1503030 - Integrated Solid Waste Management Spec Item

Title Performance Objective

Related Information Performance Standard

4.2 Home

Appliance Recycling Law Item Collection

The Contractor shall perform recycling of e-waste under local recycling law.

Additional information will be specified in the task order work statement.

All e-waste removed.

Timely performance.

4.3 Additional

Containers

The Contractor shall respond and complete unscheduled delivery and pickup of industrial waste containers.

See Spec Item 3.1.3 related information.

Container delivery and pickup are performed after receipt of order from the KO or KO’s representative.

4.4

Recurring Work Overage

The Contractor shall continue to perform recurring work requirements when the estimated weight to be collected exceeds actual weight collected by 10%.

The Contractor shall be liable under the recurring portion of the contract for up to 110% of the TOTAL annual estimated quantity (Kg) of all collection points identified in attachment J- 0200000-05.

The Contractor shall notify the Government when the weight of waste collected is 90% of the TOTAL annual estimated quantity (Kg) of all collection points identified in attachment J- 0200000-05.

The Government shall calculate an overage price based on the current total annual recurring cost under

ELIN A002, B001, C001,

D001 or E001 divided by the TOTAL annual estimated quantity (Kg) of all collection points identified in attachment J- 0200000-05.

The amount of weight beyond 110% to be added shall be negotiated.

Performance standards for this work item will be the same as those in Spec Item 3.

CUI // FEDCON

CUI // FEDCON Page 56 of 162 brian.rother Highlight brian.rother Highlight brian.rother Highlight brian.rother Highlight brian.rother Highlight brian.rother Highlight brian.rother Highlight