| Line Item 0001 - Mobilization Period | |||||
| ELINs A001 through A014 | |||||
| ELIN/ | |||||
| Sub-ELIN | Annex/Sub-annex | ||||
| Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total |
| A001 | FAMILY HOUSING | ||||
| Includes the following Annex/Sub-Annexes: |
1401000 Family Housing 1503010 Custodial
| 1503050 Grounds Maintenance and Landscaping | 4 | MO | ¥ - 0 | ¥ - 0 |
| A002 | STATION | |||
| Includes the following Annex/Sub-Annexes: |
1502000 Facility Investment 1503010 Custodial 1503050 Grounds Maintenance and Landscaping 1604000 Wastewater
| 1800000 Environmental | 4 | MO | ¥ - 0 | ¥ - 0 |
| A003 | MCCS | |||
| Includes the following Annex/Sub-Annexes: |
1502000 Facility Investment
| 1503010 Custodial | 4 | MO | ¥ - 0 | ¥ - 0 |
| A004 | DeCA | |||
| Includes the following Annex/Sub-Annexes: |
1502000 Facility Investment
| 1503010 Custodial | 4 | MO | ¥ - 0 | ¥ - 0 |
| A005 | DeCA CDC | |||
| Includes the following Annex/Sub-Annexes: |
1502000 Facility Investment
| 1503010 Custodial | 4 | MO | ¥ - 0 | ¥ - 0 |
| A006 | DoDEA | |||
| Includes the following Annex/Sub-Annexes: |
1502000 Facility Investment 1503010 Custodial
| 1503050 Grounds Maintenance and Landscaping | 4 | MO | ¥ - 0 | ¥ - 0 |
| A007 | DLA DISPOSITION | |||
| Includes the following Annex/Sub-Annexes: |
1502000 Facility Investment
| 1503010 Custodial | 4 | MO | ¥ - 0 | ¥ - 0 |
| A008 | DLA DISTRIBUTION | |||
| Includes the following Annex/Sub-Annexes: |
1502000 Facility Investment
| 1503010 Custodial | 4 | MO | ¥ - 0 | ¥ - 0 | |
| A009 | POL | ||||
| Includes the following Annex/Sub-Annexes: | |||||
| 1502000 Facility Investment | 4 | MO | ¥ - 0 | ¥ - 0 | |
| A010 | NAVY | ||||
| Includes the following Annex/Sub-Annexes: | |||||
| 1503010 Custodial | 4 | MO | ¥ - 0 | ¥ - 0 | |
| A011 | NCIS | ||||
| Includes the following Annex/Sub-Annexes: | |||||
| 1503010 Custodial | 4 | MO | ¥ - 0 | ¥ - 0 | |
| A012 | USACE | ||||
| Includes the following Annex/Sub-Annexes: | |||||
| 1503010 Custodial | 4 | MO | ¥ - 0 | ¥ - 0 | |
| A013 | AFN TV | ||||
| Includes the following Annex/Sub-Annexes: | |||||
| 1503010 Custodial | 4 | MO | ¥ - 0 | ¥ - 0 | |
| A014 | S-6 | ||||
| Includes the following Annex/Sub-Annexes: | |||||
| 1503010 Custodial | 4 | MO | ¥ - 0 | ¥ - 0 | |
| TOTAL - MOBILIZATION PERIOD: | ¥ - 0 |
&"Times New Roman,Regular"&10Attachment J-0200000-13 Exhibit Line Item Numbers - MCAS Iwakuni Solicitation/Contract No.: N40084-20-R-XXXX
Recurring Base Period
The Contractor will price the specified ELINs A015 through A028 (Family Housing, Station, MCCS, etc.) for the base period as listed below. In total, these and ELINs A001 through A0014 sum to Line Item 0001 and represent the minimum Recurring Work award for the Base Period of performance.
The subsequent ELINs for the base period (A029 through A031 as listed below) relate to decreases in Facility Services (1503010 Custodial and 1503050 Grounds Maintenance and Landscaping) as defined in the applicable ELIN. The Contractor will price only the decrease in cost associated with the reduction in service below the level preceding it. These ELINs are associated with the respective CLINs (as listed in Section B) that will be used when required to increase/decrease the level of Facility Services. These CLINs are optional and will be ordered to achieve the desired level of service.
For each Option Period, the Contractor shall price ELINs in the same manner as explained above for the Base Period of performance.
| Line Item 0001 - Recurring Work - Base Period | |||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||
| ELINs A015 through A028 | |||||||
| ELIN/ | |||||||
| Sub-ELIN | Annex/Sub-annex | ||||||
| Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total | ||
| A015 | FAMILY HOUSING | ||||||
| 1401000 | Family Housing | ||||||
| A015AA | 3.1 | Family Housing (FH) Work Reception | 8 | MO | ¥ - | ¥ - | |
| FH Work Orders | |||||||
| A015AB | 3.2.1.1 | Emergency Work Orders | 100 | EA | ¥ - | ¥ - | |
| A015AC | 3.2.1.2 | Urgent Work Orders | 867 | EA | ¥ - | ¥ - | |
| A015AD | 3.2.1.3 | Routine Work Orders | 700 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| A015AE | 3.2.2.1 | Automatic Doors, Interior | 8 | MO | ¥ - | ¥ - | |
| A015AF | 3.2.2.2 | Fire Protection (FP) Systems | 8 | MO | ¥ - | ¥ - | |
| A015AG | 3.2.2.3 | HVAC and Refrigeration Systems | 8 | MO | ¥ - | ¥ - | |
| A015AH | 3.2.2.4 | Radon Mitigation Systems | 8 | MO | ¥ - | ¥ - | |
| A015AJ | 3.2.2.5 | Solar Water Heating Systems | 8 | MO | ¥ - | ¥ - | |
| A015AK | 3.2.2.6 | Garbage Disposal Sewer Water Treatment (DSWT) System | 8 | MO | ¥ - | ¥ - | |
| A015AL | 3.2.2.7 | Dryer Vents | 8 | MO | ¥ - | ¥ - | |
| Inspection, Testing, and Certification Program | |||||||
| A015AM | 3.2.3.1 | Garbage Disposal Sewer Water Treatment (DSWT) System Effluence Testing and Inspection | 8 | MO | ¥ - | ¥ - | |
| A015AN | 3.2.3.2 | Backflow Prevention Devices | 8 | MO | ¥ - | ¥ - | |
| A015AP | 3.2.4 | Change of Occupancy Maintenance (COM) | 8 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| A015AQ | 3.2.5.1 | HVAC Seasonal Start-Up and Shutdown | 8 | MO | ¥ - | ¥ - | |
| A015AR | 3.2.5.2 | HVAC Water Testing and Treatment Services | 8 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial | ||||||
| A015AS | Services for Family Housing facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| 1503050 | Grounds Maintenance and Landscaping | ||||||
| A015AT | Services for Family Housing areas indicated in J-1503050-07 and J-1503050-14; performed as specified for the MCICOM COLS 3 Full Base Measures per the Common Output Level Standards listed in J-1503050-06. | 8 | MO | ¥ - | ¥ - | ||
| Subtotal - FAMILY HOUSING: | ¥ - | ||||||
| A016 | STATION | ||||||
| 1502000 | Facility Investment | ||||||
| Work Orders | |||||||
| A016AA | 3.1.1 | Emergency Work Orders | 40 | EA | ¥ - | ¥ - | |
| A016AB | 3.1.2 | Urgent Work Orders | 48 | EA | ¥ - | ¥ - | |
| A016AC | 3.1.3 | Routine Work Orders | 80 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| A016AD | 3.2.1 | Automatic Doors, Interior | 8 | MO | ¥ - | ¥ - | |
| A016AE | 3.2.2 | Auxiliary Generators | 8 | MO | ¥ - | ¥ - | |
| A016AF | 3.2.3 | Small Boiler Systems | 8 | MO | ¥ - | ¥ - | |
| A016AG | 3.2.4 | Fire Protection (FP) Systems | 8 | MO | ¥ - | ¥ - | |
| A016AH | 3.2.5 | Fire Drill Pit | 8 | MO | ¥ - | ¥ - | |
| A016AJ | 3.2.6 | Facility Weight Handling Equipment (WHE) | 8 | MO | ¥ - | ¥ - | |
| A016AK | 3.2.7 | HVAC and Refrigeration Systems | 8 | MO | ¥ - | ¥ - | |
| A016AL | 3.2.8 | Aircraft Hangar Doors | 8 | MO | ¥ - | ¥ - | |
| A016AM | 3.2.9 | Airfield Lighting Systems | 8 | MO | ¥ - | ¥ - | |
| A016AN | 3.2.10 | Frequency Converter (400 HZ) Systems | 8 | MO | ¥ - | ¥ - | |
| A016AP | 3.2.11 | Lightning Arrestors and Grounding Devices | 8 | MO | ¥ - | ¥ - | |
| A016AQ | 3.2.12 | Photovoltaic (PV) Systems | 8 | MO | ¥ - | ¥ - | |
| A016AR | 3.2.13 | Storm Drain Water Gates and Pumps | 8 | MO | ¥ - | ¥ - | |
| A016AS | 3.2.14 | Uninterrupted Power Supply (UPS) Systems | 8 | MO | ¥ - | ¥ - | |
| A016AT | 3.2.15 | Above Ground and Underground Storage Tanks (ASTs and USTs) | 8 | MO | ¥ - | ¥ - | |
| A016AU | 3.2.16 | Oil/Water Separators (OWS) | 8 | MO | ¥ - | ¥ - | |
| A016AV | 3.2.17 | Radon Mitigation Systems | 8 | MO | ¥ - | ¥ - | |
| A016AW | 3.2.18 | Recycle Center Equipment | 8 | MO | ¥ - | ¥ - | |
| A016AX | 3.2.19 | Swimming Pools | 8 | MO | ¥ - | ¥ - | |
| Inspection, Testing, and Certification Program | |||||||
| A016AY | 3.3.1 | Small Boiler Systems | 8 | MO | ¥ - | ¥ - | |
| A016AZ | 3.3.2 | Facility Weight Handling Equipment (WHE) | 8 | MO | ¥ - | ¥ - | |
| A016BA | 3.3.3 | Backflow Prevention Devices | 8 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| A016BB | 3.4.1 | HVAC Seasonal Start-Up and Shutdown | 8 | MO | ¥ - | ¥ - | |
| A016BC | 3.4.2 | HVAC Water Testing and Treatment Services | 8 | MO | ¥ - | ¥ - | |
| A016BD | 3.4.3 | Exhaust Hoods and Ducts | 8 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial - Station | ||||||
| A016BE | Services for Station facilities/spaces listed in J-1503010-08; performed at the MCICOM COLS 3 Full Additional Measures Level 3 frequencies specified per J-1503010-03, MCICOM Common Output Level Standards (COLS), and J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| A016BF | Services for Station facilities/spaces listed in J-1503010-08; performed at the COLS2 Prestige Areas frequencies specified per J-1503010-03, MCICOM Common Output Level Standards (COLS), and J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| Custodial - Navy Federal Credit Union (NFCU) | |||||||
| A016BG | Services for NFCU facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| Custodial - Air Mobility Command (AMC) | |||||||
| A016BH | Services for AMC facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| Custodial - USAF 36CRG | |||||||
| A016BJ | Services for USAF 36CRG facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| Custodial - Quality Recycling Program (QRP) | |||||||
| A016BK | Services for QRP facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| 1503050 | Grounds Maintenance and Landscaping | ||||||
| A016BL | Services for areas indicated in J-1503050-07, 10, 14, 15, 16, and 20; performed as specified for the MCICOM COLS 3 Full Base Measures per the Common Output Level Standards listed in J-1503050-06. | 8 | MO | ¥ - | ¥ - | ||
| A016BM | Services for areas indicated as Prestige in the maps provided in J-1503050-07 and J-1503050-14; performed as specified for the MCICOM COLS2 Prestige Areas per the Common Output Level Standards listed in J-1503050-06. | 8 | MO | ¥ - | ¥ - | ||
| 1604000 | Wastewater | ||||||
| A016BN | 3.1 | Operation | 8 | MO | ¥ - | ¥ - | |
| A016BP | 3.2 | Preventive Maintenance (PM) Program | 8 | MO | ¥ - | ¥ - | |
| A016BQ | 3.3 | Inspection Program | 8 | MO | ¥ - | ¥ - | |
| A016BR | 3.4 | Other Recurring Services Program | 8 | MO | ¥ - | ¥ - | |
| 1800000 | Environmental | ||||||
| A016BS | 3.1 | Waste Sampling and Laboratory Services | 8 | MO | ¥ - | ¥ - | |
| A016BT | 3.2 | Oil and Hazardous Substance Spill Response and Cleanup Ashore | 8 | MO | ¥ - | ¥ - | |
| Subtotal - STATION: | ¥ - | ||||||
| A017 | MCCS | ||||||
| 1502000 | Facility Investment | ||||||
| Service Orders | |||||||
| A017AA | 3.1.1 | Emergency Service Orders | 26 | EA | ¥ - | ¥ - | |
| A017AB | 3.1.2 | Urgent Service Orders | 23 | EA | ¥ - | ¥ - | |
| A017AC | 3.1.3 | Routine Service Orders | 33 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| A017AD | 3.2.1 | Automatic Doors, Interior | 8 | MO | ¥ - | ¥ - | |
| A016AE | 3.2.2 | Auxiliary Generators | 8 | MO | ¥ - | ¥ - | |
| A017AF | 3.2.4 | Fire Protection (FP) Systems | 8 | MO | ¥ - | ¥ - | |
| A017AG | 3.2.7 | HVAC and Refrigeration Systems | 8 | MO | ¥ - | ¥ - | |
| A017AH | 3.2.12 | Photovoltaic (PV) Systems | 8 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| A017AJ | 3.4.1 | HVAC Seasonal Start-Up and Shutdown | 8 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial | ||||||
| A017AK | Services for MCCS facilities/spaces listed in J-1503010-08; performed at the MCICOM COLS 3 Full Additional Measures Level 3 frequencies specified per J-1503010-03, MCICOM Common Output Level Standards (COLS), and J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| Subtotal - MCCS: | ¥ - | ||||||
| A018 | DeCA | ||||||
| 1502000 | Facility Investment | ||||||
| Service Orders | |||||||
| A018AA | 3.1.1 | Emergency Service Orders | 7 | EA | ¥ - | ¥ - | |
| A018AB | 3.1.2 | Urgent Service Orders | 7 | EA | ¥ - | ¥ - | |
| A018AC | 3.1.3 | Routine Service Orders | 7 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| A018AD | 3.2.4 | Fire Protection (FP) Systems | 8 | MO | ¥ - | ¥ - | |
| A018AE | 3.2.12 | Photovoltaic (PV) Systems | 8 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| A018AF | 3.4.3 | Exhaust Hoods and Ducts | 8 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial | ||||||
| A018AG | Services for DeCA facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| Subtotal - DeCA: | ¥ - | ||||||
| A019 | DeCA CDC | ||||||
| 1502000 | Facility Investment | ||||||
| Service Orders | |||||||
| A019AA | 3.1.1 | Emergency Service Orders | 3 | EA | ¥ - | ¥ - | |
| A019AB | 3.1.2 | Urgent Service Orders | 3 | EA | ¥ - | ¥ - | |
| A019AC | 3.1.3 | Routine Service Orders | 3 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| A019AD | 3.2.4 | Fire Protection (FP) Systems | 8 | MO | ¥ - | ¥ - | |
| A019AE | 3.2.7 | HVAC and Refrigeration Systems | 8 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| A019AF | 3.4.1 | HVAC Seasonal Start-Up and Shutdown | 8 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial | ||||||
| A019AG | Services for DeCA CDC facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| Subtotal - DeCA CDC: | ¥ - | ||||||
| A020 | DoDEA | ||||||
| 1502000 | Facility Investment | ||||||
| Service Orders | |||||||
| A020AA | 3.1.1 | Emergency Service Orders | 20 | EA | ¥ - | ¥ - | |
| A020AB | 3.1.2 | Urgent Service Orders | 13 | EA | ¥ - | ¥ - | |
| A020AC | 3.1.3 | Routine Service Orders | 40 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| A020AD | 3.2.4 | Fire Protection (FP) Systems | 8 | MO | ¥ - | ¥ - | |
| A020AE | 3.2.7 | HVAC and Refrigeration Systems | 8 | MO | ¥ - | ¥ - | |
| A020AF | 3.2.12 | Photovoltaic (PV) Systems | 8 | MO | ¥ - | ¥ - | |
| Inspection and Testing Program | |||||||
| A020AG | 3.3.3 | Backflow Prevention Devices | 8 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| A020AH | 3.4.1 | HVAC Seasonal Start-Up and Shutdown | 8 | MO | ¥ - | ¥ - | |
| A020AJ | 3.4.4 | Locking Systems Management | 8 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial | ||||||
| A020AK | Services for DoDEA facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| 1503050 | Grounds Maintenance and Landscaping | ||||||
| A020AL | Services for DoDEA areas indicated in J-1503050-07 and J-1503050-14; performed as specified for the MCICOM COLS 3 Full Base Measures per the Common Output Level Standards listed in J-1503050-06. | 8 | MO | ¥ - | ¥ - | ||
| Subtotal - DoDEA: | ¥ - | ||||||
| A021 | DLA DISPOSITION | ||||||
