This pre-solicitation notice announces an upcoming solicitation for a Design-Bid-Build construction project. The project involves constructing a reinforced concrete vertical lift fan test facility at Marine Corps Air Station Cherry Point in North Carolina, including a staging area, test facility control room, equipment room, inlet house area, lift fan test area, primary inlet plenum area, exhaust collector room, exhaust diffuser plenum area, 40,000 HP electric motor Prime Mover, and high pressure and high volume reinforced concrete air inlet/exhaust stack. The solicitation will utilize the best value lowest price technically acceptable source selection method. Large businesses must submit subcontracting plans. The NAICS code is 236220 for commercial and institutional building construction, with a small business size standard of $36.5 million. Based on two responses to a sources sought notice, there is no expectation of adequate small business participation. The request for proposal will be issued on or around February 15, 2019 via the Navy Electronic Commerce Online website.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date:
UNCLASSIFIED/FOR OFFICIAL USE ONLY
Help Note All fields can be edited. If you have trouble selecting a field, either use the tab key or click "highlight fields" in Acrobat 7. Fields that are not needed can be selected and deleted. Tool tips with "additional field" can be deleted or changed. The contract number can also be deleted or changed.
cgardner Image
P990 F- 35B Ver t i cal Li f t Fan Test Faci l i t y ePr oj ect s Wor k Or der No. 1389846
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LI ST OF DRAWI NGS
00 22 13. 00 20 SUPPLEMENTARY I NSTRUCTI ONS TO OFFERORS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRI CTI ONS
01 20 00. 00 20 PRI CE AND PAYMENT PROCEDURES
01 30 00 ADMI NI STRATI VE REQUI REMENTS
01 30 01. 00 22 DESI GN, PROCUREMENT, AND I NSTALLATI ON OF FURNI TURE,
FI XTURES, AND EQUI PMENT
01 32 17. 00 20 COST- LOADED NETWORK ANALYSI S SCHEDULES ( NAS)
01 33 00 SUBMI TTAL PROCEDURES
01 33 29 SUSTAI NABI LI TY REPORTI NG
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 20 QUALI TY CONTROL
01 45 35 SPECI AL I NSPECTI ONS
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 58 00 PROJECT I DENTI FI CATI ON
01 60 00. 00 22 REQUI REMENTS FOR PESTI CI DE AND HERBI CI DE COORDI NATI ON
01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ON AND MAI NTENANCE DATA
01 78 24. 00 20 FACI LI TY ELECTRONI C OPERATI ON AND MAI NTENANCE SUPPORT
I NFORMATI ON ( eOMSI )
01 78 30. 00 22 GI S DATA DELI VERABLES
01 91 00. 15 22 TOTAL BUI LDI NG COMMI SSI ONI NG
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
DI VI SI ON 03 - CONCRETE
03 30 00 CAST- I N- PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNI T MASONRY
DI VI SI ON 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD- FORMED METAL FRAMI NG
05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS
05 51 00 METAL STAI RS
05 51 33 METAL LADDERS
05 52 00 METAL RAI LI NGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
PROJECT TABLE OF CONTENTS Page 1
06 41 16. 00 10 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL CABI NETS
06 61 16 SOLI D SURFACI NG FABRI CATI ONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTI NG AN AI R BARRI ER SYSTEM FOR AI R TI GHTNESS
07 21 13 BOARD AND BLOCK I NSULATI ON
07 21 16 MI NERAL FI BER BLANKET I NSULATI ON
07 22 00 ROOF AND DECK I NSULATI ON
07 27 10. 00 10 BUI LDI NG AI R BARRI ER SYSTEM
07 27 19. 01 SELF- ADHERI NG AI R BARRI ERS
07 27 26 FLUI D- APPLI ED MEMBRANE AI R BARRI ERS
07 42 13 METAL WALL PANELS
07 52 00 MODI FI ED BI TUMI NOUS MEMBRANE ROOFI NG
07 60 00 FLASHI NG AND SHEET METAL
07 61 14. 00 20 STEEL STANDI NG SEAM ROOFI NG
07 81 00 SPRAY- APPLI ED FI REPROOFI NG
07 84 00 FIRESTOPPING
07 92 00 JOI NT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 33 23 OVERHEAD COI LI NG DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLI ES
08 51 13 ALUMI NUM WI NDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMI C, QUARRY, AND GLASS TI LI NG
09 51 00 ACOUSTI CAL CEI LI NGS
09 62 38 STATI C- CONTROL FLOORI NG
09 65 00 RESI LI ENT FLOORI NG
09 67 23. 13 STANDARD RESI NOUS FLOORI NG
09 69 13 RI GI D GRI D ACCESS FLOORI NG
09 90 00 PAI NTS AND COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 VI SUAL DI SPLAY UNI TS
10 14 00. 20 I NTERI OR SI GNAGE
10 14 53 TRAFFI C SI GNAGE
10 26 00 WALL AND DOOR PROTECTI ON
10 28 13 TOI LET ACCESSORI ES
10 44 16 FI RE EXTI NGUI SHERS
DI VI SI ON 12 - FURNI SHI NGS
12 48 13 ENTRANCE FLOOR GRI DS AND FRAMES
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 24 23 HYDRAULI C PASSENGER ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
PROJECT TABLE OF CONTENTS Page 2
21 13 13. 00 20 WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON
21 13 19. 00 20 DELUGE FI RE SPRI NKLER SYSTEMS
21 22 00. 00 22 CLEAN AGENT FI RE EXTI NGUI SHI NG SYSTEMS
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBI NG, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS
23 03 00. 00 20 BASI C MECHANI CAL MATERI ALS AND METHODS
23 05 15 COMMON PI PI NG FOR HVAC
23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC
23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 09 23. 13 20 BACnet DI RECT DI GI TAL CONTROL SYSTEMS FOR HVAC
23 11 25 FACI LI TY GAS PI PI NG
23 21 13. 00 20 LOW TEMPERATURE WATER ( LTW) HEATI NG SYSTEM
23 23 00 REFRI GERANT PI PI NG
23 25 00 CHEMI CAL TREATMENT OF WATER FOR MECHANI CAL SYSTEMS
23 52 00 HEATI NG BOI LERS
23 64 26 CONDENSER WATER PI PI NG SYSTEMS
23 81 00. 00 20 UNI TARY AI R CONDI TI ONI NG EQUI PMENT
23 81 47 WATER- LOOP AND GROUND- LOOP HEAT PUMP SYSTEMS
23 82 00. 00 20 TERMI NAL HEATI NG UNI TS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 CYBERSECURI TY FOR FACI LI TY- RELATED CONTROL SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS
26 08 00 APPARATUS I NSPECTI ON AND TESTI NG
26 11 14. 00 10 MAI N ELECTRI C SUPPLY STATI ON AND SUBSTATI ON
26 12 19. 10 THREE- PHASE PAD- MOUNTED TRANSFORMERS
26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
26 24 13 SWITCHBOARDS
26 29 23 VARI ABLE FREQUENCY DRI VE SYSTEMS UNDER 600 VOLTS
26 33 53. 00 20 UNI NTERRUPTI BLE POWER SUPPLY ( UPS)
26 41 00 LI GHTNI NG PROTECTI ON SYSTEM
26 51 00 I NTERI OR LI GHTI NG
26 56 00 EXTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76. 22 I NTERI OR ADDRESSABLE FI RE ALARM SYSTEMS
DI VI SI ON 31 - EARTHWORK
31 11 00 CLEARI NG AND GRUBBI NG
31 23 00. 00 20 EXCAVATI ON AND FI LL
31 31 16. 13 CHEMI CAL TERMI TE CONTROL
31 62 13. 20 PRECAST/ PRESTRESSED CONCRETE PI LES
PROJECT TABLE OF CONTENTS Page 3
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 33 LANDSCAPE ESTABLI SHMENT
32 11 20 SUBBASES FOR FLEXI BLE PAVI NG
32 12 13 BI TUMI NOUS TACK AND PRI ME COATS
32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS
32 16 19 CONCRETE SI DEWALKS
32 17 23 PAVEMENT MARKI NGS
32 31 13 CHAI N LI NK FENCES AND GATES
32 92 23 SODDING
32 93 00 EXTERI OR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG
33 30 00 SANI TARY SEWERS
33 40 00 STORM DRAI NAGE UTI LI TI ES
33 71 01 OVERHEAD TRANSMI SSI ON AND DI STRI BUTI ON
33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON
33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)
DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT
41 22 13. 14 BRI DGE CRANES, OVERHEAD ELECTRI C, TOP RUNNI NG
PROJECT TABLE OF CONTENTS Page 4 cgardner Text Box
APPENDICES
APPENDIX A - GEOTECHNICAL REPORT
APPENDIX B - GEOTECHNICAL REPORT ADDENDUM 2 DRUMMED INVESTIGATIVE DERIVED
WASTE (IDW) GENERATED DURING GEOTECHNICAL SUBSURFACE DRILLING
ACTIVITES
APPENDIX C - GEOTECHNICAL REPORT ADDENDUM 2 PILE CAPACITY
cgardner Snapshot
DOCUMENT 00 01 15
LI ST OF DRAWI NGS
02/11
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "
1. 2 CONTRACT DRAWI NGS
Cont r act dr awi ngs ar e as f ol l ows:
NAVFAC SHEET SHEET
DRAWI NG NO NUMBER NAME
GENERAL
12783176 GI 001 TI TLE SHEET
12783177 GI 002 I NDEX OF DRAWI NGS
12783178 GI 101 LI FE SAFETY PLANS
GEOTECHNICAL
12783179 BB001 BORI NG LOCATI ON PLAN
12783180 BB101 BORI NG LOGS
12783181 BB102 BORI NG LOGS
12783182 BB103 BORI NG LOGS
12783183 BB104 BORI NG LOGS
12783184 BB105 GEOTECHNI CAL TEST DATA SUMMARY
CIVIL
12783185 VF101 SURVEY DATA AND NOTES
12783186 C- 001 CI VI L NOTES
12783187 C- 002 CI VI L LEGEND AND ABBREVI ATI ONS
12783188 CD101 DEMOLI TI ON PLAN
12783189 CS101 SI TE PLAN
12783190 CS501 SI TE DETAI LS
12783191 CS502 SI TE DETAI LS
12783192 CS503 SI TE DETAI LS
12783193 CG001 EROSI ON AND SEDI MENT CONTROL NOTES
12783194 CG101 I NI TI AL EROSI ON CONTROL PLAN
12783195 CG102 I NTERMEDI ATE EROSI ON CONTROL PLAN
12783196 CG103 FI NAL EROSI ON CONTROL PLAN
12783197 CG111 GRADI NG AND DRAI NAGE PLAN
12783198 CG201 STORM DRAI N PROFI LES
12783199 CG501 EROSI ON CONTROL DETAI LS
12783200 CG502 EROSI ON CONTROL DETAI LS
12783201 CG503 DRAI NAGE DETAI LS
12783202 CG504 DRAI NAGE DETAI LS
12783203 CG601 PRE- DEVELOPMENT DRAI NAGE AREAS
12783204 CG602 POST DEVELOPMENT DRAI NAGE AREAS
12783205 CU101 UTI LI TY PLAN
12783206 CU201 UTI LI TY PROFI LES
12783207 CU501 UTI LI TY DETAI LS
12783208 CU502 UTI LI TY DETAI LS
DOCUMENT 00 01 15 Page 1
LANDSCAPING
12783209 LP101 LANDSCAPE PLAN
STRUCTURAL
12783210 S- 001 STRUCTURAL GENERAL NOTES AND LEGEND
12783211 S- 002 STRUCTURAL GENERAL NOTES AND ABBREVI ATI ONS
12783212 S- 003 STRUCTURAL EQUI PMENT NOTES
12783213 SB101 FOUNDATI ON PLAN
12783214 SB102 GROUND LEVEL SLAB PLAN
12783215 SB301 FOUNDATI ON SECTI ONS
12783216 SB302 FOUNDATI ON SECTI ONS
12783217 SB310 FOUNDATI ON SECTI ONS
12783218 SB311 FOUNDATI ON SECTI ONS
12783219 SB312 FOUNDATI ON SECTI ONS
12783220 SB313 FOUNDATI ON SECTI ONS
12783221 SB401 SWI TCHYARD FOUNDATI ON PLAN
12783222 SB402 SWI TCHYARD FOUNDATI ON SECTI ONS
12783223 SB403 SWI TCHYARD FOUNDATI ON SECTI ONS
12783224 SB501 TYPI CAL FOUNDATI ON DETAI LS
12783225 SB502 TYPI CAL FOUNDATI ON DETAI LS
12783226 SB503 TYPI CAL FOUNDATI ON DETAI LS
12783227 SF101 TEST CELL AND CONTROL ROOM LEVEL FRAMI NG PLAN
12783228 SF101A TEST CELL PLATFORM FRAMI NG PLAN
12783229 SF102 I NLET FLOOR AND LOW ROOF FRAMI NG PLAN
12783230 SF102A GRATI NG AND FLOW SCREEN FRAMI NG PLAN
12783231 SF103 ROOF FRAMI NG PLANS
12783232 SF201 WALL ELEVATI ONS
12783233 SF202 WALL ELEVATI ONS
12783234 SF203 WALL ELEVATI ONS
12783235 SF204 WALL ELEVATI ONS
12783236 SF301 FRAMI NG SECTI ONS
12783237 SF310 FRAMI NG SECTI ONS
