N4008420R0060 Amendment 0008.pdf
PDF 132 KB Posted
- Solicitation number
- N4008420R0060
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008420R0060 Amendment 0007.pdf | ||
| N4008420R0060 Amendment 0006.pdf | ||
| N4008420R0060 Amendment 0005.pdf | ||
| Revised Attachment 3 ELINS.xlsx | XLSX spreadsheet | |
| N4008420R0060 Amendment 0004.pdf | ||
| N4008420R0060 Amendment 0003.pdf | ||
| N4008420R0060 Amendment 0002.pdf | ||
| N4008420R0060 Amendment 0001.pdf | ||
| Attachment 6 Non-Disclosure Agreement.pdf | ||
| N4008420R0060 Request for Proposal.pdf | ||
| Attachment 4 Project Data Sheet.pdf | ||
| Attachment 5 Past Performance Questionnaire.pdf | ||
| Attachment 3 ELINS.xlsx | XLSX spreadsheet | |
| Attachment 2 Pre-Proposal Inquiry Form.xls | XLS spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC FAR EAST
FEAD IWAKUNI
PSC 561 BOX 1871
FPO AP 96310-0019
ACQR5630199
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N4008420R0060 Amendment 0008
See Page 2 for further details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Nov-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008420R0060
X 9B. DATED (SEE ITEM 11)
03-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Nov-2020
CODE
NAVFAC FAR EAST
CORE EXECUTION TEAM
PSC 473 BOX 13
FPO AP 96349-0013
N40084 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE N40084
FACILITY CODECODE
EMAIL:TEL:
N4008420R0060
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0008 INFO
The purpose of this Amendment 0008 is to provide responses to the pre-proposal inquiries received as shown below:
No.
Questions (Should include Specification Section or
Drawing Reference)
Answers
340 1401000 Family Housing Spec item 3.2.2.1 Automatic Doors, Attachments J-1401000-04 Sample Historical Work Order Data & J-1401000-05 Interior Automatic Doors
Question: According to J-1401000-04, there seem to be other automatic doors installed at family housing buildings (Bldg.#589, 655, 658, etc.) besides the ones listed in J-1401000-05. Are they excluded from the scope of work? If they are included in the contract, please provide the complete list with detailed information of the automatic doors requiring maintenance services.
The additional automatic doors are being considered for addition by modification after award once accurate inventory is established.
341 We would like to clarify questions and answers for Question #298.
When comparing questions and answers of Question 298 against questions 297 and 311, the answers seem to be contradicting.
Our understanding is that Auto Wash systems and drain systems have been removed. We are still unclear about the Exhaust Hood inventory for locations which have been lined out in section J-1502000-31. Please clarify each of the following points:
A) Have Auto Wash Systems for lined out items been removed?
B) Have Drain Systems for lined out items been removed?
C) Have Exhaust Hoods for lined out items been removed?
D) Have Exhaust Fans for lined out items been removed?
Please refer to the following:
A) Yes, the auto wash systems have been removed from the PM work.
B) Yes, the Drain systems have been removed from the PM work.
C) Yes, the lined out Auto Wash Systems of the exhaust hoods have been removed from the PM work.
D) Yes, the lined out Auto Wash Systems of the exhaust fans have been removed from the PM work.
No additional inquiries will be received by the Government for this solicitation. All other terms and conditions remain unchanged.
N4008420R0060
(End of Summary of Changes)