Solicitation_N4008518R1138.pdf

PDF 433 KB Posted

Attached to
RM17-1337 DB RENOVATION OF BLDG X-132 FOR MILITARY SEALIFT COMMAND CONSOLIDATION AT NAVAL
Solicitation number
N4008518R1138
Issued by

View the file

Other files

File Type Posted
Amendment0009_18R1138.pdf PDF
Telecom.pdf PDF
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Telecom.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Site_Visit_Log_X132.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Attachment_B_SECNAV_5512_1_11787.pdf PDF
Attachment_C_-_Construction_Experience_Project_Data_Sheet.docx DOCX document
Attachment_A_-_Pre-Proposal_Inquiry_Form.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN-BUILD - RM17-1337 CONVERT BUILDING X-132 FOR MILITARY SEALIFT COMMAND CONSOLIDATION, NAVAL STATION NORFOLK, VIRGINIA

GARY MILTON 757-341-2074

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

24-Oct-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________1080 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________27 Nov 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

N4008518R1138 56

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N4008518R1138

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

X-132 RENOVATE, CONVERT

FFP

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

FFP

FOB: Destination

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government 0002 N/A N/A N/A Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

Section 00100 - Bidding Schedule/Instructions to Bidders

INSTRUCTIONS TO OFFERORS

TABLE OF CONTENTS

1. GENERAL

1.1 GENERAL OVERVIEW OF PROCUREMENT PROCESS

1.2 GENERAL OVERVIEW OF CONTRACT

2. BASIS FOR AWARD

3. EVALUATION FACTORS FOR AWARD

4. PROPOSAL REQUIREMENTS

4.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT

4.2 PROPOSAL SUBMISSION INSTRUCTIONS

4.3 PRE-PROPOSAL INQUIRIES (PPIs)

4.4 NAVY ELECTRONIC COMMERCE ONLINE (NECO)

5. ATTACHMENTS: Will be located on NECO under additional documents

5.1 PRE-PROPOSAL INQUIRY LOG (ATTACHMENT A)

5.2 SEC-NAV_5512_1_11787- One Day Past Request (ATTACHMENT B)

5.3 CONSTRUCTION EXPERIENCE AND PROJECT DATA SHEET (ATTACHMENT C)

5.4 PAST PERFORMANCE QUESTIONAIRE (ATTACHMENT D)

5.5 SMALL BUSINESS SUBCONTRACTING RECORD (ATTACHMENT E)

5.6 SMALL BUSINESS PARTICIPATION AND COMMITMENT STRATEGY

(ATTACHMENT F)

5.7 SMALL BUSINESS SUBCONTRACTING PLAN (ATTACHMENT G)

1. GENERAL OVERVIEW OF PROCUREMENT PROCESS

1.1.1 This solicitation is being issued as Full and Open Competition

1.1.2 The NAICS code for this procurement is 236220 and the size standard is $36.5M

1.1.3 This acquisition will be advertised utilizing FAR Part 15 – Contracting by Negotiations Resulting in a Firm Fixed Price (FFP) contract for construction services

1.1.4 Magnitude of Construction: Between $25,000,000-$100,000,000

1.1.5 Estimated Cost of Construction is approximately: To be provided in Phase 2

1.2 GENERAL OVERVIEW OF PROCUREMENT PROCESS

1.2.1 RM17-1337 X132: This design-build project will convert, alter, and change use approximately 248,000 square feet of Building X132 to accommodate the consolidation of Military Sealift Command (MSC). Approximately 248,000 square feet will be renovated as part of this project. Portions of the first, second and fifth floor, and all the third and fourth floors layout will be demolished. The altered floor plan will include open office and private office spaces, command suite, classrooms, various size conference and meeting rooms, restrooms, janitor closets, secure enclave, mechanical/electrical/telecommunications rooms, small kitchenettes/break rooms, copy/print areas, high-density file storage rooms, entrance vestibules, and storage rooms.

All occupied spaces will have a minimum sound transmission classification of STC 50. Entire facility will comply with the American Disabilities Act (ADA). Three new stairwells will be constructed and one existing stairwell will be repaired. Code compliant fire alarm/mass notification, standpipe and sprinkler systems will be provided throughout the project scope area. Progressive collaspe retrofits and ATFP upgrades will be provided.

1.2.2 Contractor Performance Information: Contractor’s performance will be evaluated using the respective contractor performance evaluation report entry system located on the wesbite http://www.cpars.gov/.

Prior to commencement of work the contracotr is required to provide the government with the name, phone number and email address of the “Contractor’s Representative” that will be responsible for receipt and review of draft performance evaluations prepared by the government in the appropriate system. It is the contractor’s responsibility to kee this contract information current.

2. BASIS FOR AWARD

2.1 The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the Government, price and other factors considered.

2.2 The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

2.3 The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.

2.4 Factors 1-3 will be evaluated in Phase I and Factors 4-7 will be evaluated in Phase II. Factor 1 will only be rated Acceptable or Unacceptable. If the Government does not elect to conduct discussions during Phase 1 and an Offeror is rated Unacceptable in Factor 1, then that Offeror will not be considered for Phase II. Similarly, if the Government elects to conduct discussions during Phase 1 and an Offeror remains rated as Unacceptable in Factor 1 following discussions, then that Offeror will not be considered for Phase II. In making the best value award decision after Phase II, the government will consider Factors 2-7 and price. The relative order of importance of the non-price evaluation factors is as follows: Factors 2,4,5,6 and 7 are of equal importance to each other; when combined, these factors (2,4,5,6, and 7) are of equal importance to the past performance evaluation/performance confidence assessment factor, Factor 3. When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-cost/price evaluation factors) are approximately equal to price.

2.5. Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions. Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified weakness(es) and the associated risk to successful contract performance resulting from the weakness(es). This assessment must provide the rationale for proceeding to award without discussions.

3.. EVALUATION FACTORS FOR AWARD

1. The solicitation requires the evaluation of price and the following non-cost/price factors:

Phase I Factor 1 – Technical Approach

Factor 2 – Experience Factor 3 – Past Performance

Phase II Factor 4 – Safety Factor 5 – Technical Solution Factor 6 – Energy Design Reduction Factor 7 – Small Business Utilization

The distinction between experience and past performance is that experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

2. Factors 1-3 will be evaluated in Phase I. Factors 4-7 will be evaluated in Phase II. Factor 1 will only be rated Acceptable or Unacceptable. If the Government does not elect to conduct discussions during Phase 1 and an Offeror is rated Unacceptable in Factor 1, then that Offeror will not be considered for Phase II. Similarly, if the Government elects to conduct discussions during Phase 1 and an Offeror remains rated as Unacceptable in Factor 1 following discussions, then that Offeror will not be considered for Phase II. In making the best value award decision after Phase II, the government will consider Factors 2-7 and price. The relative order of importance of the non-cost/price evaluation factors is the technical factors (Factors 2, 4, 5, 6, and 7) are of equal importance to each other and, when combined are equal importance to the past performance evaluation/performance confidence assessment factor (Factor 3). The combined non-cost/price factors are approximately equal to price.

The importance of price will increase if the Offerors’ non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.

3. Basis of Evaluation and Submittal Requirements for Each Factor.

(a) Price:

(1) Solicitation Submittal Requirements:

The offeror shall submit (1) original, marked “Original”, and (1) copy, marked “copy”, in a separate three ring binder (1/2 inch. minimum) with the following:

• Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact, phone number, and email address;

• Completed SF1442 signed with all amendments acknowledged

• Price Proposal Form that includes completion of all contract line item numbers (CLINS);

• Copy of Representation and Certifications and proof of registration in System for Award

Management (SAM);

• Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the

2017 filing cycle;

• Bid Guarantee in accordance with FAR Clause 52.228-1 – Bid Guarantee (amount shall be at least 20 percent of the proposed price, but shall not exceed $3 million);

• Responsibility Determination Information (see below); and

• Small Business Subcontracting Plan Information (see below).

