Amendment_0001.pdf
PDF 191 KB Posted
- Attached to
- RM17-1337 DB RENOVATION OF BLDG X-132 FOR MILITARY SEALIFT COMMAND CONSOLIDATION AT NAVAL
- Solicitation number
- N4008518R1138
About this file
Amendment_0001.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0009_18R1138.pdf | ||
| Telecom.pdf | ||
| Amendment_0008.pdf | ||
| Amendment_0007.pdf | ||
| Telecom.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Site_Visit_Log_X132.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Attachment_B_SECNAV_5512_1_11787.pdf | ||
| Attachment_C_-_Construction_Experience_Project_Data_Sheet.docx | DOCX document | |
| Attachment_A_-_Pre-Proposal_Inquiry_Form.xlsx | XLSX spreadsheet | |
| Solicitation_N4008518R1138.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
DESIGN-BUILD - RM17-1337 CONVERT BUILDING X-132 FOR MILITARY SEALIFT COMMAND CONSOLIDATION, NAVAL STATION NORFOLK, VIRGINA.
The purpose of this Amendment is to respond to PPIs. See attached PPI log included w ith this amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R1138
X 9B. DATED (SEE ITEM 11)
24-Oct-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Nov-2018
CODE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008518R1138
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SF 30 AMENDMENT
PPI
No.
Date Submitted
REFERENCE QUESTION GOVERNMENT
RESPONSE
Amend No.
Page Section Para.
1 10/25/18 10 (2) Factor 2 - Experience
(1) Construction Experience
In reference to the "Scope/Complexity:
Comprehensiive, whole building renovation of a multi-story (minimum of two stories) facility…".
Would the Government consider changing the Scope/Completity requirements to, "Scope/Complexity: Comprehensive, whole building renovation or new construction of a multi-story (minimum of two stories) facility...".
No. Bid as Per RFP 0001
2 10/25/18 11 (2) Factor 2 - Experience
(2) Factor 2
- Experience
In reference to the "Scope/Complexity:
Comprehensiive, whole building renovation of a multi-story (minimum of two stories) facility…".
Would the Government consider changing the Scope/Completity requirements to, "Scope/Complexity: Comprehensive, whole building renovation or new construction of a multi-story (minimum of two stories) facility...".
No. Bid As Per RFP 0001
3 11/01/18 10 (2) Factor 2 - Experience
1.factor 2 Construction Experience – Page 10 of the RFP states that a minimum of 2 relevant construction projects be provided in similar size and scope. This scope is considered “Whole Building Renovation”. With the robust construction market nationally and locally and allowing for more competition to provide a best value to the Governemnt we respectively request the the following change in Factor 2:
A. Minimum of 1 renovation and 1 design-build new construction multi story facility of at least 75,000SF and a construction cost of $40,000,000 or more.
AND / OR
B. Projects submitted for the Offeror shall be completed to at least 90% and within the past 10 years of the date of issuance of this RFP.
No, Bid as Per RFP 0001
4 11/06/18 10 (2) Factor 2 - Experience
Attachment C - Construction & Design Experience Project Data sheet references "DEMO #1 and DEMO #2" in the Project No. section.
Under Factor 2 - Experience in the RFQ there is no corresponding DEMO Experience section.
Will NAVFAC please clarify if the "DEMO" boxes should be utilized on Attachment C?
Disregard DEMO #1 and DEMO #2.
DEMO boxes should not be utilized on Attachment C.
(End of Summary of Changes)