Attachment C - Price Proposal Form.docx

DOCX document 17 KB Posted

Attached to
N4008023R0022 SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
Solicitation number
N4008023R0022
Issued by

About this file

This document is an attachment to a solicitation providing a price proposal form for a construction project. The form requests pricing for a base bid to complete modernization work at the Walter Reed National Military Medical Center in Bethesda, Maryland in accordance with provided drawings and specifications. Pricing is also requested for a planned modification adding furniture, fixtures and equipment, with the government estimate for FF&E totaling $3,128,509. Offerors must propose a handling and administration rate of no more than 5% to apply to the FF&E cost. The proposal form provides notes indicating failure to enter pricing for any item will result in rejection, the government may reject unbalanced offers, and the contract duration will be 518 days regardless of option exercise. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command for a small business multiple award construction contract.

View the file

Other files

File Type Posted
Amendment 0012.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
Revised Sheet E-703.pdf PDF
Revised Sheet E-701.pdf PDF
Revised Sheet E-001.pdf PDF
Section 01 31 23.13.pdf PDF
Revised Sheet E-601.pdf PDF
Amendment 0008.pdf PDF
PPI 84 Final.pdf PDF
Revised Sheet E-702.pdf PDF
Revised Sheet E-501.pdf PDF
Revised Sheet E-705.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Bldg 9 Site Visit Sign In Sheet Attendant List.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
SECNAV 5512(fillable).pdf PDF
Building 9 Site Visit Map.pdf PDF
Attachment G - Site Visit Registration Form.xlsx XLSX spreadsheet
Amendment 0001.pdf PDF
Attachment F - WRNMMC Building 9 - Final Drawings.pdf PDF
Attachment D - Past Performance Questionnaire (PPQ) Form.docx DOCX document
N4008023R0022 Small Business MACC Solicitation 05 OCT 2023.pdf PDF
Attachment A - Pre-Proposal Inquiry (PPI) Log Template.xlsx XLSX spreadsheet
Attachment B - Construction and Design Experience Project Data.docx DOCX document
Attachment E - WRNMMC Building 9 - Final Specifications.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

PRICE PROPOSAL FORM

SOLICITATION: N40080-23-R-0022

Building 9 Entrance and Corridor Modernization Walter Reed National Military Medical Center, Bethesda, MD

CLIN
Description
Price

BASE BID:

The contractor shall provide a complete price for the entire work to be performed but not limited to labor, supervision, tools, materials and equipment necessary to complete the entire work in accordance with the drawings and specifications, Request for Proposal for Building 9 Entrance and Corridor Modernization, Work Order No. 1677850.

PLANNED MODIFICATION 1: Furniture, Fixtures, and Equipment (FF&E) Price for providing work in connection with the procurement and installation for Request for Proposal for Request for Proposal for Building 9 Entrance and Corridor Modernization, Work Order No. 1677850, all labor, material, equipment, transportation, and supervision required for any new FF&E including all work indicated in the contract documents as Planned Modification Item 1, in accordance with the following schedule:

GOVERNMENT FF&E ESTIMATE
HAR

(NTE 5%)

HAR AMOUNT (GOVT FF&E ESTIMATE x HAR %)
TOTAL FF&E ESTIMATED AMOUNT FOR CLIN 0002

(GOVT FF&E ESTIMATE + HAR AMOUNT)

$3,128,509

________%
$____________

TOTAL PRICE (CLINS 0001-0002) $__________________________

General Notes:

1. Failure to enter a price for any CLIN will result in a proposal being rejected as unacceptable.

2. The Government may reject an offer as nonresponsive if it is materially unbalanced. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

3. Total Contract duration for Base Bid is 518 calendar days from Notice to Proceed (NTP). Should the Government choose to exercise any or all options/planned modifications, the contract duration will remain the same.

4. CLIN 0002 Planned Modification: The total estimated budget amount for FF&E has been identified, to provide offerors with the projected magnitude of effort for FF&E. The FF&E Budget Amount is only an estimated amount. The contractor shall determine the final budget amount for the FF&E, during the post-award phase of the FF&E.

a. Offerors shall propose a Handling and Administration Rate (HAR) for the FF&E not to exceed (NTE) 5%. The HAR fee should account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E. The proposed HAR percentage will be incorporated into the contract/task order award and will not be adjusted regardless of fluctuations from the estimated budget amount for FF&E. The proposed HAR is a fixed rate. The dollar amount of the HAR will change based on the actual, final amount for the FF&E determined during the post award design phase of the FF&E.

b. If awarded, line item (1) under 0002 option item will be funded separately after completion of the FF&E design review by the Government, acceptance of FF&E package by the Government, and receipt of appropriate funding by the Government. The design effort and the development of the FF&E packages are performed by the Contractor under the Base Bid. See Administrative Specifications 01 30 01.00 22, including (but not limited to) FF&E Basis of Design CD for requirements and details.

c. The Government is not obligated to award the FF&E Option. Should the Government choose to award the FF&E, the Option will be awarded as a negotiated Modification to the contract/task order six months prior to the Occupant Date. The contractor’s proposed HAR will be applied to all vendor/supplier costs for the FF&E.

d. It is the contractor responsibility to purchase, deliver, and install the FF&E without impacting the overall completion date of the project. The contractor’s schedule should assume the award of the FF&E as a modification. No schedule extensions will be granted.

Acknowledgement of Amendments______, ______, ______, ______, ______, ______

Contractor Name: ________________________________________

Contractor Signature: ________________________________________ Date: _________________

File details come from the government source that posted it. Updated .