12783238 SF311 FRAMI NG SECTI ONS
12783239 SF320 FRAMI NG SECTI ONS
12783240 SF321 FRAMI NG SECTI ONS
12783241 SF501 TYPI CAL FRAMI NG DETAI LS
12783242 SF502 TYPI CAL FRAMI NG DETAI LS
12783243 SF503 TYPI CAL FRAMI NG DETAI LS
ARCHITECTURAL
12783244 A- 001 ABBREVI ATI ONS, LEGENDS, AND NOTES
12783245 AE101 GROUND LEVEL PLAN
12783246 AE102 CONTROL LEVEL PLAN
12783247 AE103 I NTAKE LEVEL PLAN
12783248 AE104 ROOF PLAN
12783249 AE105 GROUND LEVEL REFLECTED CEI LI NG PLAN
12783250 AE106 CONTROL LEVEL REFLECTED CEI LI NG PLAN
12783251 AE107 I NTAKE LEVEL REFLECTED CEI LI NG PLAN
12783252 AE201 EXTERI OR ELEVATI ON
12783253 AE202 EXTERI OR ELEVATI ON
12783254 AE203 EXTERI OR ELEVATI ON
12783255 AE204 EXTERI OR ELEVATI ON
12783256 AE301 BUI LDI NG SECTI ON
12783257 AE302 BUI LDI NG SECTI ON
12783258 AE303 WALL SECTI ONS
12783259 AE304 WALL SECTI ONS
12783260 AE401 ENLARGED PLANS AND I NTERI OR ELEVATI ONS
12783261 AE402 STAI R PLANS AND SECTI ONS
12783262 AE403 STAI R PLANS AND ELEVATI ON
DOCUMENT 00 01 15 Page 2
12783263 AE404 STAI R PLANS, SECTI ONS, AND ELEVATI ONS
12783264 AE405 STAI R PLANS, SECTI ONS, AND ELEVATI ONS
12783265 AE406 STAI R DETAI LS
12783266 AE407 ENLARGED ELEVATOR PLANS, SECTI ONS AND DETAI LS
12783267 AE408 ENCLOSURE PLANS, SECTI ONS AND ELEVATI ONS
12783268 AE409 ENCLOSURE DETAI LS
12783269 AE501 DETAI LS
12783270 AE502 DETAI LS
12783271 AE503 DETAI LS
12783272 AE504 DETAI LS
12783273 AE505 DETAI LS
12783274 AE506 DETAI LS
12783275 AE507 DETAI LS
12783276 AE601 DOORS/ FRAMES/ LOUVERS SCHEDULES AND TYPES
12783277 AE602 DOOR DETAI LS
12783278 AE603 DOOR DETAI LS
12783279 AE604 DOOR AND LOUVER DETAI LS
INTERIORS
12783280 AF101 FI NI SH & SI GNAGE PLAN
12783281 AF102 FI NI SH & SI GNAGE PLANS
12783282 AF601 FI NI SH SCHEDULE & LEGEND
12783283 AG601 SI GNAGE DETAI LS
12783284 I F101 CONTROL LEVEL FURNI TURE PLAN
FI RE PROTECTI ON
12783285 F- 001 FI RE PROTECTI ON LEGEND NOTES AND DI AGRAMS
12783286 F- 002 MATRI X OF OPERATI ON AND DI AGRAMS
12783287 FP101 GROUND, CONTROL & I NTAKE LEVEL PLANS
PLUMBI NG
12783288 P- 001 LEGEND, GENERAL NOTES, AND SCHEDULES
12783289 PF101 FOUNDATI ON PLAN
12783290 PL101 GROUND LEVEL PLAN
12783291 PL102 CONTROL LEVEL PLAN
12783292 P- 501 DETAI LS
12783293 P- 701 RI SER DI AGRAMS
12783294 P- 702 RI SER DI AGRAMS
12783295 P- 703 RI SER DI AGRAMS
MECHANICAL
12783296 M- 001 GENERAL NOTES ABBREVI ATI ONS AND LEGEND
12783297 MH101 FLOOR PLAN AND SECTI ONS
12783298 MH102 FLOOR PLANS
12783299 M- 401 ENLARGED PLANS, SECTI ONS
12783300 M- 501 ATFP DETAI LS
12783301 M- 502 DETAI LS
12783302 M- 503 DETAI LS
12783303 M- 601 SCHEDULES
12783304 M- 602 SCHEDULES
12783305 M- 701 PI PI NG DI AGRAMS
12783306 M- 702 PI PI NG DI AGRAMS
12783307 M- 801 CONTROLS
12783308 M- 802 CONTROLS
12783309 M- 803 CONTROLS
12783310 M- 804 CONTROLS
12783311 M- 805 CONTROLS
ELECTRI CAL
DOCUMENT 00 01 15 Page 3
12783312 E- 001 ELECTRI CAL LEGEND
12783313 ES101 ELECTRI CAL SI TE PLAN
12783314 ES102 ELECTRI CAL SI TE PLAN
12783315 ES103 ELECTRI CAL SI TE PLAN
12783316 ES201 SI TE SUBSTATI ON SWI TCHYARD ELEVATI ONS
12783317 ES401 SI TE ENLARGED SUBSTATI ON SWI TCHYARD PLAN - GROUNDI NG
12783318 ES402 SI TE ENLARGED SUBSTATI ON SWI TCHYARD PLAN
12783319 ES403 SI TE ENLARGED SUBSTATI ON SWI TCHYARD FOUNDATI ON AND
PATHWAYS PLAN
12783320 ES501 ELECTRI CAL SI TE DETAI LS
12783321 ES502 ELECTRI CAL SI TE DETAI LS
12783322 ES503 ELECTRI CAL SI TE DETAI LS
12783323 ES601 SI TE SUBSTATI ON CONDUI T SCHEDULE AND DUCTBANK DETAI LS
12783324 ES602 SI TE SUBSTATI ON AC ELEMENTARY DI AGRAM
12783325 ES603 SI TE SUBSTATI ON DC ELEMENTARY DI AGRAM
12783326 ES604 SI TE SUBSTATI ON DC ELEMENTARY DI AGRAM AND DC RI SER
12783327 ES701 SI TE SUBSTATI ON MAI N ONE- LI NE DI AGRAM
12783328 ES702 SI TE SUBSTATI ON RELAY METER ONE- LI NE DI AGRAM
12783329 EG101 BUI LDI NG LI GHTNI NG PROTECTI ON PLAN
12783330 EG501 LI GHTNI NG PROTECTI ON DETAI LS
12783331 EL101 GROUND LEVEL - LI GHTI NG PLAN
12783332 EL102 CONTROL AND I NTAKE LEVEL - LI GHTI NG PLAN
12783333 EL501 LI GHTI NG FI XTURE SCHEDULE AND LI GHTI NG PLATES
12783334 EL502 LI GHTI NG PLATES
12783335 EL503 LI GHTI NG PLATES AND DETAI LS
12783336 EP101 GROUND LEVEL - POWER PLAN
12783337 EP102 CONTROL AND I NTAKE LEVEL - POWER PLAN
12783338 EP501 ELECTRI CAL DETAI LS
12783339 EP502 ELECTRI CAL DETAI LS
12783340 EP601 EQUI PMENT AND PANELBOARD SCHEDULES
12783341 EP602 PANELBOARD SCHEDULES
12783342 EP603 PANELBOARD SCHEDULES
12783343 EP701 ELECTRI CAL RI SER DI AGRAM
12783344 TS101 TELECOMMUNI CATI ONS SI TE PLAN
12783345 TS501 TELECOMMUNI CATI ONS SI TE DETAI LS
12783346 T- 101 GROUND LEVEL - TELECOMMUNI CATI ONS PLAN
12783347 T- 102 CONTROL LEVEL - TELECOMMUNI CATI ONS PLAN
12783348 T- 701 TELECOMMUNI CATI ONS RI SERS AND DETAI LS
12783349 TY101 GROUND LEVEL - SYSTEMS PLAN
12783350 TY102 CONTROL AND I NTAKE LEVEL - SYSTEMS PLAN
12783351 TY501 SYSTEM DETAI LS
12783352 TY701 SYSTEMS RI SERS AND DETAI LS
- - End of Document - -
DOCUMENT 00 01 15 Page 4
DOCUMENT 00 22 13. 00 20
SUPPLEMENTARY I NSTRUCTI ONS TO OFFERORS
02/14
PART 1 GENERAL
1. 1 CONTRACT LI NE I TEMS
The t er ms Of f er or and Bi dder and ver si ons t her eof ( of f er / bi d) have t he same def i ni t i on as used wi t hi n t hi s cont r act .
Pr ovi de t he Cont r act Li ne I t em ( CLI N) l ump sum pr i ce f or t he f ol l owi ng items:
CLI N 0001 - BASE PRI CE. Pr i ce i ncl udes t he f ol l owi ng:
CLI N 0001AA. Pr i ce f or t he ent i r e wor k compl et e t o t he 5 f oot l i ne out s i de of t he bui l di ng, i n accor dance wi t h t he dr awi ngs and speci f i cat i ons, but excl udi ng wor k descr i bed i n Cont r act Li ne I t em ( CLI N) 0001AB, 0001AC, and 0002.
CLIN DESCRIPTION TOTAL PRI CE FOR CLI N
0001AA
0001AA _____ $__________
CLI N 0001AB. Pr i ce f or t he ent i r e pr oj ect Si t e Wor k, out s i de t he f aci l i t y ' s 5 f oot l i ne, compl et e i n accor dance wi t h t he dr awi ngs and speci f i cat i ons but excl udi ng wor k descr i bed i n CLI N 0001AA, 0001AC, and 0002.
CLIN DESCRIPTION TOTAL PRI CE FOR 0001AB
0001AB _____ $__________
CLI N 0001AC. Pr i ce f or concr et e pi l es compl et e i n accor dance wi t h dr awi ngs and speci f i cat i ons and i n accor dance wi t h t he f ol l owi ng schedule:
CLIN ITEM UNIT UNI T PRI CE NO. UNI TS TOTAL PRI CE FOR
CLI N 0001AC ( UNI T
PRI CE X NO. UNI TS)
0001AC Concr et e Pi l es Linear feet
$_______ 9,780 $__________
CLI N 0002 Pl anned Modi f i cat i on I t em 1 - Pr i ce i ncl udes t he f ol l owi ng:
Pr i ce t o pr ocur e and super vi se i nst al l at i on of t he Fur ni t ur e, Fi xt ur es, DOCUMENT 00 22 13. 00 20 Page 1 and Equi pment ( FF&E) compl et e i n accor dance wi t h t he pl ans and speci f i cat i ons and i n accor dance wi t h t he f ol l owi ng schedul e:
CLIN ITEM GOVERNMENT FF&E
ESTIMATE
HAR
(NTE
5%)
HAR AMOUNT
( GOVT FF&E
ESTI MATE x HAR%)
TOTAL FF&E ESTI MATED
AMOUNT FOR CLI N 0002
( GOVT FF&E ESTI MATE +
HAR AMOUNT)
0002 FF&E $75,004.15 _____% $______ $________
1. 2 GENERAL BI D NOTES
a. Awar d wi l l be made on t he t ot al sum of Cont r act Li ne I t ems 0001AA and 0001AB, and t he sum of t he ext ensi ons under Cont r act Li ne I t em 0001AC.
For CLI N 0001AC, ent er uni t pr i ces and ext ended t ot al s i n spaces pr ovi ded. I f t her e i s a di f f er ence bet ween a uni t pr i ce and t he ext ended t ot al , t he uni t pr i ce wi l l be hel d t o be t he i nt ended bi d and t he t ot al r ecomput ed accor di ngl y. I f an Of f er or pr ovi des a t ot al but f ai l s t o ent er a uni t pr i ce, t he t ot al di v i ded by t he speci f i ed quant i t y wi l l be hel d t o be t he i nt ended uni t pr i ce.
b. The Gover nment r eser ves t he uni l at er al r i ght t o awar d CLI N 0002 t o t he Cont r act or at t he pr oposed pr i ce wi t hi n 365 cal endar days af t er t he cont r act awar d. A f i r m f i xed pr oposed pr i ce i s r equi r ed f or CLI N 0001 and CLI N 0002. No pr ovi s i on i s made f or economi c pr i ce adj ust ment .
c. I f CLI N 0002 i s exer ci sed, addi t i onal bondi ng and consent of sur et y i s r equi r ed. Consequent l y, t he Per f or mance Bond must r ef l ect 100 per cent of t he aggr egat e amount of al l I t ems.
1. 3 PLANNED MODI FI CATI ON BI D NOTES
These not es appl y t o Pl anned Modi f i cat i on CLI Ns.
a. The est i mat ed amount f or FF&E has been suppl i ed by t he Gover nment , t o pr ovi de of f er or s wi t h t he pr oj ect ed magni t ude of ef f or t . The est i mat ed amount i ncl udes t he act ual cost of t he FF&E i ncl udi ng f r ei ght and i nst al l at i on char ges. The Gover nment FF&E Est i mat e i s onl y an est i mat ed amount .
b. I f awar ded, l i ne i t ems wi l l be f unded separ at el y af t er compl et i on of FF&E desi gn package r evi ew by t he Gover nment , and r ecei pt of appr opr i at e f undi ng by t he Gover nment . Requi r ement s and det ai l s ar e pr ovi ded i n Sect i on 01 30 01. 00 20 DESI GN PROCUREMENT AND I NSTALLATI ON
OF FURNI TURE, FI XTURES, AND EQUI PMENT.
c. Bondi ng i s not r equi r ed f or t he desi gn, pr ocur ement and i nst al l at i on of
FF&E.
d. Of f er or s may pr opose a Handl i ng and Admi ni st r at i on Rat e ( HAR) f or t he FF&E not t o exceed 5 per cent . Thi s f ee wi l l account f or al l admi ni st r at i ve cost s, over head, bondi ng f ees, admi ni st r at i on of subcont r act s, pr of i t , and any ot her cost s associ at ed wi t h and r el at ed
DOCUMENT 00 22 13. 00 20 Page 2 t o t he coor di nat i on and pr ocessi ng of t he pr ocur ement and i nst al l at i on of FF&E. The pr oposed HAR per cent age wi l l be i ncor por at ed i nt o t he cont r act awar d and wi l l not be adj ust ed r egar dl ess of f l uct uat i ons f r om t he est i mat e amount f or t he FF&E. The pr oposed HAR i s a f i xed r at e.
e. The Gover nment i s not obl i gat ed t o awar d t he Pl anned Modi f i cat i on l i ne i t em( s) . Shoul d t he Gover nment choose t o awar d t he Pl anned Modi f i cat i on, t he l i ne i t em wi l l be awar ded as a negot i at ed modi f i cat i on t o t he cont r act / t ask or der . The Cont r act or ' s pr oposed HAR wi l l be appl i ed t o al l vendor / suppl i er cost s f or t he FF&E.
f . I f awar ded, t he FF&E modi f i cat i on wi l l be awar ded at l east s i x mont hs pr i or t o t he cont r act compl et i on dat e. A mi ni mum of s i x mont hs i s r equi r ed f or t he Cont r act or t o pur chase, del i ver and i nst al l t he FF&E wi t hout i mpact i ng t he over al l compl et i on dat e of t he pr oj ect . The Cont r act or ' s schedul e must assume t he awar d of t he FF&E as a modi f i cat i on. No schedul e ext ensi ons wi l l be gr ant ed i f t he modi f i cat i on i s awar ded at l east s i x mont hs pr i or t o t he cont r act compl et i on dat e. I f t he Gover nment deci des t o negot i at e and awar d t he f ur ni t ur e modi f i cat i on wi t h l ess t han si x mont hs pr i or t o t he cont act compl et i on dat e, t he Cont r act or may be ent i t l ed t o a cont r act ext ensi on and ext ended f i el d over head. A cont r act ext ensi on and ext ended f i el d over head wi l l onl y be gr ant ed i n t hose cases wher e t he Cont r act or demonst r at es t hat an accept ed Fi nal FF&E package was submi t t ed wi t hi n t he appr oved schedul e deadl i nes and suf f i c i ent l ead t i me f or t he FF&E i s not avai l abl e and t he Gover nment ' s awar d of t he modi f i cat i on i s i n t he l ast s i x mont hs of t he cont r act .
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Document - -
DOCUMENT 00 22 13. 00 20 Page 3
SECTI ON 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1. 1 WORK COVERED BY CONTRACT DOCUMENTS
1. 1. 1 Pr oj ect Descr i pt i on
The wor k i ncl udes t he const r uct i on of a r oughl y 10, 500 SF t est f aci l i t y t hat wi l l suppor t t he Ver t i cal Li f t Fan whi ch i s i nt egr al i n oper at i ng t he F- 35B shor t t akeof f and ver t i cal l andi ng ai r cr af t . Thi s wi l l be a 3- l evel st r uct ur e wi t h cast - i n- pl ace concr et e wal l s and sl ab- and- beam syst ems.
Thi s wi l l be suppor t ed by a pr ecast concr et e pi l e f oundat i on syst em. The bui l di ng' s el ect r i cal power wi l l be pr ovi ded f r om a new t r ansf or mer oper at i ng at 12. 47 kV pr i mar y vol t age and 480V t hr ee phase secondar y vol t age. The pr i me mover el ect r i cal power wi l l be pr ovi ded by a new hi gh- vol t age subst at i on adj acent t o t he bui l di ng. The pr oj ect al so r equi r es f i r e pr ot ect i on, pl umbi ng, HVAC, l i ght i ng, s i t e i mpr ovement s, suppor t i ng ut i l i t i es and i nci dent al r el at ed wor k.
1. 1. 2 Location
The wor k i s l ocat ed at Mar i ne Cor ps Ai r St at i on ( MCAS) , Cher r y Poi nt , NC, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .
1. 2 EXI STI NG WORK
I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
1. 3 LOCATI ON OF UNDERGROUND UTI LI TI ES
Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.
Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 48 hour s pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.
I dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound or paved sur f ace wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound obst r uct i on not i ndi cat ed, or speci f i ed t o be r emoved, SECTI ON 01 11 00 Page 1 t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed.
Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.
1. 3. 1 Not i f i cat i on Pr i or t o Excavat i on
Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k.
1. 4 GOVERNMENT- I NSTALLED WORK
CCTV cabl i ng, devi ces, and equi pment wi l l be i nst al l ed by SPAWAR f ol l owi ng i nst al l at i on of power connect i ons and pat hways by t he Cont r act or .
1. 5 NAVY AND MARI NE CORPS ( NMCI ) COORDI NATI ON REQUI REMENTS
1. 5. 1 NMCI Cont r act or Access
Al l ow t he NMCI Cont r act or access t o t he f aci l i t y t owar ds t he end of const r uct i on ( f i ni shes 90 per cent compl et e, r ough- i n 100 per cent compl et e, I nsi de Pl ant ( I SP) / Out si de Pl ant ( OSP) i nf r ast r uct ur e i n pl ace) t o pr ovi de equi pment i n t he t el ecommuni cat i ons r ooms and make f i nal connect i ons.
Coor di nat e ef f or t s wi t h t he NMCI Cont r act or t o f ac i l i t at e j oi nt use of bui l di ng spaces dur i ng t he f i nal phases of const r uct i on. Af t er t he Cont r act i ng Of f i cer has f aci l i t at ed coor di nat i on meet i ngs bet ween t he t wo cont r act or s, wi t hi n one week, i ncor por at e t he ef f or t of addi t i onal coor di nat i on wi t h t he NMCI Cont r act or i nt o t he const r uct i on schedul e t o demonst r at e a pl an f or mai nt ai ni ng t he cont r act dur at i on.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 2
SECTI ON 01 14 00
WORK RESTRI CTI ONS
11/11
PART 1 GENERAL
1. 1 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Li st of Cont act Per sonnel ; G
Per sonnel Li st ; G
1. 2 SPECI AL SCHEDULI NG REQUI REMENTS
a. Have mat er i al s, equi pment , and per sonnel r equi r ed t o per f or m t he wor k at t he s i t e pr i or t o t he commencement of t he wor k. Speci f i c i t ems of wor k t o whi ch t hi s r equi r ement appl i es i ncl ude:
( 1) Al l connect i ons t o exi st i ng ut i l i t i es.
( 2) _____
b. Bui l di ng 4931 ( Wat er Pump St at i on) wi l l r emai n i n oper at i on dur i ng t he ent i r e const r uct i on per i od. The Cont r act or must conduct hi s oper at i ons so as t o cause t he l east possi bl e i nt er f er ence wi t h nor mal oper at i ons of t he act i v i t y. Access f or mai nt enance must be mai nt ai ned at al l t i mes.
c. Per mi ssi on t o i nt er r upt any Act i v i t y r oads or ut i l i t y ser vi ce must be r equest ed i n wr i t i ng a mi ni mum of 15 cal endar days pr i or t o t he desi r ed dat e of i nt er r upt i on.
d. The wor k under t hi s cont r act r equi r es speci al at t ent i on t o t he schedul i ng and conduct of t he wor k i n connect i on wi t h exi st i ng oper at i ons. I dent i f y on t he const r uct i on schedul e each f act or whi ch const i t ut es a pot ent i al i nt er r upt i on t o oper at i ons.
1. 3 CONTRACTOR ACCESS AND USE OF PREMI SES
1. 3. 1 Act i v i t y Regul at i ons
Ensur e t hat Cont r act or per sonnel empl oyed on t he Act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear har d hat s i n desi gnat ed ar eas. Do not ent er any r est r i c t ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Mar k Cont r act or equi pment f or i dent i f i cat i on.
SECTI ON 01 14 00 Page 1
1. 3. 1. 1 Subcont r act or s and Per sonnel Cont act s
Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.
1. 3. 1. 2 I nst al l at i on Access
Obt ai n access t o Navy i nst al l at i ons t hr ough par t i c i pat i on i n t he Def ense Bi omet r i cs I dent i f i cat i on Syst em ( DBI DS) . Requi r ement s f or Cont r act or empl oyee r egi st r at i on, and t r ansi t i on f or empl oyees cur r ent l y under Navy Commer ci al Access Cont r ol Syst em ( NCACS) , ar e avai l abl e at https://www.cnic.navy.mil/om/dbids.html . No f ees ar e associ at ed wi t h obt ai ni ng a DBI DS cr edent i al .
Par t i c i pat i on i n t he DBI DS i s not mandat or y, and Cont r act or per sonnel may appl y f or One- Day Passes at t he Base Vi s i t or Cont r ol Of f i ce t o access an installation.
1. 3. 1. 2. 1 Regi st r at i on f or DBI DS
Regi st r at i on f or DBI DS i s avai l abl e at https://www.cnic.navy.mil/om/dbids.html . Pr ocedur e i nc l udes:
a. Pr esent a l et t er or of f i c i al awar d document ( i . e. DD For m 1155 or SF 1442) f r om t he Cont r act i ng Of f i cer , t hat pr ovi des t he pur pose f or access, t o t he base Vi s i t or Cont r ol Cent er r epr esent at i ve.
b. Pr esent val i d i dent i f i cat i on, such as a passpor t or Real I D Act - compl i ant st at e dr i ver ' s l i cense.
c. Pr ovi de compl et ed SECNAV FORM 5512/ 1 t o t he base Vi s i t or Cont r ol Cent er r epr esent at i ve t o obt ai n a backgr ound check. Thi s f or m i s avai l abl e f or downl oad at https://www.cnic.navy.mil/om/dbids.html .
d. Upon successf ul compl et i on of t he backgr ound check, t he Gover nment wi l l compl et e t he DBI DS enr ol l ment pr ocess, whi ch i ncl udes Cont r act or empl oyee phot o, f i nger pr i nt s, base r est r i c t i on and sever al ot her assessments.
e. Upon successf ul compl et i on of t he enr ol l ment pr ocess, t he Cont r act or empl oyee wi l l be i ssued a DBI DS cr edent i al , and wi l l be al l owed t o pr oceed t o wor ksi t e.
1. 3. 1. 2. 2 DBI DS El i gi bi l i t y Requi r ement s
Thr oughout t he l engt h of t he cont r act , t he Cont r act or empl oyee must cont i nue t o meet backgr ound scr een st andar ds. Per i odi c backgr ound scr eeni ngs ar e conduct ed t o ver i f y cont i nued DBI DS par t i c i pat i on and i nst al l at i on access pr i v i l eges. DBI DS access pr i v i l eges wi l l be i mmedi at el y suspended or r evoked i f at any t i me a Cont r act or empl oyee becomes i nel i gi bl e.
An adj udi cat i on pr ocess may be i ni t i at ed when a backgr ound scr een f ai l ur e r esul t s i n di squal i f i cat i on f r om par t i c i pat i on i n t he DBI DS, and Cont r act or empl oyee does not agr ee wi t h t he r eason f or di squal i f i cat i on. The Gover nment i s t he f i nal aut hor i t y .
SECTI ON 01 14 00 Page 2
1. 3. 1. 2. 3 DBI DS Not i f i cat i on Requi r ement s
a. I mmedi at el y r epor t i nst ances of l ost or st ol en badges t o t he Cont r act i ng Of f i cer .
b. I mmedi at el y col l ect DBI DS cr edent i al s and not i f y t he Cont r act i ng Of f i cer i n wr i t i ng under t he f ol l owi ng c i r cumst ances:
( 1) An empl oyee has depar t ed t he company wi t hout havi ng pr oper l y r et ur ned or sur r ender ed t hei r DBI DS cr edent i al s.
( 2) Ther e i s a r easonabl e basi s t o concl ude t hat an empl oyee, or f or mer empl oyee, mi ght pose a r i sk, compr omi se, or t hr eat t o t he saf et y or secur i t y of t he I nst al l at i on or anyone t her ei n.
1. 3. 1. 2. 4 One- Day Passes
Per sonnel appl y i ng f or One- Day passes at t he Base Vi s i t or Cont r ol Of f i ce ar e subj ect t o dai l y mandat or y vehi c l e i nspect i on, and wi l l have l i mi t ed access t o t he i nst al l at i on. The Gover nment i s not r esponsi bl e f or any cost or l ost t i me associ at ed wi t h obt ai ni ng dai l y passes or added vehi c l e i nspect i ons i ncur r ed by non- par t i c i pant s i n t he DBI DS.
1. 3. 1. 3 Addi t i onal Requi r ement s
MCAS Cher r y Poi nt may al so r equi r e i ndi v i dual s t o submi t a Request f or Local Recor ds check. Coor di nat e t hi s r equi r ement wi t h t he Cont r act i ng Of f i cer . See at t ached f or m f or r ef er ence.
1. 3. 1. 4 No Smoki ng Pol i cy
Smoki ng i s pr ohi bi t ed wi t hi n and out s i de of al l bui l di ngs on i nst al l at i on, except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.
1. 3. 2 Wor ki ng Hour s
Regul ar wor ki ng hour s must consi st of an 8 1/ 2 hour per i od est abl i shed by t he Cont r act i ng Of f i cer excl udi ng Gover nment hol i days.
1. 3. 3 Occupied and Exi st i ng Bui l di ng
The Cont r act or shal l be wor ki ng i n an exi st i ng bui l di ng whi ch i s occupi ed i n or der t o connect t o exi st i ng communi cat i ons panel s. Do not ent er t he bui l di ng wi t hout pr i or appr oval of t he Cont r act i ng Of f i cer .
The exi st i ng bui l di ngs and t hei r cont ent s must be kept secur e at al l t i mes. Pr ovi de t empor ar y c l osur es as r equi r ed t o mai nt ai n secur i t y as di r ect ed by t he Cont r act i ng Of f i cer .
Pr ovi de dust cover s or pr ot ect i ve encl osur es t o pr ot ect exi st i ng wor k t hat r emai ns and Gover nment mat er i al l ocat ed i n t he Engi neer i ng Suppor t Faci l i t y dur i ng t he const r uct i on per i od.
SECTI ON 01 14 00 Page 3
1. 3. 4 Ut i l i t y Cut over s and I nt er r upt i ons
a. Make ut i l i t y cut over s and i nt er r upt i ons af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days. Conf or m t o pr ocedur es r equi r ed par agr aph WORK OUTSI DE REGULAR HOURS.
b. Ensur e t hat new ut i l i t y l i nes ar e compl et e, except f or t he connect i on, bef or e i nt er r upt i ng exi st i ng ser v i ce.
c. I nt er r upt i on t o wat er , sani t ar y sewer , st or m sewer , t el ephone ser vi ce, el ect r i c ser vi ce, ai r condi t i oni ng, heat i ng, f i r e al ar m, compr essed ai r , and t el ecommuni cat i ons ar e consi der ed ut i l i t y cut over s pur suant t o t he par agr aph WORK OUTSI DE REGULAR HOURS.
d. Connect i on t o Exi st i ng Sani t ar y Sewer Li ne: Pr ovi de posi t i ve ver i f i cat i on t hat t he exi st i ng l i ne conveys sani t ar y sewer ; ver i f y l i ne i s not i ncor r ect l y connect ed t o a st or m dr ai n.