| 1502000 | Facility Investment | ||||||
| Service Orders | |||||||
| A021AA | 3.1.1 | Emergency Service Orders | 6 | EA | ¥ - | ¥ - | |
| A021AB | 3.1.2 | Urgent Service Orders | 10 | EA | ¥ - | ¥ - | |
| A021AC | 3.1.3 | Routine Service Orders | 7 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| A021AD | 3.2.7 | HVAC and Refrigeration Systems | 8 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| A021AE | 3.4.1 | HVAC Seasonal Start-Up and Shutdown | 8 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial | ||||||
| A021AF | Services for DLA Disposition facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| Subtotal - DLA DISPOSITION: | ¥ - | ||||||
| A022 | DLA DISTRIBUTION | ||||||
| 1502000 | Facility Investment | ||||||
| Service Orders | |||||||
| A022AA | 3.1.1 | Emergency Service Orders | 7 | EA | ¥ - | ¥ - | |
| A022AB | 3.1.2 | Urgent Service Orders | 17 | EA | ¥ - | ¥ - | |
| A022AC | 3.1.3 | Routine Service Orders | 17 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| A022AD | 3.2.7 | HVAC and Refrigeration Systems | 8 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| A022AE | 3.4.1 | HVAC Seasonal Start-Up and Shutdown | 8 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial | ||||||
| A022AF | Services for DLA Distribution facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| Subtotal - DLA DISTRIBUTION: | ¥ - | ||||||
| A023 | POL | ||||||
| 1502000 | Facility Investment | ||||||
| Service Orders | |||||||
| A023AA | 3.1.1 | Emergency Service Orders | 2 | EA | ¥ - | ¥ - | |
| A023AB | 3.1.2 | Urgent Service Orders | 7 | EA | ¥ - | ¥ - | |
| A023AC | 3.1.3 | Routine Service Orders | 7 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| A023AD | 3.2.7 | HVAC and Refrigeration Systems | 8 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| A023AE | 3.4.1 | HVAC Seasonal Start-Up and Shutdown | 8 | MO | ¥ - | ¥ - | |
| Subtotal - POL: | ¥ - | ||||||
| A024 | NAVY | ||||||
| 1503010 | Custodial | ||||||
| A024AA | Services for Navy facilities/spaces listed in J-1503010-08; performed at the CNIC COL3 frequencies specified per J-1503010-03, CNIC Common Output Level Standards (COLS), and J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| A024AB | Services for facilities/spaces listed as Navy Prestige Areas in J-1503010-08; performed at the CNIC COL2 frequencies specified per J-1503010-03, CNIC Common Output Level Standards (COLS), and J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| Subtotal - NAVY: | ¥ - | ||||||
| A025 | NCIS | ||||||
| 1503010 | Custodial | ||||||
| A025AA | Services for NCIS facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| Subtotal - NCIS: | ¥ - | ||||||
| A026 | USACE | ||||||
| 1503010 | Custodial | ||||||
| A026AA | Services for USACE facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| Subtotal - USACE: | ¥ - | ||||||
| A027 | AFN TV | ||||||
| 1503010 | Custodial | ||||||
| A027AA | Services for AFN TV facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| Subtotal - AFN TV: | ¥ - | ||||||
| A028 | S-6 | ||||||
| 1503010 | Custodial | ||||||
| A028AA | Services for S-6 facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| Subtotal - S-6: | ¥ - | ||||||
| TOTAL RECURRING WORK - BASE PERIOD: | ¥ - 0 |
| Line Item 0002 - Recurring Work - Base Period OPTION (Decrease to MCICOM COLS 3 Full Base Measures/COLS 3 Full Additional Measures Level 3 for Prestige) | |||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||
| ELIN A029 | |||||||
| ELIN/ | |||||||
| Sub-ELIN | Annex/Sub-annex | ||||||
| Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total | ||
| A029 | STATION | ||||||
| 1503010 | Custodial - Station | ||||||
| A029AA | Services for Station facilities/spaces listed in J-1503010-08; performed at the MCICOM COLS 3 Full Base Measures frequencies specified J-1503010-03, MCICOM Common Output Level Standards (COLS), and J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| A029AB | Services for facilities/spaces listed as Station Prestige Areas in J-1503010-08; performed at the COLS 3 Full Additional Measures Level 3 frequencies specified J-1503010-03, MCICOM Common Output Level Standards (COLS), and J-1503010-04. | 8 | MO | ¥ - | ¥ - | ||
| TOTAL RECURRING WORK (Decrease to STATION Custodial Services): | ¥ - |
| Line Item 0003 - Recurring Work - Base Period OPTION (Decrease to MCICOM COLS 3 Minimum Base Measures) | |||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||
| ELIN A030 | |||||||
| ELIN/ | |||||||
| Sub-ELIN | Annex/Sub-annex | ||||||
| Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total | ||
| A030 | FAMILY HOUSING | ||||||
| 1503050 | Grounds Maintenance and Landscaping | ||||||
| A030AA | Services for Family Housing areas indicated in J-1503050-07 and J-1503050-14; performed as specified for the MCICOM COLS 3 Minimum Base Measures per the Common Output Level Standards listed in J-1503050-06. | 8 | MO | ¥ - | ¥ - | ||
| TOTAL RECURRING WORK (Decrease to FAMILY HOUSING Grounds Maintenance and Landscaping): | ¥ - |
| Line Item 0004 - Recurring Work - Base Period OPTION (Decrease to MCICOM COLS 3 Minimum Base Measures/COLS 3 Full Additional Measures Level 2 for Prestige) | |||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||
| ELIN A031 | |||||||
| ELIN/ | |||||||
| Sub-ELIN | Annex/Sub-annex | ||||||
| Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total | ||
| A031 | STATION | ||||||
| 1503050 | Grounds Maintenance and Landscaping | ||||||
| A031AA | Services for areas indicated in J-1503050-07, 10, 14, 15, 16, and 20; performed as specified for the MCICOM COLS 3 Minimum Base Measures per the Common Output Level Standards listed in J-1503050-06. | 8 | MO | ¥ - | ¥ - | ||
| A031AB | Services for areas indicated as Prestige in the maps provided in J-1503050-07 and J-1503050-14; performed as specified for the MCICOM COLS 3 Full Additional Measures Level 2 for the Prestige Areas per the Common Output Level Standards listed in J-1503050-06. | 8 | MO | ¥ - | ¥ - | ||
| TOTAL RECURRING WORK (Decrease to STATION Grounds Maintenance and Landscaping): | ¥ - |
&"Times New Roman,Regular"&10Attachment J-0200000-13
Solicitation/Contract No.: N40084-20-R-XXXX
Non-Recurring Base Period
| Line Item 0005 - Non-Recurring Work - Base Period | ||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 4 | ||||||
| ELINs A700 through A790 | ||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Measure | Unit Price | Extended Price |
| A700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | NOT TO EXCEED | ¥ 300,000,000 | ||
| A701 | Material and Equipment - MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor. |
| Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2. | NOT TO EXCEED | ¥ 150,000,000 | ||
| 1401000 - Family Housing | ||||
| A702 | Family Housing (FH) Emergency Work Orders - MUST BE NEGOTIATED BY KO. | The Contractor shall perform Emergency Work Orders to accomplish any work identified within the Family Housing (FH) boundary of the installation and will include a wide variety of work. |
100% of FH Emergency Work Orders are resolved within four (4) hours.
Work is continued without interruption until emergent condition is arrested.
As part of the FH Emergency Work Order, the Contractor has full responsibility for any work identified up to the Work Order Limit of Liability of ¥100,000 in direct labor and direct material.
| A Blanket Task Order (BTO) may be issued on a DD Form 1155 with a Not To Exceed (NTE) quantity and value for Non-recurring Work Family Housing Work Orders. | 100 | EA | ¥ - | ¥ - |
| A703 | Family Housing (FH) Urgent Work Orders - MUST BE NEGOTIATED BY KO. | The Contractor shall perform Urgent Work Orders to accomplish any work identified within the Family Housing (FH) boundary of the installation and will include a wide variety of work. |
100% of FH Urgent Work Orders are performed, with 90% resolved within five (5) working days of receipt of call.
As part of the FH Urgent Work Order, the Contractor has full responsibility for any work identified up to the Urgent Work Order Limit of Liability of ¥100,000 in direct labor and direct material.
| A Blanket Task Order (BTO) may be issued on a DD Form 1155 with a Not To Exceed (NTE) quantity and value for Non-recurring Work Family Housing Work Orders. | 350 | EA | ¥ - | ¥ - |
| A704 | Family Housing (FH) Routine Work Orders - MUST BE NEGOTIATED BY KO. | The Contractor shall perform Routine Work Orders to accomplish any work identified within the Family Housing (FH) boundary of the installation and will include a wide variety of work. |
100% of FH Routine Work Orders are performed, with 90% resolved within 30 calendar days of receipt of call.
As part of the FH Routine Work Order, the Contractor has full responsibility for any work identified up to the Routine Work Order Limit of Liability of ¥100,000 in direct labor and direct material.
| A Blanket Task Order (BTO) may be issued on a DD Form 1155 with a Not To Exceed (NTE) quantity and value for Non-recurring Work Family Housing Work Orders. | 300 | EA | ¥ - | ¥ - | |||
| Minor Repairs for Flooring, Walls - The Contractor shall provide minor repair services in accordance with the scope of work and requirements in Annex 1401000. | |||||||
| A705 | Replace Carpet with Loop Pile Carpet (includes removal of existing floor covering and preparation of floor surface) | 2,500 | SM | ¥ - | ¥ - | ||
| A706 | Replace loop pile carpet with Square Tile Carpet (includes removal/disposal of existing carpet and replacement of any damaged tack strip) | 5,000 | EA | ¥ - | ¥ - | ||
| A707 | Replace Square Tile Carpet with Square Tile Carpet; Glue down type 50cm x 50cm | 20,000 | EA | ¥ - | ¥ - | ||
| A708 | Furniture moving necessary for floor covering installation | 20 | EA | ¥ - | ¥ - | ||
| A709 | Replace Ceramic Floor Tile | 200 | SM | ¥ - | ¥ - | ||
| A710 | Replace White Cement | 100 | LM | ¥ - | ¥ - | ||
| A711 | Replace vinyl composite floor tile; floor tile shall be the same as existing or approved equal. 303mm/W x 303mm/L x 2mm/T | 2,000 | SM | ¥ - | ¥ - | ||
| A712 | Replace wood pattern vinyl floor | 500 | SM | ¥ - | ¥ - | ||
| A713 | Replace existing floor covering with homogeneous tile | 500 | SM | ¥ - | ¥ - | ||
| A714 | Replace vinyl baseboard (Soft baseboard), 100mm/W | 150 | LM | ¥ - | ¥ - | ||
| A715 | Replace ceiling board with new | 100 | SM | ¥ - | ¥ - | ||
| A716 | Replace ceiling board with new for occupied unit | 15 | SM | ¥ - | ¥ - | ||
| A717 | Patch holes (ranging from 3cm to 30cm) | 50 | EA | ¥ - | ¥ - | ||
| A718 | Patch holes for occupied unit (ranging from 3cm to 30cm) | 5 | EA | ¥ - | ¥ - | ||
| A719 | Replace Outdoor Patio Tiles | 150 | EA | ¥ - | ¥ - | ||
| A720 | Replace PVC Flooring (Laundry Rm, Bath Rm) | 100 | SM | ¥ - | ¥ - | ||
| Minor Repairs for Doors, Windows, Blinds - The Contractor shall provide minor repair services in accordance with the scope of work and requirements in Annex 1401000. | |||||||
| A721 | Replace window screen | 100 | SM | ¥ - | ¥ - | ||
| A722 | Replace window screen for occupied unit | 10 | SM | ¥ - | ¥ - | ||
| A723 | Replace Vertical Blinds | 300 | EA | ¥ - | ¥ - | ||
| A724 | Replace Horizontal Blinds | 300 | EA | ¥ - | ¥ - | ||
| A725 | Replace Slats of Horizontal Blinds | 10 | EA | ¥ - | ¥ - | ||
| A726 | Replace Vertical slats 80mm/W (strings & balance weight included) | 5 | EA | ¥ - | ¥ - | ||
| A727 | Replace door cylinder (GFM) | 15 | EA | ¥ - | ¥ - | ||
| A728 | Replace door hinge | 10 | EA | ¥ - | ¥ - | ||
| A729 | Replace door handle/knob | 25 | EA | ¥ - | ¥ - | ||
| A730 | Replace door closer | 25 | EA | ¥ - | ¥ - | ||
| A731 | Replace Single Door without Lock | 20 | EA | ¥ - | ¥ - | ||
| A732 | Replace Window (Single Pane) | 5 | EA | ¥ - | ¥ - | ||
| A733 | Replace Window (Double Pane) | 5 | EA | ¥ - | ¥ - | ||
| A734 | Replace Window Glazing | 50 | LM | ¥ - | ¥ - | ||
| Miscellaneous Minor Repairs - The Contractor shall provide minor repair services in accordance with the scope of work and requirements in Annex 1401000. | |||||||
| A735 | Replace Frame or side of cabinet | 50 | SM | ¥ - | ¥ - | ||
| A736 | Replace Counter Edge Band | 20 | LM | ¥ - | ¥ - | ||
| A737 | A/C Fan Coil Unit Cleaning, Wall mounted type; in addition to the cleaning, anti-bacteria tablets shall be placed/replaced in the drain pan. | 10 | EA | ¥ - | ¥ - | ||
| A738 | A/C Fan Coil Unit Cleaning, Wall mounted type (with Pump Units); in addition to the cleaning, anti-bacteria tablets shall be placed/replaced in the drain pan. | 25 | EA | ¥ - | ¥ - | ||
| A739 | A/C Fan Coil Unit Cleaning, Ceiling mounted type; in addition to the cleaning, anti-bacteria tablets shall be placed/replaced in the drain pan. | 10 | EA | ¥ - | ¥ - | ||
| A740 | A/C Fan Coil Unit Cleaning for occupied unit, Wall mounted type; in addition to the cleaning, anti-bacteria tablets shall be placed/replaced in the drain pan. | 5 | EA | ¥ - | ¥ - | ||
| A741 | A/C Fan Coil Unit Cleaning for occupied unit, Wall mounted type (with Pump Units); in addition to the cleaning, anti-bacteria tablets shall be placed/replaced in the drain pan. | 5 | EA | ¥ - | ¥ - | ||
| A742 | A/C Fan Coil Unit Cleaning for occupied unit, Ceiling mounted type; in addition to the cleaning, anti-bacteria tablets shall be placed/replaced in the drain pan. | 5 | EA | ¥ - | ¥ - | ||
| A743 | Reverse refrigerator door for occupied unit | 5 | EA | ¥ - | ¥ - | ||
| A744 | Reverse dryer door for occupied unit | 5 | EA | ¥ - | ¥ - | ||
| A745 | Replace refrigerator gasket | 20 | LM | ¥ - | ¥ - | ||
| A746 | Remove and Install Appliances | 10 | EA | ¥ - | ¥ - | ||
| A747 | Remove and Install Appliances for occupied unit | 10 | EA | ¥ - | ¥ - | ||
| A748 | Remove and Re-install Range Hood Fan unit | 10 | EA | ¥ - | ¥ - | ||
| A749 | Remove and Re-install Range Hood Fan unit for occupied unit | 10 | EA | ¥ - | ¥ - | ||
| A750 | Replace Caulking. | 150 | LM | ¥ - | ¥ - | ||
| A751 | Replace Ballast | 15 | EA | ¥ - | ¥ - | ||
| A752 | Replace Kitchen Cabinet Door | 20 | EA | ¥ - | ¥ - | ||
| A753 | Replace Kitchen Drawer | 15 | EA | ¥ - | ¥ - | ||
| Painting, One Coat Finish - The Contractor shall provide minor repair services in accordance with the scope of work and requirements in Annex 1401000. | |||||||
| A754 | Interior Painting; one coat | 150,000 | SM | ¥ - | ¥ - | ||
| A755 | Interior Painting for occupied unit; one coat | 1,000 | SM | ¥ - | ¥ - | ||
| Painting, Two Coat Finish - The Contractor shall provide minor repair services in accordance with the scope of work and requirements in Annex 1401000. | |||||||
| A756 | Interior Painting; two coat | 5,000 | SM | ¥ - | ¥ - | ||
| A757 | Interior Painting for occupied unit; two coat | 50 | SM | ¥ - | ¥ - | ||
| A758 | One coat of oil stain | 15 | SM | ¥ - | ¥ - | ||
| A759 | One coat of oil varnish | 15 | SM | ¥ - | ¥ - | ||
| A760 | Paint bottom board of cabinet/drawer | 1,500 | SM | ¥ - | ¥ - | ||
| A761 | Paint concrete | 1,000 | SM | ¥ - | ¥ - | ||
| Custodial Services - The Contractor shall provide quarters cleaning services in accordance with the scope of work and requirements in Annexes 1401000 and 1503010. | |||||||
| A762 | Custodial Cleaning (based on floor plan square meters) | 30,000 | SM | ¥ - | ¥ - | ||
| A763 | Steam Carpet Cleaning | 10,000 | SM | ¥ - | ¥ - | ||
| A764 | Floor Stripping | 1,000 | SM | ¥ - | ¥ - | ||
| A765 | Floor Waxing | 1,000 | SM | ¥ - | ¥ - | ||
| A766 | Power Wash Exterior Walls or Pavement | 5,000 | SM | ¥ - | ¥ - | ||
| A767 | Clean Exterior Rain Gutter or Trap | 800 | LM | ¥ - | ¥ - | ||
| Household Items Cleaning - The Contractor shall provide quarters cleaning services in accordance with the scope of work and requirements in Annexes 1401000 and 1503010. | |||||||
| A768 | Convection Oven Cleaning | 50 | EA | ¥ - | ¥ - | ||
| A769 | Dehumidifier Cleaning | 25 | EA | ¥ - | ¥ - | ||
| A770 | Dishwasher Cleaning | 100 | EA | ¥ - | ¥ - | ||
| A771 | Dryer Cleaning | 200 | EA | ¥ - | ¥ - | ||
| A772 | Electric Range Cleaning | 200 | EA | ¥ - | ¥ - | ||
| A773 | Refrigerator Cleaning | 150 | EA | ¥ - | ¥ - | ||
| A774 | Washer Cleaning | 150 | EA | ¥ - | ¥ - | ||
| A775 | Trash Can Cleaning | 600 | EA | ¥ - | ¥ - | ||
| A776 | Clean Queen Size Mattress | 180 | EA | ¥ - | ¥ - | ||
| A777 | Clean Single Size Mattress | 200 | EA | ¥ - | ¥ - | ||
| A778 | Furniture Cleaning (Small) | 15 | EA | ¥ - | ¥ - | ||
| A779 | Furniture Cleaning (Medium) | 10 | EA | ¥ - | ¥ - | ||
| A780 | Furniture Cleaning (Large) | 15 | EA | ¥ - | ¥ - | ||
| A781 | Exhaust Fan Cleaning | The Contractor shall provide exhaust fan cleaning services in accordance with the scope of work and requirements in Annexes 1401000 and 1503010. | 1,500 | EA | ¥ - | ¥ - | |
| A782 | Exhaust Fan Cleaning for Occupied Unit | The Contractor shall provide exhaust fan cleaning services in accordance with the scope of work and requirements in Annexes 1401000 and 1503010. | 100 | EA | ¥ - | ¥ - | |
| A783 | Room Disinfection for Vacant Unit | The Contractor shall provide room disinfection services in accordance with the scope of work and requirements in Annexes 1401000 and 1503010. |
| For Vacant unit - the area (room) includes all areas of housing unit, such as but not limited to living room, bed room, bathroom, hallway, entrance door area, stairs, storage, etc. The unit of issue of "room" size will vary and up to 40 SM. | 15 | RM | ¥ - | ¥ - |
| A784 | Room Disinfection for Occupied Unit | The Contractor shall provide room disinfection services in accordance with the scope of work and requirements in Annexes 1401000 and 1503010. |
| For Occupied Unit - the area (room) includes all areas of housing unit, such as but not limited to living room, bed room, bathroom, hallway, entrance door area, stairs, storage, etc. The unit of issue of "room" size will vary and up to 40 SM. | 25 | RM | ¥ - | ¥ - | |||
| A785 | Room Disinfection Services - Total Release Fogger in Vacant Unit | The Contractor shall provide room disinfection services in accordance with the scope of work and requirements in Annexes 1401000 and 1503010. | 150 | UN | ¥ - | ¥ - | |
| Grounds Care - The Contractor shall provide Grounds Maintenance services in accordance with the scope of work and requirements in Annexes 1401000 and 1503050. | |||||||
| A786 | Lawn Care | 25,000 | SM | ¥ - | ¥ - | ||
| A787 | Sod Replacement | ||||||
| 5,000 | SM | ¥ - | ¥ - | ||||
| 1502000 - Facility Investment | |||||||
| A788 | Facility Investment (FI) Emergency Work Orders - MUST BE NEGOTIATED BY KO. | The Contractor shall perform Emergency Work Orders to accomplish any work identified within the Facility Investment (FI) boundary of the installation and will include a wide variety of work. |
100% of FI Emergency Work Orders are resolved within four (4) hours.
Work is continued without interruption until emergent condition is arrested.
As part of the FI Emergency Work Order, the Contractor has full responsibility for any work identified up to the Work Order Limit of Liability of ¥300,000 in direct labor and direct material.
| A Blanket Task Order (BTO) may be issued on a DD Form 1155 with a Not To Exceed (NTE) quantity and value for Non-recurring Work Facility Investment Work Orders. | 200 | EA | ¥ - | ¥ - |
| A789 | Facility Investment (FI) Urgent Work Orders - MUST BE NEGOTIATED BY KO. | The Contractor shall perform Urgent Work Orders to accomplish any work identified within the Facility Investment (FI) boundary of the installation and will include a wide variety of work. |
100% of FI Urgent Work Orders are performed, with 90% resolved within five (5) working days of receipt of call.
As part of the FI Urgent Work Order, the Contractor has full responsibility for any work identified up to the Urgent Work Order Limit of Liability of ¥300,000 in direct labor and direct material.
| A Blanket Task Order (BTO) may be issued on a DD Form 1155 with a Not To Exceed (NTE) quantity and value for Non-recurring Work Facility Investment Work Orders. | 400 | EA | ¥ - | ¥ - |
| A790 | Facility Investment (FI) Routine Work Orders - MUST BE NEGOTIATED BY KO. | The Contractor shall perform Routine Work Orders to accomplish any work identified within the Facility Investment (FI) boundary of the installation and will include a wide variety of work. |
100% of FI Routine Work Orders are performed, with 90% resolved within 30 calendar days of receipt of call.
As part of the FI Routine Work Order, the Contractor has full responsibility for any work identified up to the Routine Work Order Limit of Liability of ¥300,000 in direct labor and direct material.
| A Blanket Task Order (BTO) may be issued on a DD Form 1155 with a Not To Exceed (NTE) quantity and value for Non-recurring Work Facility Investment Work Orders. | 300 | EA | ¥ - | ¥ - | |
| Total Non-Recurring Work - Base Period: | ¥ 450,000,000 |
&"Times New Roman,Regular"&10Attachment J-0200000-13
Solicitation/Contract No.: N40084-20-R-XXXX
Recurring Opt Period 01
| Line Item 0006 - Recurring Work - Option Period 01 | |||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||
| ELINs B001 through B014 | |||||||
| ELIN/ | |||||||
| Sub-ELIN | Annex/Sub-annex | ||||||
| Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total | ||
| B001 | FAMILY HOUSING | ||||||
| 1401000 | Family Housing | ||||||
| B001AA | 3.1 | Family Housing (FH) Work Reception | 12 | MO | ¥ - | ¥ - | |
| FH Work Orders | |||||||
| B001AB | 3.2.1.1 | Emergency Work Orders | 150 | EA | ¥ - | ¥ - | |
| B001AC | 3.2.1.2 | Urgent Work Orders | 1,300 | EA | ¥ - | ¥ - | |
| B001AD | 3.2.1.3 | Routine Work Orders | 1,050 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| B001AE | 3.2.2.1 | Automatic Doors, Interior | 12 | MO | ¥ - | ¥ - | |
| B001AF | 3.2.2.2 | Fire Protection (FP) Systems | 12 | MO | ¥ - | ¥ - | |
| B001AG | 3.2.2.3 | HVAC and Refrigeration Systems | 12 | MO | ¥ - | ¥ - | |
| B001AH | 3.2.2.4 | Radon Mitigation Systems | 12 | MO | ¥ - | ¥ - | |
| B001AJ | 3.2.2.5 | Solar Water Heating Systems | 12 | MO | ¥ - | ¥ - | |
| B001AK | 3.2.2.6 | Garbage Disposal Sewer Water Treatment (DSWT) System | 12 | MO | ¥ - | ¥ - | |
| B001AL | 3.2.2.7 | Dryer Vents | 12 | MO | ¥ - | ¥ - | |
| Inspection, Testing, and Certification Program | |||||||
| B001AM | 3.2.3.1 | Garbage Disposal Sewer Water Treatment (DSWT) System Effluence Testing and Inspection | 12 | MO | ¥ - | ¥ - | |
| B001AN | 3.2.3.2 | Backflow Prevention Devices | 12 | MO | ¥ - | ¥ - | |
| B001AP | 3.2.4 | Change of Occupancy Maintenance (COM) | 12 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| B001AQ | 3.2.5.1 | HVAC Seasonal Start-Up and Shutdown | 12 | MO | ¥ - | ¥ - | |
| B001AR | 3.2.5.2 | HVAC Water Testing and Treatment Services | 12 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial | ||||||
| B001AS | Services for Family Housing facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| 1503050 | Grounds Maintenance and Landscaping | ||||||
| B001AT | Services for Family Housing areas indicated in J-1503050-07 and J-1503050-14; performed as specified for the MCICOM COLS 3 Full Base Measures per the Common Output Level Standards listed in J-1503050-06. | 12 | MO | ¥ - | ¥ - | ||
| Subtotal - FAMILY HOUSING: | ¥ - | ||||||
| B002 | STATION | ||||||
| 1502000 | Facility Investment | ||||||
| Work Orders | |||||||
| B002AA | 3.1.1 | Emergency Work Orders | 60 | EA | ¥ - | ¥ - | |
| B002AB | 3.1.2 | Urgent Work Orders | 72 | EA | ¥ - | ¥ - | |
| B002AC | 3.1.3 | Routine Work Orders | 120 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| B002AD | 3.2.1 | Automatic Doors, Interior | 12 | MO | ¥ - | ¥ - | |
| B002AE | 3.2.2 | Auxiliary Generators | 12 | MO | ¥ - | ¥ - | |
| B002AF | 3.2.3 | Small Boiler Systems | 12 | MO | ¥ - | ¥ - | |
| B002AG | 3.2.4 | Fire Protection (FP) Systems | 12 | MO | ¥ - | ¥ - | |
| B002AH | 3.2.5 | Fire Drill Pit | 12 | MO | ¥ - | ¥ - | |
| B002AJ | 3.2.6 | Facility Weight Handling Equipment (WHE) | 12 | MO | ¥ - | ¥ - | |
| B002AK | 3.2.7 | HVAC and Refrigeration Systems | 12 | MO | ¥ - | ¥ - | |
| B002AL | 3.2.8 | Aircraft Hangar Doors | 12 | MO | ¥ - | ¥ - | |
| B002AM | 3.2.9 | Airfield Lighting Systems | 12 | MO | ¥ - | ¥ - | |
| B002AN | 3.2.10 | Frequency Converter (400 HZ) Systems | 12 | MO | ¥ - | ¥ - | |
| B002AP | 3.2.11 | Lightning Arrestors and Grounding Devices | 12 | MO | ¥ - | ¥ - | |
| B002AQ | 3.2.12 | Photovoltaic (PV) Systems | 12 | MO | ¥ - | ¥ - | |
| B002AR | 3.2.13 | Storm Drain Water Gates and Pumps | 12 | MO | ¥ - | ¥ - | |
| B002AS | 3.2.14 | Uninterrupted Power Supply (UPS) Systems | 12 | MO | ¥ - | ¥ - | |
| B002AT | 3.2.15 | Above Ground and Underground Storage Tanks (ASTs and USTs) | 12 | MO | ¥ - | ¥ - | |
| B002AU | 3.2.16 | Oil/Water Separators (OWS) | 12 | MO | ¥ - | ¥ - | |
| B002AV | 3.2.17 | Radon Mitigation Systems | 12 | MO | ¥ - | ¥ - | |
| B002AW | 3.2.18 | Recycle Center Equipment | 12 | MO | ¥ - | ¥ - | |
| B002AX | 3.2.19 | Swimming Pools | 12 | MO | ¥ - | ¥ - | |
| Inspection, Testing, and Certification Program | |||||||
| B002AY | 3.3.1 | Small Boiler Systems | 12 | MO | ¥ - | ¥ - | |
| B002AZ | 3.3.2 | Facility Weight Handling Equipment (WHE) | 12 | MO | ¥ - | ¥ - | |
| B002BA | 3.3.3 | Backflow Prevention Devices | 12 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| B002BB | 3.4.1 | HVAC Seasonal Start-Up and Shutdown | 12 | MO | ¥ - | ¥ - | |
| B002BC | 3.4.2 | HVAC Water Testing and Treatment Services | 12 | MO | ¥ - | ¥ - | |
| B002BD | 3.4.3 | Exhaust Hoods and Ducts | 12 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial - Station | ||||||
| B002BE | Services for Station facilities/spaces listed in J-1503010-08; performed at the MCICOM COLS 3 Full Additional Measures Level 3 frequencies specified per J-1503010-03, MCICOM Common Output Level Standards (COLS), and J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| B002BF | Services for Station facilities/spaces listed in J-1503010-08; performed at the COLS2 Prestige Areas frequencies specified per J-1503010-03, MCICOM Common Output Level Standards (COLS), and J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| Custodial - Navy Federal Credit Union (NFCU) | |||||||
| B002BG | Services for NFCU facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| Custodial - Air Mobility Command (AMC) | |||||||
| B002BH | Services for AMC facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| Custodial - USAF 36CRG | |||||||
| B002BJ | Services for USAF 36CRG facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| Custodial - Quality Recycling Program (QRP) | |||||||
| B002BK | Services for QRP facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| 1503050 | Grounds Maintenance and Landscaping | ||||||
| B002BL | Services for areas indicated in J-1503050-07, 10, 14, 15, 16, and 20; performed as specified for the MCICOM COLS 3 Full Base Measures per the Common Output Level Standards listed in J-1503050-06. | 12 | MO | ¥ - | ¥ - | ||
| B002BM | Services for areas indicated as Prestige in the maps provided in J-1503050-07 and J-1503050-14; performed as specified for the MCICOM COLS2 Prestige Areas per the Common Output Level Standards listed in J-1503050-06. | 12 | MO | ¥ - | ¥ - | ||
| 1604000 | Wastewater | ||||||
| B002BN | 3.1 | Operation | 12 | MO | ¥ - | ¥ - | |
| B002BP | 3.2 | Preventive Maintenance (PM) Program | 12 | MO | ¥ - | ¥ - | |
| B002BQ | 3.3 | Inspection Program | 12 | MO | ¥ - | ¥ - | |
| B002BR | 3.4 | Other Recurring Services Program | 12 | MO | ¥ - | ¥ - | |
| 1800000 | Environmental | ||||||
| B002BS | 3.1 | Waste Sampling and Laboratory Services | 12 | MO | ¥ - | ¥ - | |
| B002BT | 3.2 | Oil and Hazardous Substance Spill Response and Cleanup Ashore | 12 | MO | ¥ - | ¥ - | |
| Subtotal - STATION: | ¥ - | ||||||
| B003 | MCCS | ||||||
| 1502000 | Facility Investment | ||||||
| Service Orders | |||||||
| B003AA | 3.1.1 | Emergency Service Orders | 40 | EA | ¥ - | ¥ - | |
| B003AB | 3.1.2 | Urgent Service Orders | 35 | EA | ¥ - | ¥ - | |
| B003AC | 3.1.3 | Routine Service Orders | 50 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| B003AD | 3.2.1 | Automatic Doors, Interior | 12 | MO | ¥ - | ¥ - | |
| B003AE | 3.2.2 | Auxiliary Generators | 12 | MO | ¥ - | ¥ - | |
| B003AF | 3.2.4 | Fire Protection (FP) Systems | 12 | MO | ¥ - | ¥ - | |
| B003AG | 3.2.7 | HVAC and Refrigeration Systems | 12 | MO | ¥ - | ¥ - | |
| B003AH | 3.2.12 | Photovoltaic (PV) Systems | 12 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| B003AJ | 3.4.1 | HVAC Seasonal Start-Up and Shutdown | 12 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial | ||||||
| B003AK | Services for MCCS facilities/spaces listed in J-1503010-08; performed at the MCICOM COLS 3 Full Additional Measures Level 3 frequencies specified per J-1503010-03, MCICOM Common Output Level Standards (COLS), and J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| Subtotal - MCCS: | ¥ - | ||||||
| B004 | DeCA | ||||||
| 1502000 | Facility Investment | ||||||
| Service Orders | |||||||
| B004AA | 3.1.1 | Emergency Service Orders | 10 | EA | ¥ - | ¥ - | |
| B004AB | 3.1.2 | Urgent Service Orders | 10 | EA | ¥ - | ¥ - | |
| B004AC | 3.1.3 | Routine Service Orders | 10 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| B004AD | 3.2.4 | Fire Protection (FP) Systems | 12 | MO | ¥ - | ¥ - | |
| B004AE | 3.2.12 | Photovoltaic (PV) Systems | 12 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| B004AF | 3.4.3 | Exhaust Hoods and Ducts | 12 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial | ||||||
| B004AG | Services for DeCA facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| Subtotal - DeCA: | ¥ - | ||||||
| B005 | DeCA CDC | ||||||
| 1502000 | Facility Investment | ||||||
| Service Orders | |||||||
| B005AA | 3.1.1 | Emergency Service Orders | 5 | EA | ¥ - | ¥ - | |
| B005AB | 3.1.2 | Urgent Service Orders | 5 | EA | ¥ - | ¥ - | |
| B005AC | 3.1.3 | Routine Service Orders | 5 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| B005AD | 3.2.4 | Fire Protection (FP) Systems | 12 | MO | ¥ - | ¥ - | |
| B005AE | 3.2.7 | HVAC and Refrigeration Systems | 12 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| B005AF | 3.4.1 | HVAC Seasonal Start-Up and Shutdown | 12 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial | ||||||
| B005AG | Services for DeCA CDC facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| Subtotal - DeCA CDC: | ¥ - | ||||||
| B006 | DoDEA | ||||||
| 1502000 | Facility Investment | ||||||
| Service Orders | |||||||
| B006AA | 3.1.1 | Emergency Service Orders | 30 | EA | ¥ - | ¥ - | |
| B006AB | 3.1.2 | Urgent Service Orders | 20 | EA | ¥ - | ¥ - | |
| B006AC | 3.1.3 | Routine Service Orders | 60 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| B006AD | 3.2.4 | Fire Protection (FP) Systems | 12 | MO | ¥ - | ¥ - | |
| B006AE | 3.2.7 | HVAC and Refrigeration Systems | 12 | MO | ¥ - | ¥ - | |
| B006AF | 3.2.12 | Photovoltaic (PV) Systems | 12 | MO | ¥ - | ¥ - | |
| Inspection and Testing Program | |||||||
| B006AG | 3.3.3 | Backflow Prevention Devices | 12 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| B006AH | 3.4.1 | HVAC Seasonal Start-Up and Shutdown | 12 | MO | ¥ - | ¥ - | |
| B006AJ | 3.4.4 | Locking Systems Management | 12 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial | ||||||
| B006AK | Services for DoDEA facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| 1503050 | Grounds Maintenance and Landscaping | ||||||
| B006AL | Services for DoDEA areas indicated in J-1503050-07 and J-1503050-14; performed as specified for the MCICOM COLS 3 Full Base Measures per the Common Output Level Standards listed in J-1503050-06. | 12 | MO | ¥ - | ¥ - | ||
| Subtotal - DoDEA: | ¥ - | ||||||
| B007 | DLA DISPOSITION | ||||||
| 1502000 | Facility Investment | ||||||
| Service Orders | |||||||
| B007AA | 3.1.1 | Emergency Service Orders | 10 | EA | ¥ - | ¥ - | |
| B007AB | 3.1.2 | Urgent Service Orders | 15 | EA | ¥ - | ¥ - | |
| B007AC | 3.1.3 | Routine Service Orders | 10 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| B007AD | 3.2.7 | HVAC and Refrigeration Systems | 12 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| B007AE | 3.4.1 | HVAC Seasonal Start-Up and Shutdown | 12 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial | ||||||
| B007AF | Services for DLA Disposition facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| Subtotal - DLA DISPOSITION: | ¥ - | ||||||
| B008 | DLA DISTRIBUTION | ||||||
| 1502000 | Facility Investment | ||||||
| Service Orders | |||||||
| B008AA | 3.1.1 | Emergency Service Orders | 10 | EA | ¥ - | ¥ - | |
| B008AB | 3.1.2 | Urgent Service Orders | 25 | EA | ¥ - | ¥ - | |
| B008AC | 3.1.3 | Routine Service Orders | 25 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| B008AD | 3.2.7 | HVAC and Refrigeration Systems | 12 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| B008AE | 3.4.1 | HVAC Seasonal Start-Up and Shutdown | 12 | MO | ¥ - | ¥ - | |
| 1503010 | Custodial | ||||||
| B008AF | Services for DLA Distribution facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| Subtotal - DLA DISTRIBUTION: | ¥ - | ||||||
| B009 | POL | ||||||
| 1502000 | Facility Investment | ||||||
| Service Orders | |||||||
| B009AA | 3.1.1 | Emergency Service Orders | 3 | EA | ¥ - | ¥ - | |
| B009AB | 3.1.2 | Urgent Service Orders | 10 | EA | ¥ - | ¥ - | |
| B009AC | 3.1.3 | Routine Service Orders | 10 | EA | ¥ - | ¥ - | |
| Preventive Maintenance (PM) Program | |||||||
| B009AD | 3.2.7 | HVAC and Refrigeration Systems | 12 | MO | ¥ - | ¥ - | |
| Other Recurring Services Program | |||||||
| B009AE | 3.4.1 | HVAC Seasonal Start-Up and Shutdown | 12 | MO | ¥ - | ¥ - | |
| Subtotal - POL: | ¥ - | ||||||
| B010 | NAVY | ||||||
| 1503010 | Custodial | ||||||
| B010AA | Services for Navy facilities/spaces listed in J-1503010-08; performed at the CNIC COL3 frequencies specified per J-1503010-03, CNIC Common Output Level Standards (COLS), and J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| B010AB | Services for facilities/spaces listed as Navy Prestige Areas in J-1503010-08; performed at the CNIC COL2 frequencies specified per J-1503010-03, CNIC Common Output Level Standards (COLS), and J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| Subtotal - NAVY: | ¥ - | ||||||
| B011 | NCIS | ||||||
| 1503010 | Custodial | ||||||
| B011AA | Services for NCIS facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| Subtotal - NCIS: | ¥ - | ||||||
| B012 | USACE | ||||||
| 1503010 | Custodial | ||||||
| B012AA | Services for USACE facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| Subtotal - USACE: | ¥ - | ||||||
| B013 | AFN TV | ||||||
| 1503010 | Custodial | ||||||
| B013AA | Services for AFN TV facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| Subtotal - AFN TV: | ¥ - | ||||||
| B014 | S-6 | ||||||
| 1503010 | Custodial | ||||||
| B014AA | Services for S-6 facilities/spaces listed in J-1503010-08 and performed at the frequencies specified in J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| Subtotal - S-6: | ¥ - | ||||||
| TOTAL RECURRING WORK - OPTION PERIOD 01: | ¥ - 0 |
| Line Item 0007 - Recurring Work - OPTION PERIOD 01 (Decrease to MCICOM COLS 3 Full Base Measures/COLS 3 Full Additional Measures Level 3 for Prestige) | |||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||
| ELIN B015 | |||||||
| ELIN/ | |||||||
| Sub-ELIN | Annex/Sub-annex | ||||||
| Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total | ||
| B015 | STATION | ||||||
| 1503010 | Custodial - Station | ||||||
| B015AA | Services for Station facilities/spaces listed in J-1503010-08; performed at the MCICOM COLS 3 Full Base Measures frequencies specified J-1503010-03, MCICOM Common Output Level Standards (COLS), and J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| B015AB | Services for facilities/spaces listed as Station Prestige Areas in J-1503010-08; performed at the COLS 3 Full Additional Measures Level 3 frequencies specified J-1503010-03, MCICOM Common Output Level Standards (COLS), and J-1503010-04. | 12 | MO | ¥ - | ¥ - | ||
| TOTAL RECURRING WORK (Decrease to STATION Custodial Services): | ¥ - |
| Line Item 0008 - Recurring Work - OPTION PERIOD 01 (Decrease to MCICOM COLS 3 Minimum Base Measures) | |||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||
| ELIN B016 | |||||||
| ELIN/ | |||||||
| Sub-ELIN | Annex/Sub-annex | ||||||
| Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total | ||
| B016 | FAMILY HOUSING | ||||||
| 1503050 | Grounds Maintenance and Landscaping | ||||||
| B016AA | Services for Family Housing areas indicated in J-1503050-07 and J-1503050-14; performed as specified for the MCICOM COLS 3 Minimum Base Measures per the Common Output Level Standards listed in J-1503050-06. | 12 | MO | ¥ - | ¥ - | ||
| TOTAL RECURRING WORK (Decrease to FAMILY HOUSING Grounds Maintenance and Landscaping): | ¥ - |
| Line Item 0009 - Recurring Work - OPTION PERIOD 01 (Decrease to MCICOM COLS 3 Minimum Base Measures/COLS 3 Full Additional Measures Level 2 for Prestige) | |||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||
| ELIN B017 | |||||||
| ELIN/ | |||||||
| Sub-ELIN | Annex/Sub-annex | ||||||
| Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total | ||
| B017 | STATION | ||||||
| 1503050 | Grounds Maintenance and Landscaping | ||||||
| B017AA | Services for areas indicated in J-1503050-07, 10, 14, 15, 16, and 20; performed as specified for the MCICOM COLS 3 Minimum Base Measures per the Common Output Level Standards listed in J-1503050-06. | 12 | MO | ¥ - | ¥ - | ||
| B017AB | Services for areas indicated as Prestige in the maps provided in J-1503050-07 and J-1503050-14; performed as specified for the MCICOM COLS 3 Full Additional Measures Level 2 for the Prestige Areas per the Common Output Level Standards listed in J-1503050-06. | 12 | MO | ¥ - | ¥ - | ||
| TOTAL RECURRING WORK (Decrease to STATION Grounds Maintenance and Landscaping): | ¥ - |
&"Times New Roman,Regular"&10Attachment J-0200000-13
Solicitation/Contract No.: N40084-20-R-XXXX
Non-Recurring Opt Period 01
| Line Item 0010 - Non-Recurring Work - Option Period 01 | ||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 4 | ||||||
| ELINs B700 through B790 | ||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Measure | Unit Price | Extended Price |
| B700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | NOT TO EXCEED | ¥ 300,000,000 | ||
| B701 | Material and Equipment - MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor. |
| Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2. | NOT TO EXCEED | ¥ 150,000,000 | ||
| 1401000 - Family Housing |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .