This document contains responses to questions from offerors on a solicitation for grounds maintenance services at various U.S. government installations on Okinawa, Japan. The services required include recurring maintenance of grassed areas, drainage ditches, and perimeter fence lines at the specified bases. Exceptions to clearance standards may apply where boundaries or terrain prevent access. The Navy is the contracting agency, and the period of performance is from April 2020 through March 2021, with nine months for the base period and options to extend the contract annually thereafter. Estimated quantities in the solicitation are considered accurate. Contractors are advised to consider standard termination clauses and the potential effect on future bidding eligibility should performance failures exceed allowable limits. A phase-in period is allotted prior to the start of on-site work to submit deliverables and fully establish personnel and equipment access to perform at full capacity beginning on the start date.
Attach (1) 19R2009 Questions & Responses
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE PROPOSAL INQUIRY FORM
DATE: Oct 25, 2019
Question No. Reference (Sect/Para/Page) QUESTION GOVERNMENT RESPONSE
1503050/4.2/49 Referring to MCO 5530.14A, Chapter 5, Para. 5012.2, Page 5-14, it specified that "Interior/exterior clear zones combined will be minimum of 33 feet, with the interior clear zone being no less than 20 feet, and the exterior clear zone being no less than 10 feet." Please clarify which one is correct because during our site visit this morning it was stated that 10 feet for exterior clear zone and 23 feet for interior clear zone.
(NON-RECURRING WORK) The MCO specifies minimum clear zones for interior and exterior zones. However, the total combined clear zone minimum of 33 feet shall be met. This means the Contractor shall determine allocation variance between interior/exterior zones, depending on terrain (e.g. 10 feet exterior + 23 feet interior; 12 feet exterior + 21 feet interior; 13 feet exterior + 20 interior; etc.). Exceptions will exist where MCB boundaries or terrain does not allow for maintenance. Areas that do not meet this requirement will be considered for Clearing and Grubbing within the Base Year.
1503050/3.1.2/40 If MCO 5530.14A, Chapter 5, Para. 5012.2, Page 5-14 should govern this ruling for the Fence Line ATFP requirement, shouldn’t be the PWS 1503050/3.1.2/40 be amended to meet this requirement for the consistency of this particular contract? Please clarify.
(RECURRING WORK) Contract has been designed to meet the MCO as the governing rule. All Fence lines will be cleared and grubbed to meet ATFP standards with the exception of where boundaries do not permit maintenance or terrain renders area unsafe. Per PWS 3.3.3, " The Contractor shall clear and grub fence line areas that do not meet anti-terrorism force protection (ATFP) standards".
Maps and PWS 1503050 Specs. 3.1.2, 3.3.1, and 3.3.2 have been revised to add the following:
"Perimeter fence lines shall be maintained to ATFP standards indicated on the maps in J-1503050-05. Exceptions will exist where MCB boundaries or terrain does not allow for maintenance. At a minimum, fence lines will be maintained at 5 feet inside the fence and 5 feet outside the fence."
Attachment J-0200000-
There is a footnote or comment found in ELIN A005AE, stating that the total acreage for this particular ELIN is 3.2 AC. Please clarify if we should follow this quantity in quoting our bids for Base Period Recurring.
ELIN A005AE (Drainage), Camp Lester should read ELIN A004AE (Drainage), MCB Plaza and ELIN A004AG (Rodside/Drainage) , MCB Plaza. ELIN A004AG is the drainage ditch at Plaza Housing Site Visit. The base year this area will include "CLEAR and Grub". Option year will be routine maitenance.
ELINs will be updated to reflect proper location and acreage. GIS acreage has been updated reflecting a total of 1.08 ac for both areas. See revised ELIN schedule.
Attachment J-0200000-
The description in ELIN A001_Base Recurring is printed as "MCB (KINSER) (COL 3 LV2)- 1503050 Grounds Maintenance and Landscaping", accordingly. Please clarify what is "COL 3 LV2" for?
Is this the Grass Height Standard applied for when pricing ELIN A001AB, ELIN A001AD, and ELIN A001AE, respectively?
COL 3 LV 2 should read COL 3 Full. See revised ELIN schedule. Please see
PWS ATTACHMENT J-1503050-03 COMMON OUTPUT LEVEL
STANDARDS PWS concerning COLs definitions.
J-0200000-10 CLIN
0001 Recurring Work, Price Base Period, ELIN A017-A026
From A017 to A021, Quantity of Month is 12. Shall this be corrected to 9?
Yes, quantity of Month for Base Period Recurring items A017 thru A021 has been corrected from 12 months to 9 months. See revised ELIN schedule.
Attachment J-0200000-
Under the "Proposed Award" column of CLIN 0001 RECURRING WORK -Price -Base Period, is the "Unit Price" column for the contractor to fill-in? Please clarify.
Yes, please fill in "Unit Price" column under proposed award and other COL levels unit prices on the right column (Columns I, J, K, and L).
RFP N40084-19-R-2009
Grounds Maintenance Services at Southern Camps, MCB Butler Okinawa, Japan.
PRE PROPOSAL INQUIRY FORM
DATE: Oct 25, 2019
Question No. Reference (Sect/Para/Page) QUESTION GOVERNMENT RESPONSE
RFP N40084-19-R-2009
Grounds Maintenance Services at Southern Camps, MCB Butler Okinawa, Japan.
Attachment J-0200000-
Please veirfy summary page, amount shouws $ Summary page on attachement J-0200000-10 ELIN has been corrected from $ to Yen. Please see revised J-0200000-10 v1
RFP N4008419R2009,
Attachment J-0200000- 10/Exhibit A-CLIN 0002/
NON-RECURRING
WORK (IDIQ) Price- Base Period
ELIN A301 indicate an estimated quantity of 15 AC for mowing, Unimproved Fence Line. However, MCO 5530.14A, Chapter 5, Para.
5012.2, Page 5-14, specified that "Interior/exterior clear zones combined will be minimum of 33 feet, with the interior clear zone being no less than 20 feet, and the exterior clear zone being no less than 10 feet." Please clarify if the estimated quantity reflected for ELIN A301 is correct.
All Estimated quantities in the ELINS are correct and are identified on the Maps.
General Question What kind of contractual risks the awardee shall consider in case that the awardee fails to meet contract requirements on more than allowable numbber of failures? Will the government implement a contract termination? Does the bidding capability of the awardee deteriorate due to these contractural failures?
This question can only be answered by the contrcator based on the level of risk they are willing to take. The Government may only comply with and enforce the contract requirements such as, but not limited to, FAR 52.246-4 Inspection Of Services--Fixed Price, FAR 52.249-8 Default (Fixed-Price Supply & Service), etc.
Is there also a field-work the step-by-step transition period? See CLIN 0001, Phase-in Period. This period is to allow for submission of all deliverables prior to start of On-site POP on 1 April 2020. Phase-in period is to allow for build up personnel and equipment to include required base access prior to On-site POP. Expectation is for full performance (production) starting on 1 April 2020, where contractor is not lacking in personnel, base access, or equipment, and deliverables have been received.