In the event of a discrepancy between the original and copies, the original version of the proposal will govern.

Proposal packages from unsuccessful offeror will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.

The Offeror is required to submit a complete Price Proposal Form that includes completion of all line items

(CLINS).

ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:

RESPONSIBILITY DETERMINATION INFORMATION - In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards. In a separate Tab, the offeror shall provide the following information in the price proposal package:

1. One (1) Signed Bank Reference demonstrating adequate financial resources. If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).

2. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization.

Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.

3. Description of offeror’s facilities and equipment.

4. Other offeror’s work presently under contract.

Although required to be submitted with offeror’s price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm’s responsibility determination should your firm be considered for award. Proposal packages from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.

SMALL BUSINESS SUBCONTRACTING PLAN

(Reference FAR 52.219-9 Alt II and DFARS 252.219-7003)

Large businesses will be required to submit a small business subcontracting plan with their price binder. A small business awardee will be required to submit a subcontracting participation breakdown after award. The awardee’s adherence to stated goals in the subcontracting plan will be evaluated throughout contract performance. Contractors with small business subcontracting plans are required to report subcontracting activities in the Electronic Subcontracting Reporting System (eSRS).

NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging small business subcontracting goals for this acquisition.

Offerors representing as other than small businesses shall establish small business subcontracting plan goals that are consistent with their small business participation and commitment strategies submitted for evaluation under the small business utilization source selection factor in this solicitation and shall document in their subcontracting plans the basis for all proposed goals. Plans shall be submitted with initial offers.

SB 65%

SDB 15%

HUBZone SB 6%

WOSB 15%

SDVOSB 5%

Small businesses identified by name in offerors’ proposals/participation and commitment strategies and considered in the evaluation shall be listed in small business subcontracting plans submitted pursuant to FAR 52.219-9 in order to facilitate compliance with 252.219-7003(e).

See the Small Business Subcontracting Record (Attachment G) for format.

(2) Basis of Evaluation:

The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items (see Section B of the solicitation). The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

(i) Comparison of proposed prices received in response to the RFP.

(ii) Comparison of proposed prices with the IGCE.

(iii) Comparison of proposed prices with available historical information.

(iv) Comparison of market survey results.

(b) Non-cost/price Factors:

Solicitation Submittal Requirements: The offeror shall submit one original, marked “Original”, five copies marked “copy”, each in a separate three-ring binder (1.5 inch. maximum), and one electronic copy on CD with the following characteristics:

• Text pages 8 ½ x 11 format

• Drawings 11x17 inches and folded down to 8-1/2 x 11 inches

• 12 point font, Times New Roman

• One complete electronic copy of the technical proposal factors as a single .pdf searchable file on a CD-

ROM (include with the “Original” technical submission). If there are any conflicts between hard copies and/or electronic copies, the “Original” hard copy will govern.

• Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact, Title, phone number, and email address.

(1) Factor 1 – Technical Approach:

(i) Solicitation Submittal Requirements:

The composition and management of the firms proposed as the design-build (DB) team for this contract will be evaluated in this factor.

The Offeror shall submit the following information:

(1) Provide a narrative describing the proposed primary construction firms and primary design firms for this contract and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). The narrative shall also include a simple organizational chart that clearly identifies the lines of authority between the entities. If the experience of an entity is being claimed in Factor 2, that entity must be named in the above narrative and organizational chart.

The technical approach narrative shall be limited to one (1) double-sided page (or two (2) single-sided pages) including the organizational chart. The information requested in item #2 below is not included in this page limitation.

(2) In addition to the narrative, the Offeror shall submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement, approved mentor protégé agreement (MPA), or letter of commitment for each member of the Offeror’s team identified in the narrative or on the organizational chart (e.g., joint venture partner, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.).

(ii) Basis of Evaluation:

The assessment of the Offeror’s technical approach will be used as a means to evaluate the organizational structure and teaming relationships proposed by the Offeror. This factor will be rated on an Acceptable or Unacceptable basis.

(2) Factor 2 – Experience:

(i) Solicitation Submittal Requirements:

The Offeror shall submit the following information:

(1) Construction Experience:

Submit a minimum of two (2) up to a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. For the purposes of this evaluation, relevant project(s) are further defined as:

Size: Facility of at least 75,000 total square feet, and construction cost of $40,000,000 or more.

Scope/Complexity: Comprehensive, whole building renovation of a multi-story (minimum of two stories) facility that includes the following:

• Building envelope;

• Comprehensive architectural, plumbing, mechanical, and electrical renovation; and

• Construction phasing (in at least one (1) project).

Projects submitted for the Offeror shall be completed within the past ten (10) years of the date of issuance of this

RFP.

The Government has an interest in the offeror's ability to complete construction in an expeditious manner. Submitted projects in this factor that were completed early (before the established Contract Completion Date (CCD) at award) may be considered more favorably. Submitted projects completed on time despite problems/challenges during performance may also be considered more favorably. In order to receive such consideration, offerors must explicitly address on the Construction & Design Experience Project Data Sheet strategies they utilized to complete the project early or overcome performance challenges that might have been expected to lead to a late completion

A project is defined as a construction effort performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;

rather Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one and one half (1½) double-sided pages (or three (3) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Offerors who fail to submit experience for all Joint Venture members may be rated lower.

Offerors are still limited to a total of five (5) projects combined.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

(2) Design Experience

Submit a minimum of two (2) up to a maximum of five (5) relevant design projects that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. Relevant project(s) is further defined as:

Size: Facility of at least 75,000 total square feet, and construction cost of $40,000,000 or more.

Scope/Complexity: Comprehensive, whole building renovation of a multi-story (minimum of two stories) facility that includes the following:

• Building envelope;

• Comprehensive architectural, plumbing, mechanical, and electrical renovation; and

• Construction phasing (in at least one (1) project).

Projects submitted for the Offeror shall be completed within the past ten (10) years of the date of issuance of this RFP. For design-build projects, the design portion of the contract shall have been completed within the past ten (10) years of the date of issuance of this RFP. The design completion date shall be clearly stated on the Project Data Sheet. If the design completion date cannot be determined, the project may be considered not relevant.

A project is defined as a complete design effort performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;

rather Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one and one half (1½) double-sided page (or three (3) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Offerors who fail to submit experience for all Joint Venture members may be rated lower.

Offerors are still limited to a total of five (5) projects combined.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

The Offeror may utilize experience of a design subcontractor to demonstrate design experience under this evaluation factor. The Offeror must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor. Offerors proposing multiple design firms should submit relevant project experience for all design firms. Failure to do so may result in a lower rating. Offerors are still limited to a total of five (5) projects combined.

(ii) Basis of Evaluation:

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects for Construction Experience and five (5) for Design Experience. Any projects submitted in excess of the five (5) for Construction Experience and five (5) for Design Experience will not be considered.

Relevant projects where the Offeror and the proposed design firm(s) have previously worked together may be considered more favorably than relevant projects where the Offeror and the proposed design firm(s) have not worked together.

Relevant projects that demonstrate design-build experience may be considered more favorably than those that do not have design-build experience.

Relevant projects that demonstrate experience with sustainable features may be considered more favorably than those that do not demonstrate experience with sustainable features.

Relevant projects completed early or on time despite problems/challenges during performance may be considered more favorably.

(3) Factor 3 - Past Performance:

(i) Solicitation Submittal Requirements:

If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for construction experience. If a completed AE Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for design experience. If there is not a completed CPARS evaluation then submit Past Performance Questionnaires (Attachment D) for each project included in Factor 2 for both Construction Experience and Design Experience. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact.

If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Gary Milton, via email at gary.milton1@navy.mil.

Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 2 – Experience. Offerors may also address any adverse past performance issues.

Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.

The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.

Performance award or additional information submitted will not be considered.

(ii) Basis of Evaluation:

This evaluation will consider how well the Offeror’s team performed on relevant projects submitted under Factor 2 – Experience and may also consider past performance on other projects currently documented in known sources.

The Government will consider the recency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s team’s past performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.

Offerors lacking relevant past performance history will receive a NEUTRAL Confidence rating.

Past performance ratings of “Substantial Confidence” or “Satisfactory Confidence” hold more value than a “Neutral Confidence” rating and will be considered more favorably in the evaluation of past performance.

(4) Factor 4 - Safety:

(i) Solicitation Submittal Requirements:

The Offeror shall submit a narrative that fully describes the safety management system that they will use to oversee the safety compliance and performance of self-performed and sub-contractor performed work and the Offeror’s method for qualifying, evaluating, selecting all tiers of sub-contractors. The narrative shall include:

The Offeror shall submit the following information:

1) Experience Modification Rate (EMR); include three previous calendar years’ (2016, 2017, 2018) worth of data.

This rate compares company’s annual losses in insurance claims against its policy premiums. The Offeror may submit an insurance company-provided equivalent rate if no EMR exists. If there is no EMR premium, for any year, affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends should be addressed as part of the element.

2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rates; submit three previous calendar years’ (2016, 2017, 2018) worth of data. If the OSHA DART rates cannot be submitted, affirmatively state so and explain why. Any extenuating circumstances that affected the OSHA DART rate data negatively should be addressed as part of this element.

3) Total Recordable Case (TRC) Rates; submit three previous calendar years’ (2016, 2017, 2018) worth of data. If the TRC rates cannot be submitted, affirmatively state so and explain why. Any extenuating circumstances that affected the TRC rate data negatively should be addressed as part of this element.

4) Technical Approach for Safety should (1) describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors. (2) Fully describe the safety management system that will be used to oversee safety compliance and performance of self-performed and sub-contractor performed work. (3) Also describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at self-performed and all subcontractor levels. (4) Additionally, describe the methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps. The technical approach to safety narrative shall be limited to two pages.

Note: The narrative shall be limited to two pages. For a partnership or joint venture, the submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. Safety narratives for joint ventures may be up to four pages in length.

(ii) Basis of Evaluation:

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for its self-performed work and the work of its sub-contractors. The Government will evaluate the Offeror’s overall safety management system, safety performance record, and the Offeror’s methodology of qualifying, evaluating, selecting and overseeing its subcontractors. The Government’s sources of information for evaluating safety will include, but are not limited to:

OSHA, NAVFAC’s Enterprise Safety Applications Management System (ESAMS) database, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), and other related databases. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror. The Government will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project and the specific management practices that will be in place for providing deliberate safety program management and mishap prevention support.

Offeror’s Experience Modification Rates (EMR) will be evaluated against the following Navy standards:

Risk EMR Rate Very Low Risk Less than 0.6 Low Risk From 0.6 to less than 0.8 Moderate Risk From 0.8 to 1.0 High Risk Greater than 1.0 to 1.1 Extremely High Risk Greater than 1.1

Offeror’s DART and TRC rates will be evaluated against the following Navy standards:

Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0

Risk TRC Rate Very Low Risk Less Than 2.49 Low Risk From 2.5 to 3.49 Moderate Risk From 3.5 to 4.49 High Risk From 4.5 to 5.99 Extremely High Risk Greater Than 6.0

(5) Factor 5 – Technical Solution:

(i) Solicitation Submittal Requirements:

Provide a narrative describing your understanding and approach to executing the project that meets the requirements of the RFP. The narrative shall address the following:

- Interior circulation/adjacencies

- Building systems including plumbing, mechanical, and electrical.

- Site layout including roadways, parking (include ingress and egress), and emergency vehicle access.

- Schedule: The project is required to be completed in 36 months from construction award to Beneficial

Occupancy Date (BOD). Provide a design and construction schedule including narrative in sufficient details to demonstrate your ability to meet the government schedule goal of achieving BOD in 36 months from construction contract award. The narrative should address necessary shift work, proposed work hours, proposed work days, anticipated crew sizes needed for major subcontractors (ie mechanical, electrical, communications, drywall, fire sprinkler, fire alarm, elevator) including their ability to support shift and or 24 hour operations, proposed management and staffing approach including the resolution of design issues during construction, and your approach for handling subcontractors who are not resourcing the project adequately or underperforming.

Narrative shall not exceed three (3) double-sided pages (or six (6) single-sided pages). Up to three (3) conceptual drawings may be provided to supplement the narrative (i.e., floor plan, exterior elevation, and site plan).

(ii) Basis of Evaluation:

The Government will evaluate the narrative, conceptual drawings, and schedule considering the extent to which the Offeror demonstrates a clear understanding of the architectural and engineering requirements of the project. The Government will evaluate the Offeror's technical solution to determine adherence to or exceeding of the technical requirements of the RFP.

Offerors that demonstrate a schedule with supporting narrative to meet BOD in 36 months or less may be considered more favorably.

(6) Factor 6 – Energy Design Reduction:

(i) Solicitation Submittal Requirements:

Provide the following information, which describes how the project will meet or exceed the following sustainable design contract requirements pertaining to the buildings occupied by personnel.

1) Energy Efficiency Narrative:

Provide a detailed narrative describing how the proposed solution will meet baseline ASHRAE 90.1-2013. Also describe how the solution will provide at least a 30% energy reduction below the baseline ASHRAE 90.1, based on life cycle cost effectiveness. To determine solution, use the ASHRAE 90.1, Appendix G – Building Performance Rating Method, except replace the formula in G1.2 with the following:

Percentage improvement = 100 × ((Baseline building consumption − Receptacle and process loads) − (Proposed building consumption − Receptacle and process loads)) / (Baseline building consumption − Receptacle and process loads)

List assumptions used to obtain the percent energy reduction.

Organize narrative in four parts: 1) Orientation, Configuration, and Shape; 2) Envelope properties (fenestration, solar heat gain coefficients (SHGC), wall and roof insulation values (U-values), window U-values); 3) Mechanical (HVAC, plumbing, and domestic hot water heating systems, including any solar hot water systems); and 4) Electrical Systems (lighting and control systems, including any interior and exterior lighting systems, renewable energy and control systems).

Where 30% reduction is not lifecycle cost effective, provide highest percent energy reduction that is lifecycle cost effective.

Note: Building performance rating and percent energy reduction are calculated in terms of energy rather than energy cost.

Do not exceed two (2) double-sided pages (or four (4) single-sided pages).

2) Whole Building Energy Simulation:

The Whole Building Energy Solution requires the use of the following documents included in Part 6 of this RFP:

- Government Baseline Building Performance Rating

- Government Baseline Building Energy Model (input-output) schedules (If the process and receptacle loads are not given in the schedules, assume they are 25% of the total load.)

- Default simulation factors

- Utility Costs (energy rates) for project, based on local unburdened PWD rates

- “Whole Building Energy Simulation” templates

- “Performance Rating Method Compliance Reports”

Use the “Whole Building Energy Simulation” templates to demonstrate the percentage improvement over the “Proposed Building Performance Rating”. Receptacle and process loads are included in the “Whole Building Energy Simulation” as part of the building loads. Submit the Whole Building Energy Simulation in PDF electronic file format.

(i) Basis of Government Evaluation:

Energy Efficiency Narrative and Solution: The Government will evaluate the Offeror’s proposed energy efficiency narrative and solution.

Whole Building Energy Simulation: The Government will evaluate the Whole Building Energy Simulation to determine the validity of the design assumptions, thoroughness and accuracy of the Whole Building Energy Simulation, and the percent improvement of energy consumption reduction below the Government’s “Baseline Building Performance Rating”.

(7) Factor 7 – Small Business Utilization:

This Factor assesses both the historical achievements in utilizing small business concerns as subcontractors and proposed small business participation and commitment strategies.

(i) Solicitation Submittal Requirements:

1. Achievements: All offerors shall provide a narrative (limited to two pages) to describe their achievements in supporting the Government’s policy to provide maximum practicable opportunities for small business (SB), veteran-owned small business (VOSB), service-disabled veteran-owned small business (SDVOSB), historically underutilized business zone (HUBZone) small business, small disadvantaged business (SDB), and women-owned small business (WOSB) concerns to participate as subcontractors consistent with efficient contract performance. In support of narrative submissions:

a. All offerors shall submit small business subcontracting information associated with each project cited under the Corporate Experience Factor in the format provided in Attachment E, Small Business Subcontracting Record.

b. Offerors representing as other than small businesses shall also provide copies of the most current individual subcontracting reports (ISRs) associated with each project cited under the Corporate Experience Factor if a small business subcontracting plan was required by the contract. If such projects were completed under specific task orders, provide ISRs for the overall contract. For cited projects with state and local government agencies, provide similar subcontracting performance reports if required by the contracts. When not specifically addressed in the ISR or similar report, offerors shall provide explanations for all instances of failures to meet dollar or percentage goals in individual subcontracting plans.

Notes:

The Government reserves the right to consider achievements information on other recent, relevant projects from all available sources.

Offerors utilizing achievements information of team members or key subcontractors shall clearly demonstrate how these companies will have meaningful involvement in the management of the subcontracting program for this acquisition. If not, such achievement information will not be considered under this factor. If the offeror is a new joint venture, partnership or other entity consisting of more than one company, provide achievements information for each individual business entity(ies) that will be responsible for managing the subcontracting program and clearly describe those responsibilities.

Failure to provide ISRs or any other requested information must be fully explained and may negatively impact your evaluation.

2. Small Business Participation and Commitment: All offerors shall submit a small business participation and commitment strategy including all data elements shown in Attachment F, Small Business Participation and Commitment Strategy.

a. Identify in terms of dollar value and percentage of the total acquisition the extent of work the offeror will self-perform as the prime contractor. If submitting an offer as a joint venture, identify the percentage of work each member will be responsible for and indicate the size status of each member (e.g. small business, woman-owned small business, other than small business).

b. Include supplemental narratives (limited to five pages) to address other elements of the offeror’s strategy such as binding agreements covering post award roles for execution of the contract and specific initiatives and tools that will be employed under the contract to enhance small businesses opportunities to both participate in this acquisition and build capabilities to support future NAVFAC acquisitions.

c. The anticipated prime and first tier overall small business participation rate for this acquisition (i.e. work to be performed by small businesses as the prime and/or subcontractors) is 20% of the contract value. Offerors are encouraged to exceed this percentage and seek meaningful levels of participation in each of the small business socioeconomic programs listed in Attachment E consistent with efficient contract performance. Offerors shall explain in their participation and commitment strategies how proposed participation rates were established. The small business participation and commitment strategy must be in agreement with any required small business subcontracting plan and will be made a part of the contract upon award.

(ii) Basis of Evaluation:

Offerors will be evaluated on the extent to which their proposals and other performance information available to the Government demonstrate a history of successfully supporting Government policies concerning utilization of small business concerns as subcontractors including, when applicable, achievements against established small business subcontracting plan goals. Offerors will also be evaluated on the levels of small business participation proposed and the degree of commitment to use named sources. The anticipated benefits of proposed initiatives and tools to enhance small business participation and capabilities will be considered. The Government will assess proposal realism and the likelihood of success in achieving the small business objectives of this acquisition.

F…

This is the start of the file's text. The full file is on GovTribe.