Attach_(1)_19R2009_J-0200000-10_ELINs_v2.xlsx

XLSX spreadsheet 125 KB Posted

Attached to
South Grounds Maintenance Services at U. S. Government Installations, MCB Butler Okinawa, Japan
Solicitation number
N4008419R2009
Issued by

About this file

This document outlines line item numbers and pricing for grounds maintenance services at various U.S. government installations in Okinawa, Japan. The solicitation seeks recurring and non-recurring grounds maintenance including mowing, tree and vegetation removal, pruning, hydroseeding, sodding, and typhoon cleanup. Pricing is provided for multiple locations including Marine Corps bases, schools, hospitals and other facilities. Recurring work is priced by acre and specifications. Non-recurring work includes estimates and unit pricing for tasks such as tree removal, stump grinding and landscaping. The base period is April 2020 through December 2020 with four optional one-year extensions. The solicitation includes extensive line item breakdowns by location and task.

Attach (1) 19R2009 J-0200000-10 ELINs_v2

View the file

Other files

File Type Posted
N4008419R2009_Amendment_0004.pdf PDF
Attach_(1)_19R2009_J-0200000-10_ELINs_v3.xlsx XLSX spreadsheet
N4008419R2009_Amendment_0003.pdf PDF
Attach_(5a)_Performance_Work_Statement_(PWS)v1.pdf PDF
Attach_(1)_19R2009_Questions_&_Responses.pdf PDF
Attach_(4)_J-1503050-04_Total_Acreage_Summary.pdf PDF
Attach_(3)_19R2009_J-1503050-5_Site_Maps.docx DOCX document
Attach_(5c)_Performance_Work_Statement_(PWS)v1.pdf PDF
N4008419R2009_Amendment_0002.pdf PDF
Attach_(2)_19R2009_J-0200000-10_ELINs_v1.xlsx XLSX spreadsheet
Attach_(5b)_Performance_Work_Statement_(PWS)v1_.pdf PDF
N4008419R2009_Amendment_001.pdf PDF
Attach_(3)_19R2009_J-1503050-15_Site_Maps.docx DOCX document
Attach_(7)_Inquiry_Form_N4008419R2009.xlsx XLSX spreadsheet
Attach_(8)_Site_Visit_Request_Form.xlsx XLSX spreadsheet
Attach_(4)_19R2009_PAP_FAP_17Sep19.pdf PDF
Attach_(1a)_Performance_Work_Statement_(PWS)_23Sep19.pdf PDF
Attach_(6)_Past_Performance_Questionnaire.docx DOCX document
Attach_(5)_Experience_Form.docx DOCX document
Attach_(1b)_Performance_Work_Statement_(PWS)_23Sep19.pdf PDF
Attach_(1c)_Performance_Work_Statement_(PWS)_23Sep19.pdf PDF
Attach_(2)_19R2009_J-0200000-10_ELINs.xlsx XLSX spreadsheet
RFP_N4008419R2009.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-19-R-2009
ATTACHMENT J-0200000-10

GROUNDS MAINTENANCE AT SOUTHERN CAMPS, MCB BUTLER OKINAWA, JAPAN

CLINDescriptionPeriodTotal
CLIN 0001PHASE IN Period (Base period only) - A026Award date ~ 31 Mar 2020
RECURRING WORK for BASE Period1 Apr ~ 31 Dec 2020
CLIN 0002NON-RECURRING WORK for BASE Period1 Jan 2020 ~ 31 Dec 2020
Subtotal for BASIC:¥0
CLIN 0003RECURRING WORK for 1ST OPTION Period1 Jan 2021 ~ 31 Dec 2021
CLIN 0004NON-RECURRING WORK for 1ST OPTION Period1 Jan 2021 ~ 31 Dec 2021
Subtotal for OPTION 1:¥0
CLIN 0005RECURRING WORK for 2ND OPTION Period1 Jan 2022 ~ 31 Dec 2022
CLIN 0006NON-RECURRING WORK for 2ND OPTION Period1 Jan 2022 ~ 31 Dec 2022
Subtotal for OPTION 2:¥0
CLIN 0007RECURRING WORK for 3RD OPTION Period1 Jan 2023 ~ 31 Dec 2023
CLIN 0008NON-RECURRING WORK for 3RD OPTION Period1 Jan 2023 ~ 31 Dec 2023
Subtotal for OPTION 3:¥0
CLIN 0009RECURRING WORK for 4TH OPTION Period1 Jan 2024 ~ 31 Dec 2024
CLIN 0010NON-RECURRING WORK for 4TH OPTION Period1 Jan 2024 ~ 31 Dec 2024
Subtotal for OPTION 4:¥0

TOTAL AMOUNTS (Basic ~ Opt4): ¥0

BASE_RECURRING

RFP N4008419R2009 ATTACHMENT J-0200000-10

EXHIBIT LINE ITEM NUMBERS (ELIN)

EXHIBIT A - CLIN 0001

CLIN 0001 RECURRING WORK -Price -BASE Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, 1503050 Grounds Maintenance and Landscaping
Unit of Measure: AC -Acre, EA- Each, SF-Square Foot, CY-Cylinder, LF-Linear Foot / COL - Common Output level Standards.
ELINDESCRIPTIONMonth(s)Total AcreageUnit AcrePROPOSED AWARDCOL 1COL 2COL 3 FullCOL 3 Min
Unit PriceTotal Price YenTotal Price DollarUnit PriceUnit PriceUnit PriceUnit Price
MCB PORTION (A001 ~ A005)
A001MCB (KINSER) (COL 3 FULL)- 1503050 Grounds Maintenance and Landscaping
A001AAPrestige COL 2 Spec Item 398.85AC¥0$0.00
A001ABImproved Spec. Item 3.1991.66AC¥0$0.00
A001ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
A001ADFence line Spec. Item 3.1.295.02AC¥0$0.00
A001AEDrainage Spec. Item 3.490.28AC¥0$0.00
A001AFAirfield Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
A001AGRoadside/Drainage(2"-16") Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
MCB (KINSER) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
A001ABImproved Spec. Item 3.1943.64AC¥0$0.00
Total for MCB Kinser:¥0$0.00N/AN/AN/AN/A
A002MCB (MCAS FUTENMA)(COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A002AAPrestige COL 2 Spec Item 3N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
A002ABImproved Spec. Item 3.19178.38AC¥0$0.00
A002ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
A002ADFence line Spec. Item 3.1.297.48AC¥0$0.00
A002AEDrainage Spec. Item 3.491.79AC¥0$0.00
A002AFAirfield Spec. Item 3.49277.38AC¥0$0.00
A002AGRoadside/Drainage(2"-16") Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
MCB (MCAS FUTENMA) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
A002ABImproved Spec. Item 3.1954.62AC¥0$0.00
Total for MCAS Futenma:¥0$0.00N/AN/AN/AN/A
A003MCB (FOSTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A003AAPrestige COL 2 Spec Item 399.05AC¥0$0.00
A003ABImproved Spec. Item 3.19132.20AC¥0$0.00
A003ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
A003ADFence line Spec. Item 3.1.2911.97AC¥0$0.00
A003AEDrainage Spec. Item 3.496.24AC¥0$0.00
A003AFAirfield Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
A003AGRoadside/Drainage(2"-16") Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
MCB (FOSTER) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
A003ABImproved Spec. Item 3.1981.00AC¥0$0.00
Total for MCB Foster:¥0$0.00N/AN/AN/AN/A
A004MCB (PLAZA) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A004AAPrestige COL 2 Spec Item 391.76AC¥0$0.00
A004ABImproved Spec. Item 3.1911.92AC¥0$0.00
A004ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
A004ADFence line Spec. Item 3.1.295.26AC¥0$0.00
A004AEDrainage Spec. Item 3.490.08N/AN/AN/A$0.00N/AN/AN/AN/A
A004AFAirfield Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
A004AGRoadside/Drainage(2"-16") Spec. Item 3.491.00N/AN/AN/A$0.00N/AN/AN/AN/A
MCB (PLAZA) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
A004ABImproved Spec. Item 3.193.94AC¥0$0.00
Total for MCB (Plaza):¥0$0.00N/AN/AN/AN/A
A005MCB (LESTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A005AAPrestige COL 2 Spec Item 3N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
A005ABImproved Spec. Item 3.1922.87AC¥0$0.00
A005ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
A005ADFence line Spec. Item 3.1.291.53AC¥0$0.00
A005AEDrainage Spec. Item 3.4N/AN/AN/AN/A¥0$0.00
A005AFAirfield Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
A005AGRoadside/Drainage(2"-16") Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
MCB (LESTER) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
A005ABImproved Spec. Item 3.198.27AC¥0$0.00
Total for MCB Lester:¥0$0.00N/AN/AN/AN/A
TOTAL OF MCB PORTION (A001 ~ A005):¥0$0.00
MCB (MCCS) PORTION (A006 ~ A008)-TO BE ADDED TO MCB
A006MCB (MCCS) (KINSER) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping
A006ABImproved Spec. Item 3.199.69AC¥0$0.00
Total for MCB (MCCS) Kinser:¥0$0.00N/AN/AN/AN/A
A007MCB (MCCS) (FUTENMA) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping
A007ABImproved Spec. Item 3.1912.72AC¥0$0.00
Total for MCB (MCCS) Futenma:¥0$0.00N/AN/AN/AN/A
A008MCB (MCCS) (FOSTER) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping
A008ABImproved Spec. Item 3.1927.94AC¥0$0.00
Total for MCB (MCCS) Foster:¥0$0.00N/AN/AN/AN/A
TOTAL OF MCB (MCCS) PORTION (A006 ~ A008):¥0$0.00
DODDS PORTION (A009 ~ A011)
A009DODDS (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A009ABImproved Spec. Item 3.199.48AC¥0$0.00
Total for DoDDS Kinser:¥0$0.00N/AN/AN/AN/A
A010DODDS (FOSTER) (COL 3 FULL)) - 1503050 Grounds Maintenance and Landscaping
A010ABImproved Spec. Item 3.1924.52AC¥0$0.00
Total for DoDDS Foster:¥0$0.00N/AN/AN/AN/A
A011DODDS (LESTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A011ABImproved Spec. Item 3.1910.10AC¥0$0.00
Total for DoDDS Lester:¥0$0.00N/AN/AN/AN/A
TOTAL OF DODDS PORTION (A009 ~ A011):¥0$0.00N/AN/AN/AN/A
USNH NAVY PORTION (A012 ~ A014)
A012USNH (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A012ABImproved Spec. Item 3.192.24AC¥0$0.00
Total for USNH (Kinser):¥0$0.00N/AN/AN/AN/A
A013USNH (FUTENMA) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A013ABImproved Spec. Item 3.191.72AC¥0$0.00
Total for USNH (Futenma):¥0$0.00N/AN/AN/AN/A
A014USNH (FOSTER) (COL 3 FULL)- 1503050 Grounds Maintenance and Landscaping
A014ABImproved Spec. Item 3.1919.09AC¥0$0.00
Total for USNH (Foster):¥0$0.00N/AN/AN/AN/A
USNH NAVY PORTION (A012 ~ A014):¥0$0.00N/AN/AN/AN/A
NCIS PORTION (A015)
A015NCIS (FOSTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A015ABImproved Spec. Item 3.190.26AC¥0$0.00
Total for NCIS Foster:¥0$0.00N/AN/AN/AN/A
TOTAL OF NCIS PORTION (A015):¥0$0.00N/AN/AN/AN/A
USAG Kinser PORTION (A016)
A016403rd LRC (USAG KINSER) (COL 3 FULL)- 1503050 Grounds Maintenance and Landscaping
A016ABImproved Spec. Item 3.194.09AC¥0$0.00
Total for 403rd LRC (USAG Kinser):¥0$0.00N/AN/AN/AN/A
TOTAL OF USAG Kinser PORTION (A016):¥0$0.00N/AN/AN/AN/A
USAG Buckner PORTION (A017 ~ A018)
A01778th SIG (USAG FOSTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A017ABImproved Spec. Item 3.1910.92AC¥0$0.00
A017ADFence line Spec. Item 3.1.290.73AC¥0$0.00
Total for 78th SIG (USAG Foster):¥0$0.00N/AN/AN/AN/A
A01853rd Signal USAG (LESTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A018ABImproved Spec. Item 3.190.23AC$0.00
Total for 53rd SIG (USAG Lester):¥0$0.00N/AN/AN/AN/A
TOTAL OF USAG Buckner PORTION (A017 ~A018):¥0$0.00N/AN/AN/AN/A
DECA PORTION (A019 ~ A020)
A019DECA (KINSER) (COL 3 FULL)- 1503050 Grounds Maintenance and Landscaping
A019ABImproved Spec. Item 3.193.99AC¥0$0.00
Total for DECA (Kinser):¥0$0.00N/AN/AN/AN/A
A020DECA (FOSTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A020ABImproved Spec. Item 3.192.00AC¥0$0.00
Total for DECA (Foster):¥0$0.00N/AN/AN/AN/A
TOTAL OF DECA PORTION (A019~A020):¥0$0.00N/AN/AN/AN/A
DMA PORTION (AFN) (A021 ~ A022)
A021DMA (AFN) (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A021ABImproved Spec. Item 3.198.80AC¥0$0.00
Total for DMA (AFN) (Kinser):¥0$0.00N/AN/AN/AN/A
A022DMA (AFN) (PLAZA) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A022ABImproved Spec. Item 3.193.64AC¥0$0.00
Total for DMA (AFN) (Plaza):¥0$0.00N/AN/AN/AN/A
TOTAL OF DMA PORTION (AFN) (A021~A022):¥0$0.00N/AN/AN/AN/A
DLA Disposition (DRMO) PORTION (A023)
A023DLA (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A023ABImproved Spec. Item 3.190.30AC¥0$0.00
Total for DLA (KINSER):¥0$0.00N/AN/AN/AN/A
TOTAL OF DLA Disposition(DRMO) (A023):¥0$0.00N/AN/AN/AN/A
DLA Distribution PORTION (A024)
A024DLA (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A024ABImproved Spec. Item 3.192.06AC¥0$0.00
Total for DLA (KINSER):¥0$0.00N/AN/AN/AN/A
TOTAL OF DLA Distribution PORTION (A024):¥0$0.00N/AN/AN/AN/A
DLA Document PORTION (A025)
A025DLA (Foster) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A025ABImproved Spec. Item 3.190.59AC¥0$0.00
Total for DLA (Foster):¥0$0.00N/AN/AN/AN/A
TOTAL OF DLA Document PORTION (A025):¥0$0.00N/AN/AN/AN/A
USACE (ACOE) PORTION (A026)
A026ACOE (LESTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
A026ABImproved Spec. Item 3.190.23AC¥0$0.00
Total for ACOE (Lester):¥0$0.00N/AN/AN/AN/A
TOTAL OF USACE (ACOE) PORTION (A026):¥0$0.00N/AN/AN/AN/A
MCB South Clear, Grub & Maintain (A027)
A027MCB South Clear, Grub & Maintain COL 3 MIN
A027ABImproved Spec. Item 3.3.3917.50AC¥0$0.00N/AN/AN/AN/A
Total for MCB South CGM:¥0$0.00N/AN/AN/AN/A
TOTAL OF MCB North Clear & Grub (A027):¥0$0.00N/AN/AN/AN/A

Total BASE PERIOD- RECURRING WORK : ¥0 $0.00

PHASE IN PERIOD (A028)
A028Phase-In-Period (Baes period only)
Price for administrative matter that includes, but not lilmited to, submittals/deliverables, passes, manposr/ equipment,etc.From Award ~ 31 Mar 2020¥0$0.00N/AN/AN/AN/A
¥0$0.00N/AN/AN/AN/A
TOTAL OF PHASE IN PERIOD (A028):¥0$0.00N/AN/AN/AN/A
N/AN/AN/AN/A
Ground Total BASE PERIOD CLIN 0001 :
(RECURRING WORK & PHASE IN PERIOD)¥0$0.00N/AN/AN/AN/A

&9Page &P of &N

BASE_NON RECURRING

RFP N4008419R2009 ATTACHMENT J-0200000-10

EXHIBIT LINE ITEM NUMBERS (ELIN)

EXHIBIT A - CLIN 0002

CLIN 0001 RECURRING WORK -Price -BASE Period
PROVIDE PRICES FOR GROUNDS MAINTENANCE AND LANDSCAPING - NON-RECURRING WORK- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs A301 through A317
Unit of Measure: AC -Acre, EA- Each, SF-Square Foot, CY-Cylinder, LF-Linear Foot
ELINSHORT DESCRIPTIONFULL DESCRIPTIONEstimated QuantityUNIT OF ISSUEUnit PriceTotal Price
A301Mowing, Unimproved Fence LineGrass shall be mowed and trimmed to a uniform height per COL 2 specifications. All clippings and debris shall be removed. Unimproved grounds is mainly consisting of grass, shrub, and vegetations less than 6" DBH.15AC¥0
A302Reserved
A303Mowing, cutting of Unimproved groundsGrass shall be cut/mowed and trimmed to a uniform height per COL 2 specificatins. All clippings and debris shall be removed. Mowing, cutting of Unimproved grounds allowed to grow wild. Unimproved grounds is mainly consisting of grass, shrub, and vegetations less than 6" DBH.100AC¥0
A304Tree Removal Large 20" DBH and above Tree Removal.Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level.30EA¥0
A305Tree Removal Medium 12" DBH to 20" DBH and above Tree Removal.Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level.75EA¥0
A306Tree Removal Medium 6" DBH to 12" DBH and above Tree Removal.Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level.50EA¥0
A307Stump RemovalRemove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level.75EA¥0
A308Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. All debris resulting from the work shall be removed off from the Government property.150EA¥0
A309Shrubs/Hedges PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. All debris resulting from the work shall be removed off from the Government property.20EA¥0
A310Hydro-SeedingThe latest season’s crop delivered in original sealed packages bearing the producer’s guaranteed analysis for percentages of mixtures, purity, germination, weed seed content, and inert material. Mixes will be acceptable when the field mix is performed indie the presence of the Contracting Officer or designated representative. Fertilizer shall be controlled release with hydro seeding and it shall be applied in accordance with manufactures recommendation. Wood cellulose fiber or emulsified asphalt shall be used with hydraulic application of graded seed, fertilizer, and soil binder. The contractor shall re-preform hydro seeding areas which fail to firmly knit to the soil bed and/or develop the good stand of grass at no additional cost to the Government.25,000SF¥0
A311TopsoilingTopsoil to be provided by the Contractor shall be from approved sources. The topsoil shall be reasonability free from subsoil, clay clumps, weeds, or substances which might be harmful to plants. Soil proposed for use shall be inspected and approved by the Contracting Officer.50CY¥0
A312Sand FillingSand shall be clan and free of toxic materials.20CY¥0
A313SoddingSod shall be Korai-shiba. It shall be dense, uniform, weed free, and have good sod strength at minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The contractor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government.5,000SF¥0
A314Bamboo BracingThe Contractor shall install or remove and replace existing bamboo bracing for shrubs and hedges, and shall use help rope for tying.250LF¥0
A315
MCBTyphoon Clean-up (MCB Butler Only)The Contractor shall mobilize his entire workforce within eight (8) working hours or the “All Clear” Typhoon Condition announcement and be on the job site working. All collected debris shall be removed and disposed of off Government Property.
The Contractor shall collect and remove all vegetation debris (tree limbs, fallen trees, leaves. Etc.), as a result of the typhoon along fence lines and other locations within the installation. In addition, the Contractor shall remove all cracked, broken or damaged tree limbs from any tree damaged during the severe weather. The Contractor shall also commence righting, re-planting, and re-staking for any trees, shrubs, and flower beds around the installation which have been uprooted and/or blown over by the typhoon.5EA¥0
A315
USAGTyphoon Clean-up (Buckner Communication Site, Fort Buckner)The Contractor shall mobilize his entire workforce within eight (8) working hours or the “All Clear” Typhoon Condition announcement and be on the job site working. All collected debris shall be removed and disposed of off Government Property.
The Contractor shall collect and remove all vegetation debris (tree limbs, leaves. Etc.), as a result of the typhoon along fence lines and other locations within the installation. In addition, the Contractor shall remove all cracked, broken or damaged tree limbs from any tree damaged during the severe weather. The Contractor shall also commence righting, re-planting, and re-staking for any trees, shrubs, and flower beds around the installation which have been uprooted and/or blown over by the typhoon.5EA¥0
A316Composite Hourly Labor RateComposite hourly labor rate is used for performing work included within the IDIQ portion of the contract.
The composite hourly labor rate shall include all direct and indirect costs, wages, profit, insurance, overhead, applicable taxes, travel time, operating expenses, tool and all other chargers that contribute to the composite hourly labor rate.1000Hours¥0
A317Equipment Costs- MUST BE NEGOTIATED BY KO.Equipment costs will be based on Means Cost Data Catalogs or area equipment rates, whichever proves more reasonable. To be used with ELIN A316. Prices shall also include mobilization costs, bonds, and State and Local sales taxes. MUST BE NEGOTIATED BY KO40EA(Estimated Maximum Equip cost)¥1,000,000
A318Clear and GrubClear area of vegetation to COL 3 MIN. Remove vegetation and trees under 6 inches measered at breast heigh (4ft). Level, fill, and hydro-seed as required.20AC¥0
Total BASE PERIOD_NON RECURRING WORK1,000,000

&9Page &P of &N

OPT1_RECURRING

RFP N4008419R2009 ATTACHMENT J-0200000-10

EXHIBIT LINE ITEM NUMBERS (ELIN)

EXHIBIT B - CLIN 0003

CLIN 0003 RECURRING WORK -Price -First Option Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, 1503050 Grounds Maintenance and Landscaping
Unit of Measure: AC -Acre, EA- Each, SF-Square Foot, CY-Cylinder, LF-Linear Foot / COL - Common Output level Standards.
ELINDESCRIPTIONMonth(s)Total AcreageUnit AcrePROPOSED AWARDCOL 1COL 2COL 3 FullCOL 3 Min
Unit PriceTotal Price YenTotal Price DollarUnit PriceUnit PriceUnit PriceUnit Price
MCB PORTION (B001 ~ B005)
B001MCB (KINSER) (COL 3 FULL)- 1503050 Grounds Maintenance and Landscaping
B001AAPrestige COL 2 Spec Item 3128.85AC¥0$0.00
B001ABImproved Spec. Item 3.11291.66AC¥0$0.00
B001ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
B001ADFence line Spec. Item 3.1.2125.02AC¥0$0.00
B001AEDrainage Spec. Item 3.4120.28AC¥0$0.00
B001AFAirfield Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
B001AGRoadside/Drainage(2"-16") Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
MCB (KINSER) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
B001ABImproved Spec. Item 3.11246.45AC¥0$0.00
Total for MCB Kinser:¥0$0.00N/AN/AN/AN/A
B002MCB (MCAS FUTENMA)(COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B002AAPrestige COL 2 Spec Item 3N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
B002ABImproved Spec. Item 3.112178.38AC¥0$0.00
B002ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
B002ADFence line Spec. Item 3.1.2127.48AC¥0$0.00
B002AEDrainage Spec. Item 3.4121.79AC¥0$0.00
B002AFAirfield Spec. Item 3.412277.38AC¥0$0.00
B002AGRoadside/Drainage(2"-16") Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
MCB (MCAS FUTENMA) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
B002ABImproved Spec. Item 3.11258.30AC¥0$0.00
Total for MCAS Futenma:¥0$0.00N/AN/AN/AN/A
B003MCB (FOSTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B003AAPrestige COL 2 Spec Item 3129.05AC¥0$0.00
B003ABImproved Spec. Item 3.112132.20AC¥0$0.00
B003ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
B003ADFence line Spec. Item 3.1.21211.97AC¥0$0.00
B003AEDrainage Spec. Item 3.4126.24AC¥0$0.00
B003AFAirfield Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
B003AGRoadside/Drainage(2"-16") Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
MCB (FOSTER) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
B003ABImproved Spec. Item 3.11285.00AC¥0$0.00
Total for MCB Foster:¥0$0.00N/AN/AN/AN/A
B004MCB (PLAZA) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B004AAPrestige COL 2 Spec Item 3121.76AC¥0$0.00
B004ABImproved Spec. Item 3.11211.92AC¥0$0.00
B004ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
B004ADFence line Spec. Item 3.1.2125.26AC¥0$0.00
B004AEDrainage Spec. Item 3.4120.08AC$0.00
B004AFAirfield Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
B004AGRoadside/Drainage(2"-16") Spec. Item 3.4N/A1.00N/AN/AN/A$0.00N/AN/AN/AN/A
MCB (PLAZA) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
B004ABImproved Spec. Item 3.1129.40AC¥0$0.00
Total for MCB (Plaza):¥0$0.00N/AN/AN/AN/A
B005MCB (LESTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B005AAPrestige COL 2 Spec Item 3N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
B005ABImproved Spec. Item 3.11222.87AC¥0$0.00
B005ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
B005ADFence line Spec. Item 3.1.2121.53AC¥0$0.00
B005AEDrainage Spec. Item 3.4N/AN/AN/AN/AN/A$0.00
B005AFAirfield Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
B005AGRoadside/Drainage(2"-16") Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
MCB (LESTER) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
B005ABImproved Spec. Item 3.1129.82AC¥0$0.00
Total for MCB Lester:¥0$0.00N/AN/AN/AN/A
TOTAL OF MCB PORTION (B001 ~ B005):¥0$0.00
MCB (MCCS) PORTION (B006 ~ B008)-TO BE ADDED TO MCB
B006MCB (MCCS) (KINSER) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping
B006ABImproved Spec. Item 3.1129.69AC¥0$0.00
Total for MCB (MCCS) Kinser:¥0$0.00N/AN/AN/AN/A
B007MCB (MCCS) (FUTENMA) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping
B007ABImproved Spec. Item 3.11212.72AC¥0$0.00
Total for MCB (MCCS) Futenma:¥0$0.00N/AN/AN/AN/A
B008MCB (MCCS) (FOSTER) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping
B008ABImproved Spec. Item 3.11227.94AC¥0$0.00
Total for MCB (MCCS) Foster:¥0$0.00N/AN/AN/AN/A
TOTAL OF MCB (MCCS) PORTION (B006 ~ B008):¥0$0.00
DODDS PORTION (B009 ~ B011)
B009DODDS (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B009ABImproved Spec. Item 3.1129.48AC¥0$0.00
Total for DoDDS Kinser:¥0$0.00N/AN/AN/AN/A
B010DODDS (FOSTER) (COL 3 FULL)) - 1503050 Grounds Maintenance and Landscaping
B010ABImproved Spec. Item 3.11224.52AC¥0$0.00
Total for DoDDS Foster:¥0$0.00N/AN/AN/AN/A
B011DODDS (LESTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B011ABImproved Spec. Item 3.11210.10AC¥0$0.00
Total for DoDDS Lester:¥0$0.00N/AN/AN/AN/A
TOTAL OF DODDS PORTION (B009 ~ B011):¥0$0.00N/AN/AN/AN/A
USNH NAVY PORTION (B012 ~ B014)
B012USNH (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B012ABImproved Spec. Item 3.1122.24AC¥0$0.00
Total for USNH (Kinser):¥0$0.00N/AN/AN/AN/A
B013USNH (FUTENMA) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B013ABImproved Spec. Item 3.1121.72AC¥0$0.00
Total for USNH (Futenma):¥0$0.00N/AN/AN/AN/A
B014USNH (FOSTER) (COL 3 FULL)- 1503050 Grounds Maintenance and Landscaping
B014ABImproved Spec. Item 3.11219.09AC¥0$0.00
Total for USNH (Foster):¥0$0.00N/AN/AN/AN/A
USNH NAVY PORTION (B012 ~ B014):¥0$0.00N/AN/AN/AN/A
NCIS PORTION (B015)
B015NCIS (FOSTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B015ABImproved Spec. Item 3.1120.26AC¥0$0.00
Total for NCIS Foster:¥0$0.00N/AN/AN/AN/A
TOTAL OF NCIS PORTION (B015):¥0$0.00N/AN/AN/AN/A
USAG Kinser PORTION (B016)
B016403rd LRC (USAG KINSER) (COL 3 FULL)- 1503050 Grounds Maintenance and Landscaping
B016ABImproved Spec. Item 3.1124.09AC¥0$0.00
Total for 403rd LRC (USAG Kinser):¥0$0.00N/AN/AN/AN/A
TOTAL OF USAG Kinser PORTION (B016):¥0$0.00N/AN/AN/AN/A
USAG Buckner PORTION (B017 ~ B018)
B01778th SIG (USAG FOSTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B017ABImproved Spec. Item 3.11210.92AC¥0$0.00
B017ADFence line Spec. Item 3.1.2120.73AC¥0$0.00
Total for 78th SIG (USAG Foster):¥0$0.00N/AN/AN/AN/A
B01853rd Signal USAG (LESTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B018ABImproved Spec. Item 3.1120.23AC$0.00
Total for 53rd SIG (USAG Lester):¥0$0.00N/AN/AN/AN/A
TOTAL OF USAG Buckner PORTION (B017 ~B018):¥0$0.00N/AN/AN/AN/A
DECA PORTION (B019 ~ B020)
B019DECA (KINSER) (COL 3 FULL)- 1503050 Grounds Maintenance and Landscaping
B019ABImproved Spec. Item 3.1123.99AC¥0$0.00
Total for DECA (Kinser):¥0$0.00N/AN/AN/AN/A
B020DECA (FOSTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B020ABImproved Spec. Item 3.1122.00AC¥0$0.00
Total for DECA (Foster):¥0$0.00N/AN/AN/AN/A
TOTAL OF DECA PORTION (B019~B020):¥0$0.00N/AN/AN/AN/A
DMA PORTION (AFN) (B021 ~ B022)
B021DMA (AFN) (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B021ABImproved Spec. Item 3.1128.80AC¥0$0.00
Total for DMA (AFN) (Kinser):¥0$0.00N/AN/AN/AN/A
B022DMA (AFN) (PLAZA) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B022ABImproved Spec. Item 3.1123.64AC¥0$0.00
Total for DMA (AFN) (Plaza):¥0$0.00N/AN/AN/AN/A
TOTAL OF DMA PORTION (AFN) (B021~B022):¥0$0.00N/AN/AN/AN/A
DLA Disposition (DRMO) PORTION (B023)
B023DLA (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B023ABImproved Spec. Item 3.1120.30AC¥0$0.00
Total for DLA (KINSER):¥0$0.00N/AN/AN/AN/A
TOTAL OF DLA Disposition(DRMO) (B023):¥0$0.00N/AN/AN/AN/A
DLA Distribution PORTION (B024)
B024DLA (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B024ABImproved Spec. Item 3.1122.06AC¥0$0.00
Total for DLA (KINSER):¥0$0.00N/AN/AN/AN/A
TOTAL OF DLA Distribution PORTION (B024):¥0$0.00N/AN/AN/AN/A
DLA Document PORTION (B025)
B025DLA (Foster) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B025ABImproved Spec. Item 3.1120.59AC¥0$0.00
Total for DLA (Foster):¥0$0.00N/AN/AN/AN/A
TOTAL OF DLA Document PORTION (B025):¥0$0.00N/AN/AN/AN/A
USACE (ACOE) PORTION (B026)
B026ACOE (LESTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
B026ABImproved Spec. Item 3.1120.23AC¥0$0.00
Total for ACOE (Lester):¥0$0.00N/AN/AN/AN/A
TOTAL OF USACE (ACOE) PORTION (B026):¥0$0.00

Ground Total 1ST OPTION PERIOD- RECURRING WORK CLIN 0003 : ¥0 $0.00

&9Page &P of &N

1OPT_NON RECURRING

RFP N4008419R2009 ATTACHMENT J-0200000-10

EXHIBIT LINE ITEM NUMBERS (ELIN)

EXHIBIT B - CLIN 0004

CLIN 0001 RECURRING WORK -Price -BASE Period
PROVIDE PRICES FOR GROUNDS MAINTENANCE AND LANDSCAPING - NON-RECURRING WORK- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs B301 through B317
Unit of Measure: AC -Acre, EA- Each, SF-Square Foot, CY-Cylinder, LF-Linear Foot
ELINSHORT DESCRIPTIONFULL DESCRIPTIONEstimated QuantityUNIT OF ISSUEUnit PriceTotal Price
B301Mowing, Unimproved Fence LineGrass shall be mowed and trimmed to a uniform height per COL 2 specifications. All clippings and debris shall be removed. Unimproved grounds is mainly consisting of grass, shrub, and vegetations less than 6" DBH.15AC¥0
B302Reserved
B303Mowing, cutting of Unimproved groundsGrass shall be cut/mowed and trimmed to a uniform height per COL 2 specificatins. All clippings and debris shall be removed. Mowing, cutting of Unimproved grounds allowed to grow wild. Unimproved grounds is mainly consisting of grass, shrub, and vegetations less than 6" DBH.100AC¥0
B304Tree Removal Large 20" DBH and above Tree Removal.Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level.30EA¥0
B305Tree Removal Medium 12" DBH to 20" DBH and above Tree Removal.Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level.75EA¥0
B306Tree Removal Medium 6" DBH to 12" DBH and above Tree Removal.Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level.50EA¥0
B307Stump RemovalRemove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level.75EA¥0
B308Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. All debris resulting from the work shall be removed off from the Government property.150EA¥0
B309Shrubs/Hedges PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. All debris resulting from the work shall be removed off from the Government property.20EA¥0
B310Hydro-SeedingThe latest season’s crop delivered in original sealed packages bearing the producer’s guaranteed analysis for percentages of mixtures, purity, germination, weed seed content, and inert material. Mixes will be acceptable when the field mix is performed indie the presence of the Contracting Officer or designated representative. Fertilizer shall be controlled release with hydro seeding and it shall be applied in accordance with manufactures recommendation. Wood cellulose fiber or emulsified asphalt shall be used with hydraulic application of graded seed, fertilizer, and soil binder. The contractor shall re-preform hydro seeding areas which fail to firmly knit to the soil bed and/or develop the good stand of grass at no additional cost to the Government.25,000SF¥0
B311TopsoilingTopsoil to be provided by the Contractor shall be from approved sources. The topsoil shall be reasonability free from subsoil, clay clumps, weeds, or substances which might be harmful to plants. Soil proposed for use shall be inspected and approved by the Contracting Officer.50CY¥0
B312Sand FillingSand shall be clan and free of toxic materials.20CY¥0
B313SoddingSod shall be Korai-shiba. It shall be dense, uniform, weed free, and have good sod strength at minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The contractor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government.5,000SF¥0
B314Bamboo BracingThe Contractor shall install or remove and replace existing bamboo bracing for shrubs and hedges, and shall use help rope for tying.250LF¥0
B315
MCBTyphoon Clean-up (MCB Butler Only)The Contractor shall mobilize his entire workforce within eight (8) working hours or the “All Clear” Typhoon Condition announcement and be on the job site working. All collected debris shall be removed and disposed of off Government Property.
The Contractor shall collect and remove all vegetation debris (tree limbs, fallen trees, leaves. Etc.), as a result of the typhoon along fence lines and other locations within the installation. In addition, the Contractor shall remove all cracked, broken or damaged tree limbs from any tree damaged during the severe weather. The Contractor shall also commence righting, re-planting, and re-staking for any trees, shrubs, and flower beds around the installation which have been uprooted and/or blown over by the typhoon.5EA¥0
B315
USAGTyphoon Clean-up (Buckner Communication Site, Fort Buckner)The Contractor shall mobilize his entire workforce within eight (8) working hours or the “All Clear” Typhoon Condition announcement and be on the job site working. All collected debris shall be removed and disposed of off Government Property.
The Contractor shall collect and remove all vegetation debris (tree limbs, leaves. Etc.), as a result of the typhoon along fence lines and other locations within the installation. In addition, the Contractor shall remove all cracked, broken or damaged tree limbs from any tree damaged during the severe weather. The Contractor shall also commence righting, re-planting, and re-staking for any trees, shrubs, and flower beds around the installation which have been uprooted and/or blown over by the typhoon.5EA¥0
B316Composite Hourly Labor RateComposite hourly labor rate is used for performing work included within the IDIQ portion of the contract.
The composite hourly rate labor rate shall include all direct and indirect costs, wages, profit, insurance, overhead, applicable taxes, travel time, operating expenses, tool and all other chargers that contribute to the composite hourly labor rate.1000Hours¥0
B317Equipment Costs- MUST BE NEGOTIATED BY KO.Equipment costs will be based on Means Cost Data Catalogs or area equipment rates, whichever proves more reasonable. To be used with ELIN B316. Prices shall also include mobilization costs, bonds, and State and Local sales taxes. MUST BE NEGOTIATED BY KO40EA(Estimated Maximum Equip cost)¥1,000,000
B318Clear and GrubClear area of vegetation to COL 3 MIN. Remove vegetation and trees under 6 inches measered at breast heigh (4ft). Level, fill, and hydro-seed as required.20AC¥0
Total 1st OPTION PERIOD_NON RECURRING WORK1,000,000

&9Page &P of &N

OPT2_RECURRING

RFP N4008419R2009 ATTACHMENT J-0200000-10

EXHIBIT LINE ITEM NUMBERS (ELIN)

EXHIBIT C - CLIN 0005

CLIN 0005 RECURRING WORK -Price -2nd OPTION Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, 1503050 Grounds Maintenance and Landscaping
Unit of Measure: AC -Acre, EA- Each, SF-Square Foot, CY-Cylinder, LF-Linear Foot / COL - Common Output level Standards.
ELINDESCRIPTIONMonth(s)Total AcreageUnit AcrePROPOSED AWARDCOL 1COL 2COL 3 FullCOL 3 Min
Unit PriceTotal Price YenTotal Price DollarUnit PriceUnit PriceUnit PriceUnit Price
MCB PORTION (C001 ~ C005)
C001MCB (KINSER) (COL 3 FULL)- 1503050 Grounds Maintenance and Landscaping
C001AAPrestige COL 2 Spec Item 3128.85AC¥0$0.00
C001ABImproved Spec. Item 3.11291.66AC¥0$0.00
C001ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
C001ADFence line Spec. Item 3.1.2125.02AC¥0$0.00
C001AEDrainage Spec. Item 3.4120.28AC¥0$0.00
C001AFAirfield Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
C001AGRoadside/Drainage(2"-16") Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
MCB (KINSER) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
C001ABImproved Spec. Item 3.11246.45AC¥0$0.00
Total for MCB Kinser:¥0$0.00N/AN/AN/AN/A
C002MCB (MCAS FUTENMA)(COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C002AAPrestige COL 2 Spec Item 3N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
C002ABImproved Spec. Item 3.112178.38AC¥0$0.00
C002ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
C002ADFence line Spec. Item 3.1.2127.48AC¥0$0.00
C002AEDrainage Spec. Item 3.4121.79AC¥0$0.00
C002AFAirfield Spec. Item 3.412277.38AC¥0$0.00
C002AGRoadside/Drainage(2"-16") Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
MCB (MCAS FUTENMA) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
C002ABImproved Spec. Item 3.11258.30AC¥0$0.00
Total for MCAS Futenma:¥0$0.00N/AN/AN/AN/A
C003MCB (FOSTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C003AAPrestige COL 2 Spec Item 3129.05AC¥0$0.00
C003ABImproved Spec. Item 3.112132.20AC¥0$0.00
C003ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
C003ADFence line Spec. Item 3.1.21211.97AC¥0$0.00
C003AEDrainage Spec. Item 3.4126.24AC¥0$0.00
C003AFAirfield Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
C003AGRoadside/Drainage(2"-16") Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
MCB (FOSTER) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
C003ABImproved Spec. Item 3.11285.00AC¥0$0.00
Total for MCB Foster:¥0$0.00N/AN/AN/AN/A
C004MCB (PLAZA) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C004AAPrestige COL 2 Spec Item 3121.76AC¥0$0.00
C004ABImproved Spec. Item 3.11211.92AC¥0$0.00
C004ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
C004ADFence line Spec. Item 3.1.2125.26AC¥0$0.00
C004AEDrainage Spec. Item 3.4120.08AC$0.00
C004AFAirfield Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
C004AGRoadside/Drainage(2"-16") Spec. Item 3.4N/A1.00N/AN/AN/A$0.00N/AN/AN/AN/A
MCB (PLAZA) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
C004ABImproved Spec. Item 3.1129.40AC¥0$0.00
Total for MCB (Plaza):¥0$0.00N/AN/AN/AN/A
C005MCB (LESTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C005AAPrestige COL 2 Spec Item 3N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
C005ABImproved Spec. Item 3.11222.87AC¥0$0.00
C005ACSemi-Improved Spec. Item 3.1N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
C005ADFence line Spec. Item 3.1.2121.53AC¥0$0.00
C005AEDrainage Spec. Item 3.4N/AN/AN/AN/AN/A$0.00
C005AFAirfield Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
C005AGRoadside/Drainage(2"-16") Spec. Item 3.4N/AN/AN/AN/AN/A$0.00N/AN/AN/AN/A
MCB (LESTER) (COL3 MIN) - 1503050 Grounds Maintenance and Landscaping
C005ABImproved Spec. Item 3.1129.82AC¥0$0.00
Total for MCB Lester:¥0$0.00N/AN/AN/AN/A
TOTAL OF MCB PORTION (C001 ~ C013):¥0$0.00
MCB (MCCS) PORTION (C006 ~ C008)-TO BE ADDED TO MCB
C006MCB (MCCS) (KINSER) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping
C006ABImproved Spec. Item 3.1129.69AC¥0$0.00
Total for MCB (MCCS) Kinser:¥0$0.00N/AN/AN/AN/A
C007MCB (MCCS) (FUTENMA) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping
C007ABImproved Spec. Item 3.11212.72AC¥0$0.00
Total for MCB (MCCS) Futenma:¥0$0.00N/AN/AN/AN/A
C008MCB (MCCS) (FOSTER) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping
C008ABImproved Spec. Item 3.11227.94AC¥0$0.00
Total for MCB (MCCS) Foster:¥0$0.00N/AN/AN/AN/A
TOTAL OF MCB (MCCS) PORTION (C019 ~ C021):¥0$0.00
DODDS PORTION (C009 ~ C011)
C009DODDS (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C009ABImproved Spec. Item 3.1129.48AC¥0$0.00
Total for DoDDS Kinser:¥0$0.00N/AN/AN/AN/A
C010DODDS (FOSTER) (COL 3 FULL)) - 1503050 Grounds Maintenance and Landscaping
C010ABImproved Spec. Item 3.11224.52AC¥0$0.00
Total for DoDDS Foster:¥0$0.00N/AN/AN/AN/A
C011DODDS (LESTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C011ABImproved Spec. Item 3.11210.10AC¥0$0.00
Total for DoDDS Lester:¥0$0.00N/AN/AN/AN/A
TOTAL OF DODDS PORTION (C022 ~ C025):¥0$0.00N/AN/AN/AN/A
USNH NAVY PORTION (C012 ~ C014)
C012USNH (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C012ABImproved Spec. Item 3.1122.24AC¥0$0.00
Total for USNH (Kinser):¥0$0.00N/AN/AN/AN/A
C013USNH (FUTENMA) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C013ABImproved Spec. Item 3.1121.72AC¥0$0.00
Total for USNH (Futenma):¥0$0.00N/AN/AN/AN/A
C014USNH (FOSTER) (COL 3 FULL)- 1503050 Grounds Maintenance and Landscaping
C014ABImproved Spec. Item 3.11219.09AC¥0$0.00
Total for USNH (Foster):¥0$0.00N/AN/AN/AN/A
USNH NAVY PORTION (C026 ~ C031):¥0$0.00N/AN/AN/AN/A
NCIS PORTION (C015)
C015NCIS (FOSTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C015ABImproved Spec. Item 3.1120.26AC¥0$0.00
Total for NCIS Foster:¥0$0.00N/AN/AN/AN/A
TOTAL OF NCIS PORTION (C032):¥0$0.00N/AN/AN/AN/A
USAG Kinser PORTION (C016)
C016403rd LRC (USAG KINSER) (COL 3 FULL)- 1503050 Grounds Maintenance and Landscaping
C016ABImproved Spec. Item 3.1124.09AC¥0$0.00
Total for 403rd LRC (USAG Kinser):¥0$0.00N/AN/AN/AN/A
TOTAL OF USAG Kinser PORTION (C033):¥0$0.00N/AN/AN/AN/A
USAG Buckner PORTION (C017 ~ C018)
C01778th SIG (USAG FOSTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C017ABImproved Spec. Item 3.11210.92AC¥0$0.00
C017ADFence line Spec. Item 3.1.2120.73AC¥0$0.00
Total for 78th SIG (USAG Foster):¥0$0.00N/AN/AN/AN/A
C01853rd Signal USAG (LESTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C018ABImproved Spec. Item 3.1120.23AC$0.00
Total for 53rd SIG (USAG Lester):¥0$0.00N/AN/AN/AN/A
TOTAL OF USAG Buckner PORTION (C034 ~C035):¥0$0.00N/AN/AN/AN/A
DECA PORTION (C019 ~ C020)
C019DECA (KINSER) (COL 3 FULL)- 1503050 Grounds Maintenance and Landscaping
C019ABImproved Spec. Item 3.1123.99AC¥0$0.00
Total for DECA (Kinser):¥0$0.00N/AN/AN/AN/A
C020DECA (FOSTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C020ABImproved Spec. Item 3.1122.00AC¥0$0.00
Total for DECA (Foster):¥0$0.00N/AN/AN/AN/A
TOTAL OF DECA PORTION (C037~C039):¥0$0.00N/AN/AN/AN/A
DMA PORTION (AFN) (C021 ~ C022)
C021DMA (AFN) (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C021ABImproved Spec. Item 3.1128.80AC¥0$0.00
Total for DMA (AFN) (Kinser):¥0$0.00N/AN/AN/AN/A
C022DMA (AFN) (PLAZA) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C022ABImproved Spec. Item 3.1123.64AC¥0$0.00
Total for DMA (AFN) (Plaza):¥0$0.00N/AN/AN/AN/A
TOTAL OF DMA PORTION (AFN) (C040~C041):¥0$0.00N/AN/AN/AN/A
DLA Disposition (DRMO) PORTION (C023)
C023DLA (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C023ABImproved Spec. Item 3.1120.30AC¥0$0.00
Total for DLA (KINSER):¥0$0.00N/AN/AN/AN/A
TOTAL OF DLA Disposition(DRMO) (C042):¥0$0.00
DLA Distribution PORTION (C024)
C024DLA (KINSER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C024ABImproved Spec. Item 3.1122.06AC¥0$0.00
Total for DLA (KINSER):¥0$0.00N/AN/AN/AN/A
TOTAL OF DLA Distribution PORTION (C024):¥0$0.00
DLA Document PORTION (C025)
C025DLA (Foster) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C025ABImproved Spec. Item 3.1120.59AC¥0$0.00
Total for DLA (Foster):¥0$0.00N/AN/AN/AN/A
TOTAL OF DLA Document PORTION (C025):¥0$0.00
USACE (ACOE) PORTION (C026)
C026ACOE (LESTER) (COL 3 FULL) - 1503050 Grounds Maintenance and Landscaping
C026ABImproved Spec. Item 3.1120.23AC¥0$0.00
Total for ACOE (Lester):¥0$0.00N/AN/AN/AN/A
TOTAL OF USACE (ACOE) PORTION (C026):¥0$0.00

Ground Total 2ND OPTION PERIOD - RECURRING WORK CLIN 0005 : ¥0 $0.00

&9Page &P of &N

2OPT_NON RECURRING

RFP N4008419R2009 ATTACHMENT J-0200000-10

EXHIBIT LINE ITEM NUMBERS (ELIN)

EXHIBIT C - CLIN 0006

CLIN 0001 RECURRING WORK -Price -BASE Period
PROVIDE PRICES FOR GROUNDS MAINTENANCE AND LANDSCAPING - NON-RECURRING WORK- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs C301 through C317
Unit of Measure: AC -Acre, EA- Each, SF-Square Foot, CY-Cylinder, LF-Linear Foot
ELINSHORT DESCRIPTIONFULL DESCRIPTIONEstimated QuantityUNIT OF ISSUEUnit PriceTotal Price
C301Mowing, Unimproved Fence LineGrass shall be mowed and trimmed to a uniform height per COL 2 specifications. All clippings and debris shall be removed. Unimproved grounds is mainly consisting of grass, shrub, and vegetations less than 6" DBH.15AC¥0
C302Reserved
C303Mowing, cutting of Unimproved groundsGrass shall be cut/mowed and trimmed to a uniform height per COL 2 specificatins. All clippings and debris shall be removed. Mowing, cutting of Unimproved grounds allowed to grow wild. Unimproved grounds is mainly consisting of grass, shrub, and vegetations less than 6" DBH.100AC¥0
C304Tree Removal Large 20" DBH and above Tree Removal.Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level.30EA¥0
C305Tree Removal Medium 12" DBH to 20" DBH and above Tree Removal.Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level.75EA¥0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .