This document contains an amendment to a federal contract and information on a related federal contract opportunity. The amendment revises several drawings and specifications for contract N40085-15-D-0068-0018 to construct a Vertical Lift Fan Test Facility at MCAS Cherry Point in North Carolina. Revisions include adding erosion control notes, updating drainage details, and revising seeding and stabilization details.
The related federal contract opportunity is solicitation N4008519R9019 to design and construct the P990 F-35B Vertical Lift Fan Test Facility at MCAS Cherry Point. The project scope involves constructing a reinforced concrete facility including a test area, control room, inlet and exhaust structures, and equipment to support lift fan testing. The solicitation will utilize best value tradeoff source selection and include both non-price and price factors. As a construction project valued between $10-25 million under NAICS 236220, proposals are due in February 2019 with award by the Department of the Navy Naval Facilities Engineering Command.
20190612_AMENDMENT_0004.pdf
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40085-15-D-0068-0018
NAVFAC eProject No: 1389846
Revision to Contract Documents
06/12/2019
P990 Vertical LiftFan Test Facility
MCAS Cherry Point, NC eProject No: 1389846
The purpose of this revision is to:
To capture revisions and provide greater clarification to final design of construction documents dated 2/25/2019. Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original
Contract Documents. The following revisions to the drawings and specifications are made as part of the project and takes precedence over the section of the drawings, in part, and/or specifications, as originally written.
DRAWINGS
NAVFAC Dwg. Nos. 12783186, 12783187, 12783193, 12783194, 12783195, 12783196, 12783198, 12783199, and 12783200 are revised as of June 12, 2019. These revised drawings accompany this amendment.
On NAVFAC Dwg. No. 12783186 (C-001)
1. Additional notes were added to comply with the revised NCDEQ Erosion Control permit that became effective in April 2019.
On NAVFAC Dwg. No. 12783187 (C-002) became effective in April 2019.
On NAVFAC Dwg. No. 12783193 (CG001) became effective in April 2019 and several notes were changed based on MCAS EAD comments.
On NAVFAC Dwg. No. 12783194 (CG101)
1. Additional compost socks were added.
2. The legend was updated to remove seeding and sediment trap symbols.
3. Detail numbers revised.
4. Note added to clarify location of E&SC notes added.
5. Temporary seeding removed.
On NAVFAC Dwg. No. 12783195 (CG102)
1. Additional compost socks were added.
2. Note added to clarify location of E&SC notes added.
N40085-15-D-0068-0018
NAVFAC eProject No: 1389846
P990 Vertical LiftFan Test Facility
MCAS Cherry Point, NC eProject No: 1389846
06/12/2019
3. Temporary seeding removed.
4. Compost socks around the swales were adjusted.
On NAVFAC Dwg. No. 12783196 (CG103)
1. Note added to clarify location of E&SC notes added.
On NAVFAC Dwg. No. 12783198 (CG201)
1. The storm drain profile has been updated to reflect a change from circular pipe to elliptical pipe, with sizes adjusted.
2. A note to clarify HDPE material was added to the yard inlet detail.
3. Text height adjusted on yard inlet detail.
On NAVFAC Dwg. No. 12783199 (CG501)
1. Detail C3 has been updated.
2. A note was added to detail A3 to place jute matting over the berm. Temporary seeding was removed as an option.
On NAVFAC Dwg. No. 12783200 (CG502)
1. Detail A5 has been updated.
2. Detail B2 has been updated.
3. Detail A1 – temporary seeding has been removed and replaced with mulching.
-- END OF AMENDMENT 0004 --