180615_Vol_II_Specifications.pdf
PDF 2 MB Posted
- Attached to
- DESIGN-BID-BUILD (DBB), MEDICAL HOMEPORT RENOVATION, B449, NAVSUBBASE NLON, GROTON, CONNECTICUT
- Solicitation number
- N4008518R8715
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_0008.pdf | ||
| Amend0007_18-8715.pdf | ||
| Amend0007_-_PPI.pdf | ||
| Existing_Air-Handling_Units_Info.pdf | ||
| Amend0006_18-8715.pdf | ||
| Amend0006_-_PPI.pdf | ||
| Amend0005_-_PPI.pdf | ||
| B449-site_visit.pdf | ||
| Amend0005_18-8715.pdf | ||
| Amend0004_-_PPIs.pdf | ||
| Amend0004_-_map.pdf | ||
| Amend0004_18-8715.pdf | ||
| Amend_0003_18-8715.pdf | ||
| Amend0002_18-8715.pdf | ||
| Amend0002_-_sample_ltr.pdf | ||
| Amend0002_-_PPIs.pdf | ||
| Amend_0001_18-8715.pdf | ||
| 180615_Vol_I_Specifications.pdf | ||
| N4008518R8715_RFP.pdf | ||
| Attachments.zip | ZIP file |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date:
UNCLASSIFIED/FOR OFFICIAL USE ONLY
Help Note All fields can be edited. If you have trouble selecting a field, either use the tab key or click "highlight fields" in Acrobat 7. Fields that are not needed can be selected and deleted. Tool tips with "additional field" can be deleted or changed. The contract number can also be deleted or changed.
cwheeler Image
Medical Homeport Renovation, Building 449 N40085-18-R-8715
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 42 51 CARPET REMOVAL AND RECLAMATION
02 82 16.00 22 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS
02 82 33.13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 01 00 REHABILITATION OF CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 54 16 HYDRAULIC CEMENT UNDERLAYMENT
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 43 00 CHANNEL STRUT FRAMING SYSTEM
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
PROJECT TABLE OF CONTENTS Page 1
06 06 60 TRANSLUCENT RESIN PANEL SYSTEM
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 13 COILING COUNTER DOORS
08 34 59 VAULT DOORS AND DAY GATES
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 87 00 WINDOW FILM
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 54 26 LINEAR WOOD CEILINGS AND WALLS
09 65 00 RESILIENT FLOORING
09 66 16 TERRAZZO FLOOR TILE
09 68 00 CARPETING
09 72 00 WALLCOVERINGS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 21 23.16 CUBICLE TRACK AND HARDWARE
10 22 19 DEMOUNTABLE AND MOVABLE PARTITIONS
10 28 13 MISCELLANEOUS WALL-MOUNTED AND TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 11 - EQUIPMENT
11 70 00 GENERAL REQUIREMENTS FOR MEDICAL EQUIPMENT
11 72 13 MEDICAL EQUIPMENT, MISCELLANEOUS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 35 70 HEALTHCARE CASEWORK
12 48 13 ENTRANCE FLOOR GRID AND FRAMES
PROJECT TABLE OF CONTENTS Page 2
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 70 PLUMBING, HEALTHCARE FACILITIES
22 05 48.00 20 MECHANICAL SOUND AND VIBRATION CONTROL
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 01 30.41 HVAC SYSTEM CLEANING
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 22 26.00 20 STEAM SYSTEM AND TERMINAL UNITS
23 64 26 CHILLED WATER PIPING SYSTEMS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 50 00.00 20 CYBERSECURITY OF FACILITY-RELATED CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS
27 52 24 NURSE CALL SYSTEM
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
SECTION 21 13 13.00 20
WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
04/08
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D709 (2017) Standard Specification for Laminated Thermosetting Materials
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 13 (2016; TIA 16-1; TIA 16-2; TIA 16-3 2016;
Errata 17-1; Errata 17-2) Standard for the Installation of Sprinkler Systems
NFPA 20 (2016; ERTA 2016) Standard for the Installation of Stationary Pumps for Fire Protection
NFPA 24 (2013) Standard for the Installation of Private Fire Service Mains and Their Appurtenances
UNDERWRITERS LABORATORIES (UL)
UL Fire Prot Dir (2012) Fire Protection Equipment Directory
1.2 SYSTEM DESCRIPTION
Design and provide new and modify existing automatic wet pipe fire extinguishing sprinkler systems for complete fire protection coverage throughout the first floor renovated areas.
1.3 SPRINKLER SYSTEM DESIGN
Except as modified herein, design automatic wet pipe fire extinguishing sprinkler systems in accordance with the required and advisory provisions of NFPA 13 , including all recommendations and advisory portions, which shall be considered mandatory; this includes advisory provisions listed in the appendices of such standard(s), as though the word "shall" had been substituted for the word "should" wherever it appears. Design system by hydraulic calculations for uniform distribution of water over the design area. Hydraulic calculations shall assume a 12 psi pressure loss for the backflow preventer assembly. Locate sprinklers in a consistent pattern
SECTION 21 13 13.00 20 Page 1 with ceiling grid, lights, and air supply diffusers. Provide sprinklers and piping system layout. All Devices and equipment for fire protection service shall be UL Fire Prot Dir listed or FM APP GUIDE approved for use in wet pipe sprinkler systems. Provide seismic protection for the sprinkler system.
1.3.1 Location of Sprinklers
Sprinklers in relation to the ceiling and the spacing of sprinklers shall not exceed that permitted by NFPA 13 for the hazards indicated on the contract drawings. Uniformly space sprinklers on the branch piping.
Sprinklers shall provide coverage throughout 100 percent of the renovation areas. This includes, but is not limited to, telephone rooms, electrical equipment rooms, boiler rooms, switchgear rooms, transformer rooms, and other electrical and mechanical spaces.
1.3.2 Water Distribution
Distribution shall be uniform throughout the area in which the sprinklers will open. Discharge from individual sprinklers in hydraulically most remote area shall be between 100 percent and 120 percent of the specified density.
1.3.3 Density of Application of Water
Size pipe to provide the specified density when the system is discharging the specified total maximum required flow. Application to horizontal surfaces below the sprinklers shall be as indicated on the contract drawings.
1.3.4 Sprinkler Discharge Area
Sprinkler discharge area is indicated on the contract drawings.
1.3.5 Outside Hose Allowances
Hydraulic calculations shall include a hose allowance for outside hose streams as indicated on the contract drawings.
1.3.6 Water Supply
Base hydraulic calculations on the water supply data shown on the fire protection contract drawings at the discharge flange of the existing fire pump. Base hydraulic calculations on operation of existing fire pump and backflow assembly. Verify water supply available, provide and execute fire pump water flow test in accordance with NFPA 20 witnessed by Fire Protection Engineer Designer of Record. Contractor shall capture all discharge water for proper disposal in accordance with local requirements. Contractor shall be responsible to properly dispose of all test water discharge in accordance with local criteria. Contractor shall provide Owner with 4 weeks notice prior to fire pump test execution.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval.
Partial submittals and submittals not fully complying with the
SECTION 21 13 13.00 20 Page 2 requirements and recommended practices of NFPA 13 and this specification section shall be returned disapproved without review. This contract stipulation is non-negotiable.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Shop Drawings; G
Prepare 24 by 36 inch detail working drawings of sprinklers and piping. Floor plans shall be drawn to a scale not less than 1/8" = 1'-0". Show data essential for proper installation of each system. Show details, plan view, elevations and sections of the systems supply and piping. Show piping schematic of systems supply, devices, valves, pipe and fittings. Show point to point electrical wiring diagrams. Submit drawings signed by a registered fire protection engineer or NICET Level 3 registered designer.
Provide three copies of the Sprinkler System Shop Drawings, no later than 21 days prior to the start of sprinkler system installation.
SD-03 Product Data
Pipe; G Fittings ; G Valves, including gate, check, and globe ; G Sprinklers ; G Pipe hangers and supports ; G Mechanical couplings ; G Seismic Bracing ; G
Annotate descriptive data to show the specific model, type, and size of each item. Catalog cuts shall also indicate UL Listing/FM Approval and country of manufacture.
SD-05 Design Data
Hydraulic Calculations; G
Submit computer program generated hydraulic calculations to substantiate compliance with hydraulic design requirements.
Calculations shall be performed by computer using software intended specifically for fire protection system design. Submit name of software program used.
SD-06 Test Reports request to schedule Preliminary Tests; G
Preliminary Test Report; G
Provide Three copies of the completed Preliminary Test Report, no later than 7 days after the completion of the Preliminary Tests.
The Preliminary Tests Report shall include both the Contractor's Material and Test Certificate for Underground Piping and the Contractor's Material and Test Certificate for Aboveground Piping. All items in the Preliminary Tests Report shall be signed
SECTION 21 13 13.00 20 Page 3 by the Fire Protection Engineer.
request to schedule Final Acceptance Test; G
Final Acceptance Test; G
Provide Three copies of the completed Final Acceptance Tests Reports, no later than 7 days after the completion of the Final Acceptance Tests. All items in the Final Acceptance Report shall be signed by the Fire Protection Engineer.
SD-07 Certificates
Inspection by Fire Protection Engineer; G
Concurrent with the Final Acceptance Test Report, certification by the Fire Protection Engineer that the sprinkler system is installed in accordance with the contract requirements, including signed approval of the Preliminary and Final Acceptance Test Reports.
Fire Protection Engineer; G
The name and documentation of certification of the proposed Fire Protection Engineer, no later than 14 days after the Notice to Proceed and prior to the submittal of the sprinkler system drawings and hydraulic calculations.
Sprinkler System Installer; G
Submit data showing the Sprinkler System Installer has successfully installed systems of the same type and design as specified herein, Data shall include names and locations of at least two installations where the Contractor, or the subcontractor referred to above, has installed such systems. Indicate type and design of each system and certify that each system has performed satisfactorily in the manner intended for not less than 18 months. Provide NICET certification of the system technician.
Contractor shall submit data along with submittal of the Fire Protection Engineer Qualifications.
NICET Level 3 Designer; G
The name and documentation of certification of the proposed NICET Level 3 Designer, no later than 14 days after the Notice to Proceed and prior to the submittal of the sprinkler system drawings and hydraulic calculations.
SD-10 Operation and Maintenance Data
Operating and Maintenance Instructions
Submit in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA as supplemented and modifies by this specification section.
Provide six manuals in accordance with NFPA 13. The manuals shall include the manufacturer's name, model number, parts list, list of parts and tools that should be kept in stock by the owner for
SECTION 21 13 13.00 20 Page 4 routine maintenance including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization (including address and telephone number) for each item of equipment. Each service organization submitted shall be capable of providing 4 hour on-site response to a service call on an emergency basis.
SD-11 Closeout Submittals
As-built drawings
As-built shop drawings, at no later than 14 days after completion of the Final Tests. The Sprinkler System Drawings shall be updated to reflect as-built conditions after all related work is completed. Provide electronic drawings in dwg or pdf format.
On-site training
1.5 QUALIFICATIONS
1.5.1 Fire Protection Engineer
A Fire Protection Engineer is a registered professional engineer (P.E.)
who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES).
1.5.2 NICET Level 3 Designer
A NICET Level 3 Designer is a certified designer who has completed a Level 3 minimum water based systems layout certification from the National Institute for Certification in Engineering Technologies (NICET) a Division of National Society of Professional Engineers.
1.5.3 Sprinkler System Installer
The Sprinkler System Installer shall be regularly engaged in the installation of the type and complexity of system specified in the Contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months. Installation drawings, shop drawings and as-built drawings shall be prepared, by or under the supervision of, a NICET Level 3 designer or water based system layout or by a fire protection engineer.
1.6 QUALITY ASSURANCE
1.6.1 Material and Equipment Qualifications
Provide materials and equipment that are standard products of manufacturers regularly engaged in the manufacture of such products, which are of a similar material, design and workmanship. Standard products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use shall include applications of equipment and materials under similar circumstances and of similar size.
The product shall have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2 year period.
SECTION 21 13 13.00 20 Page 5
1.6.2 Alternative Qualifications
Products having less than a two-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.
1.6.3 Manufacturer's Nameplate
Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.
1.6.4 Field Fabricated Nameplates
ASTM D709. Provide laminated plastic nameplates for each equipment enclosure, relay, switch, and device; as specified in the technical sections or as indicated on the drawings. Each nameplate inscription shall identify the function and, when applicable, the position.
Nameplates shall be melamine plastic, 0.125 inch thick, white with black center core. Surface shall be matte finish. Corners shall be square.
Accurately align lettering and engrave into the core. Minimum size of nameplates shall be one by 2.5 inches. Lettering shall be a minimum of
0.25 inch high normal block style.
1.7 ACCESSIBILITY
Install all work so that parts requiring periodic inspection, operation, maintenance, and repair are readily accessible. Install concealed valves, expansion joints, controls, dampers, and equipment requiring access, in locations freely accessible through access doors.
1.8 DELIVERY, STORAGE AND HANDLING
All equipment delivered and placed in storage shall be housed in a manner to preclude any damage from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Additionally, all pipes shall either be capped or plugged until installed.
PART 2 PRODUCTS
2.1 FIRE PUMP CIRCULATING RELIEF VALVE
2.1.1 3/4 Inch Circulating Relief Valve
Provide and install circulating relief valve for existing horizontal split-case fire pump.
2.2 ABOVEGROUND PIPING COMPONENTS
All components of the aboveground piping shall fully comply with the requirements and recommended practices of NFPA 13 and this specification section. Aboveground piping shall be steel.
2.2.1 Steel Pipe
Pipe shall be rigid black steel. Steel pipe shall be Schedule 40 for sizes less than 3 inches and Schedule 10 for sizes 3 inches or larger.
SECTION 21 13 13.00 20 Page 6
Fittings into which sprinklers, sprinkler riser nipples, or drop nipples are threaded shall be welded, threaded, or grooved-end type. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe and segmented welded fittings shall not be permitted. Rubber gasketed grooved-end pipe and fittings with mechanical couplings shall be permitted in pipe sizes 1.5 inches and larger.
Fittings, mechanical couplings, and rubber gaskets shall be supplied by the same manufacturer. Steel piping with wall thickness less than Schedule 30 shall not be threaded. Side outlet tees using rubber gasketed fittings shall not be permitted. Sprinkler pipe and fittings shall be metal.
2.2.2 Grooved Mechanical Joints and Fittings
Grooved couplings, fittings and grooving tools shall be products of the same manufacturer.
2.2.3 Flexible Sprinkler Hose
The use of flexible sprinkler hose is not permitted.
2.2.4 Plastic Pipe and Fittings
The use of plastic pipe is not permitted.
2.2.5 Sprinklers
Provide nominal 0.50 inch or 0.53 inch orifice sprinklers. Sprinklers with internal O-rings shall not be used. Sprinklers shall be used in accordance with their listed coverage limitations. Provide Concealed Pendent, Upright quick response sprinklers. Concealed sprinklers shall be provided with white factory finished cover plates. Sprinklers shall have a brass finish. Temperature classification shall be ordinary.
Sprinklers in high heat areas including attic spaces or in close proximity to unit heaters shall have temperature classification in accordance with NFPA 13 . Extended coverage sprinklers shall not be used. Provide corrosion-resistant sprinklers and sprinkler guards as required by NFPA 13 .
Deflector shall not be more than 3 inches below suspended ceilings.
Ceiling plates shall not be more than 0.5 inch deep. Ceiling cups shall not be permitted.
2.2.6 Valves
Provide valves of types approved for fire service. Valves shall open by counterclockwise rotation. Check valves shall be clear opening swing-check type with inspection and access cover plate for sizes 8 inches and larger. Each new control valve shall be electrically supervised;
minimum contact ratings shall be 2.5 amps at 24 volts DC. Provide supervision against valve closure or tampering of valve. Existing floor control station locations shall be reused.
2.2.7 Pipe Supports
Provide Pipe hangers and supports and Seismic Bracing in accordance with
NFPA 13 .
2.2.8 Fire Department Connections
Existing to remain.
SECTION 21 13 13.00 20 Page 7
2.2.9 Backflow Prevention Assembly
Existing to remain.
2.3 ALARM INITIATING AND SUPERVISORY DEVICES
Existing to remain.
2.4 ACCESSORIES
2.4.1 Sprinkler Cabinet
Provide metal cabinet with extra sprinklers and sprinkler wrench to Government. The number and types of extra sprinklers shall be as specified in NFPA 13 .
2.4.2 Pipe Escutcheon
Provide split hinge metal plates for piping entering walls, floors, and ceilings in exposed spaces. Provide polished stainless steel plates or chromium-plated finish on copper alloy plates in finished spaces. Provide paint finish on metal plates in unfinished spaces.
PART 3 EXECUTION
3.1 INSPECTION BY FIRE PROTECTION ENGINEER
The Fire Protection Engineer shall inspect the sprinkler system periodically during the installation to assure the sprinkler system is being provided and installed in accordance with the contract requirements and the approved sprinkler system submittal(s). The Fire Protection Engineer shall attend both the preliminary and final tests, and shall sign the test results. After the preliminary testing has been completed, the Fire Protection Engineer, shall certify in writing the system is ready for the final inspections and tests. This report shall document any discrepancies found and what actions will be taken to correct. Any discrepancy noted during the periodic site visits or the preliminary testing shall be brought to the attention of the Contracting Officer in writing, no later than three working days after the discrepancy is discovered.
3.2 ABOVEGROUND PIPING INSTALLATION
The methods of fabrication and installation of the aboveground piping shall fully comply with the requirements and recommended practices of NFPA 13 and this specification section.
3.2.1 Piping in Finished Areas
In areas with suspended or dropped ceilings and in areas with concealed spaces above the ceiling, piping shall be concealed above ceilings.
Piping shall be inspected, tested and approved before being concealed.
Risers and similar vertical runs of piping in finished areas shall be concealed.
SECTION 21 13 13.00 20 Page 8
3.2.2 Pendent Sprinklers
Where sprinklers are installed below suspended or dropped ceilings, drop nipples shall be cut such that sprinkler ceiling plates or escutcheons are of a uniform depth throughout the finished space. The outlet of the reducing coupling shall not extend more than 1 inch below the underside of the ceiling. Pendent sprinklers in suspended ceilings shall be a minimum of 6 inches from ceiling grids.
3.2.3 Reducers
Reductions in pipe sizes shall be made with one-piece tapered reducing fittings. Bushings are prohibited.
3.2.4 Pipe Penetrations
Cutting structural members for passage of pipes or for pipe-hanger fastenings will not be permitted. Pipes that must penetrate concrete or masonry walls or concrete floors shall be core-drilled and provided with pipe sleeves. Each sleeve shall be Schedule 40 galvanized steel, ductile iron or cast iron pipe and shall extend through its respective wall or floor and be cut flush with each wall surface. Sleeves shall provide required clearance between the pipe and the sleeve per NFPA 13 . The space between the sleeve and the pipe shall be firmly packed with mineral wool insulation. Where pipes penetrate fire walls, fire partitions, or floors, pipes shall be fire stopped in accordance with Section 07 84 00 FIRESTOPPING. In penetrations that are not fire-rated or not a floor penetration, the space between the sleeve and the pipe shall be sealed at both ends with plastic waterproof cement that will dry to a firm but pliable mass or with a mechanically adjustable segmented elastomer seal.
3.2.5 Inspector's Test Connection
Existing to remain.
3.2.6 Drains
Existing to remain.
3.2.7 Installation of Fire Department Connection
Existing to remain.
3.2.8 Identification Signs
Signs shall be affixed to each control valve, inspector test valve, main drain, auxiliary drain, test valve, and similar valves as appropriate or as required by NFPA 13 . Valve identification signs shall be minimum 6 inches wide by 2 inches high with enamel baked finish on minimum 18 gauge steel or 0.024 inch aluminum with red letters on a white background or white letters on red background. Hydraulic design data nameplates shall be permanently affixed to each sprinkler riser as specified in NFPA 13 .
3.3 ELECTRICAL WORK
Except as supplemented and modified herein, electric equipment and wiring shall be in accordance with Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Alarm signal wiring connected to the building fire alarm control system shall be in accordance with 28 31 76 INTERIOR FIRE ALARM AND MASS
SECTION 21 13 13.00 20 Page 9
NOTIFICATION SYSTEM.
3.4 PIPE PAINTING AND COLOR CODE MARKING
Paint and color code mark sprinkler piping system as specified in Section
09 90 00 PAINTS AND COATINGS.
3.5 PRELIMINARY TESTS
The system, the aboveground piping and system components, shall be tested to assure that equipment and components function as intended. The aboveground interior piping systems and attached appurtenances subjected to system working pressure shall be tested in accordance with NFPA 13 and
NFPA 24 .
Submit request to schedule Preliminary Tests, no later than 14 days prior to the proposed start of the tests. Upon completion of specified tests, the Contractor shall submit for approval a Preliminary Test Report.
3.5.1 Aboveground Piping
3.5.1.1 Hydrostatic Testing
Aboveground piping shall be hydrostatically tested in accordance with
NFPA 13 .
3.6 FINAL ACCEPTANCE TEST
Final Acceptance Test shall begin only when the Preliminary Test Report has been approved. Submit request to schedule Final Acceptance Test, no later than 14 days prior to the proposed start of the tests. Notification shall include a copy of the Contractor's Material & Test Certificates.
Submit as-built drawings upon completion.
An experienced technician regularly employed by the system installer shall be present during the inspection. The Fire Protection Engineer shall attend the final inspections and tests. At this inspection, repeat any or all of the required tests as directed. Correct defects in work provided by the Contractor, and make additional tests until the systems comply with contract requirements. Furnish appliances, equipment, electricity, instruments, connecting devices, and personnel for the tests. The Government will furnish water for the tests. The New London Division, Naval Facilities Engineering Command, Fire Protection Engineer, will witness formal tests and approve systems before they are accepted.
3.7 ON-SITE TRAINING
Submit request to schedule the On-site Training, at least 14 days prior to the start of related training but prior to the final inspections and tests. The sprinkler contractor shall conduct a training course for operating and maintenance personnel as designated by the Contracting Officer. Training shall be provided for a period of 4 hours of normal working time and shall start after the system is functionally complete and after the Final Acceptance Test. The On-Site Training shall cover all of the items contained in the approved Operating and Maintenance Instructions.
-- End of Section --
SECTION 21 13 13.00 20 Page 10
SECTION 22 00 70
PLUMBING, HEALTHCARE FACILITIES
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI Z21.22/CSA 4.4 (2015) Relief Valves for Hot Water Supply Systems
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 90.1 - IP (2013) Energy Standard for Buildings Except Low-Rise Residential Buildings
AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)
ASSE 1001 (2016) Performance Requirements for Atmospheric Type Vacuum Breakers
ASSE 1003 (2009) Performance Requirements for Water Pressure Reducing Valves for Domestic Water Distribution Systems - (ANSI approved 2010)
ASSE 1010 (2004) Performance Requirements for Water Hammer Arresters (ANSI approved 2004)
ASSE 1018 (2001) Performance Requirements for Trap Seal Primer Valves - Potable Water Supplied (ANSI Approved 2002
ASSE 1037 (2015) Performance Requirements for Pressurized Flushing Devices (Flushometers) for Plumbing Fixtures
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA 10084 (2005) Standard Methods for the Examination of Water and Wastewater
AWWA B300 (2010; Addenda 2011) Hypochlorites
AWWA B301 (2010) Liquid Chlorine
AWWA C203 (2008) Coal-Tar Protective Coatings and Linings for Steel Water Pipelines - Enamel and Tape - Hot-Applied
SECTION 22 00 70 Page 1
AWWA C606 (2015) Grooved and Shouldered Joints
AWWA C651 (2014) Standard for Disinfecting Water Mains
AWWA C652 (2011) Disinfection of Water-Storage Facilities
AMERICAN WELDING SOCIETY (AWS)
AWS A5.8/A5.8M (2011; Amendment 2012) Specification for Filler Metals for Brazing and Braze Welding
AWS B2.1/B2.1M (2014; Errata 2015) Specification for Welding Procedure and Performance Qualification
AWS B2.2/B2.2M (2016) Specification for Brazing Procedure and Performance Qualification
ASME INTERNATIONAL (ASME)
ASME A112.14.1 (2003; R 2017) Backwater Valves
ASME A112.19.2/CSA B45.1 (2013) Standard for Vitreous China Plumbing Fixtures and Hydraulic Requirements for Water Closets and Urinals
ASME A112.19.3/CSA B45.4 (2017; Errata 2017) Stainless Steel Plumbing Fixtures
ASME A112.36.2M (1991; R 2017) Cleanouts
ASME A112.6.1M (1997; R 2017) Floor Affixed Supports for Off-the-Floor Plumbing Fixtures for Public Use
ASME A112.6.3 (2016) Standard for Floor and Trench Drains
ASME B1.20.1 (2013) Pipe Threads, General Purpose (Inch)
ASME B16.18 (2012) Cast Copper Alloy Solder Joint Pressure Fittings
ASME B16.21 (2011) Nonmetallic Flat Gaskets for Pipe Flanges
ASME B16.22 (2013) Standard for Wrought Copper and Copper Alloy Solder Joint Pressure Fittings
ASME B16.5 (2013) Pipe Flanges and Flanged Fittings:
NPS 1/2 Through NPS 24 Metric/Inch Standard
ASME B31.1 (2016; Errata 2016) Power Piping
ASME B31.5 (2016) Refrigeration Piping and Heat Transfer Components
SECTION 22 00 70 Page 2
ASME B40.100 (2013) Pressure Gauges and Gauge Attachments
ASME BPVC SEC IV (2010) BPVC Section IV-Rules for Construction of Heating Boilers
ASME BPVC SEC IX (2010) BPVC Section IX-Welding and Brazing Qualifications
ASTM INTERNATIONAL (ASTM)
ASTM A105/A105M (2014) Standard Specification for Carbon Steel Forgings for Piping Applications
ASTM A193/A193M (2016) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications
ASTM A515/A515M (2010) Standard Specification for Pressure Vessel Plates, Carbon Steel, for Intermediate- and Higher-Temperature Service
ASTM A516/A516M (2010; R 2015) Standard Specification for Pressure Vessel Plates, Carbon Steel, for Moderate- and Lower-Temperature Service
ASTM A74 (2016) Standard Specification for Cast Iron Soil Pipe and Fittings
ASTM A888 (2013a) Standard Specification for Hubless Cast Iron Soil Pipe and Fittings for Sanitary and Storm Drain, Waste, and Vent Piping Applications
ASTM B117 (2016) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM B32 (2008; R 2014) Standard Specification for Solder Metal
ASTM B370 (2012) Standard Specification for Copper Sheet and Strip for Building Construction
ASTM B813 (2016) Standard Specification for Liquid and Paste Fluxes for Soldering of Copper and Copper Alloy Tube
ASTM B88 (2016) Standard Specification for Seamless Copper Water Tube
ASTM C564 (2014) Standard Specification for Rubber Gaskets for Cast Iron Soil Pipe and Fittings
ASTM C920 (2014a) Standard Specification for Elastomeric Joint Sealants
SECTION 22 00 70 Page 3
ASTM D2822/D2822M (2005; R 2011; E 2011) Standard Specification for Asphalt Roof Cement, Asbestos-Containing
ASTM E1 (2014) Standard Specification for ASTM Liquid-in-Glass Thermometers
CAST IRON SOIL PIPE INSTITUTE (CISPI)
CISPI 301 (2009) Hubless Cast Iron Soil Pipe and Fittings for Sanitary and Storm Drain, Waste, and Vent Piping Applications
CISPI 310 (2011) Coupling for Use in Connection with Hubless Cast Iron Soil Pipe and Fittings for Sanitary and Storm Drain, Waste, and Vent Piping Applications
COPPER DEVELOPMENT ASSOCIATION (CDA)
CDA A4015 (2010) Copper Tube Handbook
INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS
(IAPMO)
IAPMO Z124.5 (2013; E 2013) Plastic Toilet Seats
INTERNATIONAL CODE COUNCIL (ICC)
ICC A117.1 COMM (2017) Standard And Commentary Accessible and Usable Buildings and Facilities
ICC IPC (2015) International Plumbing Code
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
ANSI/ISEA Z358.1 (2014) American National Standard for Emergency Eyewash and Shower Equipment
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-110 (2010) Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared Ends
MSS SP-25 (2013) Standard Marking System for Valves, Fittings, Flanges and Unions
MSS SP-58 (1993; Reaffirmed 2010) Pipe Hangers and Supports - Materials, Design and Manufacture, Selection, Application, and Installation
MSS SP-67 (2017) Butterfly Valves
MSS SP-69 (2003; Notice 2012) Pipe Hangers and Supports - Selection and Application (ANSI Approved American National Standard)
SECTION 22 00 70 Page 4
MSS SP-70 (2011) Gray Iron Gate Valves, Flanged and Threaded Ends
MSS SP-71 (2011; Errata 2013) Gray Iron Swing Check Valves, Flanged and Threaded Ends
MSS SP-78 (2011) Cast Iron Plug Valves, Flanged and Threaded Ends
MSS SP-80 (2013) Bronze Gate, Globe, Angle and Check Valves
MSS SP-85 (2011) Gray Iron Globe & Angle Valves Flanged and Threaded Ends
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 250 (2014) Enclosures for Electrical Equipment (1000 Volts Maximum)
NEMA MG 1 (2016; SUPP 2016) Motors and Generators
NEMA MG 11 (1977; R 2012) Energy Management Guide for Selection and Use of Single Phase Motors
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 90A (2018) Standard for the Installation of Air Conditioning and Ventilating Systems
NSF INTERNATIONAL (NSF)
NSF/ANSI 61 (2016) Drinking Water System Components - Health Effects
PLUMBING AND DRAINAGE INSTITUTE (PDI)
PDI WH 201 (2010) Water Hammer Arresters Standard
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE J1508 (2009) Hose Clamp Specifications
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
PL 93-523 (1974; A 1999) Safe Drinking Water Act
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
10 CFR 430 Energy Conservation Program for Consumer Products
UNDERWRITERS LABORATORIES (UL)
UL 1951 (2011; Reprint Aug 2017) UL Standard for Safety Electric Plumbing Accessories
SECTION 22 00 70 Page 5
1.2 SYSTEM DESCRIPTION
Provide complete and operable plumbing systems including sanitary domestic water, plumbing fixtures, valves, pumps, water heaters, supports, and all associated appurtenances.
1.2.1 Accessibility of Equipment
Install all work so that parts requiring periodic inspection, operation, maintenance, and repair are readily accessible. Install concealed valves, and equipment requiring access, in locations freely accessible through access doors.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Plumbing System; G
SD-03 Product Data
Pipe and Fittings; G
Pipe Hangers, Inserts, and Supports; G
Valves; G
Plumbing Fixtures; G
Drains and Backwater Valves; G
Cleanouts; G
Water Heaters; G
Vibration-Absorbing Features; G
Plumbing System
SD-06 Test Reports
Tests, Flushing and Disinfection
Test and balance report of domestic hot water and recirculation system
SD-07 Certificates
Materials and Equipment
Welding
SECTION 22 00 70 Page 6
Bolts
SD-10 Operation and Maintenance Data
Plumbing System; G
1.4 QUALITY ASSURANCE
1.4.1 Qualifications
1.4.1.1 Manufacturer Qualifications
Manufacturers must be regularly engaging in the manufacturing, supplying, and servicing of specified products and equipment, as well as, providing engineering and/or start-up services as specified. Provide evidence demonstrating compliance for a minimum of 5 years, and on 5 projects of similar complexity.
1.4.1.2 Installer Qualifications
Installer must be licensed, and must provide evidence of the successful completion of at least five projects of equal or greater size and complexity. Provide tradesmen skilled in the appropriate trade.
1.4.2 Welding
Weld piping in accordance with qualified procedures using performance-qualified welders and welding operators. Submit a list of names and identification symbols of qualified welders and welding operators. Provide documentation that welders, and welding operators are certified in accordance with American Welding Society Standard AWS B2.1/B2.1M . Qualify procedures and welders in accordance with ASME BPVC SEC IX . Welding procedures qualified by others, and welders and welding operators qualified by another employer, may be accepted as permitted by ASME B31.1 . Notify the Contracting Officer 24 hours in advance of tests, and perform the tests at the work site if practicable.
Welders or welding operators must apply their assigned symbols near each weld they make as a permanent record.
1.4.3 Regulatory Requirements
1.4.3.1 International Code Council (ICC) Codes
Unless otherwise required herein, perform plumbing work in accordance with the ICC IPC .
a. For ICC Codes, interpret reference to the "code official" to mean the "Contracting Officer." For Government owned property, interpret references to the "owner" to mean the "Contracting Officer." For leased facilities, interpret references to the "owner" to mean the "lessor." Interpret references to the "permit holder" to mean the "Contractor."
b. For ICC Codes referenced in the Contract documents, the provisions of Chapter 1, "Administrator," do not apply. These administrative requirements are covered by the applicable Federal Acquisition Regulations (FAR) included in this Contract and by the authority granted to the Officer in Charge of Construction to administer the
SECTION 22 00 70 Page 7 construction of this project. References in the ICC Codes to sections of Chapter 1, must be applied appropriately by the Contracting Officer as authorized by his administrative cognizance and the FAR.
1.4.4 Alternative Qualifications
Products having less than a two-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.
1.4.5 Service Support
The equipment items must be supported by service organizations. Submit a certified list of qualified permanent service organizations for support of the equipment which includes their addresses and qualifications. These service organizations must be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the Contract.
1.5 DELIVERY, STORAGE, AND HANDLING
Handle, store, and protect equipment and materials to prevent damage before and during installation in accordance with the manufacturer's recommendations, and as approved by the Contracting Officer. Replace damaged or defective items.
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
Provide materials and equipment which are the standard products of a manufacturer regularly engaged in the manufacture of such products.
Specified equipment must essentially duplicate equipment that has performed satisfactorily at least two years prior to bid opening. Provide standard products that have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use must include applications of equipment and materials under similar circumstances and of similar size. The product must have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2 year period.
2.2 MANUFACTURER'S NAMEPLATE
Each item of equipment must have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable. See also paragraph "Nameplates" in PART 3.
2.3 MATERIALS AND EQUIPMENT
Submit manufacturer's catalog data with highlighting to show model, size, options, etc., that are intended for consideration. Provide adequate data to demonstrate compliance with Contract requirements. Submit certificate stating that the design, fabrication, and installation conform to the code, where equipment is specified to conform to requirements of the ASME Boiler and Pressure Vessel Code.
a. Cast-iron pipe must contain a minimum of 95 percent recycled content.
SECTION 22 00 70 Page 8
Provide data identifying percentage of recycled content for cast iron pipe. Hubless cast-iron soil pipe must not be installed underground, under concrete floor slabs, or in crawl spaces below kitchen floors.
b. Material or equipment containing lead must not be used in any potable water system. In line devices such as water meters, building valves, check valves, meter stops, valves, fittings and back flow preventers must comply with PL 93-523 and NSF/ANSI 61 , Section 8. End point devices such as water coolers, lavatory faucets, kitchen faucets, ice makers, supply stops and end point control valves used to dispense water for drinking must meet the requirements of NSF/ANSI 61 , Section 9.
2.4 PIPE AND FITTINGS
2.4.1 Domestic Water Piping
Domestic water piping at service entrance (from 1 foot inside building to 5 feet outside): Same as indicated for outside utilities.
a. 2 inches and smaller after service entrance above grade:
(1) Copper tube conforming to ASTM B88, type L, with soldered joints and wrought copper ASME B16.22 or cast brass ASME B16.18 fittings.
b. Below grade:
(1) Copper tube conforming to ASTM B88, type K soft, with brazed joints and wrought copper ASME B16.22 fittings.
(2) Where below-grade run of piping is shorter than 50 feet, below-grade joints are not acceptable.
c. 2-1/2 to 4 inches after service entrance:
(1) Copper tube conforming to ASTM B88, type L, with soldered joints and wrought copper ASME B16.22 or cast brass ASME B16.18 fittings.
d. 5 inches and larger after service entrance:
(1) Copper tube conforming to ASTM B88, type L, with soldered joints and wrought copper ASME B16.22 fittings.
(2) Connections to existing galvanized piping: Threaded, mechanical plain-end, or flanged.
2.4.2 Drainage Piping (Soil, Waste, Vent, Indirect, and Storm)
a. Above grade:
(1) Cast-iron conforming to CISPI 301 or ASTM A888, hubless pipe, fittings, and CISPI 310 elastomeric sealing sleeves with stainless-steel or cast iron clamps.
b. Below grade: Cast-iron conforming to ASTM A74, hubbed pipe and fittings with ASTM C564 elastomeric push joints.
SECTION 22 00 70 Page 9
2.4.3 Pressure Drainage Piping
a. Cast iron pressure pipe and fittings, with mechanical joints.
2.4.4 Exposed Piping in Finished Areas
a. Chrome or nickel plated brass to wall or floor.
b. Piping 2 inches and larger may be provided with chrome or nickel plated brass sleeves to cover pipe and fittings in lieu of plating.
2.4.5 Trap Primer Pipe Between Primer Device and Drain
a. Above grade: Copper tube conforming to ASTM B88, type L, with soldered joints and wrought copper ASME B16.22 or cast brass ASME B16.18 fittings.
b. Below grade: Copper tube conforming to ASTM B88, type K soft, with soldered joints and wrought copper ASME B16.22 or cast brass ASME B16.18 fittings.
2.5 PIPE JOINT MATERIALS
Hubless cast-iron soil pipe must not be used under ground. Solder containing lead must not be used with copper pipe. Mark cast iron soil pipe and fittings with the collective trademark of the Cast Iron Soil Pipe Institute. Joints and gasket materials must conform to the following:
a. Coupling for Cast-Iron Pipe: for hub and spigot type ASTM A74, AWWA C606. For hubless type: CISPI 310
b. Flange Gaskets: Gaskets must be made of non-asbestos material in accordance with ASME B16.21 . Gaskets must be flat, 1/16 inch thick, and contain Aramid fibers bonded with Styrene Butadiene Rubber (SBR) or Nitro Butadiene Rubber (NBR). Gaskets must be the full face or self centering flat ring type. Gaskets used for hydrocarbon service must be bonded with NBR.
c. Brazing Material: Brazing material must conform to AWS A5.8/A5.8M , BCuP-5.
d. Brazing Flux: Flux must be in paste or liquid form appropriate for use with brazing material. Flux must be as follows: lead-free; have a 100 percent flushable residue; contain slightly acidic reagents;
contain potassium borides; and contain fluorides.
e. Solder Material: Solder metal must conform to ASTM B32 and be Code approved "Lead Free" having a chemical composition equal to or less than 0.2 percent lead.
f. Solder Flux: Flux must be liquid form, non-corrosive, Code approved "Lead Free" and conform to ASTM B813, Standard Test 1.
i. PTFE Tape: PTFE Tape, for use with Threaded Metal or Plastic Pipe.
g. Rubber Gaskets for Cast-Iron Soil-Pipe and Fittings (hub and spigot type and hubless type): ASTM C564.
h. Flanged fittings including flanges, bolts, nuts, bolt patterns, etc., SECTION 22 00 70 Page 10 must be in accordance with ASME B16.5 class 150 and must have the manufacturer's trademark affixed in accordance with MSS SP-25 . Flange material must conform to ASTM A105/A105M . Blind flange material must conform to ASTM A516/A516M cold service and ASTM A515/A515M for hot service. Bolts must be high strength or intermediate strength with material conforming to ASTM A193/A193M . Submit written certification by the bolt manufacturer that the bolts furnished comply with the specified requirements.
2.6 MISCELLANEOUS MATERIALS
Miscellaneous materials must conform to the following:
a. Water Hammer Arrester: PDI WH 201 . Water hammer arrester must be diaphragm or piston type.
b. Copper, Sheet and Strip for Building Construction: ASTM B370.
c. Asphalt Roof Cement: ASTM D2822/D2822M .
d. Hose Clamps: SAE J1508 .
e. Supports for Off-The-Floor Plumbing Fixtures: ASME A112.6.1M .
f. Metallic Cleanouts: ASME A112.36.2M .
g. Plumbing Fixture Setting Compound: A preformed flexible ring seal molded from hydrocarbon wax material. The seal material must be nonvolatile nonasphaltic and contain germicide and provide watertight, gastight, odorproof and verminproof properties.
h. Coal-Tar Protective Coatings and Linings for Steel Water Pipelines:
AWWA C203.
i. Hypochlorites: AWWA B300.
j. Liquid Chlorine: AWWA B301.
k. Gauges - Pressure Indicating Dial Type - Elastic Element: ASME B40.100 .
l. Thermometers: ASTM E1. Mercury must not be used in thermometers.
m. Vacuum gauges: Provide for vacuum line use adjacent to source equipment, ASME B40.100 vacuum compound gauges, 4 1/2 inches in diameter with metal case for vacuum system, accurate to within two percent. Dial graduations and figures shall be black on a white background, or white on a black background. Label for vacuum service.
Provide with bourdon tube and bras movement. Install with gauge cock.
Gauges for all services upstream of main shutoff valve shall be same as those adjacent to source except diameter may be reduced to 1 1/2 inches. Dial range shall be 0 to 30 inches Hg vacuum.
2.7 PIPE INSULATION MATERIAL
Provide insulation as specified in Section 23 07 00 THERMAL INSULATION FOR
MECHANICAL SYSTEMS.
SECTION 22 00 70 Page 11
2.8 PIPE HANGERS, INSERTS, AND SUPPORTS
Provide pipe hangers, inserts, and supports conforming to MSS SP-58 .
2.9 VALVES
Provide valves on supplies to equipment and fixtures. Valves 2-1/2 inches and smaller must be bronze with threaded bodies for pipe and solder-type connections for tubing. Valves 3 inches and larger must have flanged iron bodies and bronze trim. Pressure ratings must be based upon the application. Valves must conform to the following standards:
Description Standard
Butterfly Valves MSS SP-67
Cast-Iron Gate Valves, Flanged and Threaded Ends MSS SP-70
Cast-Iron Swing Check Valves, Flanged and Threaded Ends MSS SP-71
Ball Valves Threaded, Socket-Welding, Solder Joint MSS SP-110
Cast-Iron Plug Valves, Flanged and Threaded Ends MSS SP-78
Bronze Gate, Globe, Angle, and Check Valves MSS SP-80
Cast-Iron Globe and Angle Valves, Flanged and Threaded Ends MSS SP-85
Backwater Valves ASME A112.14.1
Vacuum Relief Valves ANSI Z21.22/CSA 4.4
Water Pressure Reducing Valves ASSE 1003
Water Heater Drain Valves ASME BPVC SEC IV , Part HLW-810
Trap Seal Primer Valves ASSE 1018
Temperature and Pressure Relief Valves for Hot Water Supply Systems
ANSI Z21.22/CSA 4.4
2.9.1 Vacuum Piping Systems
Vacuum piping systems up to 20 inches Hg vacuum:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.