreadsheet | |
| PRICE PROPOSAL FORM.pdf | ||
| Waiver.pdf | ||
| Amnd 0001 20R4044 FINAL.pdf | ||
| Master PPI Form Template.xls | XLS spreadsheet | |
| RFP Training Road Repairs Phase 3.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| TRAINING ROAD REPAIR PHASE 3 | PROJECT TOTAL = | $ 13,788,302 | |
| PROJECT #: | 19-0169 |
| PROJECT # | M1 # | |||
| 19-0158 | 19M176CN | REPAIR CULVERT, HWY 172 | PROJECT TOTAL = | $ 3,151,729 |
| 19-0161 | 19M179CN | REPAIR JULIAN C SMITH ROAD | PROJECT TOTAL = | $ 436,190 |
| 19-0164 | 19M182CN | REPAIR S455 PED BRIDGE | PROJECT TOTAL = | $ 210,580 |
| 19-0170 | 19M235CN | REPAIR CULVERT, CAMP DAVIS S | PROJECT TOTAL = | $ 183,610 |
| 19-0171 | 19M236CN | REPAIR CULVERT, COMBAT TOWN | PROJECT TOTAL = | $ 421,283 |
| 19-0172 | 19M237CN | REPAIR CULVERT, MAC RANGE ROAD | PROJECT TOTAL = | $ 421,283 |
| 19-0174 | 19M239CN | REPAIR STORMWATER SYSTEM, RIFLE RANGE | PROJECT TOTAL = | $ 575,282 |
| 19-0175 | 19M240CN | REPAIR CULVERT, HOLCOMB BLVD | PROJECT TOTAL = | $ 364,174 |
| 19-0176 | 19M241CN | REPAIR S1668 PED BRIDGE | PROJECT TOTAL = | $ 198,550 |
| 19-0177 | 19M175CN | REPAIR WASHOUT B ST AND C ST MARSOC | PROJECT TOTAL = | $ 273,893 |
| 19-0178 | 19M196CN | REPAIR MULTIPLE STORMWATER GREENWAY TRAIL | PROJECT TOTAL = | $ 1,067,255 |
| 19-0179 | 19M223CN | REPAIR EROSION WILSON BLVD OVERPASS | PROJECT TOTAL = | $ 1,084,473 |
| 20-0022 | GRAVEL ROAD REPAIR PHASE 3 | PROJECT TOTAL = | $ 5,400,000 |
NO COST
| REPAIR TRAINING DOCKS AND SPLASHPOINTS | |||
| PROJECT 19-0081 | |||
| PROJECT 17-0070 | REPLACE VARIOUS BOAT RAMPS | ||
| QUANTITY | |||
| STT122 | NEW DOCK | 1014 | SF |
| NEW RAMP | 720 | SF | |
| SVL185 | NEW DOCK | 800 | SF |
| NEW RAMP | 1094 | SF | |
| SVL140 | NEW DOCK | 294 | SF |
| NEW RAMP | 420 | SF | |
| SRR94 | NEW DOCK | 246 | SF |
| NEW RAMP | 645 | SF | |
| SFC595 | NEW DOCK | 486 | SF |
| PROJECT 19-0082 | REPLACE DOCKS MCB CLNC | ||
| QUANTITY | |||
| PERMIT | 1 | EA | |
| S1936 | NEW DOCK | 2200 | SF |
| SA93 | NEW DOCK | 1620 | SF |
| SA95 | NEW DOCK | 1026 | SF |
| SA29 | NEW DOCK | 4974 | SF |
| SBA299 | NEW DOCK | 972 | SF |
| SBA174 | NEW DOCK | 396 | SF |
| SAS2811 | NEW DOCK | 1000 | SF |
| PROJECT 19-0083 | REPAIR SPLASH POINTS MCB CLNC | ||
| QUANTITY | |||
| PERMIT | 1 | ea | |
| SP4 (BOTH SIDES) | 2016 | SF | |
| SP6 (BEACH SIDE) | 1008 | SF | |
| SP7 (BOTH SIDES) | 4336 | SF | |
| SP20 (WEIL PT) | 1008 | SF | |
| SP22 | 1008 | SF | |
| SP23 | 1008 | SF | |
| SP29 | 1008 | SF | |
| SP32 | 1008 | SF | |
| SP38 | 1008 | SF | |
| SP42 | 1008 | SF | |
| SP43 | 1008 | SF |
File details come from the government source that posted it. Updated .