19-0169 GE REV A.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
TRAINING ROAD REPAIRS AND DEBRIS REMOVAL, PHASE III
Solicitation number
N4008520R4044
Issued by

View the file

Other files

File Type Posted
19-0161 DWG REV A.pdf PDF
Amnd 0002 20R4044 FINAL.pdf PDF
19-0178 DWG REV A.pdf PDF
20-0022 SOW Phase 3 REV A.pdf PDF
CLNC 02 82 30 RE-ESTABLISH VEGETATION.pdf PDF
20-0022 SITE MAP.pdf PDF
31 05 19 GEOTEXTILE.pdf PDF
19-0177 DWG REV.pdf PDF
19-0158 DWG REV A.pdf PDF
19-0169 SOW REV A.pdf PDF
19-0179 DWG REV A.pdf PDF
19-0179 GE REV A.xlsx XLSX spreadsheet
PRICE PROPOSAL FORM.pdf PDF
Waiver.pdf PDF
Amnd 0001 20R4044 FINAL.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
RFP Training Road Repairs Phase 3.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TRAINING ROAD REPAIR PHASE 3PROJECT TOTAL =$ 13,788,302
PROJECT #:19-0169
PROJECT #M1 #
19-015819M176CNREPAIR CULVERT, HWY 172PROJECT TOTAL =$ 3,151,729
19-016119M179CNREPAIR JULIAN C SMITH ROADPROJECT TOTAL =$ 436,190
19-016419M182CNREPAIR S455 PED BRIDGEPROJECT TOTAL =$ 210,580
19-017019M235CNREPAIR CULVERT, CAMP DAVIS SPROJECT TOTAL =$ 183,610
19-017119M236CNREPAIR CULVERT, COMBAT TOWNPROJECT TOTAL =$ 421,283
19-017219M237CNREPAIR CULVERT, MAC RANGE ROADPROJECT TOTAL =$ 421,283
19-017419M239CNREPAIR STORMWATER SYSTEM, RIFLE RANGEPROJECT TOTAL =$ 575,282
19-017519M240CNREPAIR CULVERT, HOLCOMB BLVDPROJECT TOTAL =$ 364,174
19-017619M241CNREPAIR S1668 PED BRIDGEPROJECT TOTAL =$ 198,550
19-017719M175CNREPAIR WASHOUT B ST AND C ST MARSOCPROJECT TOTAL =$ 273,893
19-017819M196CNREPAIR MULTIPLE STORMWATER GREENWAY TRAILPROJECT TOTAL =$ 1,067,255
19-017919M223CNREPAIR EROSION WILSON BLVD OVERPASSPROJECT TOTAL =$ 1,084,473
20-0022GRAVEL ROAD REPAIR PHASE 3PROJECT TOTAL =$ 5,400,000

NO COST

REPAIR TRAINING DOCKS AND SPLASHPOINTS
PROJECT 19-0081
PROJECT 17-0070REPLACE VARIOUS BOAT RAMPS
QUANTITY
STT122NEW DOCK1014SF
NEW RAMP720SF
SVL185NEW DOCK800SF
NEW RAMP1094SF
SVL140NEW DOCK294SF
NEW RAMP420SF
SRR94NEW DOCK246SF
NEW RAMP645SF
SFC595NEW DOCK486SF
PROJECT 19-0082REPLACE DOCKS MCB CLNC
QUANTITY
PERMIT1EA
S1936NEW DOCK2200SF
SA93NEW DOCK1620SF
SA95NEW DOCK1026SF
SA29NEW DOCK4974SF
SBA299NEW DOCK972SF
SBA174NEW DOCK396SF
SAS2811NEW DOCK1000SF
PROJECT 19-0083REPAIR SPLASH POINTS MCB CLNC
QUANTITY
PERMIT1ea
SP4 (BOTH SIDES)2016SF
SP6 (BEACH SIDE)1008SF
SP7 (BOTH SIDES)4336SF
SP20 (WEIL PT)1008SF
SP221008SF
SP231008SF
SP291008SF
SP321008SF
SP381008SF
SP421008SF
SP431008SF

File details come from the government source that posted it. Updated .