Amendment_0007__PHASE_II.pdf

PDF 197 KB Posted

Attached to
AWARD OF P977, COMBAT VEHICLE WAREHOUSE, ALBANY GA
Solicitation number
N4008518R0617
Issued by

About this file

Amendment_0007__PHASE_II.pdf

View the file

Other files

File Type Posted
0012.pdf PDF
Amendment_0011.pdf PDF
P977_REVISEDPrice_Proposal_Form.pdf PDF
Amendment_0010.pdf PDF
Room_Requirments_Break_Room.docx DOCX document
Amendment_0009.pdf PDF
P977_REVISEDPrice_Proposal_Form.docx DOCX document
AMENDMENT_0008.pdf PDF
GEOTECH_REPORT_DATED_Feb_2_18.pdf PDF
P977_sitevisitAttendees000.pdf PDF
Map1.pdf PDF
Albany_Motels.pdf PDF
P977_Price_Proposal_Form.docx DOCX document
0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amend_0002.pdf PDF
0001.pdf PDF
Attachment_A_-_Construction_and_Design_Experience_Project_Data_Sheet.docx DOCX document
Attachment_B_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_C_-_Small_Business_Subcontracting_Record.docx DOCX document
RFP.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5347625

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to issue the Phase II Solicitation Requirements to ONLY those offerors selected to participate in Phase II.

Phase II proposals are due on December 6, 2018 at 2:00 p.m. (EST). Wage Rate Requirements (Construction) remain unchanged.

See Section SF 30 Block 14 Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Oct-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R0617

X 9B. DATED (SEE ITEM 11)

18-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Oct-2018

CODE

NAVFAC MID ATLANTIC

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518R0617

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0007

THIS AMENDMENT IS ISSUED TO INITIATE PHASE II. ONLY OFFERORS SELECTE SHALL SUBMIT

PROPOSALS FOR PHASE II.

PROPOSAL DUE DATE: December 6, 2018 at 2:00 p.m.

PROPOSAL SUBMISSION INSTRUCTIONS: SEE PROPOSAL SUBMISSION INSTRUCTIONS

INCLUDED IN THE ORIGINAL SOLICITATION. The evaluation factors, including both non-price/technical and price submittal requirements are available in the original Request for Proposal document (and any applicable amendments) and have not been reproduced in this amendment.

(See N4008518R0617 for Phase II Evaluation Factors and Submittal Requirements).

Specifically, PRICE FACTOR submittal instructions are on page 6-8 (include all information in the “Additional information to be submitted with Price Proposal Package (PHASE II).

NON-PRICE proposal submission instructions for Phase II begin on Page 15 (Factors 5-7).

Hand Carried Proposals will be received at :

NAVFAC Mid-Lant Bldg Z140, Room 225 – Attn: Elizabeth Carmack 9324 Virginia Avenue, Norfolk, Va. 23511

See original solicitation for instructions regarding new access using the VETS 5512. ALL REQUESTS FOR HAND DELIVERING PRPOSALS (i.e. Form 5512) MUST BE RECEIVED NO LATER THAN 10 DAYS PRIOR

TO PROPOSAL DUE DATE.

PRE PROPOSAL INQUIRIES (PPIs): See page 22 of original solicitation – paragraph 3. PPI Form is within the additional documents. PPI cutoff is 10 days prior to Proposal Due Date.

SITE VISIT: The site visit is scheduled for November 8, 2018 at 9:00 a.m. at MCLB Albany, Georgia. The following instructions are provided:

To obtain a guest pass to MCLB Albany, interested parties shall bring their ID, vehicle insurance and vehicle registration. Additionally all non‐DBIDS visitors will be required to submit their Driver's license # & State of issuance to: james.l.thomas4@navy.mil no less than 3 working days prior to their arrival (no later than noon on 5 Nov 2018 since the meeting is scheduled on the 8th). If anyone is planning on arriving the day before and plans to stay overnight, they need to know to stay in an area near the Albany Mall (Exit 7 off of Hwy 520/US 82 ‐ Zip Code 31707). Attached (NECO ADDITIONAL DOCUMENTS) is a map showing the base Pass & ID office (outside the gate) and meeting location (B5500) for reference.

ATTACHMENTS: The Price Proposal Form, Drawings, and Specifications will be provided under Additional Documents in NECO in addition to maps and information pertaining to the site visit.

SECTION 00010 - SOLICITATION CONTRACT FORM

The Issued By organization has changed from

NAVFAC MID ATLANTIC

MARINE CORPS IPT

9324 VIRGINIA AVE

NORFOLK VA 23511

to

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

SECTION 00700 - CONTRACT CLAUSES

The following have been deleted:

52.236-14

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

WAGE DETERMINATION

General Decision Number: GA180139 05/04/2018 GA139

Superseded General Decision Number: GA20170139

State: Georgia

Construction Type: Building

County: Dougherty County in Georgia.

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/19/2018 2 05/04/2018

* BOIL0026-001 03/01/2018

Rates Fringes

BOILERMAKER......................$ 28.97 22.39

ELEC1531-001 01/01/2018

Rates Fringes

ELECTRICIAN (Excluding Low Voltage Wiring)..................$ 22.70 4%+12.30

ENGI0474-001 07/01/2017

Rates Fringes

POWER EQUIPMENT OPERATOR:

Bobcat/Skid Steer/Skid Loader, Bulldozer, and Forklift (under 15 tons)....$ 25.02 13.83 Crane (over 10 tons) and Forklift (15 tons and over).$ 26.85 13.83 Crane (over 120 tons).......$ 27.85 13.83 Crane (over 250 tons).......$ 28.85 13.83 Oiler.......................$ 22.68 13.83

PLUM0072-002 08/01/2016

Rates Fringes

PLUMBER/PIPEFITTER...............$ 30.18 13.82

SHEE0085-009 07/01/2017

Rates Fringes

SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 31.04 14.10

SUGA2012-046 08/11/2012

Rates Fringes

BRICKLAYER.......................$ 15.09 1.04

CARPENTER........................$ 14.57 0.00

CEMENT MASON/CONCRETE FINISHER...$ 15.18 3.89

ELECTRICIAN (Low Voltage Wiring)..........................$ 16.81 6.54

ELEVATOR MECHANIC................$ 19.38 7.53

IRONWORKER, REINFORCING..........$ 20.47 3.89

IRONWORKER, STRUCTURAL...........$ 24.04 9.26

LABORER: Common or General......$ 12.00 0.23

LABORER: Mason Tender - Brick...$ 9.00 0.00

LABORER: Pipelayer..............$ 11.48 1.90

OPERATOR: Backhoe/Excavator.....$ 14.63 0.00

OPERATOR: Grader/Blade..........$ 17.52 0.00

OPERATOR: Loader................$ 8.00 0.00

PAINTER: Brush, Roller and Spray............................$ 16.00 3.13

ROOFER...........................$ 14.48 0.00

SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 18.03 0.00

TILE FINISHER....................$ 10.31 0.00

TILE SETTER......................$ 20.00 0.00

TRUCK DRIVER: Dump Truck........$ 10.00 1.33

TRUCK DRIVER: Lowboy Truck......$ 17.41 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)

File details come from the government source that posted it.