1. 4 SECURI TY REQUI REMENTS
1. 4. 1 Per sonnel Li st
Submi t f or appr oval , at l east 15 days pr i or t o t he desi r ed dat e of ent r y, an or i gi nal al phabet i cal l i s t of per sonnel who r equi r e ent r y i nt o Gover nment pr oper t y t o per f or m wor k on t he pr oj ect . Fur ni sh f or each person:
a. Name
b. Dat e and pl ace of bi r t h
c. Ci t i zenshi p
d. Home addr ess
The r equest f or per sonnel passes must be accompani ed wi t h t he f ol l owi ng certification:
" I her eby cer t i f y t hat al l per sonnel on t hi s l i s t ar e ei t her bor n U. S.
c i t i zens, nat ur al i zed U. S. c i t i zens wi t h t he nat ur al i zat i on number shown, or l egal al i ens wi t h t he al i en r egi st r at i on number i ndi cat ed. "
Si gnat ur e/ Fi r m Name
1. 4. 1. 1 Ci t i zenshi p Requi r ement s
Al i ens wi l l not be admi t t ed t o t he wor k s i t e wi t hout appr oval .
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 14 00 Page 4
UNITED STATES MARINE CORPS
PROVOST MARSHAL’S OFFICE
POSTAL SERVICE CENTER BOX 8035
MARINE CORPS AIR STATION
CHERRY POINT, NORTH CAROLINA 28533-0035
IN REPLY REFER TO:
PMO
From: Pass & Identification Office To: (1) PMO Records Manager
(2) Criminal Investigation Division Office
Subj: Request for Local Records check for the below named individual.
Ref: ASO 5500.14
Attach: (1) Individual 50 State Criminal History Report
(2) Authorization to Release of Information (back of this page)
1. The following information is provided for pending access aboard MCAS, Cherry Point, NC
FULL NAME: _________________________________________________________________
FULL SSN: _________________________________________________________________
COMPANY/SPONOR’S NAME: __________________________________________________
DATE OF BIRTH: ______________________________________________________________
CURRENT ADDRESS: __________________________________________________________
CONTACT PHONE NUMBER: ___________________________________________________
SIGNATURE: _________________________________________________________________
PMO / CID USE ONLY TLO VERIFIED (DATE/TIME/INITIALS)______________________
Provost Marshal’s Office Provost Marshal’s Office Date:_______________ Date:_______________ Time:_______________ Time:_______________ Results: _________________________________ Results:____________________________________
Name of Processor_________________________ Name of Processor___________________________ PMO RECORDS Criminal Investigation Division
INDIVIDUAL CONTACTED (DATE/TIME/INITIALS): ______________________________________________
APPROVED DENIED
APPROVAL OFFICIAL SIGNATURE
Authorization for Release of Information
Carefully read this authorization to release information about you, then sign and date it in ink.
I Authorize any investigator, special agent, or other duly accredited representative of the OPM, the Federal Bureau of Investigation, the Department of Defense, the Department of State, and any other authorized Federal agency, to request criminal record information about me from criminal justice agencies for the purpose of determining my eligibility for requesting access to the facilities aboard Marine Corps Air Station Cherry Point N.C.
I Authorize custodians of records and other sources of information pertaining to me to release such information upon request of the investigator, special agent, or other duly accredited representative of any Federal agency authorized above regardless of any previous agreement to the contrary.
I Understand that, for some sources of information, a spearate specific release will be needed, and I may be contacted for such a release at a later date.
I Understand that the information released by records custodians and sources of information is for official use by the Federal Government only for the purpose provided above, and it may be disclosed by the Government only as authorized by law.
Photocopies of this authorization that show my signature are NOT VALID
Signature(sign in ink)
Full Name (First, Middle, Last) Date Signed (mm/dd/yyyy)
Other Names Used
Date of Birth Social Security Number
Current Street Address
City, State, Zip Code Contact Telephone Number
SECTI ON 01 20 00. 00 20
PRI CE AND PAYMENT PROCEDURES
11/11
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EP-1110-1-8 ( 2009) Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Schedul e of Pr i ces; G
1. 3 SCHEDULE OF PRI CES
1. 3. 1 Dat a Requi r ed
Thi s cont r act r equi r es t he use of a cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . The i nf or mat i on r equi r ed f or t he Schedul e of Pr i ces wi l l be ent er ed as an i nt egr al par t of t he Net wor k Anal ysi s Schedul e. Wi t hi n 15 cal endar days of not i ce of awar d, pr epar e and del i ver t o t he Cont r act i ng Of f i cer a Schedul e of Pr i ces ( const r uct i on cont r act ) as di r ect ed by t he Cont r act i ng Of f i cer . Pr ovi de a det ai l ed br eakdown of t he cont r act pr i ce, gi v i ng quant i t i es f or each of t he var i ous k i nds of wor k, uni t pr i ces, and ext ended pr i ces. Cost s shal l be summar i zed and t ot al s pr ovi ded f or each const r uct i on cat egor y.
1. 3. 2 Schedul e I nst r uct i ons
Payment s wi l l not be made unt i l t he Schedul e of Pr i ces has been submi t t ed t o and accept ed by t he Cont r act i ng Of f i cer . I dent i f y t he cost f or s i t e wor k, and i ncl ude i nci dent al wor k t o t he 5 f t l i ne. I dent i f y cost s f or t he bui l di ng( s) , and i ncl ude wor k out t o t he 5 f t l i ne. Wor k out t o t he 5 f t l i ne shal l i ncl ude const r uct i on encompassed wi t hi n a t heor et i cal l i ne 5 f t f r om t he f ace of ext er i or wal l s and shal l i ncl ude at t endant const r uct i on, such as pad mount ed HVAC cool i ng equi pment , cool i ng t ower s, and t r ansf or mer s pl aced beyond t he 5 f t l i ne.
SECTI ON 01 20 00. 00 20 Page 1
1. 3. 3 Real Pr oper t y Asset s
The Gover nment wi l l pr ovi de t he Dr af t DD For m 1354, Tr ansf er and Accept ance of Mi l i t ar y Real Pr oper t y f i l l ed i n wi t h t he appr opr i at e Real Pr oper t y Uni que I dent i f i er s ( RPUI D) and r el at ed const r uct i on Cat egor y Codes t o summar i ze t he desi gned r eal pr oper t y asset s t hat appl y t o t hi s cont r act .
The Cont r act or shal l meet wi t h t he Cont r act i ng Of f i cer and t he Real Pr oper t y Account i ng Of f i cer dur i ng t he Pr e Const r uct i on Meet i ng and t he Pr oj ect Cl oseout Meet i ngs t o modi f y and i ncl ude any necessar y changes t o t he DD For m 1354. The Cont r act or shal l pr ovi de t he I nt er i m DD For m 1354 t hat uses t he appr opr i at e di v i s i on of t he RPUI Ds/ Cat egor y Codes t o r epr esent t he f i nal const r uct ed f aci l i t y and i ncl ude al l associ at ed cost .
Coor di nat e t he Cont r act or ' s Pr i ce and Payment st r uct ur e wi t h t he st r uct ur e of t he RPUI Ds/ Cat egor y Codes.
Di v i de det ai l ed asset br eakdown i nt o t he RPUI Ds and r el at ed const r uct i on Cat egor y Codes and popul at e associ at ed cost s whi ch r epr esent al l aspect s of t he wor k. Wher e asset s di ver ge i nt o mul t i pl e RPUI D/ Cat egor y Codes, di v i de t he asset and pr ovi de t he pr opor t i on of t he asset s i n each RPUI D/ Cat egor y Code. Asset s and r el at ed RPUI D/ Cat egor y Codes may be modi f i ed by t he Cont r act i ng Of f i cer as necessar y dur i ng cour se of t he wor k. Coor di nat e i dent i f i cat i on and pr opor t i on of t hese asset s wi t h t he Gover nment Real Pr oper t y Account i ng Of f i cer .
Cost dat a accumul at ed under t hi s sect i on ar e r equi r ed i n t he pr epar at i on of DD For m 1354.
1. 3. 4 Schedul e Requi r ement s f or HVAC TAB
The f i el d wor k Sect i on 23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC shal l be br oken down i n t he Schedul e of Pr i ces and i n t he Const r uct i on Pr ogr ess Document at i on by separ at e l i ne i t ems whi ch r ef l ect measur abl e del i ver abl es. Speci f i c payment per cent ages f or each l i ne i t em shal l be det er mi ned on a case by case basi s f or each cont r act . The l i ne i t ems shal l be as f ol l ows:
a. Appr oval of Desi gn Revi ew Repor t : The TABS Agency i s r equi r ed t o conduct a r evi ew of t he pr oj ect pl ans and speci f i cat i ons t o i dent i f y any f eat ur e, or t he l ack t her eof , t hat woul d pr ecl ude successf ul t est i ng and bal anci ng of t he pr oj ect HVAC syst ems. The r esul t i ng f i ndi ngs shal l be submi t t ed t o t he Gover nment t o al l ow cor r ect i on of t he desi gn. The pr ogr ess payment shal l be i ssued af t er r evi ew and appr oval of t he r epor t .
b. Appr oval of t he pr e- f i el d engi neer i ng r epor t : The TABS Agency submi t s a r epor t whi ch out l i nes t he scope of f i el d wor k. The r epor t shal l cont ai n det ai l s of what syst ems wi l l be t est ed, pr ocedur es t o be used, sampl e r epor t f or ms f or r epor t i ng t est r esul t s and a qual i t y cont r ol checkl i st of wor k i t ems t hat must be compl et ed bef or e TABS f i el d wor k commences.
c. Season I f i el d wor k: I ncr ement al payment s ar e i ssued as t he TABS f i el d wor k pr ogr esses. The TABS Agency mobi l i zes t o t he pr oj ect s i t e and execut es t he f i el d wor k as out l i ned i n t he pr e- f i el d engi neer i ng r epor t . The HVAC wat er and ai r syst ems ar e bal anced and oper at i onal dat a shal l be col l ect ed f or one seasonal condi t i on ( ei t her summer or wi nt er dependi ng on pr oj ect t i mi ng) .
d. Appr oval of Season I r epor t : On compl et i on of t he Season I f i el d wor k, SECTI ON 01 20 00. 00 20 Page 2 t he dat a i s compi l ed i nt o a r epor t and submi t t ed t o t he Gover nment .
The r epor t i s r evi ewed, and appr oved, af t er ensur i ng compl i ance wi t h t he pr e- f i el d engi neer i ng r epor t scope of wor k.
e. Compl et i on of Season I f i el d QA check: Cont r act QC and Gover nment r epr esent at i ves meet t he TABS Agency at t he j obsi t e t o r et est por t i ons of t he syst ems r epor t ed i n t he Season I r epor t . The pur pose of t hese t est s ar e t o val i dat e t he accur acy and compl et eness of t he pr evi ousl y submi t t ed Season I r epor t .
f . Appr oval of Season I I r epor t : The TABS Agency compl et es al l Season I I f i el d wor k, whi ch i s nor mal l y compr i sed mai nl y of t aki ng heat t r ansf er t emper at ur e r eadi ngs, i n t he season opposi t e of t hat under whi ch Season I per f or mance dat a was compi l ed. Thi s dat a shal l be compi l ed i nt o a r epor t and submi t t ed t o t he Gover nment . On compl et i on of submi t t al r evi ew t o ensur e compl i ance wi t h t he pr e- f i el d engi neer i ng r epor t scope, pr ogr ess payment i s i ssued. Pr ogr ess payment i s l ess t han t hat i ssued f or t he Season I r epor t s i nce most of t he wat er and ai r bal anci ng wor k ef f or t i s compl et ed under Season I .
1. 4 CONTRACT MODI FI CATI ONS
I n conj unct i on wi t h t he Cont r act Cl ause DFARS 252. 236- 7000 Modi f i cat i on Pr oposal s- Pr i ce Br eakdown, and wher e act ual owner shi p and oper at i ng cost s of const r uct i on equi pment cannot be det er mi ned f r om Cont r act or account i ng r ecor ds, equi pment use r at es shal l be based upon t he appl i cabl e pr ovi s i ons of t he EP-1110-1-8 .
1. 5 CONTRACTOR' S I NVOI CE AND CONTRACT PERFORMANCE STATEMENT
1. 5. 1 Cont ent of I nvoi ce
Request s f or payment wi l l be pr ocessed i n accor dance wi t h t he Cont r act Cl ause FAR 52. 232- 27 Pr ompt Payment f or Const r uct i on Cont r act s and FAR
52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s. The r equest s f or payment shal l i ncl ude t he document s l i s t ed bel ow.
a. The Cont r act or ' s i nvoi ce, on NAVFAC For m 7300/ 30 f ur ni shed by t he Gover nment , showi ng i n summar y f or m, t he basi s f or ar r i v i ng at t he amount of t he i nvoi ce. For m 7300/ 30 shal l i ncl ude cer t i f i cat i on by Cont r act or and Qual i t y Cont r ol ( QC) Manager .
b. The Est i mat e f or Voucher / Cont r act Per f or mance St at ement on NAVFAC For m 4330/ 54 f ur ni shed by t he Gover nment , showi ng i n det ai l : t he est i mat ed cost , per cent age of compl et i on, and val ue of compl et ed per f or mance. Use NAVFAC For m 43300/ 54 on NAVFAC cont r act s when a Mont hl y Est i mat e f or Voucher i s r equi r ed.
c. Updat ed Pr oj ect Schedul e and r epor t s r equi r ed by t he cont r act .
d. Cont r act or Saf et y Sel f Eval uat i on Checkl i st .
e. Ot her suppor t i ng document s as r equest ed.
f . Updat ed copy of submi t t al r egi st er .
g. I nvoi ces not compl et ed i n accor dance wi t h cont r act r equi r ement s wi l l be r et ur ned t o t he Cont r act or f or cor r ect i on of t he def i c i enci es.
SECTI ON 01 20 00. 00 20 Page 3
h. Cont r act or ' s Mont hl y Est i mat e f or Voucher and Cont r act or s Cer t i f i cat i on ( NAVFAC For m 4330/ 54) wi t h Subcont r act or and suppl i er payment certification.
1. 5. 2 Submi ssi on of I nvoi ces
I f DFARS Cl ause 5252. 232- 7006 i s i ncl uded i n t he cont r act , pr ovi de t he document s l i s t ed i n par agr aph CONTENT OF I NVOI CE i n t hei r ent i r et y as at t achment s i n Wi de Ar ea Wor k Fl ow ( WAWF) f or each i nvoi ce submi t t ed. The maxi mum si ze of each WAWF at t achment i s t wo megabyt es, but t her e ar e no l i mi t s on t he number of at t achment s.