180615_Vol_I_Specifications.pdf

PDF 7 MB Posted

Attached to
DESIGN-BID-BUILD (DBB), MEDICAL HOMEPORT RENOVATION, B449, NAVSUBBASE NLON, GROTON, CONNECTICUT
Solicitation number
N4008518R8715
Issued by

View the file

Other files

File Type Posted
Amend_0008.pdf PDF
Amend0007_18-8715.pdf PDF
Amend0007_-_PPI.pdf PDF
Existing_Air-Handling_Units_Info.pdf PDF
Amend0006_18-8715.pdf PDF
Amend0006_-_PPI.pdf PDF
Amend0005_-_PPI.pdf PDF
B449-site_visit.pdf PDF
Amend0005_18-8715.pdf PDF
Amend0004_-_PPIs.pdf PDF
Amend0004_-_map.pdf PDF
Amend0004_18-8715.pdf PDF
Amend_0003_18-8715.pdf PDF
Amend0002_18-8715.pdf PDF
Amend0002_-_sample_ltr.pdf PDF
Amend0002_-_PPIs.pdf PDF
Amend_0001_18-8715.pdf PDF
N4008518R8715_RFP.pdf PDF
Attachments.zip ZIP file
180615_Vol_II_Specifications.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK ORDER NO.

At the

PREPARED BY:

Architectural: Mechanical:

Civil: Electrical:

Structural:

APPROVED BY:

Specifications:

For Commander, NAVFAC:

Date:

Submitted By: Date:

UNCLASSIFIED/FOR OFFICIAL USE ONLY

Help Note All fields can be edited. If you have trouble selecting a field, either use the tab key or click "highlight fields" in Acrobat 7. Fields that are not needed can be selected and deleted. Tool tips with "additional field" can be deleted or changed. The contract number can also be deleted or changed.

cwheeler Image

Medical Homeport Renovation, Building 449 N40085-18-R-8715

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00.00 20 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT

MANAGEMENT SYSTEM

01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 20 QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT

INFORMATION (eOMSI)

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 42 51 CARPET REMOVAL AND RECLAMATION

02 82 16.00 22 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS

02 82 33.13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DIVISION 03 - CONCRETE

03 01 00 REHABILITATION OF CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 54 16 HYDRAULIC CEMENT UNDERLAYMENT

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 43 00 CHANNEL STRUT FRAMING SYSTEM

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

PROJECT TABLE OF CONTENTS Page 1

06 06 60 TRANSLUCENT RESIN PANEL SYSTEM

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING

07 60 00 FLASHING AND SHEET METAL

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 33 13 COILING COUNTER DOORS

08 34 59 VAULT DOORS AND DAY GATES

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 87 00 WINDOW FILM

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 54 26 LINEAR WOOD CEILINGS AND WALLS

09 65 00 RESILIENT FLOORING

09 66 16 TERRAZZO FLOOR TILE

09 68 00 CARPETING

09 72 00 WALLCOVERINGS

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 21 23.16 CUBICLE TRACK AND HARDWARE

10 22 19 DEMOUNTABLE AND MOVABLE PARTITIONS

10 28 13 MISCELLANEOUS WALL-MOUNTED AND TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 11 - EQUIPMENT

11 70 00 GENERAL REQUIREMENTS FOR MEDICAL EQUIPMENT

11 72 13 MEDICAL EQUIPMENT, MISCELLANEOUS

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 35 70 HEALTHCARE CASEWORK

12 48 13 ENTRANCE FLOOR GRID AND FRAMES

PROJECT TABLE OF CONTENTS Page 2

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 70 PLUMBING, HEALTHCARE FACILITIES

22 05 48.00 20 MECHANICAL SOUND AND VIBRATION CONTROL

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 01 30.41 HVAC SYSTEM CLEANING

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 22 26.00 20 STEAM SYSTEM AND TERMINAL UNITS

23 64 26 CHILLED WATER PIPING SYSTEMS

23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 50 00.00 20 CYBERSECURITY OF FACILITY-RELATED CONTROL SYSTEMS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 51 00 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS

27 52 24 NURSE CALL SYSTEM

27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

DRAWING NUMBER TITLE

GENERAL

12770722 1 GI001 TITLE SHEET

12770723 2 GI002 INDEX OF DRAWINGS

12770724 3 GI003 LIFE SAFETY & CODE INFORMATION

12770725 4 GI101 FIRST FLOOR COMPOSITE LIFE SAFETY PLAN

12770726 5 GI110 BASEMENT PHASING PLAN

12770727 6 GI111 FIRST FLOOR PHASING PLAN - EXISTING

12770728 7 GI112 FIRST FLOOR PHASING PLAN - NEW

HAZARDOUS MATERIALS

12770729 8 HM001 COMPOSITE FIRST FLOOR HAZARDOUS MATERIALS REMOVAL

PLAN

STRUCTURAL

12770730 9 S-001 STRUCTURAL GENERAL NOTES AND ABBREVIATIONS

12770731 10 S-002 STRUCTURAL GENERAL NOTES

12770732 11 SF101 TYPICAL FRAMING DETAILS

12770733 12 SF102 TYPICAL FRAMING DETAILS

ARCHITECTURAL

12770734 13 A-001 ARCHITECTURAL LEGENDS, NOTES & ABBREVIATIONS

12770735 14 AD100D BASEMENT DEMOLITION PLAN - AREA 'D'

