Attach_03_J-0200000-05 Exhibit Line Item_Rev2.xlsx

XLSX spreadsheet 83 KB Posted

Attached to
Integrated Solid Waste Management Services for Bulk Wastes, U. S. Installation MCB Camp Butler, Okinawa, Japan
Solicitation number
N40084-21-R-2003
Issued by

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

Attachment J-0200000-05 ELIN Schedule

Solicitation No.: N40084-21-R-2002
Project Title: Bulky Waste Collection and Disposal Recurring Work
CLIN NO.:ITEM DESCRIPTIONTotal
Base YearCLIN 0001Phase-In Period (Base Year Only) PRE-PRICED¥500,000
CLIN 0002Recurring Work: Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1)¥0
CLIN 0003Contractor Operated Bulk Waste Sites¥0
CLIN 0004Non-Recurring Work¥125,500,000
Subtotal for BASE:¥126,000,000
Option 1CLIN 0005Recurring Work: Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1)¥0
CLIN 0006Contractor Operated Bulk Waste Sites¥0
CLIN 0007Non-Recurring Work¥125,500,000
Subtotal for OPTION 1:¥125,500,000
Option 2CLIN 0008Recurring Work: Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1)¥0
CLIN 0009Contractor Operated Bulk Waste Sites¥0
CLIN 0010Non-Recurring Work¥125,500,000
Subtotal for OPTION 2:¥125,500,000
Option 3CLIN 0011Recurring Work: Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1)¥0
CLIN 0012Contractor Operated Bulk Waste Sites¥0
CLIN 0013Non-Recurring Work¥125,500,000
Subtotal for OPTION 3:¥125,500,000
Option 4CLIN 0014Recurring Work: Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1)¥0
CLIN 0015Contractor Operated Bulk Waste Sites¥0
CLIN 0016Non-Recurring Work¥125,500,000
Subtotal for OPTION 4:¥125,500,000
TOTAL AMOUNTS (Base ~ Opt4) JPY:¥0
TOTAL AMOUNTS (Base ~ Opt4) $:$0.00
NON-RECURRING TOTAL AMOUNTS (Base ~ Opt4) JPY:¥627,500,000
NON-RECURRING TOTAL AMOUNTS (Base ~ Opt4) $:$5,814,955.60

FY21 Exchange Rate: ¥107.9114

BASE CLIN0001

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
CONTRACT #N40084-21-R-2003
EXHIBIT A - CLIN 0001
Bulky Waste Collection and Disposal Recurring Work
PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management
Period of Performance: BASE

ELIN/Sub ELIN Description - CLIN 0001 - Recurring Work Estimated Quantity Unit Price Estimated Amount

A001MCB - Phase-In Period Per Spec Item 2.5 of Sub-Annex 1503030
A001AA60 days Phase-in1¥500,000LS¥500,000

&"Times New Roman,Regular"&10Page &P of &N

BASE CLIN0002

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
CONTRACT #N40084-21-R-2003
EXHIBIT A - CLIN 0002
Bulky Waste Collection and Disposal Recurring Work
PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management
Period of Performance: BASE

ELIN/Sub ELIN Description - CLIN 0002 - Recurring Work Estimated Quantity Unit Price Estimated Amount

A002MCB - Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1)
A002AABulk Waste Collection Points - Camp Foster Bldg.563112per Mo¥0
(Annual Estimated Quanity = 361,728Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes¥0
c) E-waste (Other than under home appliance recycling law)¥0
d) Concrete and Asphalt¥0
* The Price is to include segregation and disposal fee
A002ABBulk Waste Collection Points - Camp Kinser Bldg.42512per Mo¥0
(Annual Estimated Quanity = 60,000Kg)
But are not limited to;
a) Wood Waste¥0
* The Price is to include segregation and disposal fee
A002ACBulk Waste Collection Points - Camp Kinser (Near Bldg. 104)12per Mo¥0
(Annual Estimated Quanity = 548,664Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
A002ADBulk Waste Collection Points - MCAS Futenma Bldg.62112per Mo¥0
(Annual Estimated Quanity = 280,440Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
A002AEBulk Waste Collection Points - Camp Courtney Bldg.410112per Mo¥0
(Annual Estimated Quanity = 12,000Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
A002AFBulk Waste Collection Points - Camp Hansen Bldg.289512per Mo¥0
(Annual Estimated Quanity = 260,011Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
A002AGBulk Waste Collection Points - Camp Schwab Bldg.312512per Mo¥0
(Annual Estimated Quanity = 98,136Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee

Total Amount: ¥0

A003 Spec Item 3.1.3 - Unscheduled Container Delivery and Removal But are not limited to Non-Burnable Mixed Construction and Demo Debris

The orders for container delivery service will include delivery, pick-up, segregation and disposal. The container delivery request require at least 3 business days notification, but if contractor could not meet the requested date of the container delivery, the contractor is to provide/suggest a new delivery schedule within 48 hours of the request. The new suggested delivery schedule should be within the next three days.
The duration of service (per occurrence) shall be from 1 to 3days or on a case by case situation. See SPEC 3.1.3.

The size will be contractor's discretion based on availability.

A003AAMCB - Unscheduled Container Delivery and Removal
a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton50Ea.¥0
** Provide price to include container and transportation fee
A003ABDoDEA - Unscheduled Container Delivery and Removal
a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton10Ea.¥0
** Provide price to include container and transportation fee

Grand Total Amount: ¥0

&"Times New Roman,Regular"&10Page &P of &N

BASE CLIN0003

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
CONTRACT #N40084-21-R-2003
EXHIBIT A - CLIN 0003
Bulky Waste Collection and Disposal Recurring Work
PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management
Period of Performance: BASE

ELIN/Sub ELIN Description - CLIN 0003 - Recurring Work Estimated Quantity Unit Price Estimated Amount

A004Contractor Operated Bulk Waste Sites
The Contractor will price only the additional cost associated with the requirements of specification item 3.1.1.
A004AAContractor Operated Bulk Waste Sites
i) Bulk Waste Collection Points - Camp Foster Bldg.563112¥0per Mo¥0
ii) Bulk Waste Collection Points - Camp Kinser (near Bldg. 104)12¥0per Mo¥0
iii) Bulk Waste Collection Points - MCAS Futenma Bldg.62112¥0per Mo¥0
iv) Bulk Waste Collection Points - Camp Courtney Bldg.410112¥0per Mo¥0
v) Bulk Waste Collection Points - Camp Hansen Bldg.289512¥0per Mo¥0
vi) Bulk Waste Collection Points - Camp Schwab Bldg.312512¥0per Mo¥0

Total of 6 Collection Points: ¥0

&"Times New Roman,Regular"&10Page &P of &N

BASE CLIN0004

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40084-21-R-2003
EXHIBIT A - CLIN 0004
Line Item 0004 Nonrecurring Work - Base Period
PROVIDE UNIT PRICES FOR NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A005 THROUGH A008
ELINSHORT DESCRIPTIONFULL DESCRIPTIONEST
QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

A00510-Ton Metal Refuse Container/27 CYAdditional containers per spec item 4.3.50EA¥0
A006Reimbursement of Cost Repair on Contractor's Damaged PropertyDuring the performance of work in this service contract, a damage of property (e.g., truck, dumpster, etc.) occurs and at no fault of the performing contractor and determined to be result of Government negligence, The Contractor shall submit a request for reimbursement of cost repair of damaged property along with all necessary supporting documents.1NTE¥500,000¥500,000
A007One-Time Clean Up of Bulk Waste SiteThe Contractor shall perform a one-time cleanup of the bulk waste site(s) per spec item 4.1. To be Negotiated.1NTE¥35,000,000¥35,000,000
A008Recurring Work OverageThe Contractor shall continue to perform recurring work requirements when estimated weight to be collected exceeds actual weight collected by 10% per spec item 4.4.1NTE¥75,000,000¥75,000,000
A009E-waste – Items Under Home Appliance Recycling Law; To be Negotiated
Home Appliance Recycling Item¥0
a) Air Conditioning

(Split, Wall Mounted, Floor Stand, and Window Type),

b) TV
c) Refrigerator and Freezer
d) Washer and dryer
Collection, Recycling, and Transportation Fee1NTE¥15,000,000¥15,000,000

Total Amount: ¥125,500,000

1ST OPT CLIN0005

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
CONTRACT #N40084-21-R-2003
EXHIBIT B - CLIN 0005
Bulky Waste Collection and Disposal Recurring Work
PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management
Period of Performance: 1ST OPTION

ELIN/Sub ELIN Description - CLIN 0005 - Recurring Work Estimated Quantity Unit Price Estimated Amount

B001MCB - Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1)
B001AABulk Waste Collection Points - Camp Foster Bldg.563112per Mo¥0
(Annual Estimated Quanity = 361,728Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes¥0
c) E-waste (Other than under home appliance recycling law)¥0
d) Concrete and Asphalt¥0
* The Price is to include segregation and disposal fee
B001ABBulk Waste Collection Points - Camp Kinser Bldg.42512per Mo¥0
(Annual Estimated Quanity = 60,000Kg)
But are not limited to;
a) Wood Waste¥0
* The Price is to include segregation and disposal fee
B001ACBulk Waste Collection Points - Camp Kinser (Near Bldg. 104)12per Mo¥0
(Annual Estimated Quanity = 548,664Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
B001ADBulk Waste Collection Points - MCAS Futenma Bldg.62112per Mo¥0
(Annual Estimated Quanity = 280,440Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
B001AEBulk Waste Collection Points - Camp Courtney Bldg.410112per Mo¥0
(Annual Estimated Quanity = 12,000Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
B001AFBulk Waste Collection Points - Camp Hansen Bldg.289512per Mo¥0
(Annual Estimated Quanity = 260,011Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
B001AGBulk Waste Collection Points - Camp Schwab Bldg.312512per Mo¥0
(Annual Estimated Quanity = 98,136Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee

Total Amount: ¥0

B002 Spec Item 3.1.3 - Unscheduled Container Delivery and Removal But are not limited to Non-Burnable Mixed Construction and Demo Debris

The orders for container delivery service will include delivery, pick-up, segregation and disposal. The container delivery request require at least 3 business days notification, but if contractor could not meet the requested date of the container delivery, the contractor is to provide/suggest a new delivery schedule within 48 hours of the request. The new suggested delivery schedule should be within the next three days.
The duration of service (per occurrence) shall be from 1 to 3days or on a case by case situation. See SPEC 3.1.3.

The size will be contractor's discretion based on availability.

B002AAMCB - Unscheduled Container Delivery and Removal
a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton50Ea.¥0
** Provide price to include container and transportation fee
B002ABDoDEA - Unscheduled Container Delivery and Removal
a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton10Ea.¥0
** Provide price to include container and transportation fee

Grand Total Amount: ¥0

&"Times New Roman,Regular"&10Page &P of &N

1ST OPT CLIN0006

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
CONTRACT #N40084-21-R-2003
EXHIBIT B - CLIN 0006
Bulky Waste Collection and Disposal Recurring Work
PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management
Period of Performance: 1ST OPTION PERIOD

ELIN/Sub ELIN Description - CLIN 0006 - Recurring Work Estimated Quantity Unit Price Estimated Amount

B003Contractor Operated Bulk Waste Sites
The Contractor will price only the additional cost associated with the requirements of specification item 3.1.1.
B003AAContractor Operated Bulk Waste Sites
i) Bulk Waste Collection Points - Camp Foster Bldg.563112¥0per Mo¥0
ii) Bulk Waste Collection Points - Camp Kinser (near Bldg. 104)12¥0per Mo¥0
iii) Bulk Waste Collection Points - MCAS Futenma Bldg.62112¥0per Mo¥0
iv) Bulk Waste Collection Points - Camp Courtney Bldg.410112¥0per Mo¥0
v) Bulk Waste Collection Points - Camp Hansen Bldg.289512¥0per Mo¥0
vi) Bulk Waste Collection Points - Camp Schwab Bldg.312512¥0per Mo¥0

Total of 6 Collection Points: ¥0

&"Times New Roman,Regular"&10Page &P of &N

1ST OPT CLIN0007

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40084-21-R-2003
EXHIBIT B - CLIN 0007
Line Item 0007 Nonrecurring Work - 1ST OPTION PERIOD
PROVIDE UNIT PRICES FOR NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B004 THROUGH B008
ELINSHORT DESCRIPTIONFULL DESCRIPTIONEST
QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

B00410-Ton Metal Refuse Container/27 CYAdditional containers per spec item 4.3.50EA¥0
B005Reimbursement of Cost Repair on Contractor's Damaged PropertyDuring the performance of work in this service contract, a damage of property (e.g., truck, dumpster, etc.) occurs and at no fault of the performing contractor and determined to be result of Government negligence, The Contractor shall submit a request for reimbursement of cost repair of damaged property along with all necessary supporting documents.1NTE¥500,000¥500,000
B006One-Time Clean Up of Bulk Waste SiteThe Contractor shall perform a one-time cleanup of the bulk waste site(s) per spec item 4.1. To be Negotiated.1NTE¥35,000,000¥35,000,000
B007Recurring Work OverageThe Contractor shall continue to perform recurring work requirements when estimated weight to be collected exceeds actual weight collected by 10% per spec item 4.4.1NTE¥75,000,000¥75,000,000
B008E-waste – Items Under Home Appliance Recycling Law; To be Negotiated
Home Appliance Recycling Item¥0
a) Air Conditioning

(Split, Wall Mounted, Floor Stand, and Window Type),

b) TV
c) Refrigerator and Freezer
d) Washer and dryer
Collection, Recycling, and Transportation Fee1NTE¥15,000,000¥15,000,000

Total Amount: ¥125,500,000

2ND OPT CLIN0008

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
CONTRACT #N40084-21-R-2003
EXHIBIT C - CLIN 0008
Bulky Waste Collection and Disposal Recurring Work
PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management
Period of Performance: 2ND OPTION PERIOD

ELIN/Sub ELIN Description - CLIN 0008 - Recurring Work Estimated Quantity Unit Price Estimated Amount

C001MCB - Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1)
C001AABulk Waste Collection Points - Camp Foster Bldg.563112per Mo¥0
(Annual Estimated Quanity = 361,728Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes¥0
c) E-waste (Other than under home appliance recycling law)¥0
d) Concrete and Asphalt¥0
* The Price is to include segregation and disposal fee
C001ABBulk Waste Collection Points - Camp Kinser Bldg.42512per Mo¥0
(Annual Estimated Quanity = 60,000Kg)
But are not limited to;
a) Wood Waste¥0
* The Price is to include segregation and disposal fee
C001ACBulk Waste Collection Points - Camp Kinser (Near Bldg. 104)12per Mo¥0
(Annual Estimated Quanity = 548,664Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
C001ADBulk Waste Collection Points - MCAS Futenma Bldg.62112per Mo¥0
(Annual Estimated Quanity = 280,440Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
C001AEBulk Waste Collection Points - Camp Courtney Bldg.410112per Mo¥0
(Annual Estimated Quanity = 12,000Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
C001AFBulk Waste Collection Points - Camp Hansen Bldg.289512per Mo¥0
(Annual Estimated Quanity = 260,011Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
C001AGBulk Waste Collection Points - Camp Schwab Bldg.312512per Mo¥0
(Annual Estimated Quanity = 98,136Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee

Total Amount: ¥0

C002 Spec Item 3.1.3 - Unscheduled Container Delivery and Removal But are not limited to Non-Burnable Mixed Construction and Demo Debris

The orders for container delivery service will include delivery, pick-up, segregation and disposal. The container delivery request require at least 3 business days notification, but if contractor could not meet the requested date of the container delivery, the contractor is to provide/suggest a new delivery schedule within 48 hours of the request. The new suggested delivery schedule should be within the next three days.
The duration of service (per occurrence) shall be from 1 to 3days or on a case by case situation. See SPEC 3.1.3.

The size will be contractor's discretion based on availability.

C002AAMCB - Unscheduled Container Delivery and Removal
a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton50Ea.¥0
** Provide price to include container and transportation fee
C002ABDoDEA - Unscheduled Container Delivery and Removal
a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton10Ea.¥0
** Provide price to include container and transportation fee

Grand Total Amount: ¥0

&"Times New Roman,Regular"&10Page &P of &N

2ND OPT CLIN0009

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
CONTRACT #N40084-21-R-2003
EXHIBIT C - CLIN 0009
Bulky Waste Collection and Disposal Recurring Work
PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management
Period of Performance: 2ND OPTION PERIOD

ELIN/Sub ELIN Description - CLIN 0009 - Recurring Work Estimated Quantity Unit Price Estimated Amount

C003Contractor Operated Bulk Waste Sites
The Contractor will price only the additional cost associated with the requirements of specification item 3.1.1.
C003AAContractor Operated Bulk Waste Sites
i) Bulk Waste Collection Points - Camp Foster Bldg.563112¥0per Mo¥0
ii) Bulk Waste Collection Points - Camp Kinser (near Bldg. 104)12¥0per Mo¥0
iii) Bulk Waste Collection Points - MCAS Futenma Bldg.62112¥0per Mo¥0
iv) Bulk Waste Collection Points - Camp Courtney Bldg.410112¥0per Mo¥0
v) Bulk Waste Collection Points - Camp Hansen Bldg.289512¥0per Mo¥0
vi) Bulk Waste Collection Points - Camp Schwab Bldg.312512¥0per Mo¥0

Total of 6 Collection Points: ¥0

&"Times New Roman,Regular"&10Page &P of &N

2ND OPT CLIN0010

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40084-21-R-2003
EXHIBIT C - CLIN 0010
Line Item 0010 Nonrecurring Work - 2ND OPTION PERIOD
PROVIDE UNIT PRICES FOR NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs C004 THROUGH C008
ELINSHORT DESCRIPTIONFULL DESCRIPTIONEST
QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

C00410-Ton Metal Refuse Container/27 CYAdditional containers per spec item 4.3.50EA¥0
C005Reimbursement of Cost Repair on Contractor's Damaged PropertyDuring the performance of work in this service contract, a damage of property (e.g., truck, dumpster, etc.) occurs and at no fault of the performing contractor and determined to be result of Government negligence, The Contractor shall submit a request for reimbursement of cost repair of damaged property along with all necessary supporting documents.1NTE¥500,000¥500,000
C006One-Time Clean Up of Bulk Waste SiteThe Contractor shall perform a one-time cleanup of the bulk waste site(s) per spec item 4.1. To be Negotiated.1NTE¥35,000,000¥35,000,000
C007Recurring Work OverageThe Contractor shall continue to perform recurring work requirements when estimated weight to be collected exceeds actual weight collected by 10% per spec item 4.4.1NTE¥75,000,000¥75,000,000
C008E-waste – Items Under Home Appliance Recycling Law; To be Negotiated
Home Appliance Recycling Item¥0
a) Air Conditioning

(Split, Wall Mounted, Floor Stand, and Window Type),

b) TV
c) Refrigerator and Freezer
d) Washer and dryer
Collection, Recycling, and Transportation Fee1NTE¥15,000,000¥15,000,000

Total Amount: ¥125,500,000

3RD OPT CLIN0011

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
CONTRACT #N40084-21-R-2003
EXHIBIT D - CLIN 0011
Bulky Waste Collection and Disposal Recurring Work
PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management
Period of Performance: 3RD OPTION PERIOD

ELIN/Sub ELIN Description - CLIN 0011 - Recurring Work Estimated Quantity Unit Price Estimated Amount

D001MCB - Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1)
D001AABulk Waste Collection Points - Camp Foster Bldg.563112per Mo¥0
(Annual Estimated Quanity = 361,728Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes¥0
c) E-waste (Other than under home appliance recycling law)¥0
d) Concrete and Asphalt¥0
* The Price is to include segregation and disposal fee
D001ABBulk Waste Collection Points - Camp Kinser Bldg.42512per Mo¥0
(Annual Estimated Quanity = 60,000Kg)
But are not limited to;
a) Wood Waste¥0
* The Price is to include segregation and disposal fee
D001ACBulk Waste Collection Points - Camp Kinser (Near Bldg. 104)12per Mo¥0
(Annual Estimated Quanity = 548,664Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
D001ADBulk Waste Collection Points - MCAS Futenma Bldg.62112per Mo¥0
(Annual Estimated Quanity = 280,440Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
D001AEBulk Waste Collection Points - Camp Courtney Bldg.410112per Mo¥0
(Annual Estimated Quanity = 12,000Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
D001AFBulk Waste Collection Points - Camp Hansen Bldg.289512per Mo¥0
(Annual Estimated Quanity = 260,011Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
D001AGBulk Waste Collection Points - Camp Schwab Bldg.312512per Mo¥0
(Annual Estimated Quanity = 98,136Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee

Total Amount: ¥0

D002 Spec Item 3.1.3 - Unscheduled Container Delivery and Removal But are not limited to Non-Burnable Mixed Construction and Demo Debris

The orders for container delivery service will include delivery, pick-up, segregation and disposal. The container delivery request require at least 3 business days notification, but if contractor could not meet the requested date of the container delivery, the contractor is to provide/suggest a new delivery schedule within 48 hours of the request. The new suggested delivery schedule should be within the next three days.
The duration of service (per occurrence) shall be from 1 to 3days or on a case by case situation. See SPEC 3.1.3.

The size will be contractor's discretion based on availability.

D002AAMCB - Unscheduled Container Delivery and Removal
a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton50Ea.¥0
** Provide price to include container and transportation fee
D002ABDoDEA - Unscheduled Container Delivery and Removal
a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton10Ea.¥0
** Provide price to include container and transportation fee

Grand Total Amount: ¥0

&"Times New Roman,Regular"&10Page &P of &N

3RD OPT CLIN0012

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
CONTRACT #N40084-21-R-2003
EXHIBIT D - CLIN 0012
Bulky Waste Collection and Disposal Recurring Work
PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management
Period of Performance: 3RD OPTION PERIOD

ELIN/Sub ELIN Description - CLIN 00012 - Recurring Work Estimated Quantity Unit Price Estimated Amount

D003Contractor Operated Bulk Waste Sites
The Contractor will price only the additional cost associated with the requirements of specification item 3.1.1.
D003AAContractor Operated Bulk Waste Sites
i) Bulk Waste Collection Points - Camp Foster Bldg.563112¥0per Mo¥0
ii) Bulk Waste Collection Points - Camp Kinser (near Bldg. 104)12¥0per Mo¥0
iii) Bulk Waste Collection Points - MCAS Futenma Bldg.62112¥0per Mo¥0
iv) Bulk Waste Collection Points - Camp Courtney Bldg.410112¥0per Mo¥0
v) Bulk Waste Collection Points - Camp Hansen Bldg.289512¥0per Mo¥0
vi) Bulk Waste Collection Points - Camp Schwab Bldg.312512¥0per Mo¥0

Total of 6 Collection Points: ¥0

&"Times New Roman,Regular"&10Page &P of &N

3RD OPT CLIN0013

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40084-21-R-2003
EXHIBIT D - CLIN 0013
Line Item 0013 Nonrecurring Work - 3RD OPTION
PROVIDE UNIT PRICES FOR NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs D004 THROUGH D008
ELINSHORT DESCRIPTIONFULL DESCRIPTIONEST
QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

D00410-Ton Metal Refuse Container/27 CYAdditional containers per spec item 4.3.50EA¥0
D005Reimbursement of Cost Repair on Contractor's Damaged PropertyDuring the performance of work in this service contract, a damage of property (e.g., truck, dumpster, etc.) occurs and at no fault of the performing contractor and determined to be result of Government negligence, The Contractor shall submit a request for reimbursement of cost repair of damaged property along with all necessary supporting documents.1NTE¥500,000¥500,000
D006One-Time Clean Up of Bulk Waste SiteThe Contractor shall perform a one-time cleanup of the bulk waste site(s) per spec item 4.1. To be Negotiated.1NTE¥35,000,000¥35,000,000
D007Recurring Work OverageThe Contractor shall continue to perform recurring work requirements when estimated weight to be collected exceeds actual weight collected by 10% per spec item 4.4.1NTE¥75,000,000¥75,000,000
D008E-waste – Items Under Home Appliance Recycling Law; To be Negotiated
Home Appliance Recycling Item¥0
a) Air Conditioning

(Split, Wall Mounted, Floor Stand, and Window Type),

b) TV
c) Refrigerator and Freezer
d) Washer and dryer
Collection, Recycling, and Transportation Fee1NTE¥15,000,000¥15,000,000

Total Amount: ¥125,500,000

4TH OPT CLIN0014

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
CONTRACT #N40084-21-R-2003
EXHIBIT E - CLIN 0014
Bulky Waste Collection and Disposal Recurring Work
PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management
Period of Performance: 4TH OPT PERIOD

ELIN/Sub ELIN Description - CLIN 0014 - Recurring Work Estimated Quantity Unit Price Estimated Amount

E001MCB - Spec Item 3 and Attachment J-1503030-06 Waste Categories (excluding Spec Item 3.1.1)
E001AABulk Waste Collection Points - Camp Foster Bldg.563112per Mo¥0
(Annual Estimated Quanity = 361,728Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes¥0
c) E-waste (Other than under home appliance recycling law)¥0
d) Concrete and Asphalt¥0
* The Price is to include segregation and disposal fee
E001ABBulk Waste Collection Points - Camp Kinser Bldg.42512per Mo¥0
(Annual Estimated Quanity = 60,000Kg)
But are not limited to;
a) Wood Waste¥0
* The Price is to include segregation and disposal fee
E001ACBulk Waste Collection Points - Camp Kinser (Near Bldg. 104)12per Mo¥0
(Annual Estimated Quanity = 548,664Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
E001ADBulk Waste Collection Points - MCAS Futenma Bldg.62112per Mo¥0
(Annual Estimated Quanity = 280,440Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
E001AEBulk Waste Collection Points - Camp Courtney Bldg.410112per Mo¥0
(Annual Estimated Quanity = 12,000Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
E001AFBulk Waste Collection Points - Camp Hansen Bldg.289512per Mo¥0
(Annual Estimated Quanity = 260,011Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee
E001AGBulk Waste Collection Points - Camp Schwab Bldg.312512per Mo¥0
(Annual Estimated Quanity = 98,136Kg)
But are not limited to;
a) Wood Waste¥0
b) Mixed Wastes
c) E-waste (Other than under home appliance recycling law)
d) Concrete and Asphalt
* The Price is to include segregation and disposal fee

Total Amount: ¥0

E002 Spec Item 3.1.3 - Unscheduled Container Delivery and Removal But are not limited to Non-Burnable Mixed Construction and Demo Debris

The orders for container delivery service will include delivery, pick-up, segregation and disposal. The container delivery request require at least 3 business days notification, but if contractor could not meet the requested date of the container delivery, the contractor is to provide/suggest a new delivery schedule within 48 hours of the request. The new suggested delivery schedule should be within the next three days.
The duration of service (per occurrence) shall be from 1 to 3days or on a case by case situation. See SPEC 3.1.3.

The size will be contractor's discretion based on availability.

E002AAMCB - Unscheduled Container Delivery and Removal
a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton50Ea.¥0
** Provide price to include container and transportation fee
E002ABDoDEA - Unscheduled Container Delivery and Removal
a) Solid Waste Containers, 10Tons or 4Tons x 2Ea=10Ton10Ea.¥0
** Provide price to include container and transportation fee

Grand Total Amount: ¥0

&"Times New Roman,Regular"&10Page &P of &N

4TH OPT CLIN0015

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
CONTRACT #N40084-21-R-2003
EXHIBIT E - CLIN 0015
Bulky Waste Collection and Disposal Recurring Work
PROVIDE PRICES FOR REFUSE BULKY COLLECTION AND DISPOSAL SERVICES - RECURRING WORK - IN ACCORDANCE WITH ANNEX 2, Management and Administration, 1503030 Integrated Solid Waste Management
Period of Performance: 4TH OPTION PERIOD

ELIN/Sub ELIN Description - CLIN 0015 - Recurring Work Estimated Quantity Unit Price Estimated Amount

E003Contractor Operated Bulk Waste Sites
The Contractor will price only the additional cost associated with the requirements of specification item 3.1.1.
E003AAContractor Operated Bulk Waste Sites
i) Bulk Waste Collection Points - Camp Foster Bldg.563112¥0per Mo¥0
ii) Bulk Waste Collection Points - Camp Kinser (near Bldg. 104)12¥0per Mo¥0
iii) Bulk Waste Collection Points - MCAS Futenma Bldg.62112¥0per Mo¥0
iv) Bulk Waste Collection Points - Camp Courtney Bldg.410112¥0per Mo¥0
v) Bulk Waste Collection Points - Camp Hansen Bldg.289512¥0per Mo¥0
vi) Bulk Waste Collection Points - Camp Schwab Bldg.312512¥0per Mo¥0

Total of 6 Collection Points: ¥0

&"Times New Roman,Regular"&10Page &P of &N

4TH OPT CLIN0016

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40084-21-R-2003
EXHIBIT E - CLIN 0016
Line Item 0016 Nonrecurring Work - 4TH OPTION
PROVIDE UNIT PRICES FOR NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs E004 THROUGH E008
ELINSHORT DESCRIPTIONFULL DESCRIPTIONEST
QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

E00410-Ton Metal Refuse Container/27 CYAdditional containers per spec item 4.3.50EA¥0
E005Reimbursement of Cost Repair on Contractor's Damaged PropertyDuring the performance of work in this service contract, a damage of property (e.g., truck, dumpster, etc.) occurs and at no fault of the performing contractor and determined to be result of Government negligence, The Contractor shall submit a request for reimbursement of cost repair of damaged property along with all necessary supporting documents.1NTE¥500,000¥500,000
E006One-Time Clean Up of Bulk Waste SiteThe Contractor shall perform a one-time cleanup of the bulk waste site(s) per spec item 4.1. To be Negotiated.1NTE¥35,000,000¥35,000,000
E007Recurring Work OverageThe Contractor shall continue to perform recurring work requirements when estimated weight to be collected exceeds actual weight collected by 10% per spec item 4.4.1NTE¥75,000,000¥75,000,000
E008E-waste – Items Under Home Appliance Recycling Law; To be Negotiated
Home Appliance Recycling Item¥0
a) Air Conditioning

(Split, Wall Mounted, Floor Stand, and Window Type),

b) TV
c) Refrigerator and Freezer
d) Washer and dryer
Collection, Recycling, and Transportation Fee1NTE¥15,000,000¥15,000,000

Total Amount: ¥125,500,000

File details come from the government source that posted it. Updated .