Encl_01_Bulk Waste PWS pg46 AMD5.pdf
PDF 92 KB Posted
- Solicitation number
- N40084-21-R-2003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach_03_J-0200000-05 Exhibit Line Item_Rev3.xlsx | XLSX spreadsheet | |
| N4008421R2003_Amend 0005.pdf | ||
| N4008421R2003_Amend 0004.pdf | ||
| Attach_03_J-0200000-05 Exhibit Line Item_Rev2.xlsx | XLSX spreadsheet | |
| Encl_01a_Bulk Waste PWS pg53 AMD4.pdf | ||
| N4008421R2003_Amend 0003.pdf | ||
| N4008421R2003_Amend 0002.pdf | ||
| Attach_03_J-0200000-05 Exhibit Line Item_Rev1.xlsx | XLSX spreadsheet | |
| Encl_01a_Bulk Waste PWS pg56 AMD1.pdf | ||
| N4008421R2003_Amend 0001.pdf | ||
| Encl_01b_Bulk Waste PWS pg162 AMD1.pdf | ||
| Attach_03_J-0200000-05 Exhibit Line Item_Final_.xlsx | XLSX spreadsheet | |
| Attach_02_21R2003_Bulk Waste Management_PAP_FAP_3May21.pdf | ||
| N4008421R2003_RFP.pdf | ||
| Attach_06_Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| Attach_01_Bulk Waste PWS_Final_25May21.pdf | ||
| Attach_04_Corporate Experience Data Sheet.docx | DOCX document | |
| Attach_07a_Site Visit_Request_Form.xlsx | XLSX spreadsheet | |
| Attach_05_Past Performance Questionnaire.docx | DOCX document | |
| Attach_07b_GAP blank form.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1503030 - Integrated Solid Waste Management
Spec
Item
Title Description
2.3.9 Inclement Weather
Schedule
Once directed by the KO for the commencement of work in anticipation of inclement weather, the Contractor shall proceed with accelerated acceptance at collection sites, transportation, and disposal of waste per Contractor’s SWM Plan.
The Contractor’s scheduled work for the day will not be reduced or excused. The Contractor shall make up all missed collections the following work day after the all clear has been given.
Informational note: Historically, it has been rare for this to occur.
Refer to Marine Corps Air Station Order (MCASO) P3140.4, Destruction Weather Bill for TCCOR levels.
2.3.9.1 Government Operated
Bulk Waste Site
The Contractor may be required to adjust their schedule to collect bulk waste during TCCOR 3 to ensure no bulk waste is strewn about the installation. Exceptions to this may be authorized by the KO or COR.
2.3.9.2 Contractor Operated
Bulk Waste Site
The Contractor may be required to accept all bulk waste into each site during TCCOR 3. To prevent all solid waste from being strewn about the Installation the Contractor shall secure all bulk waste items during TCCOR 3 at no additional cost to the Government. The Contractor shall shutdown the bulk waste site and depart the installation at TCCOR 2. Exceptions to this may be authorized by the KO or COR.
2.4 References and
Technical Documents
References and Technical Documents are listed in J-1503030-02.
2.5 Phase-in Period Forty-five days prior to the commencement of the base period of this contract, the Contractor shall mobilize for performance. This includes, but is not limited to, staffing and hiring, equipment preparation, administrative requirements, base access coordination, and providing submittals (deliverables) to the Government.