12770736 15 AD100E BASEMENT DEMOLITION PLAN - AREA 'E'

12770737 16 AD100F BASEMENT DEMOLITION PLAN - AREA 'F'

12770738 17 AD101A FIRST FLOOR DEMOLITION PLAN - AREA 'A'

12770739 18 AD101B FIRST FLOOR DEMOLITION PLAN - AREA 'B'

12770740 19 AD101C FIRST FLOOR DEMOLITION PLAN - AREA 'C'

12770741 20 AD101D FIRST FLOOR DEMOLITION PLAN - AREA 'D'

12770742 21 AD101E FIRST FLOOR DEMOLITION PLAN - AREA 'E'

12770743 22 AD101F FIRST FLOOR DEMOLITION PLAN - AREA 'F'

12770744 23 AD111A FIRST FLOOR SLAB DEMOLITION PLAN - AREA 'A'

12770745 24 AD111B FIRST FLOOR SLAB DEMOLITION PLAN - AREA 'B'

12770746 25 AD111C FIRST FLOOR SLAB DEMOLITION PLAN - AREA 'C'

12770747 26 AD111D FIRST FLOOR SLAB DEMOLITION PLAN - AREA 'D'

12770748 27 AD111E FIRST FLOOR SLAB DEMOLITION PLAN - AREA 'E'

12770749 28 AD111F FIRST FLOOR SLAB DEMOLITION PLAN - AREA 'F'

12770750 29 AD901 DEMOLITION PHOTOS

12770751 30 AE100D BASEMENT PLAN - AREA 'D'

12770752 31 AE100E BASEMENT PLAN - AREA 'E'

DOCUMENT 00 01 15 Page 1

12770753 32 AE100F BASEMENT PLAN - AREA 'F'

12770754 33 AE101 COMPOSITE FIRST FLOOR PLAN

12770755 34 AE101A FIRST FLOOR PLAN - AREA 'A'

12770756 35 AE101B FIRST FLOOR PLAN - AREA 'B'

12770757 36 AE101C FIRST FLOOR PLAN - AREA 'C'

12770758 37 AE101D FIRST FLOOR PLAN - AREA 'D'

12770759 38 AE101E FIRST FLOOR PLAN - AREA 'E'

12770760 39 AE101F FIRST FLOOR PLAN - AREA 'F'

12770761 40 AE102 COMPOSITE ROOF PLAN

12770762 41 AE111 COMPOSITE FIRST FLOOR REFLECTED CEILING PLAN

12770763 42 AE111A FIRST FLOOR REFLECTED CEILING PLAN - AREA 'A'

12770764 43 AE111B FIRST FLOOR REFLECTED CEILING PLAN - AREA 'B'

12770765 44 AE111C FIRST FLOOR REFLECTED CEILING PLAN - AREA 'C'

12770766 45 AE111D FIRST FLOOR REFLECTED CEILING PLAN - AREA 'D'

12770767 46 AE111E FIRST FLOOR REFLECTED CEILING PLAN - AREA 'E'

12770768 47 AE111F FIRST FLOOR REFLECTED CEILING PLAN - AREA 'F'

12770769 48 AE401 ENLARGED PLANS

12770770 49 AE402 ENLARGED PLANS

12770771 50 AE403 ENLARGED ROOF PLANS

12770772 51 AE404 ENLARGED ROOF PLANS & DETAILS

12770773 52 AE501 PARTITION TYPES

12770774 53 AE502 DETAILS

12770775 54 AE503 CEILING DETAILS

12770776 55 AE601 DOOR SCHEDULE

12770777 56 AE602 DOOR SCHEDULE

12770778 57 AE701 WINDOW ELEVATIONS & DETAILS

12770779 58 AE801 LOBBY DETAILS

12770780 59 AE802 SHARED WAITING DETAILS

12770781 60 AE803 PHARMACY WINDOW DETAILS

12770782 61 AE804 UNDERSEA MED & REFERRAL MGMT RECEPTION DETAILS

12770783 62 AE805 IMR, LAB & PHYSICAL THERAPY RECEPTION DETAILS

12770784 63 AE806 INFORMATION & CHECK-IN DESK DETAILS

12770785 64 AE807 HOMEPORT RECEPTION DETAILS

12770786 65 AE808 INTERIOR ELEVATIONS

12770787 66 AE809 MILLWORK SECTIONS & DETAILS

INTERIORS

12770788 67 AF101 FINISH & SIGNAGE PLAN - AREA 'A1'

12770789 68 AF102 FINISH & SIGNAGE PLAN - AREA 'A2'

12770790 69 AF103 FINISH & SIGNAGE PLAN - AREA 'B1'

12770791 70 AF104 FINISH & SIGNAGE PLAN - AREA 'B2'

12770792 71 AF105 FINISH & SIGNAGE PLAN - AREA 'C1'

12770793 72 AF106 FINISH & SIGNAGE PLAN - AREA 'C2'

12770794 73 AF107 FINISH & SIGNAGE PLAN - AREA 'D1'

12770795 74 AF108 FINISH & SIGNAGE PLAN - AREA 'D2'

12770796 75 AF109 FINISH & SIGNAGE PLAN - AREA 'E1'

12770797 76 AF110 FINISH & SIGNAGE PLAN - AREA 'E2'

12770798 77 AF111 FINISH & SIGNAGE PLAN - AREA 'F1'

12770799 78 AF112 FINISH & SIGNAGE PLAN - AREA 'F2'

12770800 79 AF601 FINISH SCHEDULE

12770801 80 AF602 FINISH SCHEDULE

12770802 81 AG601 SIGNAGE DETAILS

12770803 82 AG602 SIGNAGE DETAILS

12770804 83 IF100 FURNITURE LEGEND

12770805 84 IF101 FURNITURE PLAN - AREA 'A1'

12770806 85 IF102 FURNITURE PLAN - AREA 'A2'

12770807 86 IF103 FURNITURE PLAN - AREA 'B1'

12770808 87 IF104 FURNITURE PLAN - AREA 'B2'

12770809 88 IF105 FURNITURE PLAN - AREA 'C1'

DOCUMENT 00 01 15 Page 2

12770810 89 IF106 FURNITURE PLAN - AREA 'C2'

12770811 90 IF107 FURNITURE PLAN - AREA 'D1'

12770812 91 IF108 FURNITURE PLAN - AREA 'D2'

12770813 92 IF109 FURNITURE PLAN - AREA 'E1'

12770814 93 IF110 FURNITURE PLAN - AREA 'E2'

12770815 94 IF111 FURNITURE PLAN - AREA 'F1'

12770816 95 IF112 FURNITURE PLAN - AREA 'F2'

MEDICAL EQUIPMENT

12770817 96 EQ100 MEDICAL EQUIPMENT SCHEDULE

12770818 97 EQ101 EQUIPMENT PLAN - AREA 'A1'

12770819 98 EQ102 EQUIPMENT PLAN - AREA 'A2'

12770820 99 EQ103 EQUIPMENT PLAN - AREA 'B1'

12770821 100 EQ104 EQUIPMENT PLAN - AREA 'B2'

12770822 101 EQ105 EQUIPMENT PLAN - AREA 'C1'

12770823 102 EQ106 EQUIPMENT PLAN - AREA 'C2'

12770824 103 EQ107 EQUIPMENT PLAN - AREA 'D1'

12770825 104 EQ108 EQUIPMENT PLAN - AREA 'D2'

12770826 105 EQ109 EQUIPMENT PLAN - AREA 'E1'

12770827 106 EQ110 EQUIPMENT PLAN - AREA 'E2'

12770828 107 EQ111 EQUIPMENT PLAN - AREA 'F1'

12770829 108 EQ112 EQUIPMENT PLAN - AREA 'F2'

FIRE PROTECTION

12770830 109 F-001 FIRE PROTECTION LEGEND

12770831 110 F-002 FIRE ALARM LEGEND & DETAILS

12770832 111 FD101A FIRST FLOOR DEMOLITION PLAN - AREA 'A'

12770833 112 FD101B FIRST FLOOR DEMOLITION PLAN - AREA 'B'

12770834 113 FD101C FIRST FLOOR DEMOLITION PLAN - AREA 'C'

12770835 114 FD101D FIRST FLOOR DEMOLITION PLAN - AREA 'D'

12770836 115 FD101E FIRST FLOOR DEMOLITION PLAN - AREA 'E'

12770837 116 FD101F FIRST FLOOR DEMOLITION PLAN - AREA 'F'

12770838 117 FP101A FIRST FLOOR PLAN - AREA 'A'

12770839 118 FP101B FIRST FLOOR PLAN - AREA 'B'

12770840 119 FP101C FIRST FLOOR PLAN - AREA 'C'

12770841 120 FP101D FIRST FLOOR PLAN - AREA 'D'

12770842 121 FP101E FIRST FLOOR PLAN - AREA 'E'

12770843 122 FP101F FIRST FLOOR PLAN - AREA 'F'

PLUMBING

12770844 123 P-001 PLUMBING LEGEND

12770845 124 PD100A FOUNDATION DEMOLITION PLAN - AREA 'A'

12770846 125 PD100B FOUNDATION DEMOLITION PLAN - AREA 'B'

12770847 126 PD100C FOUNDATION DEMOLITION PLAN - AREA 'C'

12770848 127 PD100D BASEMENT DEMOLITION PLAN – AREA ‘D’

12770849 128 PD100E BASEMENT DEMOLITION PLAN – AREA ‘E’

12770850 129 PD100F BASEMENT DEMOLITION PLAN – AREA 'F'

12770851 130 PD101A FIRST FLOOR DEMOLITION PLAN – AREA ‘A’

12770852 131 PD101B FIRST FLOOR DEMOLITION PLAN – AREA ‘B’

12770853 132 PD101C FIRST FLOOR DEMOLITION PLAN – AREA ‘C’

12770854 133 PD101D FIRST FLOOR DEMOLITION PLAN – AREA ‘D’

12770855 134 PD101E FIRST FLOOR DEMOLITION PLAN – AREA ‘E’

12770856 135 PD101F FIRST FLOOR DEMOLITION PLAN – AREA ‘F’

12770857 136 PF100A FOUNDATION PLAN – AREA ‘A’

12770858 137 PF100B FOUNDATION PLAN – AREA ‘B’

12770859 138 PF100C FOUNDATION PLAN – AREA ‘C’

12770860 139 PL100D BASEMENT PLAN – AREA ‘D’

12770861 140 PL100E BASEMENT PLAN – AREA ‘E’

12770862 141 PL100F BASEMENT PLAN – AREA ‘F’

DOCUMENT 00 01 15 Page 3

12770863 142 PL101A FIRST FLOOR PLAN – AREA ‘A’

12770864 143 PL101B FIRST FLOOR PLAN – AREA ‘B’

12770865 144 PL101C FIRST FLOOR PLAN – AREA ‘C’

12770866 145 PL101D FIRST FLOOR PLAN – AREA ‘D’

12770867 146 PL101E FIRST FLOOR PLAN – AREA ‘E’

12770868 147 PL101F FIRST FLOOR PLAN – AREA ‘F’

12770869 148 P-501 DETAILS

12770870 149 P-701 PIPING DIAGRAMS

MECHANICAL

12770871 150 M-001 LEGEND AND NOTES

12770872 151 M-002 PHASING PLANS & NOTES

12770873 152 M-003 PHASING PLANS & NOTES

12770874 153 MD100D BASEMENT DEMOLITION PLAN - AREA 'D'

12770875 154 MD100E BASEMENT DEMOLITION PLAN - AREA 'E'

12770876 155 MD100F BASEMENT DEMOLITION PLAN - AREA 'F'

12770877 156 MD101A FIRST FLOOR DEMOLITION PLAN - AREA 'A'

12770878 157 MD101B FIRST FLOOR DEMOLITION PLAN - AREA 'B'

12770879 158 MD101C FIRST FLOOR DEMOLITION PLAN - AREA 'C'

12770880 159 MD101D FIRST FLOOR DEMOLITION PLAN - AREA 'D'

12770881 160 MD101E FIRST FLOOR DEMOLITION PLAN - AREA 'E'

12770882 161 MD101F FIRST FLOOR DEMOLITION PLAN - AREA 'F'

12770883 162 MD102D SECOND FLOOR DEMOLITION PLAN - AREA 'D'

12770884 163 MD103 ROOF DEMOLITION PLAN

12770885 164 MD401 ENLARGED DEMOLITION PLAN

12770886 165 MD402 ENLARGED DEMOLITION PLANS

12770887 166 MD403 ENLARGED DEMOLITION PLANS

12770888 167 MD404 ENLARGED DEMOLITION PLANS

12770889 168 MH100D BASEMENT DUCT PLAN - AREA 'D'

12770890 169 MH100F BASEMENT DUCT PLAN - AREA 'F'

12770891 170 MH101A FIRST FLOOR DUCT PLAN - AREA 'A'

12770892 171 MH101B FIRST FLOOR DUCT PLAN - AREA 'B'

12770893 172 MH101C FIRST FLOOR DUCT PLAN - AREA 'C'

12770894 173 MH101D FIRST FLOOR DUCT PLAN - AREA 'D'

12770895 174 MH101E FIRST FLOOR DUCT PLAN - AREA 'E'

12770896 175 MH101F FIRST FLOOR DUCT PLAN - AREA 'F'

12770897 176 MH102D SECOND FLOOR DUCT PLAN - AREA 'D'

12770898 177 MH103 ROOF PLAN

12770899 178 MP100D BASEMENT PIPING PLAN - AREA 'D'

12770900 179 MP100F BASEMENT PIPING PLAN - AREA 'F'

12770901 180 MP101A FIRST FLOOR PIPING PLAN - AREA 'A'

12770902 181 MP101B FIRST FLOOR PIPING PLAN - AREA 'B'

12770903 182 MP101C FIRST FLOOR PIPING PLAN - AREA 'C'

12770904 183 MP101D FIRST FLOOR PIPING PLAN - AREA 'D'

12770905 184 MP101E FIRST FLOOR PIPING PLAN - AREA 'E'

12770906 185 MP101F FIRST FLOOR PIPING PLAN - AREA 'F'

12770907 186 M-401 ENLARGED PLAN

12770908 187 M-402 ENLARGED PLANS

12770909 188 M-403 ENLARGED PLANS

12770910 189 M-404 ENLARGED PLANS

12770911 190 M-501 DETAILS

12770912 191 M-502 DETAILS

12770913 192 M-503 DETAILS

12770914 193 M-504 DETAILS

12770915 194 M-601 SCHEDULES

12770916 195 M-602 SCHEDULES

12770917 196 M-603 SCHEDULES

12770918 197 M-701 PIPING FLOW DIAGRAM

12770919 198 M-702 PIPING FLOW DIAGRAMS

DOCUMENT 00 01 15 Page 4

12770920 199 M-703 PIPING FLOW DIAGRAMS

12770921 200 MI801 DDC CONTROLS

12770922 201 MI802 DDC CONTROLS

12770923 202 MI803 DDC CONTROLS

12770924 203 MI804 DDC CONTROLS

ELECTRICAL

12770925 204 E-001 ELECTRICAL LEGEND

12770926 205 E-002 SCHEDULES AND NOTES

12770927 206 ED101A FIRST FLOOR DEMOLITION PLAN - AREA 'A'

12770928 207 ED101B FIRST FLOOR DEMOLITION PLAN - AREA 'B'

12770929 208 ED101C FIRST FLOOR DEMOLITION PLAN - AREA 'C'

12770930 209 ED101D FIRST FLOOR DEMOLITION PLAN - AREA 'D'

12770931 210 ED101E FIRST FLOOR DEMOLITION PLAN - AREA 'E'

12770932 211 ED101F FIRST FLOOR DEMOLITION PLAN - AREA 'F'

12770933 212 ED103 ROOF PLAN - DEMOLITION

12770934 213 ED401 ENLARGED PLANS - DEMOLITION

12770935 214 ED402 ENLARGED PLANS - DEMOLITION

12770936 215 ED701 DEMOLITION POWER RISER DIGAGRAM

12770937 216 ED702 DEMOLITION POWER RISER DIAGRAM

12770938 217 EL101A FIRST FLOOR LIGHTING PLAN - AREA 'A'

12770939 218 EL101B FIRST FLOOR LIGHTING PLAN - AREA 'B'

12770940 219 EL101C FIRST FLOOR LIGHTING PLAN - AREA 'C'

12770941 220 EL101D FIRST FLOOR LIGHTING PLAN - AREA 'D'

12770942 221 EL101E FIRST FLOOR LIGHTING PLAN - AREA 'E'

12770943 222 EL101F FIRST FLOOR LIGHTING PLAN - AREA 'F'

12770944 223 EL501 LIGHTING FIXTURE DETAILS

12770945 224 EL502 LIGHTING FIXTURE DETAILS

12770946 225 EL601 LIGHTING FIXTURE SCHEDULE

12770947 226 EP100 OVERAL BASEMENT POWER PLAN

12770948 227 EP101A FIRST FLOOR POWER PLAN - AREA 'A'

12770949 228 EP101B FIRST FLOOR POWER PLAN - AREA 'B'

12770950 229 EP101C FIRST FLOOR POWER PLAN - AREA 'C'

12770951 230 EP101D FIRST FLOOR POWER PLAN - AREA 'D'

12770952 231 EP101E FIRST FLOOR POWER PLAN - AREA 'E'

12770953 232 EP101F FIRST FLOOR POWER PLAN - AREA 'F'

12770954 233 EP103 ROOF POWER PLAN

12770955 234 EP401 ENLARGED POWER PLANS

12770956 235 EP402 ENLARGED POWER PLANS

12770957 236 EP403 ENLARGED POWER PLANS

12770958 237 EP501 POWER DETAILS

12770959 238 EP601 PANELBOARD SCHEDULES

12770960 239 EP602 PANELBOARD SCHEDULES

12770961 240 EP603 PANELBOARD SCHEDULES

12770962 241 EP604 PANELBOARD SCHEDULES

12770963 242 EP605 PANELBOARD SCHEDULES

12770964 243 EP606 EQUIPMENT SCHEDULES

12770965 244 EP701 POWER RISER DIAGRAM

12770966 245 EP702 POWER RISER DIAGRAM

12770967 246 ET001 TELECOMMUNICATIONS LEGEND

12770968 247 ET002 TELECOMMUNCIATIONS NOTES

12770969 248 ET101A FIRST FLOOR COMMUNICATIONS PLAN - AREA 'A'

12770970 249 ET101B FIRST FLOOR COMMUNICATIONS PLAN - AREA 'B'

12770971 250 ET101C FIRST FLOOR COMMUNICATIONS PLAN - AREA 'C'

12770972 251 ET101D FIRST FLOOR COMMUNICATIONS PLAN - AREA 'D'

12770973 252 ET101E FIRST FLOOR COMMUNICATIONS PLAN - AREA 'E'

12770974 253 ET101F FIRST FLOOR COMMUNICATIONS PLAN - AREA 'F'

12770975 254 ET401 ENLARGED COMMUNICATIONS PLANS

12770977 255 ET501 COMMUNICATIONS DETAILS

DOCUMENT 00 01 15 Page 5

12770977 256 ET502 COMMUNICATIONS DETAILS

12770978 257 ET503 COMMUNICATIONS DETAILS

12770979 258 ET504 COMMUNICATIONS DETAILS

12770980 259 ET700 DEMOLITION TELECOM RISER DIAGRAMS

12770981 260 ET701 TELECOM RISERS

12770982 261 ET702 TELECOM RISERS

-- End of Document --

DOCUMENT 00 01 15 Page 6

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Welding Permits Salvage Plan; G

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes The project includes, but is not limited to, correcting existing deficiencies and partially renovating approximately 56,128 SF of the existing 153,320 SF five-level facility. The scope of work includes removal of hazardous materials, demolition, new flooring, ceilings, finishes, casework, fire protection, security requirements, FFE and Medical equipment, electrical systems, plumbing and mechanical systems.

Selective demolition will occur as necessary in renovated areas and will include removal and disposal of hazardous materials. Conceptually phasing will occur in multiple phases with sub-phases as indicated to support operations and departments that will be renovated in place. This project will renovate the clinic to align with the Medical Homeport model at the Naval Branch Health Clinic in Groton, CT and incidental related work.

1.2.2 Location

The work is located at the Naval Branch Health Clinic, Groton, CT, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.3 OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.4 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

SECTION 01 11 00 Page 1

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.5 ON-SITE PERMITS

1.5.1 Welding Permits

ACTIVITY SUBMISSION DATE

Welding Permits 10 calendar days prior to work

Post permits at a conspicuous location in the construction area.

Welding permits shall be issued by the Base Fire Inspector. Request for permits shall be sent via e-mail to andrew.willey@navy.mil.

Burning of trash or rubbish is not permitted at on project site.

1.6 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within 2 miles of the construction site.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 2

SECTION 01 14 00

WORK RESTRICTIONS

11/11

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel; G

Personnel List; G

1.2 SPECIAL SCHEDULING REQUIREMENTS

a. The medical clinic will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

b. Permission to interrupt any Activity roads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

c. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations. This includes scheduling time for Government required inspections, reviews, and approvals.

The following conditions apply:

(1) This construction project consists of four phases as indicated.

Each phase must be completed and ready for owner move-in prior to commencement of the subsequent phase.

(2) At the completion of each phase and prior to commencement of the subsequent phase contractor shall allow thirty days for the owner to remove and relocate equipment such that work on the subsequent phase can begin.

1.3 DETAILED CONSTRUCTION SEQUENCING PLAN

Contractor shall provide to the Contracting Officer a Detailed Construction Sequencing Plan, showing phases and sub-phases, within 30 days after contract award identifying all construction activities (including coordination activities with the Government). Government approval of the plan shall be obtained prior to the start of any demolition or

SECTION 01 14 00 Page 1 construction activities.

1.4 CONTRACTOR ACCESS AND USE OF PREMISES

1.4.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.4.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.4.1.2 Installation Access

Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html . No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is mandatory for Contractor personnel One-Day Passes may be obtained for deliveries at the Pass and ID office (Building

500) to access an installation.

1.4.1.2.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html . Procedure includes:

a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Pass and ID office (Building 500) representative.

b. Present valid identification, Real ID Act-compliant state driver's license. In addition a US passsport or a social security card and birth certificate must be provided.

c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html .

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

SECTION 01 14 00 Page 2

1.4.1.2.2 DBIDS Eligibility Requirements

Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.

The Government is the final authority.

1.4.1.2.3 DBIDS Notification Requirements

a. Immediately report instances of lost or stolen badges to the Contracting Officer.

b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

1.4.1.2.4 One-Day Passes

Personnel applying for One-Day passes at the Pass and ID office (Building

500) are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.4.1.3 No Smoking Policy

Smoking and the use of any tobacco products are prohibited within and outside of all buildings on installation. This applies to existing buildings, buildings under construction and buildings under renovation.

1.4.2 Working Hours

Regular working hours must consist of an 8 1/2 hour period established by the Contracting Officer, between 7 a.m. and 6 p.m., Monday through Friday, and 8 a.m. to 12 p.m. on Saturday, excluding Government holidays.

1.4.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after

SECTION 01 14 00 Page 3 normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.4.4 Occupied and Existing Building

The Contractor shall be working in an existing building which is occupied.

Do not enter the building without prior approval of the Contracting Officer.

The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the medical clinic during the construction period.

When working in occupied spaces relocate movable furniture approximately as required to perform the work, protect the furniture, and replace the furniture in its original location upon completion of the work. Leave attached equipment in place, and protect it against damage, or temporarily disconnect, relocate, protect, and reinstall it at the completion of the work.

The Government will remove and relocate other Government property in the areas of the building scheduled to receive work.

1.4.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air, are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.

1.5 NOISE REDUCTION

The Contractor shall minimize noise from construction activities using every action possible and shall coordinate the performance of any significant noise generating construction activities with the Contracting Officer. The Contractor shall incorporate the necessary means and methods, including but not limited to, working during off peak hours (as approved by the Contracting Officer) and the installation of acoustical barriers, as required to minimize the generated noise which may result in disruptions to ongoing Clinic operations.

1.6 SECURITY REQUIREMENTS

Contract Clause "FAR 52.204-2, Security Requirements and Alternate II," "FAC 5252.236-9301, Special Working Conditions and Entry to Work Area," and the following apply:

Access to certain areas will require escorts including MID (Material

SECTION 01 14 00 Page 4

Information Division) and all communication rooms. Where access to the Pharmacy, Pathology/Lab, and Medical Records is required. Medical Clinic will provide escorts upon written notification to the Contracting Officer 24 hours in advance.

1.6.1 Photographs

The taking of photographs exterior to the medical clinic is strictly prohibited. When operationally required for construction documentation photographs may be within the boundaries of construction areas.

1.6.2 Personnel List

1.6.2.1 Citizenship Requirements

Aliens are not allowed on the project site. Work under this contract is restricted to U.S. citizens.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 14 00 Page 5

SECTION 01 20 00.00 20

PRICE AND PAYMENT PROCEDURES

11/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP-1110-1-8 (2009) Construction Equipment Ownership and Operating Expense Schedule

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Earned Value Report; G

1.3 EARNED VALUE REPORT

1.3.1 Data Required

This contract requires the use of a cost-loaded Network Analysis Schedule (NAS). The information required for the Schedule of Prices will be entered as an integral part of the Network Analysis Schedule. Within 15 calendar days of notice of award, prepare and deliver to the Contracting Officer an Earned Value Report (construction contract) as directed by the Contracting Officer. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices. Costs shall be summarized and totals provided for each construction category.

1.3.2 Schedule Instructions

Payments will not be made until the Earned Value Report from the cost-loaded NAS has been submitted to and accepted by the Contracting Officer. Identify the cost for site work, and include incidental work to the 5 ft line. Identify costs for the building(s), and include work out to the 5 ft line. Work out to the 5 ft line shall include construction encompassed within a theoretical line 5 ft from the face of exterior walls and shall include attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 ft line.

SECTION 01 20 00.00 20 Page 1

1.3.3 Real Property Assets

The Government will provide the Draft DD Form 1354, Transfer and Acceptance of Military Real Property filled in with the appropriate Real Property Unique Identifiers (RPUID) and related construction Category Codes to summarize the designed real property assets that apply to this contract. The Contractor shall meet with the Contracting Officer and the Real Property Accounting Officer during the Pre Construction Meeting and the Project Closeout Meetings to modify and include any necessary changes to the DD Form 1354. The Contractor shall provide the Interim DD Form 1354 that uses the appropriate division of the RPUIDs/ Category Codes to represent the final constructed facility and include all associated cost.

Coordinate the Contractor's Price and Payment structure with the structure of the RPUIDs/ Category Codes.

Divide detailed asset breakdown into the RPUIDs and related construction Category Codes and populate associated costs which represent all aspects of the work. Where assets diverge into multiple RPUID/ Category Codes, divide the asset and provide the proportion of the assets in each RPUID/ Category Code. Assets and related RPUID/ Category Codes may be modified by the Contracting Officer as necessary during course of the work.

Coordinate identification and proportion of these assets with the Government Real Property Accounting Officer.

Cost data accumulated under this section are required in the preparation of DD Form 1354.

1.3.4 Schedule Requirements for HVAC TAB

The field work Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC shall be broken down in the Earned Value Report from the cost-loaded NAS by separate line items which reflect measurable deliverables. Specific payment percentages for each line item shall be determined on a case by case basis for each contract. The line items shall be as follows:

a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. The resulting findings shall be submitted to the Government to allow correction of the design. The progress payment shall be issued after review and approval of the report.

b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report shall contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results and a quality control checklist of work items that must be completed before TABS field work commences.

c. Season I field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational data shall be collected for one seasonal condition (either summer or winter depending on project timing).

d. Approval of Season I report: On completion of the Season I field work, the data is compiled into a report and submitted to the

SECTION 01 20 00.00 20 Page 2

Government. The report is reviewed, and approved, after ensuring compliance with the pre-field engineering report scope of work.

e. Completion of Season I field QA check: Contract QC and Government representatives meet the TABS Agency at the jobsite to retest portions of the systems reported in the Season I report. The purpose of these tests are to validate the accuracy and completeness of the previously submitted Season I report.

f. Approval of Season II report: The TABS Agency completes all Season II field work, which is normally comprised mainly of taking heat transfer temperature readings, in the season opposite of that under which Season I performance data was compiled. This data shall be compiled into a report and submitted to the Government. On completion of submittal review to ensure compliance with the pre-field engineering report scope, progress payment is issued. Progress payment is less than that issued for the Season I report since most of the water and air balancing work effort is completed under Season I.

1.4 CONTRACT MODIFICATIONS

In conjunction with the Contract Clause "DFARS 252.236-7000, Modification Proposals-Price Breakdown," and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, equipment use rates shall be based upon the applicable provisions of the EP-1110-1-8 .

1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT

1.5.1 Content of Invoice

Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27, Prompt Payment Construction Contracts and FAR 52.232-5, Payments Under Fixed-Price Construction Contracts. The requests for payment shall include the documents listed below.

a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 shall include certification by Contractor and Quality Control (QC) Manager.

b. The Earned Value Report from the cost-loaded NAS, showing in detail:

the estimated cost, percentage of completion, and value of completed performance for each of the construction categories stated in this contract. Use NAVFAC Form 43300/54 on NAVFAC contracts when a Monthly Estimate for Voucher is required.

c. Updated Project Schedule and reports required by the contract.

d. Contractor Safety Self Evaluation Checklist.

e. Other supporting documents as requested.

f. Updated copy of submittal register.

g. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies.

h. Contractor's Monthly Estimate for Voucher and Conractors Certification

SECTION 01 20 00.00 20 Page 3

(NAVFAC Form 4330/54) with Subcontractor and supplier payment certification.

i. Materials on Site.

1.5.2 Submission of Invoices

If DFARS Clause 5252.232-7006 is included in the contract, provide the documents listed in paragraph CONTENT OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.

Monthly invoices and supporting forms for work performed through the anniversary award date of the contract shall be submitted to the Contracting Officer within 5 calendar days of the date of invoice. For example, contract award date is the 7th of the month, the date of each monthly invoice shall be the 7th and the invoice shall be submitted by the 12th of the month.

1.5.3 Final Invoice

a. A final invoice shall be accompanied by the certification required by DFARS 252.247.7023 TRANSPORTATION OF SUPPLIES BY SEA, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release shall contain the corporate seal. An officer of the corporation shall sign and the corporate secretary shall certify the Final Release.

b. For final invoices being submitted via WAWF, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor shall then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.

c. Final invoices shll be accompanied by electronic files of Record Drawings in accordance with Section 01 78 00 CLOSEOUT SUBMITTALS.

d. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.

1.6 PAYMENTS TO THE CONTRACTOR

Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.

1.6.1 Obligation of Government Payments

The obligation of the Government to make payments required under the provisions of this contract will, at the discretion of the Contracting Officer, be subject to reductions and suspensions permitted under the FAR

SECTION 01 20 00.00 20 Page 4 and agency regulations including the following in accordance with FAR 32.503-6:

a. Reasonable deductions due to defects in material or workmanship;

b. Claims which the Government may have against the Contractor under or in connection with this contract;

c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and

d. Failure to provide up to date record drawings not current as stated in Contract Clause "FAC 5252.236-9310, Record Drawings."

1.6.2 Payment for Onsite and Offsite Materials

Progress payments may be made to the contractor for materials delivered on the site, for materials stored off construction sites, or materials that are in transit to the construction sites under the following conditions:

a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.

b. Materials delivered on the site but not installed, including completed preparatory work, and off-site materials to be considered for progress payment shall be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage in storage or in transit to the construction site. Examples of materials acceptable for payment consideration include, but are not limited to, structural steel, non-magnetic steel, non-magnetic aggregate, equipment, machinery, large pipe and fittings,precast/prestressed concrete products, plastic lumber (e.g., fender piles/curbs), and high-voltage electrical cable. Materials not acceptable for payment include consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings.

c. Materials to be considered for progress payment prior to installation shall be specifically and separately identified in the Contractor's estimates of work submitted for the Contracting Officer's approval in accordance with Earned Value Report requirement of this contract.

Requests for progress payment consideration for such items shall be supported by documents establishing their value and that the title requirements of the clause at FAR 52.232-5 have been met.

d. Materials are adequately insured and protected from theft and exposure.

e. Provide a written consent from the surety company with each payment request for offsite materials.

f. Materials to be considered for progress payments prior to installation shall be stored either in Hawaii, Guam, Puerto Rico, or the Continental United States. Other locations are subject to written approval by the Contracting Officer.

SECTION 01 20 00.00 20 Page 5

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 20 00.00 20 Page 6

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

08/15

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

View Location Map; G

Progress and Completion Pictures; G

1.3 VIEW LOCATION MAP

Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.

1.4 PROGRESS AND COMPLETION PICTURES

Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color minimum resolution in JPEG file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten views from points located by the Contracting Officer. Submit with the monthly invoice two sets of digital photographs, each set on a separate compact disc (CD) or data versatile disc (DVD), cumulative of all photos to date. Indicate photographs demonstrating environmental procedures. Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch on the CD or DVD as a digital file. Include a date designator in file names. Cross reference submittals in the appropriate daily report. Photographs provided are for unrestricted use by the Government.

SECTION 01 30 00 Page 1

1.5 MINIMUM INSURANCE REQUIREMENTS

Provide the minimum insurance coverage required by FAR 28.307-2 LIABILITY, during the entire period of performance under this contract.

Provide other insurance coverage as required by State law.

1.6 SUPERVISION

1.6.1 Minimum Communication Requirements

Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work. In addition, if a Quality Control (QC) representative is required on the contract, then that individual must also have fluent English communication skills.

1.6.2 Superintendent Qualifications

The project superintendent must have a minimum of 10 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.

1.6.2.1 Duties

The project superintendent is primarily responsible for managing and coordinating day-to-day production and schedule adherence on the project.

The superintendent is required to attend NAVFAC Red Zone meetings, partnering meetings, and quality control meetings. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.

1.6.3 Non-Compliance Actions

The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to insure timely completion.

Furthermore, the Contracting Officer may…

This is the start of the file's text. The full file is on GovTribe.