Attach_03_J-0200000-05 Exhibit Line Item_Final_.xlsx
XLSX spreadsheet 84 KB Posted
- Solicitation number
- N40084-21-R-2003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach_03_J-0200000-05 Exhibit Line Item_Rev3.xlsx | XLSX spreadsheet | |
| Encl_01_Bulk Waste PWS pg46 AMD5.pdf | ||
| N4008421R2003_Amend 0005.pdf | ||
| N4008421R2003_Amend 0004.pdf | ||
| Attach_03_J-0200000-05 Exhibit Line Item_Rev2.xlsx | XLSX spreadsheet | |
| Encl_01a_Bulk Waste PWS pg53 AMD4.pdf | ||
| N4008421R2003_Amend 0003.pdf | ||
| N4008421R2003_Amend 0002.pdf | ||
| Attach_03_J-0200000-05 Exhibit Line Item_Rev1.xlsx | XLSX spreadsheet | |
| Encl_01a_Bulk Waste PWS pg56 AMD1.pdf | ||
| N4008421R2003_Amend 0001.pdf | ||
| Encl_01b_Bulk Waste PWS pg162 AMD1.pdf | ||
| Attach_02_21R2003_Bulk Waste Management_PAP_FAP_3May21.pdf | ||
| N4008421R2003_RFP.pdf | ||
| Attach_06_Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| Attach_01_Bulk Waste PWS_Final_25May21.pdf | ||
| Attach_04_Corporate Experience Data Sheet.docx | DOCX document | |
| Attach_07a_Site Visit_Request_Form.xlsx | XLSX spreadsheet | |
| Attach_05_Past Performance Questionnaire.docx | DOCX document | |
| Attach_07b_GAP blank form.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
Attachment J-0200000-05 ELIN Schedule
| Solicitation No.: N40084-21-R-2003 | ||||
| Project Title: Bulky Waste Collection and Disposal Recurring Work | ||||
| CLIN NO.: | ITEM DESCRIPTION | Total | ||
| Base Year | CLIN 0001 | Phase-In Period (Base Year Only) PRE-PRICED | ¥500,000 | |
| CLIN 0002 | Recurring Work: Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1) | ¥0 | ||
| CLIN 0003 | ** Optional** | |||
| Contractor Operated Bulk Waste Sites, Spec Item 3.1.1 | ¥0 | |||
| CLIN 0004 | Non-Recurring Work | ¥50,500,000 | ||
| *** Do not forget to provide price for A005 *** | ||||
| Subtotal for BASE: | ¥51,000,000 |
| Option 1 | CLIN 0005 | Recurring Work: Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1) | ¥0 | |
| CLIN 0006 | ** Optional** | |||
| Contractor Operated Bulk Waste Sites, Spec Item 3.1.1 | ¥0 | |||
| CLIN 0007 | Non-Recurring Work | ¥50,500,000 | ||
| *** Do not forget to provide price for B004 *** | ||||
| Subtotal for OPTION 1: | ¥50,500,000 |
| Option 2 | CLIN 0008 | Recurring Work: Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1) | ¥0 | |
| CLIN 0009 | ** Optional** | |||
| Contractor Operated Bulk Waste Sites, Spec Item 3.1.1 | ¥0 | |||
| CLIN 0010 | Non-Recurring Work | ¥50,500,000 | ||
| *** Do not forget to provide price for C004 *** | ||||
| Subtotal for OPTION 2: | ¥50,500,000 |
| Option 3 | CLIN 0011 | Recurring Work: Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1) | ¥0 | |
| CLIN 0012 | ** Optional** | |||
| Contractor Operated Bulk Waste Sites, Spec Item 3.1.1 | ¥0 | |||
| CLIN 0013 | Non-Recurring Work | ¥50,500,000 | ||
| *** Do not forget to provide price for D004 *** | ||||
| Subtotal for OPTION 3: | ¥50,500,000 |
| Option 4 | CLIN 0014 | Recurring Work: Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1) | ¥0 | |
| CLIN 0015 | ** Optional** | |||
| Contractor Operated Bulk Waste Sites, Spec Item 3.1.1 | ¥0 | |||
| CLIN 0016 | Non-Recurring Work | ¥50,500,000 | ||
| *** Do not forget to provide price for E004 *** | ||||
| Subtotal for OPTION 4: | ¥50,500,000 |
| TOTAL AMOUNTS (Base ~ Opt4) JPY: | ¥0 |
| TOTAL AMOUNTS (Base ~ Opt4) $: | $0.00 |
| NON-RECURRING TOTAL AMOUNTS (Base ~ Opt4) JPY: | ¥252,500,000 |
| NON-RECURRING TOTAL AMOUNTS (Base ~ Opt4) $: | $2,339,882.53 |
FY21 Exchange Rate: ¥107.9114
&"Times New Roman,Regular"CUI//FEDCON [when filled in] Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
&"Times New Roman,Regular"CUI//FEDCON [when filled in] Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
BASE CLIN0001
| ATTACHMENT J-0200000-05 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #N40084-21-R-2003 |
| EXHIBIT A - CLIN 0001 |
| Bulky Waste Collection and Disposal Recurring Work |
| PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management |
| Period of Performance: BASE |
ELIN/Sub ELIN Description - CLIN 0001 - Recurring Work Estimated Quantity Unit Price Estimated Amount
| A001 | MCB - Phase-In Period Per Spec Item 2.5 of Sub-Annex 1503030 | ||||
| A001AA | 60 days Phase-in | 1 | ¥500,000 | LS | ¥500,000 |
&"Times New Roman,Regular"CUI//FEDCON [when filled in] Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
BASE CLIN0002
| ATTACHMENT J-0200000-05 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #N40084-21-R-2003 |
| EXHIBIT A - CLIN 0002 |
| Bulky Waste Collection and Disposal Recurring Work |
| PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management |
| Period of Performance: BASE |
ELIN/Sub ELIN Description - CLIN 0002 - Recurring Work Estimated Quantity Unit Price Estimated Amount
| A002 | MCB - Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1) | |||
| A002AA | Bulk Waste Collection Points - Camp Foster Bldg.5631 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 361,728Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ¥0 | |||
| c) E-waste (Other than under home appliance recycling law) | ¥0 | |||
| d) Concrete and Asphalt | ¥0 | |||
| * The Price is to include segregation and disposal fee |
| A002AB | Bulk Waste Collection Points - Camp Kinser Bldg.425 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 60,000Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| * The Price is to include segregation and disposal fee |
| A002AC | Bulk Waste Collection Points - Camp Kinser (Near Bldg. 104) | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 548,664Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| A002AD | Bulk Waste Collection Points - MCAS Futenma Bldg.621 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 280,440Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| A002AE | Bulk Waste Collection Points - Camp Courtney Bldg.4101 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 12,000Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| A002AF | Bulk Waste Collection Points - Camp Hansen Bldg.2895 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 260,011Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| A002AG | Bulk Waste Collection Points - Camp Schwab Bldg.3125 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 98,136Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
Total Amount: ¥0
A003 Spec Item 3.1.3 - Unscheduled Container Delivery and Removal But are not limited to Non-Burnable Mixed Construction and Demo Debris
| The orders for container delivery service will include delivery, pick-up, segregation and disposal. The container delivery request require at least 3 business days notification, but if contractor could not meet the requested date of the container delivery, the contractor is to provide/suggest a new delivery schedule within 48 hours of the request. The new suggested delivery schedule should be within the next three days. |
| The duration of service (per occurrence) shall be from 1 to 3days or on a case by case situation. See SPEC 3.1.3. |
The size will be contractor's discretion based on availability.
| A003AA | MCB - Unscheduled Container Delivery and Removal | |||
| a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton | 50 | Ea. | ¥0 | |
| ** Provide price to include container and transportation fee |
Grand Total Amount: ¥0
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
BASE CLIN0003
| ATTACHMENT J-0200000-05 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #N40084-21-R-2003 |
| EXHIBIT A - CLIN 0003 |
| Bulky Waste Collection and Disposal Recurring Work |
| PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management |
| Period of Performance: BASE |
ELIN/Sub ELIN Description - CLIN 0003 - Recurring Work Estimated Quantity Unit Price Estimated Amount
| A004 | Contractor Operated Bulk Waste Sites |
| The Contractor will price only the additional cost associated with the requirements of specification item 3.1.1. |
| A004AA | Contractor Operated Bulk Waste Sites | ||||
| i) Bulk Waste Collection Points - Camp Foster Bldg.5631 | 12 | ¥0 | per Mo | ¥0 | |
| ii) Bulk Waste Collection Points - Camp Kinser (near Bldg. 104) | 12 | ¥0 | per Mo | ¥0 | |
| iii) Bulk Waste Collection Points - MCAS Futenma Bldg.621 | 12 | ¥0 | per Mo | ¥0 | |
| iv) Bulk Waste Collection Points - Camp Courtney Bldg.4101 | 12 | ¥0 | per Mo | ¥0 | |
| v) Bulk Waste Collection Points - Camp Hansen Bldg.2895 | 12 | ¥0 | per Mo | ¥0 | |
| vi) Bulk Waste Collection Points - Camp Schwab Bldg.3125 | 12 | ¥0 | per Mo | ¥0 |
Total of 6 Collection Points: ¥0
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
BASE CLIN0004
| ATTACHMENT J-0200000-05 | ||||
| EXHIBIT LINE ITEM NUMBERS | ||||
| SOLICITATION/CONTRACT #N40084-21-R-2003 | ||||
| EXHIBIT A - CLIN 0004 | ||||
| Line Item 0004 Nonrecurring Work - Base Period | ||||
| PROVIDE UNIT PRICES FOR NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||
| ELINs A005 THROUGH A008 | ||||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | EST | |
| QTY | UNIT OF | |||
| ISSUE | UNIT | |||
| PRICE | TOTAL |
AMOUNT
| A005 | 10-Ton Metal Refuse Container/27 CY | Additional containers per spec item 4.3. | 50 | EA | ¥0 | |
| A006 | Reimbursement of Cost Repair on Contractor's Damaged Property | During the performance of work in this service contract, a damage of property (e.g., truck, dumpster, etc.) occurs and at no fault of the performing contractor and determined to be result of Government negligence, The Contractor shall submit a request for reimbursement of cost repair of damaged property along with all necessary supporting documents. | 1 | NTE | ¥500,000 | ¥500,000 |
| A007 | One-Time Clean Up of Bulk Waste Site | The Contractor shall perform a one-time cleanup of the bulk waste site(s) per spec item 4.1. To be Negotiated. | 1 | NTE | ¥35,000,000 | ¥35,000,000 |
| A008 | E-waste – Items Under Home Appliance Recycling Law; To be Negotiated | |||||
| Home Appliance Recycling Item | ¥0 | |||||
| a) Air Conditioning |
(Split, Wall Mounted, Floor Stand, and Window Type),
| b) TV | ||||
| c) Refrigerator and Freezer | ||||
| d) Washer and dryer | ||||
| Collection, Recycling, and Transportation Fee | 1 | NTE | ¥15,000,000 | ¥15,000,000 |
Total Amount: ¥50,500,000
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
1ST OPT CLIN0005
| ATTACHMENT J-0200000-05 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #N40084-21-R-2003 |
| EXHIBIT B - CLIN 0005 |
| Bulky Waste Collection and Disposal Recurring Work |
| PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management |
| Period of Performance: 1ST OPTION |
ELIN/Sub ELIN Description - CLIN 0005 - Recurring Work Estimated Quantity Unit Price Estimated Amount
| B001 | MCB - Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1) | |||
| B001AA | Bulk Waste Collection Points - Camp Foster Bldg.5631 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 361,728Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| * The Price is to include segregation and disposal fee |
| B001AB | Bulk Waste Collection Points - Camp Kinser Bldg.425 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 60,000Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| * The Price is to include segregation and disposal fee |
| B001AC | Bulk Waste Collection Points - Camp Kinser (Near Bldg. 104) | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 548,664Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| B001AD | Bulk Waste Collection Points - MCAS Futenma Bldg.621 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 280,440Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| B001AE | Bulk Waste Collection Points - Camp Courtney Bldg.4101 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 12,000Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| B001AF | Bulk Waste Collection Points - Camp Hansen Bldg.2895 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 260,011Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| B001AG | Bulk Waste Collection Points - Camp Schwab Bldg.3125 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 98,136Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
Total Amount: ¥0
B002 Spec Item 3.1.3 - Unscheduled Container Delivery and Removal But are not limited to Non-Burnable Mixed Construction and Demo Debris
| The orders for container delivery service will include delivery, pick-up, segregation and disposal. The container delivery request require at least 3 business days notification, but if contractor could not meet the requested date of the container delivery, the contractor is to provide/suggest a new delivery schedule within 48 hours of the request. The new suggested delivery schedule should be within the next three days. |
| The duration of service (per occurrence) shall be from 1 to 3days or on a case by case situation. See SPEC 3.1.3. |
The size will be contractor's discretion based on availability.
| B002AA | MCB - Unscheduled Container Delivery and Removal | |||
| a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton | 50 | Ea. | ¥0 | |
| ** Provide price to include container and transportation fee |
Grand Total Amount: ¥0
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
1ST OPT CLIN0006
| ATTACHMENT J-0200000-05 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #N40084-21-R-2003 |
| EXHIBIT B - CLIN 0006 |
| Bulky Waste Collection and Disposal Recurring Work |
| PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management |
| Period of Performance: 1ST OPTION PERIOD |
ELIN/Sub ELIN Description - CLIN 0006 - Recurring Work Estimated Quantity Unit Price Estimated Amount
| B003 | Contractor Operated Bulk Waste Sites |
| The Contractor will price only the additional cost associated with the requirements of specification item 3.1.1. |
| B003AA | Contractor Operated Bulk Waste Sites | ||||
| i) Bulk Waste Collection Points - Camp Foster Bldg.5631 | 12 | ¥0 | per Mo | ¥0 | |
| ii) Bulk Waste Collection Points - Camp Kinser (near Bldg. 104) | 12 | ¥0 | per Mo | ¥0 | |
| iii) Bulk Waste Collection Points - MCAS Futenma Bldg.621 | 12 | ¥0 | per Mo | ¥0 | |
| iv) Bulk Waste Collection Points - Camp Courtney Bldg.4101 | 12 | ¥0 | per Mo | ¥0 | |
| v) Bulk Waste Collection Points - Camp Hansen Bldg.2895 | 12 | ¥0 | per Mo | ¥0 | |
| vi) Bulk Waste Collection Points - Camp Schwab Bldg.3125 | 12 | ¥0 | per Mo | ¥0 |
Total of 6 Collection Points: ¥0
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
1ST OPT CLIN0007
| ATTACHMENT J-0200000-05 | ||||
| EXHIBIT LINE ITEM NUMBERS | ||||
| SOLICITATION/CONTRACT #N40084-21-R-2003 | ||||
| EXHIBIT B - CLIN 0007 | ||||
| Line Item 0007 Nonrecurring Work - 1ST OPTION PERIOD | ||||
| PROVIDE UNIT PRICES FOR NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||
| ELINs B004 THROUGH B007 | ||||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | EST | |
| QTY | UNIT OF | |||
| ISSUE | UNIT | |||
| PRICE | TOTAL |
AMOUNT
| B004 | 10-Ton Metal Refuse Container/27 CY | Additional containers per spec item 4.3. | 50 | EA | ¥0 | |
| B005 | Reimbursement of Cost Repair on Contractor's Damaged Property | During the performance of work in this service contract, a damage of property (e.g., truck, dumpster, etc.) occurs and at no fault of the performing contractor and determined to be result of Government negligence, The Contractor shall submit a request for reimbursement of cost repair of damaged property along with all necessary supporting documents. | 1 | NTE | ¥500,000 | ¥500,000 |
| B006 | One-Time Clean Up of Bulk Waste Site | The Contractor shall perform a one-time cleanup of the bulk waste site(s) per spec item 4.1. To be Negotiated. | 1 | NTE | ¥35,000,000 | ¥35,000,000 |
| B007 | E-waste – Items Under Home Appliance Recycling Law; To be Negotiated | |||||
| Home Appliance Recycling Item | ¥0 | |||||
| a) Air Conditioning |
(Split, Wall Mounted, Floor Stand, and Window Type),
| b) TV | ||||
| c) Refrigerator and Freezer | ||||
| d) Washer and dryer | ||||
| Collection, Recycling, and Transportation Fee | 1 | NTE | ¥15,000,000 | ¥15,000,000 |
Total Amount: ¥50,500,000
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
2ND OPT CLIN0008
| ATTACHMENT J-0200000-05 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #N40084-21-R-2003 |
| EXHIBIT C - CLIN 0008 |
| Bulky Waste Collection and Disposal Recurring Work |
| PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management |
| Period of Performance: 2ND OPTION PERIOD |
ELIN/Sub ELIN Description - CLIN 0008 - Recurring Work Estimated Quantity Unit Price Estimated Amount
| C001 | MCB - Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1) | |||
| C001AA | Bulk Waste Collection Points - Camp Foster Bldg.5631 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 361,728Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ¥0 | |||
| c) E-waste (Other than under home appliance recycling law) | ¥0 | |||
| d) Concrete and Asphalt | ¥0 | |||
| * The Price is to include segregation and disposal fee |
| C001AB | Bulk Waste Collection Points - Camp Kinser Bldg.425 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 60,000Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| * The Price is to include segregation and disposal fee |
| C001AC | Bulk Waste Collection Points - Camp Kinser (Near Bldg. 104) | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 548,664Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| C001AD | Bulk Waste Collection Points - MCAS Futenma Bldg.621 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 280,440Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| C001AE | Bulk Waste Collection Points - Camp Courtney Bldg.4101 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 12,000Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| C001AF | Bulk Waste Collection Points - Camp Hansen Bldg.2895 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 260,011Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| C001AG | Bulk Waste Collection Points - Camp Schwab Bldg.3125 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 98,136Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
Total Amount: ¥0
C002 Spec Item 3.1.3 - Unscheduled Container Delivery and Removal But are not limited to Non-Burnable Mixed Construction and Demo Debris
| The orders for container delivery service will include delivery, pick-up, segregation and disposal. The container delivery request require at least 3 business days notification, but if contractor could not meet the requested date of the container delivery, the contractor is to provide/suggest a new delivery schedule within 48 hours of the request. The new suggested delivery schedule should be within the next three days. |
| The duration of service (per occurrence) shall be from 1 to 3days or on a case by case situation. See SPEC 3.1.3. |
The size will be contractor's discretion based on availability.
| C002AA | MCB - Unscheduled Container Delivery and Removal | |||
| a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton | 50 | Ea. | ¥0 | |
| ** Provide price to include container and transportation fee |
Grand Total Amount: ¥0
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
2ND OPT CLIN0009
| ATTACHMENT J-0200000-05 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #N40084-21-R-2003 |
| EXHIBIT C - CLIN 0009 |
| Bulky Waste Collection and Disposal Recurring Work |
| PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management |
| Period of Performance: 2ND OPTION PERIOD |
ELIN/Sub ELIN Description - CLIN 0009 - Recurring Work Estimated Quantity Unit Price Estimated Amount
| C003 | Contractor Operated Bulk Waste Sites |
| The Contractor will price only the additional cost associated with the requirements of specification item 3.1.1. |
| C003AA | Contractor Operated Bulk Waste Sites | ||||
| i) Bulk Waste Collection Points - Camp Foster Bldg.5631 | 12 | ¥0 | per Mo | ¥0 | |
| ii) Bulk Waste Collection Points - Camp Kinser (near Bldg. 104) | 12 | ¥0 | per Mo | ¥0 | |
| iii) Bulk Waste Collection Points - MCAS Futenma Bldg.621 | 12 | ¥0 | per Mo | ¥0 | |
| iv) Bulk Waste Collection Points - Camp Courtney Bldg.4101 | 12 | ¥0 | per Mo | ¥0 | |
| v) Bulk Waste Collection Points - Camp Hansen Bldg.2895 | 12 | ¥0 | per Mo | ¥0 | |
| vi) Bulk Waste Collection Points - Camp Schwab Bldg.3125 | 12 | ¥0 | per Mo | ¥0 |
Total of 6 Collection Points: ¥0
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
2ND OPT CLIN0010
| ATTACHMENT J-0200000-05 | ||||
| EXHIBIT LINE ITEM NUMBERS | ||||
| SOLICITATION/CONTRACT #N40084-21-R-2003 | ||||
| EXHIBIT C - CLIN 0010 | ||||
| Line Item 0010 Nonrecurring Work - 2ND OPTION PERIOD | ||||
| PROVIDE UNIT PRICES FOR NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||
| ELINs C004 THROUGH C007 | ||||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | EST | |
| QTY | UNIT OF | |||
| ISSUE | UNIT | |||
| PRICE | TOTAL |
AMOUNT
| C004 | 10-Ton Metal Refuse Container/27 CY | Additional containers per spec item 4.3. | 50 | EA | ¥0 | |
| C005 | Reimbursement of Cost Repair on Contractor's Damaged Property | During the performance of work in this service contract, a damage of property (e.g., truck, dumpster, etc.) occurs and at no fault of the performing contractor and determined to be result of Government negligence, The Contractor shall submit a request for reimbursement of cost repair of damaged property along with all necessary supporting documents. | 1 | NTE | ¥500,000 | ¥500,000 |
| C006 | One-Time Clean Up of Bulk Waste Site | The Contractor shall perform a one-time cleanup of the bulk waste site(s) per spec item 4.1. To be Negotiated. | 1 | NTE | ¥35,000,000 | ¥35,000,000 |
| C007 | E-waste – Items Under Home Appliance Recycling Law; To be Negotiated | |||||
| Home Appliance Recycling Item | ¥0 | |||||
| a) Air Conditioning |
(Split, Wall Mounted, Floor Stand, and Window Type),
| b) TV | ||||
| c) Refrigerator and Freezer | ||||
| d) Washer and dryer | ||||
| Collection, Recycling, and Transportation Fee | 1 | NTE | ¥15,000,000 | ¥15,000,000 |
Total Amount: ¥50,500,000
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
3RD OPT CLIN0011
| ATTACHMENT J-0200000-05 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #N40084-21-R-2003 |
| EXHIBIT D - CLIN 0011 |
| Bulky Waste Collection and Disposal Recurring Work |
| PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management |
| Period of Performance: 3RD OPTION PERIOD |
ELIN/Sub ELIN Description - CLIN 0011 - Recurring Work Estimated Quantity Unit Price Estimated Amount
| D001 | MCB - Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1) | |||
| D001AA | Bulk Waste Collection Points - Camp Foster Bldg.5631 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 361,728Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ¥0 | |||
| c) E-waste (Other than under home appliance recycling law) | ¥0 | |||
| d) Concrete and Asphalt | ¥0 | |||
| * The Price is to include segregation and disposal fee |
| D001AB | Bulk Waste Collection Points - Camp Kinser Bldg.425 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 60,000Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| * The Price is to include segregation and disposal fee |
| D001AC | Bulk Waste Collection Points - Camp Kinser (Near Bldg. 104) | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 548,664Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| D001AD | Bulk Waste Collection Points - MCAS Futenma Bldg.621 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 280,440Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| D001AE | Bulk Waste Collection Points - Camp Courtney Bldg.4101 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 12,000Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| D001AF | Bulk Waste Collection Points - Camp Hansen Bldg.2895 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 260,011Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| D001AG | Bulk Waste Collection Points - Camp Schwab Bldg.3125 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 98,136Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
Total Amount: ¥0
D002 Spec Item 3.1.3 - Unscheduled Container Delivery and Removal But are not limited to Non-Burnable Mixed Construction and Demo Debris
| The orders for container delivery service will include delivery, pick-up, segregation and disposal. The container delivery request require at least 3 business days notification, but if contractor could not meet the requested date of the container delivery, the contractor is to provide/suggest a new delivery schedule within 48 hours of the request. The new suggested delivery schedule should be within the next three days. |
| The duration of service (per occurrence) shall be from 1 to 3days or on a case by case situation. See SPEC 3.1.3. |
The size will be contractor's discretion based on availability.
| D002AA | MCB - Unscheduled Container Delivery and Removal | |||
| a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton | 50 | Ea. | ¥0 | |
| ** Provide price to include container and transportation fee |
Grand Total Amount: ¥0
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
3RD OPT CLIN0012
| ATTACHMENT J-0200000-05 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #N40084-21-R-2003 |
| EXHIBIT D - CLIN 0012 |
| Bulky Waste Collection and Disposal Recurring Work |
| PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management |
| Period of Performance: 3RD OPTION PERIOD |
ELIN/Sub ELIN Description - CLIN 00012 - Recurring Work Estimated Quantity Unit Price Estimated Amount
| D003 | Contractor Operated Bulk Waste Sites |
| The Contractor will price only the additional cost associated with the requirements of specification item 3.1.1. |
| D003AA | Contractor Operated Bulk Waste Sites | ||||
| i) Bulk Waste Collection Points - Camp Foster Bldg.5631 | 12 | ¥0 | per Mo | ¥0 | |
| ii) Bulk Waste Collection Points - Camp Kinser (near Bldg. 104) | 12 | ¥0 | per Mo | ¥0 | |
| iii) Bulk Waste Collection Points - MCAS Futenma Bldg.621 | 12 | ¥0 | per Mo | ¥0 | |
| iv) Bulk Waste Collection Points - Camp Courtney Bldg.4101 | 12 | ¥0 | per Mo | ¥0 | |
| v) Bulk Waste Collection Points - Camp Hansen Bldg.2895 | 12 | ¥0 | per Mo | ¥0 | |
| vi) Bulk Waste Collection Points - Camp Schwab Bldg.3125 | 12 | ¥0 | per Mo | ¥0 |
Total of 6 Collection Points: ¥0
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
3RD OPT CLIN0013
| ATTACHMENT J-0200000-05 | ||||
| EXHIBIT LINE ITEM NUMBERS | ||||
| SOLICITATION/CONTRACT #N40084-21-R-2003 | ||||
| EXHIBIT D - CLIN 0013 | ||||
| Line Item 0013 Nonrecurring Work - 3RD OPTION | ||||
| PROVIDE UNIT PRICES FOR NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||
| ELINs D004 THROUGH D007 | ||||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | EST | |
| QTY | UNIT OF | |||
| ISSUE | UNIT | |||
| PRICE | TOTAL |
AMOUNT
| D004 | 10-Ton Metal Refuse Container/27 CY | Additional containers per spec item 4.3. | 50 | EA | ¥0 | |
| D005 | Reimbursement of Cost Repair on Contractor's Damaged Property | During the performance of work in this service contract, a damage of property (e.g., truck, dumpster, etc.) occurs and at no fault of the performing contractor and determined to be result of Government negligence, The Contractor shall submit a request for reimbursement of cost repair of damaged property along with all necessary supporting documents. | 1 | NTE | ¥500,000 | ¥500,000 |
| D006 | One-Time Clean Up of Bulk Waste Site | The Contractor shall perform a one-time cleanup of the bulk waste site(s) per spec item 4.1. To be Negotiated. | 1 | NTE | ¥35,000,000 | ¥35,000,000 |
| D007 | E-waste – Items Under Home Appliance Recycling Law; To be Negotiated | |||||
| Home Appliance Recycling Item | ¥0 | |||||
| a) Air Conditioning |
(Split, Wall Mounted, Floor Stand, and Window Type),
| b) TV | ||||
| c) Refrigerator and Freezer | ||||
| d) Washer and dryer | ||||
| Collection, Recycling, and Transportation Fee | 1 | NTE | ¥15,000,000 | ¥15,000,000 |
Total Amount: ¥50,500,000
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
4TH OPT CLIN0014
| ATTACHMENT J-0200000-05 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #N40084-21-R-2003 |
| EXHIBIT E - CLIN 0014 |
| Bulky Waste Collection and Disposal Recurring Work |
| PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management |
| Period of Performance: 4TH OPT PERIOD |
ELIN/Sub ELIN Description - CLIN 0014 - Recurring Work Estimated Quantity Unit Price Estimated Amount
| E001 | MCB - Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1) | |||
| E001AA | Bulk Waste Collection Points - Camp Foster Bldg.5631 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 361,728Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ¥0 | |||
| c) E-waste (Other than under home appliance recycling law) | ¥0 | |||
| d) Concrete and Asphalt | ¥0 | |||
| * The Price is to include segregation and disposal fee |
| E001AB | Bulk Waste Collection Points - Camp Kinser Bldg.425 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 60,000Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| * The Price is to include segregation and disposal fee |
| E001AC | Bulk Waste Collection Points - Camp Kinser (Near Bldg. 104) | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 548,664Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| E001AD | Bulk Waste Collection Points - MCAS Futenma Bldg.621 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 280,440Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| E001AE | Bulk Waste Collection Points - Camp Courtney Bldg.4101 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 12,000Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| E001AF | Bulk Waste Collection Points - Camp Hansen Bldg.2895 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 260,011Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
| E001AG | Bulk Waste Collection Points - Camp Schwab Bldg.3125 | 12 | per Mo | ¥0 |
| (Annual Estimated Quanity = 98,136Kg) | ||||
| But are not limited to; | ||||
| a) Wood Waste | ¥0 | |||
| b) Mixed Wastes | ||||
| c) E-waste (Other than under home appliance recycling law) | ||||
| d) Concrete and Asphalt | ||||
| * The Price is to include segregation and disposal fee |
Total Amount: ¥0
E002 Spec Item 3.1.3 - Unscheduled Container Delivery and Removal But are not limited to Non-Burnable Mixed Construction and Demo Debris
| The orders for container delivery service will include delivery, pick-up, segregation and disposal. The container delivery request require at least 3 business days notification, but if contractor could not meet the requested date of the container delivery, the contractor is to provide/suggest a new delivery schedule within 48 hours of the request. The new suggested delivery schedule should be within the next three days. |
| The duration of service (per occurrence) shall be from 1 to 3days or on a case by case situation. See SPEC 3.1.3. |
The size will be contractor's discretion based on availability.
| E002AA | MCB - Unscheduled Container Delivery and Removal | |||
| a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton | 50 | Ea. | ¥0 | |
| ** Provide price to include container and transportation fee |
Grand Total Amount: ¥0
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
4TH OPT CLIN0015
| ATTACHMENT J-0200000-05 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #N40084-21-R-2003 |
| EXHIBIT E - CLIN 0015 |
| Bulky Waste Collection and Disposal Recurring Work |
| PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management |
| Period of Performance: 4TH OPTION PERIOD |
ELIN/Sub ELIN Description - CLIN 0015 - Recurring Work Estimated Quantity Unit Price Estimated Amount
| E003 | Contractor Operated Bulk Waste Sites |
| The Contractor will price only the additional cost associated with the requirements of specification item 3.1.1. |
| E003AA | Contractor Operated Bulk Waste Sites | ||||
| i) Bulk Waste Collection Points - Camp Foster Bldg.5631 | 12 | ¥0 | per Mo | ¥0 | |
| ii) Bulk Waste Collection Points - Camp Kinser (near Bldg. 104) | 12 | ¥0 | per Mo | ¥0 | |
| iii) Bulk Waste Collection Points - MCAS Futenma Bldg.621 | 12 | ¥0 | per Mo | ¥0 | |
| iv) Bulk Waste Collection Points - Camp Courtney Bldg.4101 | 12 | ¥0 | per Mo | ¥0 | |
| v) Bulk Waste Collection Points - Camp Hansen Bldg.2895 | 12 | ¥0 | per Mo | ¥0 | |
| vi) Bulk Waste Collection Points - Camp Schwab Bldg.3125 | 12 | ¥0 | per Mo | ¥0 |
Total of 6 Collection Points: ¥0
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
4TH OPT CLIN0016
| ATTACHMENT J-0200000-05 | ||||
| EXHIBIT LINE ITEM NUMBERS | ||||
| SOLICITATION/CONTRACT #N40084-21-R-2003 | ||||
| EXHIBIT E - CLIN 0016 | ||||
| Line Item 0016 Nonrecurring Work - 4TH OPTION | ||||
| PROVIDE UNIT PRICES FOR NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||
| ELINs E004 THROUGH E007 | ||||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | EST | |
| QTY | UNIT OF | |||
| ISSUE | UNIT | |||
| PRICE | TOTAL |
AMOUNT
| E004 | 10-Ton Metal Refuse Container/27 CY | Additional containers per spec item 4.3. | 50 | EA | ¥0 | |
| E005 | Reimbursement of Cost Repair on Contractor's Damaged Property | During the performance of work in this service contract, a damage of property (e.g., truck, dumpster, etc.) occurs and at no fault of the performing contractor and determined to be result of Government negligence, The Contractor shall submit a request for reimbursement of cost repair of damaged property along with all necessary supporting documents. | 1 | NTE | ¥500,000 | ¥500,000 |
| E006 | One-Time Clean Up of Bulk Waste Site | The Contractor shall perform a one-time cleanup of the bulk waste site(s) per spec item 4.1. To be Negotiated. | 1 | NTE | ¥35,000,000 | ¥35,000,000 |
| E007 | E-waste – Items Under Home Appliance Recycling Law; To be Negotiated | |||||
| Home Appliance Recycling Item | ¥0 | |||||
| a) Air Conditioning |
(Split, Wall Mounted, Floor Stand, and Window Type),
| b) TV | ||||
| c) Refrigerator and Freezer | ||||
| d) Washer and dryer | ||||
| Collection, Recycling, and Transportation Fee | 1 | NTE | ¥15,000,000 | ¥15,000,000 |
Total Amount: ¥50,500,000
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
Source Selection Information--See FAR 2.10 and 3.104 [when filled in]
File details come from the government source that posted it. Updated .