Attach_(5a)_Performance_Work_Statement_(PWS)v1.pdf

PDF 4 MB Posted

Attached to
South Grounds Maintenance Services at U. S. Government Installations, MCB Butler Okinawa, Japan
Solicitation number
N4008419R2009
Issued by

About this file

This document is a performance work statement for grounds maintenance services at various U.S. government installations on Marine Corps Base Camp Butler in Okinawa, Japan. The contractor will provide labor, supervision, tools, materials, equipment and other items necessary to perform grounds maintenance such as mowing, edging, trimming, leaf and debris removal. The services will be provided under a performance-based contract with recurring and non-recurring work items. The contractor must comply with all applicable U.S., Japanese, prefecture and local laws and regulations, and Department of Defense, Navy and Marine Corps directives. The contractor will also be responsible for quality management, safety, environmental compliance, and other administrative requirements outlined in the document.

Attach (5a) Performance Work Statement (PWS)v1

View the file

Other files

File Type Posted
N4008419R2009_Amendment_0004.pdf PDF
Attach_(1)_19R2009_J-0200000-10_ELINs_v3.xlsx XLSX spreadsheet
N4008419R2009_Amendment_0003.pdf PDF
Attach_(1)_19R2009_J-0200000-10_ELINs_v2.xlsx XLSX spreadsheet
Attach_(1)_19R2009_Questions_&_Responses.pdf PDF
Attach_(4)_J-1503050-04_Total_Acreage_Summary.pdf PDF
Attach_(3)_19R2009_J-1503050-5_Site_Maps.docx DOCX document
Attach_(5c)_Performance_Work_Statement_(PWS)v1.pdf PDF
N4008419R2009_Amendment_0002.pdf PDF
Attach_(2)_19R2009_J-0200000-10_ELINs_v1.xlsx XLSX spreadsheet
Attach_(5b)_Performance_Work_Statement_(PWS)v1_.pdf PDF
N4008419R2009_Amendment_001.pdf PDF
Attach_(3)_19R2009_J-1503050-15_Site_Maps.docx DOCX document
Attach_(7)_Inquiry_Form_N4008419R2009.xlsx XLSX spreadsheet
Attach_(8)_Site_Visit_Request_Form.xlsx XLSX spreadsheet
Attach_(4)_19R2009_PAP_FAP_17Sep19.pdf PDF
Attach_(1a)_Performance_Work_Statement_(PWS)_23Sep19.pdf PDF
Attach_(6)_Past_Performance_Questionnaire.docx DOCX document
Attach_(5)_Experience_Form.docx DOCX document
Attach_(1b)_Performance_Work_Statement_(PWS)_23Sep19.pdf PDF
Attach_(1c)_Performance_Work_Statement_(PWS)_23Sep19.pdf PDF
Attach_(2)_19R2009_J-0200000-10_ELINs.xlsx XLSX spreadsheet
RFP_N4008419R2009.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No. N40084-19-R-2009

SOUTH GROUNDS MAINTENANCE AT

U.S. GOVERNMENT INSTALLATIONS, MCB BUTLER OKINAWA, JAPAN

BY

RECURRING AND NON-RECURRING WORK CONTRACT

SUBMITTED BY:

NAVFAC FAR EAST FEAD/FSC

PREPARED BY:

FSC

23 SEP 2019

Reviewed By:

Garry Brust 23 September 2019

FEAD FSCM DATE

DATE

BRUST.GARRY.DA

LTON.1179923820

Digitally signed by

BRUST.GARRY.DALTON.1179923820

Date: 2019.09.23 11:39:51 +09'00'

APPROVED BY

RFP N40084-19-R-2009

(Revision 1)

UNCLASSIFIED/FOR OFFICIAL USE ONLY

0100000 – General Information Spec Item Title

1 General Information

1.1 Outline of Services

1.2 Project Location

1.3 Acquisition of Additional Work

1.4 Background Information

1.5 Verification of Workload and Conditions

1.6 Climate Patterns

1.7 Related Information

1.8 Navy Approach to Service Contracting

1.8.1 Partnering Philosophy

1.8.2 Contractor’s Knowledge

1.8.3 Industry Best Practices

1.9 Standard Template

1.10 Navy PBSA Approach

1.11 Technical Proposal Certification

RFP N40084-19-R-2009

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 2

Spec Item Title Description 1 General Information

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Marine Corps Base Camp Smedley D. Butler, Okinawa, Japan, under a performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items.

The PWS is organized into annexes. Annex 1 is “General Information”.

Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.

The annex numbers are identified as 1 through 18 in the description column, but the full-expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).

Annex 1 General Information Annex 2 Management and Administration Annex 3 Not Applicable (N/A) Annex 4 N/A Annex 5 N/A Annex 6 N/A Annex 7 N/A Annex 8 N/A Annex 9 N/A Annex 10 N/A Annex 11 N/A Annex 12 N/A Annex 13 N/A Annex 14 N/A Annex 15 Facilities Support

Sub Annex 1503050 Grounds Maintenance Annex 16 N/A Annex 17 N/A Annex 18 N/A

1.2 Project Location The work shall be performed at various locations on Marine Corps Base Installations, Okinawa, Japan located throughout MCB Butler. The following is an example of the dispersion of work at the various locations but not limited to:

Grounds Maintenance: Camp Kinser, Camp Foster, Camp Lester, Plaza Housing, Marine Corp. Air Station Futenma (MCAS Futenma).

See J-1503050-04 & J-1503050-05 for maps.

1.3 Acquisition of

Additional Work

The Government reserves the right to acquire additional grounds maintenance services at additional locations in addition to the services and locations identified in the Recurring Work requirements of this contract.

Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the Non- Recurring Work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.4 Background Information Okinawa is the largest island in the Ryukyu Islands chain and is 300 miles due south of mainland Japan. It is about 66 miles long, 19 miles at its widest point, and is about 485 square miles. The population is over 1.3 million. Okinawa is home to more than 23,000 Marines, Sailors, DoD Civilians and their families.

RFP N40084-19-R-2009

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 3

MCB Camp Butler supports the current and future combat readiness of III MEF forward-based forces while in garrison or deployed by providing training support, mobilization and deployment support, and installation services. Additionally, we provide services and support to other commands, service members, and all family members.

1.5 Verification of

Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, inventories, maps, floor plans, and tables to represent the type, quantity, and location of services to be provided.

As prescribed in FAR 52.237-1, offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

1.6 Climate Patterns Okinawa is subtropical with the average temperature of 81º F from May until mid-September and down to 50º F in the winter. Typhoons occur on a regular basis from June through November. Typhoons have winds of more than 64 knots – 74 miles per hour – 119 km per hour (71.4 MPH).

Current and projected weather patterns may be found on the internet at:

http://weather.kadenaforcesupport.com/ or http://www.jma.go.jp/jma/en/menu.html.

1.7 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the “Informational Notes” as material representations of the Government. Information provided in “Informational Notes” does not create a contractual requirement on either party to this contract.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.8 Navy Approach to

Service Contracting

The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.

The Navy also supports the following principles:

RFP N40084-19-R-2009

(Revision 1)

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 4 http://weather.kadenaforcesupport.com/ http://www.jma.go.jp/jma/en/menu.html

1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners’ success drives the Navy’s successful mission completion. Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.

1.8.2 Contractor’s Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use Contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy’s use of performance-based objectives evidences this principle.

Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy’s and contractor’s responsibility as partners to reach this goal. To that end, the Navy’s emphasis will be in evaluating performance objectives (end results).

1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.

The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.

Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Recurring Work requirements.

Specification item 4 will always contain the Non-recurring Work requirements. Requirements and standards for higher-level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items.

Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associate with Annexes 1 and 2 and Specification items 1 and 2 must be priced and their price must be allocated across the Exhibit Line Items.

1.10 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are:

1) performance outcomes,

2) measurable standards,

3) consideration of incentives, and

4) performance assessment plan.

1.11 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.

RFP N40084-19-R-2009

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 5

0200000 – Management and Administration

2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment

2.3.3 Partnering

2.3.3.1 Informal Partnering

2.3.3.2 Contract Partnering Administration

2.3.3.3 Contract Partnering Session Attendees

2.3.4 Permits and Licenses

2.3.5 Insurance

2.3.5.1 Certificate of Insurance

2.3.5.2 Minimum Insurance Amounts

2.3.6 Protection of Government Property

2.3.7 Government Information Technology (IT) System

2.3.8 Directives, Instructions, and References

2.3.9 Invoicing Procedures

2.3.10 Forms

2.4 Government-Furnished Property, Materials and Services

2.4.1 Government-Furnished Facilities (GFF)

2.4.2 Government-Furnished Utilities

2.4.3 Government-Furnished Materials (GFM)

2.4.4 Government-Furnished Equipment (GFE)

2.4.5 Government-Furnished Services (GFS)

2.5 Contractor-Furnished Items

2.6 Management

2.6.1 Work Reception

2.6.2 Work Control

2.6.3 Work Schedule

2.6.4 Deliverables

2.6.5 Service Interruptions

2.6.6 NAVFAC MAXIMO

2.6.7 Quality Management System (QMS)

2.6.7.1 Quality Management (QM) Plan

2.6.7.2 Quality Inspection and Surveillance

2.6.7.3 Quality Inspection and Surveillance Report

2.6.8 Property Management Plan

2.6.9 System and Equipment Replacement

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

2.7.1.2 Quality Manager

2.7.1.3 Site Safety and Health Officer (SSHO)

2.7.1.4 Environmental/Energy Manager

2.7.2 Employee Requirements

2.7.2.1 Employee Certification and Training

2.7.2.2 Employee Appearance

2.7.2.3 Employee Conduct

2.7.2.4 Identification as Contractor Employee

2.7.2.5 Removal of Employees

RFP N40084-19-R-2009

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 6

2.7.2.6 Proof of Legal Residency

2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)

2.8 Security Requirements

2.8.1 Employee Listing

2.8.2 Vehicles

2.8.3 Passes and Badges

2.8.4 Access to Installation

2.8.4.1 DBIDS Program

2.8.4.2 DBIDS Credentials

2.8.5 Access to Buildings

2.8.6 Access Arrangements

2.8.6.1 Escort Arrangement for Secured Areas

2.8.7 Security Clearances

2.8.8 Access to Sensitive Unclassified Information

2.8.9 Access to Navy Marine Corps Intranet (NMCI)

2.8.10 Employee Status

2.9 Contractor Safety Program

2.9.1 Accident Prevention Plan (APP)

2.9.2 Activity Hazard Analysis (AHA)

2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans

2.9.3.1 Alcohol and Drug Abuse Prevention Plan

2.9.3.2 Chemical Hazard Communication Program

2.9.3.3 Confined Space Program

2.9.3.4 Critical Lift Plan

2.9.3.5 Fall Prevention and Protection Plan

2.9.4 Crane Operations

2.9.4.1 Crane Inspections

2.9.4.2 Rigging Gear

2.9.4.3 Crane Operators

2.9.5 Accident and Damage Reporting

2.9.5.1 Accident Reporting and Notification Criteria

2.9.6 Fire Protection

2.9.7 Monthly On-Site Labor Report

2.9.8 OSHA Citations and Violations

2.9.8.1 Japanese Labor Standards Inspection Office (LSIO) Citations and Violations

2.9.9 Safety Inspections and Monitoring

2.9.10 Safety Certification

2.9.11 Safety Apparel on Jobsites

2.9.12 Emergency Medical Treatment

2.9.13 Excavations

2.10 Environmental Management and Sustainability

2.10.1 Energy Management Program

2.10.2 Environmental Protection

2.10.2.1 Solid Waste Management and Recycling

2.10.2.2 Non-Regulated Waste Disposal

2.10.2.3 Regulated Waste Disposal

2.10.2.4 Universal Waste

2.10.2.5 Spill Prevention, Containment, and Clean-up

2.10.2.6 Hazardous Material Management

2.10.2.7 Protection of Endangered and Threatened Species (Flora and Fauna)

2.10.2.8 Noise Control

2.10.2.9 Salvage

2.10.2.10 Asbestos Containing Material (ACM)

RFP N40084-19-R-2009

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 7

2.10.2.11 Clean Air Act (CAA)

2.10.3 Sustainable Procurement and Practices

2.10.3.1 Environmentally Preferable Products

2.10.3.2 Use of Recovered Materials

2.10.3.3 Use of Bio based Products

2.11 Disaster Preparedness

2.12 Technical Library

2.13 Recurring Work Procedures

2.13.1 Notification to the Government for Work Above the Recurring Work Limitations

2.13.2 Recurring Work Exhibit Line Item Numbers (ELINs)

2.13.3 Common Output Level Standards (COLS) Options

2.13.4 Optional COLS CLINs for Region Funded Facility Services

2.13.5 Option to Change COLS at Contract Award

2.13.6 Option to Change COLS at Exercise of an Option Period

2.14 Non-Recurring Work

2.14.1 Unit Priced Task (UPT) Work (Non Negotiated)

2.14.1.1 Acceptance and Performance

2.14.1.2 Invoicing and Receiving Payment

2.14.2 Unit Priced Labor (UPL) Work (Negotiated)

2.14.2.1 Non-Recurring Work Preparation of Proposals

2.14.2.1.1 Labor Requirements

2.14.2.1.2 Materials and Equipment Requirements

2.14.2.2. Issuance of Final Task Order

2.14.3 Non-Recurring work ELINS

2.14.4 Blanket Task Order (BTO)

2.15 Performance Evaluation

RFP N40084-19-R-2009

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 8

0200000 - Management and Administration

2 Management and

Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-0200000-01.

2.2 General

Information

2.2.1 Government

Regular Working Hours

The Government's regular working hours are from 0730-1630, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. The performance of work requirements shall be accomplished Monday

– Sunday during daylight hours not to exceed 40 hours per week

2.2.1.1 Observed Federal

Holidays

The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.

2.2.1.2 Restriction to

Contractor Working Hours

The Contractor shall schedule and arrange work so as to cause the least interference with the normal occurrence of Government business and mission.

In those cases where some interference may be essentially unavoidable, the Contractor shall make every effort to minimize the impact of the interference, inconvenience, equipment downtime, interrupted service, customer discomfort, etc. The requirements of military exercises and mission requirements takes precedence over all Contractor activities and such requirements may cause changes in the Contractor’s work schedule. In such cases, the Contractor is responsible for re-scheduling the work to comply with all clauses of this contract at no additional cost to the Government.

2.2.2 Wage

Determinations

Not Applicable (N/A)

2.2.3 Requirements

Hierarchy

Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.

RFP N40084-19-R-2009

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 9

2.3 General

Administrative Requirements

2.3.1 Required

Conferences and Meetings

The Contractor shall attend administrative and coordination meetings. The Contractor shall attend meetings as requested by the Contracting Officer. The Contractor will ensure their attendees are fluent in English or have a translator within the conferences or meetings.

The Contractor shall provide sign-in sheets and prepare minutes of all meetings and submit per Section F for review and comments. Comments received within two working days shall be incorporated into the minutes and a copy of the final revision shall be submitted per Section F for concurrence.

Historically, there have been approximately four meetings per year on a quarterly basis.

2.3.2 Training for

Maintenance and Operation of New and Replacement Systems and Equipment

When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.

2.3.3 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate.

The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

Partnering should accomplish three goals:

- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.

- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.

- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.

2.3.3.1 Informal Partnering The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.

The Initial Informal Partnering Session will be conducted and facilitated by the Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.

The Partners will determine the frequency of the follow-on sessions.

2.3.3.2 Contract Partnering

Administration

Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.

Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If

RFP N40084-19-R-2009

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 10 replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.3.3 Contract Partnering

Session Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

President/Vice President

* Project Manager

* Quality Manager Site Safety and Health Officer

2.3.4 Permits and

Licenses

The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, host nation (Japanese), prefecture and local laws and regulations.

The Contractor shall submit copies of Permits and Licenses per Section F.

2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause

52.228-5, INSURANCE – WORK ON A GOVERNMENT

INSTALLATION. This insurance must be maintained during the performance period.

2.3.5.1 Certificate of

Insurance

The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.

2.3.5.2 Minimum

Insurance Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: ¥50,000,000 per occurrence

Automobile Liability: ¥20,000,000 per person, ¥50,000,000 per occurrence for bodily injury, ¥20,000,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and Japanese worker's compensation and occupational disease statutes

Employer's Liability coverage: ¥10,000,000, except in states where worker's compensation may not be written by private carriers

Other as required by law.

2.3.6 Protection of

Government Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.

2.3.7 Government

Information Technology (IT) System

N/A

2.3.8 Directives, Instructions, and References

Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-02. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

2.3.9 Invoicing

Procedures

Invoicing procedures refer Invoicing Instructions under Special Contract Requirements. Refer to Sample Invoice Form in J-0200000-04.

RFP N40084-19-R-2009

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 11

Refer to Section G for invoicing instructions. The Contractor shall submit payment requests and receiving reports using WAWF (Wide Area Work Flow) via NAVFAC Form 7300/30 (rev NOV 2010), in J-0200000-04.

Electronic Invoicing: The WAWF system is a method to electronically process vendor payment requests and receiving reports, as authorized by DFARs 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

WAWF Training: The Contractor shall follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at:

https://wawf.eb.mil/

WAWF information can be found at the NAVFAC FE Portal Page.

http://navfac.navy.mil/navfac_worldwide/pacific/fecs/far_east/about_us/contr actors_information.html

2.3.10 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-03.

2.4 Government-

Furnished Property, Materials and Services

In accordance with FAR 52.245 GOVERNMENT PROPERTY and NAVFAC clause 5252.245-9300, GOVERNMENT-FURNISHED PROPERTY, MATERIALS AND SERVICES, and the following paragraphs, the Government will furnish or make available to the Contractor certain Government-owned facilities, utilities, materials, equipment and services for use in connection with this contract as stated below.

2.4.1 Government-

Furnished Facilities

(GFF)

The Government will not provide office space and operational facilities to the Contractor. The Contractor may secure and maintain the necessary office space and other facilities required for the performance of this contract at his/her own expense upon approval. If there is adequate land area available, and on the basis of non-interference in the requirements of the Government, the Contractor may be permitted to erect a structure of reasonable size at or near the site of the work upon approval. The Government is under no obligation to provide such land, but the Contracting Officer or designated representative will accept a written request for temporary assignment of an area for such use. If approved, the Contractor may proceed, providing that it is clearly understood that the Government will bear no responsibility for the safety and security of the structure or its contents (including equipment, material or any other things of whatever nature). If the Contractor erects a structure on Government controlled land in accordance with the foregoing, it shall at all times be kept neat, clean orderly in appearance and condition in order to improve safety and reduce fire hazards. The disposal of trash and debris shall be the Contractor’s responsibility.

2.4.2 Government-

Furnished Utilities

Where available at job sites, the Government will furnish water and electricity at existing outlets required for the work to be performed under the contract at no cost to the Contractor. Information concerning the location of existing outlets may be secured from the KO. The Contractor shall provide and maintain, at his expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, MCB, GOJ, Prefectural, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.

RFP N40084-19-R-2009

(Revision 1)

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 12 https://wawf.eb.mil/ http://navfac.navy.mil/navfac_worldwide/pacific/fecs/far_east/about_us/contractors_information.html http://navfac.navy.mil/navfac_worldwide/pacific/fecs/far_east/about_us/contractors_information.html

If the Government approves the Contractor to erect a structure as described above in section 2.4.1, electrical power and water may be installed in the structure, subject to the approval of the Government, on payment by the Contractor of the established charges. Utilities specified above will be furnished at no cost to the Contractor.

2.4.3 Government-

Furnished Materials (GFM)

None.

2.4.4 Government-

Furnished Equipment (GFE)

None.

2.4.5 Government-

Furnished Services

(GFS)

None.

2.5 Contractor-

Furnished Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.

Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.

2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.

2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business.

In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall submit monthly schedules to the Government three days in advance of the scheduled month. The Contractor shall submit ninety day schedules for the Central Training Areas (CTA) to the Government three days in advance of the scheduled work. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.

2.6.4 Deliverables Records and reports are specified in Sections C, F, H, I, J, and within the Directives, Instructions, and References. The Contractor shall submit accurate and complete documents within the specified timeframes. The

RFP N40084-19-R-2009

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 13

Contractor shall revise/modify records and reports, as directed by the KO, at no additional cost to the Government. All Contractor submittals shall be in English or may be submitted in Japanese with English translations.

Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office Version 2010 compatible format.

Deliverables shall be unprotected and capable of being sorted by CLIN, work order number, asset number, section, annex/sub-annex, spec item and ELIN/Sub-ELIN or clause. All formulas shall be traceable.

Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.

2.6.5 Service

Interruptions

If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers a minimum of 45 days’ notice for family housing, all other areas require 30 days’ notice. If the discontinued service is due to an emergency breakdown, the Contractor shall notify the KO, affected tenants and customers as soon as practicable. The Contractor shall notify the KO within 48 hours of any areas that are inaccessible and work cannot be performed due to construction or other reasons.

2.6.6 NAVFAC

MAXIMO

N/A

2.6.7 Quality

Management System (QMS)

The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:

• Accurate documentation of work processes, procedures, and output measures.

• A systematic procedure for assessing compliance with performance objectives and standards.

• Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.

• Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

The Contractor QMS Pre-Performance Review Checklist for compliance with this requirement is provided in J-0200000-09.

2.6.7.1 Quality

Management (QM) Plan

The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.

The Contractor’s QM Plan shall include, at a minimum, the following:

• Policy and objectives of Quality Management System (QMS)

• Quality organization o List of personnel o Organization chart o Responsibilities & lines of authority o Training and qualifications o Quality Manger resume

• Approach to assuring quality of services provided and conformance with performance objectives and standards

• Methods and procedures for effective planning, operation and control of processes and performance of work

• Procedures for inspection and surveillance of services

RFP N40084-19-R-2009

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 14 o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight of subcontracted work

• Documentation and records management

• Communication with government (customers)

2.6.7.2 Quality Inspection

and Surveillance

The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be submitted to the KO after termination of the contract per Section F.

2.6.7.3 Quality Inspection

and Surveillance Report

The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.

2.6.8 Property

Management Plan

N/A

2.6.9 System and

Equipment Replacement

The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work.

Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced. Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.

2.7 Personnel

Requirements

The Contractor shall comply with the personnel requirements stated below.

2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.

The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract.

The key personnel shall be revised as applicable for the contract.

Key personnel shall be able to speak, read, and comprehend English or a translator/interpreter shall be furnished at no additional cost to the Government.

2.7.1.1 Project Manager

(PM)

The Contractor shall provide a PM and designated alternate, as applicable, who has the have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the Government's regular working hours and shall be available on-site within one hour after the Government's regular working hours.

The PM shall have at least three (3) years of experience in managing a workforce providing services on contracts of similar size, scope and complexity.

RFP N40084-19-R-2009

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 15

The PM and alternate shall not be the same person as the Quality Manager.

2.7.1.2 Quality Manager The Contractor shall provide a Quality Manager or designated alternate shall be on-site during the Government's regular working hours and shall be available on-site within two hours after the Government’s regular working hours. The Quality Manager must report directly to a senior corporate official and shall not report directly to the Project Manager. The Quality Manager shall not be the same person as the Project Manager.

The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract:

The Quality Manager shall have at least three (3) years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The Quality Manager may be the same person as the SSHO.

2.7.1.3 Site Safety and

Health Officer

(SSHO)

The SSHO must meet the requirements of EM 385-1-1 Section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO).

The SSHO or an equally-qualified Designated Representative/alternate shall be on-site at all times when work is being performed to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.

A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.

The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract.

The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:

The SSHO shall have completed five (5) years of satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past or three years’ experience if he possesses a Certified Safety Professional (CSP) or safety and health degree. The SSHO shall have completed the OSHA 30-hour construction safety class or equivalent and maintain competency through 24 hours of formal safety and health related coursework every four years. The SSHO may be the same person as the project manager but shall have fulfilled the pre-requisite qualification and experience.

Note: The Japan Construction Occupational Safety and Health Association (JCOSHA) provides the construction site safety and health management course “KOUJI SHUNIN COURSE”, or “SHOCHOU COURSE”, which is as acceptable equivalent to the 30-hours OSHA safety class. This training can be viewed at the JCOSHA website: http://www.kensaibou.or.jp or https://www.kensaibou.or.jp/eng/index.html

RFP N40084-19-R-2009

(Revision 1)

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 16 http://www.kensaibou.or.jp/ https://www.kensaibou.or.jp/eng/index.html

This training course has five (5) years of validated date. SSHO shall maintain renewal of certificate. The refresher course is also an equivalent course after the initial training course has been completed.

2.7.1.4 Environmental/

Energy Manager

The Contractor shall provide an Environmental/Energy Manager whose primary duty and responsibility is to ensure Contractor operations adhere to the goals and policies of the Environmental Management System, the Installation Energy Plan, and other specified Sustainability requirements affecting this contract. The Environmental/Energy Manager shall develop, implement and monitor environmental strategies, policies and programs that promote sustainable development and examine the contract activities to establish where improvements can be made and ensure compliance with environmental legislation and energy policy.

The Environmental/Energy Manager shall have a minimum two years’ experience with environmental procedures similar to those of this contract;

familiarity with Environmental Management Systems (EMSs); and knowledge of environmental regulations and federal energy laws and policy (including energy and water reduction requirements and renewable energy requirements) that are applicable to operations similar to those of this contract.

2.7.2 Employee

Requirements

The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can read and understand printed regulations, detailed written orders, operating procedures, training instructions and materials in order to perform the contract requirements and comply with installation emergency procedures or a translator/interpreter shall be furnished at no additional cost to the Government.

Contractor personnel shall be trained and knowledgeable in all safety requirements prior to performing any operation and maintenance of any of the facilities, equipment, and systems, to include components therein, identified within this contract. The Contractor shall implement an ongoing training program that refreshes the safety skills, qualifications and awareness of the Contractor workforce on a regular, periodic basis.

The details of the Contractor’s safety training program shall be included as part of the Contractor’s Accident Prevention Plan, as required in Spec Item 2.9.1.

2.7.2.1 Employee

Certification and Training

The Contractor shall maintain personnel certification, training, and licensing records for employee requirements specified herein and within all technical annexes/sub-annexes. Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods.

Records shall be made available for Government review within 4 hours of request.

Marine Corp Air Station Futenma (MCAS) requirements reference Section J- 1503050-06

2.7.2.2 Employee

Appearance

The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.

RFP N40084-19-R-2009

UNCLASSIFIED/FOR OFFICIAL USE ONLY Page 17

2.7.2.3 Employee Conduct Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.

2.7.2.4 Identification as

Contractor Employee

Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. All Contractor employees shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

2.7.2.5 Removal of

Employees

The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.

2.7.2.6 Proof of Legal

Residency

No employee or representative of the Contractor will be admitted to the site of work unless satisfactory proof of citizenship is furnished, or if an alien, legal residency within Japan is confirmed. Proof is submitted per Section F.

2.7.3 Enterprise-wide

Contractor Manpower Reporting Application (eCMRA)

The Contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:

https://www.ecmra.mil

Per Section F, reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://www.ecmra.mil

2.8 Security

Requirements

The Contractor shall comply with all U.S. Federal, Government of Japan, Command and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.

Neither the Contractor nor any of its employees shall disclose or cause to be disseminated any information concerning the operations of the activity which could result in or increase the likelihood of the possibility of a breach of the activity’s security or interrupt the continuity of operations.

All inquiries, comments or complaints arising from any matter observed, experienced, or learned as a result of or in connection with the performance of this contract, the resolution of which may require the dissemination of official information, will be directed to the activity Commander.

Deviations from or violations of any of the provisions of this paragraph will, in addition to all other criminal and civil remedies, provided by law subjects the Contractor to immediate termination for default and/or the individuals involved to a withdrawal of the Government’s acceptance and approval of employment.

The Contractor shall prohibit the opening of locked areas by the Contractor employees to permit entrance of persons other than Contractor’s employees engaged in the performance of assigned work in those areas.

New Contractor personnel shall comply with directives under MCBJ 5512.3B, Base…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .