RM17-1337 DB RENOVATION OF BLDG X-132 FOR MILITARY SEALIFT COMMAND CONSOLIDATION AT NAVAL
Solicitation number
N4008518R1138
Issued by

About this file

Amendment_0002.pdf

View the file

Other files

File Type Posted
Amendment0009_18R1138.pdf PDF
Telecom.pdf PDF
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Telecom.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Site_Visit_Log_X132.pdf PDF
Amendment_0003.pdf PDF
Amendment_0001.pdf PDF
Attachment_B_SECNAV_5512_1_11787.pdf PDF
Attachment_C_-_Construction_Experience_Project_Data_Sheet.docx DOCX document
Attachment_A_-_Pre-Proposal_Inquiry_Form.xlsx XLSX spreadsheet
Solicitation_N4008518R1138.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

DESIGN-BUILD, RM17-1337 CONVERT BUILDING X-132 FOR MILITARY SEALIFT COMMAND CONSOLIDATION, NAVAL STATION NORFOLK, NORFOLK, VIRGINIA

This amendment is issued to enter Phase II of the solicitation

SEE SF30 BLOCK 14 CONTINUATION SHEET.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R1138

X 9B. DATED (SEE ITEM 11)

24-Oct-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Jan-2019

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518R1138

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SF30 CONTINUATION PAGE

1. ONLY OFFERORS SELECTED SHALL SUBMIT PROPOSALS FOR PHASE II.

The evaluation factors and submittal requirements for both non-price and price are available in the previously posted Solicitation, Offer, and Award N4008518R1138 and have not been reproduced in this amendment.

2. Phase II Proposal Due Date: Tuesday, 5 March 2019 @ 1400 EST

3. Phase II Proposal Delivery Instructions: See Solicitation, Offer, and Award N4008518R1138, 4. Proposal Requirements.

4. Pre Proposal Inquiries (PPIs): See Solicitation, Offer, and Award N4008518R1138, 4. Proposal Requirements.

5. Site Visit Information:

Tuesday, 5 February 2019

9:00 AM EST

Norfolk Naval Station, Norfolk, Virginia

This will be the ONLY Government scheduled site visit.

Requirements and deadlines below will be strictly enforced. Late requests may not be processed in time for the site visit.

Meet at 9:00 AM EST at Bldg. X132. Map is provided as Attachment I.

Submit the completed one-day pass request PDF document (form SEC-NAV_5512_1_11787 (Attachment B) as soon as possible, but NOT LATER THAN 24 January 2019. The pass request is upload under Additional Documents in NECO. The request form shall be completed in its entirety and sent to Gary Milton at gary.milton1@navy.mil. Note that Item 25, BASE SPONSER’S NAME should include the following name and telephone number: GARY MILTON (757-341-2074). This request is separate from the site visit request. The PDF document is uploaded with this solicitation under Additional Documents.

Present the following information at the pass office: Two forms of ID (i.e. Valid Driver’s License and one of the following (US Social Security Card or Birth Certificate), Current Vehicle Registration and/or Rental Car Contract, Current State Safety Inspection, Current Proof of Insurance.

Naval Station Norfolk Pass & ID Office is located in Bldg. CD9 at 9040 Hampton Boulevard across from Gate 5.

The level of security at the Naval Station Norfolk may change at any time. As the level of security heightens, the amount of time required to gain access to the Naval Station also increases. Early arrival is advised. To verify identity, visitors MUST present a second form of identification at the pass office from the list of A or B Documents found at http:www.uscis.gov/i-9-central/acceptable-documents.

Submission of a pass request form is no guarantee you will be able to get on the base. If for any reason you get to the gate and are not allowed onto the base (even if you have submitted a request form), Government personnel may not be able to sponsor you on base. Due to heightened security, it is recommended that you allow sufficient time to arrive prior to the start time. The submitted pass request only allows access on the site visit date. If the site visit date is changed, the Government will revise the date on the pass request. Submission of a new pass request form is not necessary. If any other information listed on a submitted pass request form changes, a new pass request form with the updated information must be submitted.

Cameras and photography are permitted with limitations to be discussed at the site visit. Contractors are responsible for taking their own photographs during the site visit. The Government will not take photographs nor will photographs be made available after the site visit.

6. Wage Determination: This amendment hereby incorporates Revised General Decision Number: VA190160 01/11/2019 VA160 and replaces all versions previously incorporated. See Section 00800.

7. Attachments will be uploaded to NECO under additional documents:

Attachment H – Supplementary Instruction to Offerors Attachment I – Map for Site Visit

Specification Package WO# 1582904 and Supplementary Attachments

15829040rfp1of10_Part 1 thru Part 5 1582904rfp02of10_Part 6 – A thru C 1582904rfp03of10_Part 6 – D thru L 1582904rfp04of10_Part 6 – M thru U 1582904rfp05of10_Part 6 – V Dwgs General and Arch 1582904rfp06of10_Part 6 – V Dwgs-Inter thru Elec 1582904rfp07of10_BOD 1582904rfp08of10_CALCS ELECTRICAL 1582904rfp09of10_CALCS FIRE PROTECTION 1582904rfp10of10_CALCS STRUCTURAL

SECTION 00010 - SOLICITATION CONTRACT FORM

The offeror acceptance period has increased by 120 from 120 to 240.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

GENERAL DECISION NUMBER

General Decision Number: VA190160 01/11/2019 VA160

Superseded General Decision Number: VA20180171

State: Virginia

Construction Type: Building

County: Norfolk* County in Virginia.

* INDEPENDENT CITY OF NORFOLK

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 01/11/2019

ASBE0024-006 10/01/2017

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 35.13 16.22

BOIL0045-003 01/01/2017

Rates Fringes

BOILERMAKER......................$ 32.72 25.26

BRVA0008-001 02/01/2018

Rates Fringes

BRICKLAYER.......................$ 20.59 8.13

ELEC0080-010 06/01/2018

Rates Fringes

ELECTRICIAN (Includes Low Voltage Wiring and Alarm Installation)....................$ 27.94 12.56%+6.95+a

a. Workmen shall take off 1 hour with pay, at the discretion of the employer, on State and National Election days;

Tuesday following the first Monday in November, provided they are qualified and vote.

* ELEV0052-005 01/01/2019

Rates Fringes

ELEVATOR MECHANIC................$ 41.34 33.705+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate for all hours worked.

ENGI0147-019 11/01/2013

Rates Fringes

POWER EQUIPMENT OPERATOR

Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100

ft. above ground............$ 28.30 8.69%+8.15 Cranes under 90 tons........$ 27.38 8.69%+8.15

IRON0079-012 05/01/2017

Rates Fringes

IRONWORKER, STRUCTURAL AND

ORNAMENTAL.......................$ 25.50 14.80

IRON0079-013 05/01/2017

Rates Fringes

IRONWORKER, RIGGER...............$ 25.50 14.80

PLUM0110-008 11/01/2018

Rates Fringes

PIPEFITTER (Includes HVAC Pipe, Unit and Temperature

Controls Installations)..........$ 28.57 16.73

PLUMBER..........................$ 28.57 16.73

SUVA2013-043 01/11/2016

Rates Fringes

CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 19.80 3.98

CAULKER..........................$ 18.49 1.33

CEMENT MASON/CONCRETE FINISHER...$ 20.02 2.00

GLAZIER..........................$ 19.36 4.68

IRONWORKER, REINFORCING..........$ 27.18 4.13

LABORER: Mason Tender - Brick...$ 14.82 3.34

LABORER: Mason Tender - Cement/Concrete..................$ 12.96 3.12

LABORER: Pipelayer..............$ 12.40 1.86

LABORER: Common or General, Including Demolition.............$ 11.28 1.89

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 18.57 1.19

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03

OPERATOR: Bulldozer.............$ 18.07 3.50

OPERATOR: Forklift..............$ 19.40 7.00

OPERATOR: Loader................$ 21.28 3.17

OPERATOR: Roller................$ 16.25 4.88

PAINTER (Brush and Roller).......$ 16.92 0.00

PAINTER: Spray..................$ 18.10 5.43

ROOFER...........................$ 18.40 2.31

SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 20.98 2.62

SPRINKLER FITTER (Fire Sprinklers)......................$ 18.91 4.67

TILE FINISHER....................$ 23.40 0.00

TILE SETTER......................$ 27.80 10.25

TRUCK DRIVER: Dump Truck........$ 15.50 0.75

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION