Encl_01a_Bulk Waste PWS pg56 AMD1.pdf
PDF 22 KB Posted
- Solicitation number
- N40084-21-R-2003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach_03_J-0200000-05 Exhibit Line Item_Rev3.xlsx | XLSX spreadsheet | |
| Encl_01_Bulk Waste PWS pg46 AMD5.pdf | ||
| N4008421R2003_Amend 0005.pdf | ||
| N4008421R2003_Amend 0004.pdf | ||
| Attach_03_J-0200000-05 Exhibit Line Item_Rev2.xlsx | XLSX spreadsheet | |
| Encl_01a_Bulk Waste PWS pg53 AMD4.pdf | ||
| N4008421R2003_Amend 0003.pdf | ||
| N4008421R2003_Amend 0002.pdf | ||
| Attach_03_J-0200000-05 Exhibit Line Item_Rev1.xlsx | XLSX spreadsheet | |
| N4008421R2003_Amend 0001.pdf | ||
| Encl_01b_Bulk Waste PWS pg162 AMD1.pdf | ||
| Attach_03_J-0200000-05 Exhibit Line Item_Final_.xlsx | XLSX spreadsheet | |
| Attach_02_21R2003_Bulk Waste Management_PAP_FAP_3May21.pdf | ||
| N4008421R2003_RFP.pdf | ||
| Attach_06_Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| Attach_01_Bulk Waste PWS_Final_25May21.pdf | ||
| Attach_04_Corporate Experience Data Sheet.docx | DOCX document | |
| Attach_07a_Site Visit_Request_Form.xlsx | XLSX spreadsheet | |
| Attach_05_Past Performance Questionnaire.docx | DOCX document | |
| Attach_07b_GAP blank form.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1503030 - Integrated Solid Waste Management Spec Item
Title Performance Objective
Related Information Performance Standard
4.2 Home
Appliance Recycling Law Item Collection
The Contractor shall perform recycling of e-waste under local recycling law.
Additional information will be specified in the task order work statement.
All e-waste removed.
Timely performance.
4.3 Additional
Containers
The Contractor shall respond and complete unscheduled delivery and pickup of industrial waste containers.
See Spec Item 3.1.3 related information.
Container delivery and pickup are performed after receipt of order from the KO or KO’s representative.
4.4
Recurring Work Overage
The Contractor shall continue to perform recurring work requirements when the estimated weight to be collected exceeds actual weight collected by 10%.
The Contractor shall be liable under the recurring portion of the contract for up to 110% of the TOTAL annual estimated quantity (Kg) of all collection points identified in attachment J- 0200000-05.
The Contractor shall notify the Government when the weight of waste collected is 90% of the TOTAL annual estimated quantity (Kg) of all collection points identified in attachment J- 0200000-05.
The Government shall calculate an overage price based on the current total annual recurring cost under
ELIN A002, B001, C001,
D001 or E001 divided by the TOTAL annual estimated quantity (Kg) of all collection points identified in attachment J- 0200000-05.
The amount of weight beyond 110% to be added shall be negotiated.
Performance standards for this work item will be the same as those in Spec Item 3.
CUI // FEDCON
CUI // FEDCON Page 56 of 162 brian.rother Highlight brian.rother Highlight brian.rother Highlight brian.rother Highlight brian.rother Highlight brian.rother Highlight brian.rother Highlight
File details come from the government source that posted it. Updated .