This document summarizes an amendment to a solicitation for a small business multiple award construction contract issued by the Department of the Navy Naval Facilities Engineering Command. The solicitation seeks proposals for a seed project to modernize hospital entrances, common areas, and patient relations suites at a military medical center in Bethesda, Maryland. It provides responses to pre-proposal inquiries, revises specifications and drawings, and adds federal acquisition clauses. Proposals are due by December 14, 2023. Construction is to be completed within 518 calendar days of award.

View the file

Other files

File Type Posted
Amendment 0012.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
Revised Sheet E-703.pdf PDF
Revised Sheet E-701.pdf PDF
Revised Sheet E-001.pdf PDF
Section 01 31 23.13.pdf PDF
Revised Sheet E-601.pdf PDF
PPI 84 Final.pdf PDF
Revised Sheet E-702.pdf PDF
Revised Sheet E-501.pdf PDF
Revised Sheet E-705.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Bldg 9 Site Visit Sign In Sheet Attendant List.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
SECNAV 5512(fillable).pdf PDF
Building 9 Site Visit Map.pdf PDF
Attachment G - Site Visit Registration Form.xlsx XLSX spreadsheet
Amendment 0001.pdf PDF
Attachment F - WRNMMC Building 9 - Final Drawings.pdf PDF
Attachment C - Price Proposal Form.docx DOCX document
Attachment D - Past Performance Questionnaire (PPQ) Form.docx DOCX document
N4008023R0022 Small Business MACC Solicitation 05 OCT 2023.pdf PDF
Attachment A - Pre-Proposal Inquiry (PPI) Log Template.xlsx XLSX spreadsheet
Attachment B - Construction and Design Experience Project Data.docx DOCX document
Attachment E - WRNMMC Building 9 - Final Specifications.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 68

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Dec-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008023R0022

X 9B. DATED (SEE ITEM 11)

05-Oct-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Dec-2023

CODE

COMNAVFACSYSCOM WASHINGTON

1314 HARWOOD ST

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008023R0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0008

The purpose of this amendment is to:

1) Provide Pre-Proposal Inquiry Responses

2) Provide Revisions to noted Specification Sections and Drawings

3) Provide Drawing and Specification Attachments

4) Add the following FAR Provision and Clause:

FAR Provision: FAR 52.204-29, Federal Acquisition Supply Chain Security Act Orders –Representations FAR Clause: FAR 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition

5) Proposal Due Date Remains 14 December 2023 by 2PM(ET)

ATTACHMENTS:

PPI 84 Final Revised Sheet E-001 Revised Sheet E-501 Revised Sheet E-601 Revised Sheet E-701 Revised Sheet E-702 Revised Sheet E-703 Revised Sheet E-705 Section 01 31 23.13

PRE-PROPOSAL INQUIRY RESPONSES & REVISIONS TO THE FOLLOWING SECTIONS:

PPI 19: No spec is available. Price to match existing and provide submittals during construction.

PPI 21: Drawings AD101, AD105, AD111, AD115, A-101, A-105, A-111, A-115, AF101, AF106 the graphic scale is incorrectly shown as 3/32” = 1’; replace scale with 3/64” = 1’.

PPI 22: Add/apply Note 02.28 to two rooms adjacent to Column K-5 on sheet AD119.

PPI 57: Work is to be performed under this contract. The owner does not have a telecom subcontractor.

PPI 68: Contractor will be provided 500 square feet on NSA Bethesda.

PPI 82: Please see revised sheet E-501 dated 12/6/2023.

PPI 84: Add PDF “PPI 84 Final” which provides a partial basement plan showing location of room A0314.

PPI 85: Please see revised sheet E-701 dated 12/6/2023.

PPI 87: Please see revised sheet E- 001 dated 12/6/2023.

PPI 93: Bid per RFP. See sheet ED103 for existing location.

PPI 96: Revise room number on sheet A602 From “1021” To “1020”. Doors to be replaced/added are noted in the Door Schedule on sheet A-602 and are not called out specifically on a plan.

PPI 99: Please see the Exit Light on revised sheet E-501 dated 12/6/2023.

PPI 105: Bid per RFP. See sheet E-601

PPI 106: Please see revised sheet E-601 dated 12/6/2023.

PPI 107: Please see revised sheet E-701 dated 12/6/2023.

PPI 115: FX-104, FX-105 & FX-106 Revise General Note 3 From “Existing ceilings will be replaced refer to architectural drawings for more detail.” To “Refer to architectural drawings for ceiling conditions.”

PPI 123: AF-102 thru AF-109 Revise General Note 25 From “All existing corner guards to remain, UNO.” To “All new outside wall corners to receive 4’-0” high stainless steel corner guards.”

PPI 127: Revise keynote 02.67 From “Demolish existing concrete for walk-off mat and frame - 1" depth" To “Demolish existing concrete walk-off mat and frame – 1-1/8” depth”.

PPI 130: Add: All exposed steel shall be painted with a semi-gloss low VOC paint.

PPI 141: TAB both seasons.

PPI 151: Add spec section 01 31 23.13 20

PPI 160: Johnson Controls maintains the BMS for this facility.

PPI 182: Bid per RFP. See Note #1 on sheet E-101.

PPI 209: Bid per RFP. Detail 1 is the first floor framing plan. Detail 2 is the escalator pit framing plan and as per note 2, it is approximately 3’10” below the first floor framing.

PPI 247: There is no existing security vendor.

PPI 292: Confirm that verification of existing sanitary line connection and flow is not required and can be deleted.

PPI 293: AV design is not required. Disregard reference to design services for A/V.

PPI 310: Please see revised sheet E-703 dated 12/6/2023.

PPI 324: Clarify that 2-1/2” insulation shall be R9 and 3-1/2” insulation shall be R13

PPI 331: Install grain horizontally.

PPI 333: Comply with new floor material manufacturer’s requirements for surface preparation.

Question No.

REFERENCE

QUESTION

GOVERNMENT

RESPONSE

Posted on Amend No.

Page Section Para.

of 69

2.

GENER

AL

OVERVI

EW OF

THE

DEMON

STRATI

ON

PROJEC

T

2.1

Is there going to be a Site Visit for the proposed demonstration project is Work Order Number (WON) 1678929, Design-Bid-Build Modernize East Entrance, Common Areas, and Patient Relations Suite at Walter Reed National Military Medical Center (WRNMMC), Naval Support Activity Bethesda in Bethesda, Maryland?

See Amendment 0001. 0004 of 69

2.

GENER

AL

OVERVI

EW OF

THE

DEMON

STRATI

ON

PROJEC

T

2.1 Is a bid bond required for the demonstration project?

Bid per RFP, General Requirements, Bond Requirements.

Page 11 of

Factor 2 Experien ce

Construction experience requires projects within 5 years from RFP date, but Design experience requires 7 years from RFP date. Is this correct? Please clarify.

Confirmed 0004

Page 11 of

Factor 2 ce

Construction & Design Experience Project Data Sheet (Attachment B) for construction experience states cannot exceed 2 pages. But same form is used for Design Experience and it states not to exceed 3 pages.

Is this correct? Please clarify.

See Amendment 0004. 0004

Page 15 of

Factor 3

– Project Specific Require ments

How many pages is the Demonstration Project's narrative work plan? Is an task order org chart required to be included as part of this narrative?

See Amendment 0004. 0004

6 19/68

Section 01 00 00 does not provide for Site Visit Information. Please provide Site Visit information otherwise noted in Solicitation as

TBD.

See Amendment 0001. 0004

11 of

Section 00 21 16 Instructio ns to Proposer s

Constru ction Experie nce, Size

This section states that at least one project must have a final construction cost of $10,000 000 or greater. As a Small Business firm, most of our projects are smaller in dollar value. We respectfully request that the government lower the $10,000,000 project requirement to $3,000,000.

Bid per RFP. 0004

8 1 01 11 00 1.2.1

In Spec Section 01 11 00 - 1.2.1 Project Description, the work is described to include "architectural planning and design services."

However, In the General Requirements for Demonstration Project in The Solicitation says that this project is Design-Bid-Build.

Please cofirm that the design is complete and the SEED project will not require Design Services.

Confirmed. The demonstration project is a design-bid-build contract wherein the design is complete. Seed project does not require design other than specifically indicated "delegated design".

9 2 01 11 00 1.5

In reference to Spec Section 01 11 00 - 1.5.1 - NMCI Contractor Access, please confirm that the General Contractor may continue their work alongside the NMCI Contractor.

Confirmed. 0004

10 N/A N/A N/A What level of ICRA protection if any is required for this project?

Bid per RFP. 0005

There is no mention of hazardous materials in the specifications.

Please confirm that no HazMat Abatement is required for this project or to be included in our bid.

Bid per RFP. Refer to spec section 01 35 23 3.1.4.

The Structural Steel specs in Section 051200 (paragraph 1.3) calls for an AISC Certified Fabricator and an AISC Certified Erector. It will be very difficult to get any AISC fabricators or erectors to bid on this project, since there is a very small amount of new steelwork compared to other AISC projects and they typically refuse to bid on renovation work. Please waive the AISC Certification requirements, so we can obtain competitive bids on the structural steel framing.

Bid per RFP. 0004

Spec Section 07 42 63

FABRICATED WALL PANEL

ASSEMBLIES appears to be based on Metal Wall Panels, but para 1.3 Description lists Solid Phenolic Panels by Trespa. Please clarify this.

Bid per RFP. Spec Section 07 42 63, Para

1.3 correctly describes Solid Phenolic Panels by Trespa to be used in specific areas. Refer to drawing sheet AF110 for Interior Finish Materials Schedule.

Can you tell us other acceptable manufacturers for these Fabricated Wall Panels?

Bid per RFP. 0004

The plans call for some Wood and Glass Guardrails to match existing, near the new monumental stair, but there are no specs for this work.

Please provide specifications so we can get pricing for this.

Bid per RFP. 0008

16 AD103

Note 02.01

Note 02.01 calls to demo a receptionist desk, however, looking at the tag near near Columns G-4, it looks like it is pointing at what is drawn as gypsum partitions. Can you confirm there are reception desks in this area and if so, how many linear feet of casework is to be removed?

Bid per RFP. Refer to Spec Section 02 41 00 Para 1.2.1. There are reception desks in Columns G-4, approximately 20 LF in length.

AD103

AD108

02.59

Note 02.59 calls to remove Vinyl wallcovering. The note is sporadic through the demo drawings but does not say "typical" nor does it show where the limits of the note are. Can you clarify how much wall space has vinyl wallcovering? For example does each inset/nook also have wallcovering? How about

Bid per RFP, Note 2.59.

Note states "typical at all first floor walls".

Contractor to verify in field.

areas like Lobby 1014 or Room 1005?

18 07 81 00 Does the new decking, intalled for infills, get new spray fireproofing?

Bid per RFP. See Spec Section 07 81 00 para 1.2.2

S-101 & S-

Note 6

Note 6 on DWG S-101 and S-102 mentions scraping fireproofing off existing steel and replacing after connecting new steel. It does not state to add spray fireproofing to the new steel (i.e columns, beams, connections, etc...). Can you confirm the new steel does not get any spray fireproofing?

Bid per RFP. See Spec Section 07 81 00 para

1.2.2 Revised: No spec

is available. Price to match existing and provide submittals during construction

Revised

AD-

Column Line L

Column Line L on DWG AD109 is a thin double dashed line with no note tags. The lines look thinner than a partition and different than the Note 02.11. Can you identify the scope for this line?

Bid per RFP. See See Drawing AD109.

Demolish per KeyNotes

02.33 and 02.50

AD101

AD105

,AD11

1, AD115

AD301

, etc…

In reference to any drawing with 3/64" scale, the scale bar at the bottom of this page seems to be incorrect. It shows 0' - 32', but I believe it should be 0' - 64' for proper scaling. Can you confirm?

See Amendment 0008. 0008

22 AD119

The two rooms near Columns K-5 do not show a tag to remove Gyp Ceiling. Can you confirm the ceiling gets demolished?

See Amendment 0008. 0008

A102 A413

10.01

Note 10.01 calls for "Relocated Kiosk Check In Station." I could not find this check in station on the demo drawings. Where is this kiosk coming from? Will the Owner carry the kiosk to the install location? If not, how far away is it located in storage?

Bid per RFP. See Spec Section 02 41 00 para

1.8 Relocations. Existing

Kiosks are located outside of every check in station.

24 A405 In Detail 3/A405, can you confirm the wood panel behind the new monitor is WD2?

Confirmed. 0004

Specs

PDF

page

Section 01 50 00, p 11

3.7 Will the government be able provide an itemized list of salavagable items, if any, prior to the bid date?

Bid per RFP. Refer to Key Notes on Sheet AD101-AD312. Salvage items per keynote 02.18 and 02.58

Amendm ent 1

Due to the size and complexity of this project, would NAVFAC please consider a second site visit to allow additional contractors and subcontractors to visit the site?

No, Bid per RFP. 0004

Specs

PDF

page

Section 01 35 26, 3.1.4

For estimating purposes, can offerors assume that no contaminated or hazardous material will be encountered during construction or that the costs associated with responding to the discovery if hazardous material will be addressed with a contract modification?

Refer to PPI response #12.

Will the government provide a phasing schedule based on the hospital's operations?

No, Bid per RFP. 0004

Sol.

PDF

Section 00 21 16

Section 00 21 16 shows the demonstration project performance period as 518 days after award while Amendment 1 shows the performance period as 533 days after award. Are we correct to assume that 533 calendar days is the correct duration?

The construction duration is 518 calendar days. 533 calendar days includes 518 days for the construction duration plus 15 days for bonds submission and approval.

Sol.

PDF

In NAVFAC terminology, what is the difference between a seed project and a demonstration project?

A demonstration project is primarly used to evaluate the reasonableness of proposed pricing in order to assist in making best value determinations.

The Government reserves the right to award the demonstration project at the time of the basic contract award or before the proposal expiration period, should funds become available.

Sol.

PDF

page

The paragraph with instructions for the Non-cost/price Factors cover page mentions Times new Roman, 10-point font. Is the minimum font size that applies to the whole proposal?

Yes, Bid per RFP. 0004

Sol.

PDF

pages 11 &

Construction projects for Factor 2 must have been completed after 10/5/2018 and design projects for Factor 2 must have been completed after 10/5/2016. Is this correct?

Confirmed, bid per RFP. 0004

Sol.

PDF

page

The instructions for Factor 3 say that "Information beyond the five

(5) pages will not be considered, with the exception of the organizational chart and critical path schedule which is not included in the page limitation." The reference to the "organizational chart" seems out of place because an organizational chart is required for Factor 1. Should this be removed from the cited sentence?

See Amendment 0004. 0004

Specs

PDF

page

Section 01 14 00, p 3

Due to the centralized location of this project and the facility being active at all hours, will there be a requirement for off hours work?

Bid per RFP, See Spec section 01 14 00 para 1.2.2, and para 1.2.3.

Specs

PDF

page

Section 01 11 00

1.3 Will the contractor be provided with a lay-down area for use during construction?

Bid per RFP. See Section 01 50 00 Para 1.3

Can NAVFAC provide the name of the fire alarm vendor for the facility

WRNMMC's fire alarm vender is BFPE who is contracted through J&J.

37 3 01 45 00 1.5.1.1

Please confirm that the following is accurate for personel.

a. Superintendent can also be the

QCM.

b. QCM can also be the superintendent.

c. SSHO cannot be the superintendent or QCM.

d. 2 personal are required on site during construction.

Bid per RFP, Section 01 45 00.00 para 1.5

38 N/A N/A N/A

Can the facility please provide a laydown area for the following.

a. Trailer

b. Storage Boxes

Refer to PPI response #37.

39 N/A N/A N/A Can personal use existing restrooms or will porta johns be required?

Bid per RFP. 0005

40 N/A N/A N/A

Can the facility please provide security fence specification for temp fence around the laydown are and installation preference? (ie. Post driven or cinderblock)

Bid per RFP, spec section 01 50 00.

41 3 01 45 00 1.4.1

Can the facility please confirm that commissioning is or not required for this project?

a. If so please provide commissioning specification for pricing.

Bid per RFP. Full commissioning is not required; refer to 23 05 93 for Testing, Adjusting, and Balancing for HVAC.

42 N/A N/A N/A

Can the facility please provide a phasing plan or number of phases for this project so all bids will be fair and reasonable?

Refer to RFP response #29.

43 N/A N/A N/A Can the facility please confirm that no spray applied fireproofing will be required as part of this project?

Not confirmed. Refer to PPI #s 18 and 19. Bid per RFP. See Spec Section 07 81 00 para 1.2.2

44 N/A N/A N/A

Can the facility please supply a decommissioning letter from the existing Escalator maintenance firm.

Or please provide the owner of the escalator to be demolished so we can hire them to decommission and remove the existing escalator?

The escalator is government owned.

Escalator maintenance compnay is A&E Elevator.

45 N/A N/A N/A

Can the facility please provide confirmation that an AISC certification will be required for steel fabrication and erection for all steel associated with this contract.?

Bid per RFP 0004

46 N/A N/A N/A

Can the facility please provide the level of ICRA barrier requirements for interior and exterior storefront work for this project per phase?

Bid per RFP. Refer to PPI #10. Level 3 ICRA is required.

47 1 01 33 29 1 Can the facility please confirm that sustainability reporting requirements will be needed for this project.

Bid per RFP, See Spec section 01 33 29

48 1 01 31 17.00

1.2.2 Can The Facility Please confirm that P-6 scheduling will be required for this contract

Confirmed. 0004

49 N/A N/A N/A Please confirm that air barrier testing will be required for the curtainwall installation.

Confirmed, refer to spec 08 44 00

50 N/A N/A N/A

Please confirm that liquid applied waterproofing will be required after concrete slab is removed at entrance of building 9?

Not required, bid per

RFP.

Can the Facility please provide a railing specification and scope for new railings that will be required around openings on the second floor.

See Amendment 0008, add Spec Section 05 73 15 Tempered Glass Railing Assembly, and add Spec Section 06 20 00 Finish Carpentry.

Guardrails to match exisiting Wood and Glass Guradrails.

52 N/A N/A N/A Please provide specification for expansion joint replacement.

The Government requests additional details (drawing number, spec section, etc.) in order to provide response.

53 1 01 30 01.00

1.3

Can the facility please confirm the FF&E design is not required in this contract for bidding purposes and the budget provided is inclusive of the A/V Design per spec section 01 30 01 is within the budget provided.

Bid per RFP. See Spec Section 01 30 01.00 23, para 1.4.1. Prime contractor is responsible for hiring FF&E Designer, 54 3 21 13 13 1.2.2 Please confirm the General contractor does not have to provide an QFPE on staff for this project?

Bid per RFP, para 21 13

13. GC does have to provide a QFPE.

55 3 21 13 13 1.2.2 Please confirm that no design is required for the sprinkler system.

Bid per RFP. A design is required.

56 3 28 31 76 1.3.2 Please confirm no design is required for the fire alarm system.

Bid per RFP. A design is required.

Page 12 & Plan Pages E-107 throug h E-

27 10

N/A

The specifications call out CAT6 horizontal cabling and the electrical power plans have telecom symbols noted. But there are no telecom drawings and the electrical notes & symbols do not have telecom symbol definitions or a legend. Does the owner already have a telecom subcontractor to perform the work?

If not, is there a telecom symbol legend available to define the telecom symbols by cable type and cable counts?

See Amendment 0008.

Work is to be performed under this contract. The owner does not have a telecom subcontractor.

58 11

RFP -

Section 4

Under the "Construction Experience" section of the RFP one project must have a final construction cost of $10,000,000 or greater. We believe requirement is overly restrictive for most SBs.

Opportunities of this magnitude are not as frequently awarded to SBs.

In fact, based on open-source data, NAVFAC Capital Region has only awarded on average two MATOC task orders over this size per year, with an average of one other NAVFAC Capital Region award outside the MATOC environment.

Further, many other agencies procure projects over the $10M threshold as full and open competition. To expand competition for this solicitation we request that NAVFAC extend the recency period for this project to 7 years to match that of the designer experience.

Bid per RFP. 0004

59 5 Solicitati on

1.3.1 Can each of the bases for the NAVFAC Washington Area of Resposibility (AOR) be identified?

See Amendment 0004. 0005

60 1 01 11 00 1.2.1

In Spec Section 01 11 00 - 1.2.1 Project Description, the work is described to include "architectural planning and design services."

However, In the General Requirements for Demonstration Project in The Solicitation says that this project is Design-Bid-Build.

Please cofirm that the design is complete and the SEED project will not require Design Services.

Confirmed. Design Released with RFP is final signed.

61 2 01 11 00 1.5

In reference to Spec Section 01 11 00 - 1.5.1 - NMCI Contractor Access, please confirm that the General Contractor may continue their work alongside the NMCI Contractor.

Confirmed, bid per RFP 0005

Attach ment C

Please confirm that the price proposal will be evaluated based on the Total Price of CLIN0001-

CLIN0002.

Confirmed, Bid per RFP, Price, (ii) Basis of Evaluation: The Government will evaluate price based on the total price.

63 - DIV 1 -

Does the Government have a phasing plan developed for this project.

Bid per RFP, See Section 01 30 00 para 1.7

64 - DIV 1 -

The drawings and specifications do not reference any ICRA Requirements. If ICRA standards are applicable, please confirm the requirements.

See Amendment 0005 0008

65 - DIV 1 -

If there are ICRA barrier requirements, will an anti-room be required? If so, please provide construction details/perameters for this requirement.

See Amendment 0005 0008

66 - 01 11 00 -

The project documents describe that building must be open and operational throughout the duration of the work. What limitations will there be on phasing and closure/partitioning off areas of work.

Bid per RFP, See Section 01 30 00 para 1.7

67 - 01 11 00 -

When the new entry storefront is being installed and renovated, can that entrance be closed for the public for any lengh of time? Please clarify.

Bid per RFP, See Section 01 30 00 para 1.7

68 - 01 11 00 - Where is the proposed contractor laydown area?

See Amendment 0008.

Contractor will be provided 500SF on NSA Bethesda

69 - 01 11 00 - Will the contractor have designated parking spots?

No, Bid per RFP. 0005

70 - 01 11 00 - Can the contractor store materials inside the building?

No, Bid per RFP. 0005

71 - DIV 1 -

Is there a noise limitation for work performed during daytime operating hours.

Bid per RFP. Refer to Sec 01 14 00- Para 1.2.4, Coordinate work with NAVFAC CM and Hospital Rep, 14 days prior to work

72 - DIV 1 -

Please confirm the acceptable method for constructing temporary partitions at areas of work.

Bid per RFP, Refer to Section 01 50 00 para 1.3

73 - DIV 1 -

Because the individual reception desks, and pharmacy reception area will be closed for renovations, please confirm that the contractor is not required to coordinate/provide temporary reception areas while the work is being performed.

Bid per RFP, See Section 01 30 00 para 1.7

74 - DIV 1 -

How large will the contractor laydown area be?

Bid per RFP, Refer to Section 01 50 00 para 1.3

75 - DIV 1 -

Please confirm that the entire patient relations suite can be closed at one time so it can be renovated in a single phase.

Bid per RFP, See Section 01 30 00 para 1.7

Archit ectural Drawi ngs note 10.1

Architectural drawings note 10.01 references relocating kiosk stations.

Please confirm that these stations will be provided by the owner for installation. They are not shown at any locations on the demo plans.

See Spec Section 02 41 00 para 1.8 Relocations.

Existing Kiosks are located outside of every check-in station

77 - 01 30

01.00 23

1.4.3 Spec Section 01 30 01.00 23 mentions A/V Design. Is A/V design required?

Bid per RFP. 0008

78 - - - Please confirm procurment and installation/construction of A/V is not to be included in this project.

Confirmed, bid per RFP. 0008

79 - DIV 2 -

Please confirm that the government will remove/relocate all furniture to be salvaged within the areas of work.

Bid per RFP, Refer to Sec 01 50 00, Para 3.7 and Sec 02 41 00 para 1.2.1, Para 1.2.2

80 - DIV 2&3 -

Please confirm if steel and concrete installation will be permitted during regular working hours.

Bid per RFP. Refer to Sec 01 14 00- Para 1.2.4, Coordinate work with NAVFAC CM and Hospital Rep, 14 days prior to work

81 - DIV 1 -

Please confirm if demolition will be permitted during regular working hours.

Bid per RFP, See Section 01 30 00 para 1.7

82 E501

1. On the electrical plans there is a Type 12 linear LED light fixture shown over all of the patient check in and pharmacy areas. There is no

See Amendment 0008 0008 spec provided for this fixture.Please provide spec/catalog number for Type 12 light fixtures.

83 17 1.2.1.2.1 1

2. Quick question, it mentioned American citizenship, would lawful residents (green card holders) be accepted or not?

Bid per RFP 0005

New panel PPR requires a new feed from existing switchboard 11601 in room 0314A in the basement. Please provide location of this existing switchboard or distance to new panel PPR. Basement drawings are not provided.

See Amendment 0008 and PDF “PPI 84 Final” document.

Please provide notes associated with circled items on existing switchboard schedules on drawing E-701.

See Amendment 0008 0008

It shows an light fixture type “12” on the drawings and refer to the Arch’s but there no type “12” on the fixture schedule. Please confirm?

See Amendment 0008 0008

Comm spec. shows data outlets but there is no data outlets on the electrical legend so Please confirm what is needed it ie., rough in up into the ceiling ?

Typical data symbols are shown on drawings but is missing from the legend. Bid per RFP

Building 9 was originally constructed in 1975. We did not see any mention of a HAZMAT / asbestos survey or if this was abated during a previous renovation. Please cofirm if there is hazmat/asbestos. If so, please provide report

Bid per RFP. Refer to Section 01 35 26, para 3.1.4

89 Who is the HVAC controls? See PPI 160 0008

THe contract specs requires ony US citizens, Can workers with legal status can work?

Bid per RFP 0005

On the demo drawings note G3 calls for removing the existing PA speakers, wireless antenna’s and security camera’s and reinstalling them in the new ceiling. Who is doing this portion of the work? We are talking about taking on the responsibility of existing equipment that’s being reinstalled and not knowing the status of it’s operation.

Bid Per RFP, contractor is responsible.

Sheet E601 calls for the new feeder for the new panel “PPR” to come out of switchboard (11601) but it is not shown on the drawings to be able to get a footage for the feeder run. Please clarify.

See PPI 84. 0008

Sheet E601 calls out the existing panelboard 1E19 to be relocated from electrical closet 1440 to office 1323. The drawings do not show where electrical closet 1440 is located. Please clarify

Bid per RFP. See Sheet ED103 for existing location.

The FAR clause125.2 amended in Sep 2019 states that a small buisness contractor can use the first tier subcontractors capabilities and past performance who are identified in the proposal when the SB do not have the past performance necessary for the award . Please advise if the SBA approved JV partners experince will be acceptable.

See Amendment 0004. 0004

Drawings AD102, AD103, AD104, Keynote 02.59 indicates to remove all existing vinyl wallcovering, patch, repair and prep for finish, existing partitions to remain. Does this apply to all first floor bulkheads also as per attached pics?

Bid per RFP. Note refers to wall covering only

As per door schedule in drawing A602, radiology door is under 1021.

The only radiology door found in the drawings shows 1020 as per Level 1 Floor Plan, Area A, South A102 (unmarked). Also the archives

See Amendment 0008.

Revise room number on sheet A602 from "1021" to "1020". Doors to be replaced/added are noted in the door schedule on door shown in schedule is not marked in drawings. Please confirm.

sheet A-602 and are not called out specifically on a plan.

As per drawings A113 - A117 showing a 2'x4' acoustical ceiling in elevator lobbies, legend does not indicate new acoustical tiles for these. Also, finish schedule AF110 does not show any 2' x4' acoustical replacement for these areas. Please confirm.

Bid per RFP, ceilings are to remain.

How many phases will be required for this project?

Bid per RFP, See Section 01 30 00 para 1.7

Drawing E-101 shows Light Fixture 2C. There is no 2C in the fixture schedule. Please provide product information.

See Amendment 0008 0008

The fixture schedule shows no model numbers. Are there specific models that are required for this project?

Bid per RFP 0005

Are Type 9 fixtures a trim/led/driver retrofit kit for the 2nd floor beam mounted fixtures or is the intent to cut out the drywall and install a new housing as well?

Bid per RFP 0005

Exit light fixtures have not been assigned a fixture number. Exit light fixtures are not in the lighting fixture schedule. Please provided product information.

Bid per RFP 0005

Drawing E-101 shows Light Fixture

12. There is no 12 in the fixture schedule. Please provide product information.

See PPI 82 0008

Does the Buy American Act apply to the lighting fixtures and electrical materials?

No, Bid per RFP. 0005

Drawing E-601 states that Panelboard 1E19 is to be relocated to room 1323. Room 1323 is not shown on the drawings. Please identify the location.

Bid per RFP. See Sheet E-601

Drawing E-601 Panel 1E19 shows "ERR-Existing to be removed and relocated", "RE-Relocated Existing". Drawings ED103 and E-

See Amendment 0008 0008

109 show Panel 1E19 as Relocated/Replaced panel. Is the existing panel 1E19 to be relocated/reused or is the existing panel to be replaced in kind and relocated?

Drawing E-701 shows Notes 1-7 throughout, but there is no description of each note. Please provide a description for Notes 1-7.

See Amendment 0008 0008

Will onsite space be available to store the new lighting fixtures?

Bid per RFP, refer to Section 01 50 00 para

1.3 and Section 01 45

00.00 Para 3.1

Please provide basis of design for the corner guards.

Bid per RFP, See section 06 20 00 para 3.2

110 14500 1.5.4

This paragraph states that we must have a Submittal Reviewer with 10 years experience in addition to the QC Manager. Is this required for this project?

Bid per RFP. 0005

Per the specifications we are required to have a superintendent, SSHO and QC Manager on site at all times work is being performed.

Do there personnel have to be direct employees of the General Contractor awarded this project?

Bid per RFP 0005

Will the awarded General Contractor be provided with an area for staging of materials and to set up an field office trailer? If yes, please provide a location.

Bid per RFP, refer to Section 01 50 00 para 1.3

Has a HAZMAT survey been performed for the areas to be renovated. If it has been can we be provided with this report?

Bid per RFP. Refere to Section 01 35 26, para 3.1.4

114 A-413 1

Only 1 partition on this drawing for the café, scrubs, radiology and archives is identified for the partition type. Please provide what types of partitions are to be used in these areas?

Bid per RFP 0008

FX-

104, FX-

105 &

FX-

General Note 3 on these pages states "Existing ceilings will be replaced refer to Architectural Drawings for more detail." Per the Reflected Ceiling Drawings for the second floor most of the ceilings are existing to remain. Please provide direction on which of these is to be followed in preparing our proposal?

See Amendment 0008. 0008

PD-

and P-

PD-101 shows the disconnection and pipe removal for the existing café. Drawing P-101 has nothing showing any new work for the café sink. Please clarify the extent of new plumbing work required for the new café?

Bid per RFP 0008

E-107, E-108, & E-

For the new Kiosk locations on these drawings we are required to core drill the floor and run new power and date in the ceiling of Level 0. Are there existing ceilings on Level 0 and if so what types of ceilings will need to be removed to install this new work?

Bid per RFP 0005

118 G-002

SCOPE OF WORK states " The work includes Architectural Design Services to modernize the East Hospital Entrance." As this project appears to be fully designed what Architectural Design Services are to be provided by the awarded General Contractor?

Design Released with RFP is final signed. No architectural planning services are required.

As part of this project we are to renovate multiple reception areas for adjoining medical suites. Who will be responsible for providing temporary reception areas while this work is being performed?

Bid per RFP 0005

AD-

General Note 18 on the demolition drawings states "General Contractor must phase the construction so as to maintain proper egress and safety for the building occupants.

Coordinate with the Contracting Officer for temporary closures for complete construction." How large of an area will we be able to work on at a time and how many phases are anticipated for this project?

Bid per RFP, refer to Section 01 50 00 para 1.3

AD-

103 & A-103

Will another entry be available when the work is being performed for the new curtain wall and vestibule in Level 1 & 2 Area B east?

Bid per RFP, refer to Section 01 50 00 para 1.3

Are all existing doors and frames in the corridors to be cleaned and repainted or only those doors and frames identified on the project drawings?

Bid per RFP. 0005

AF-

thru

AF-

General Note 25 states "All existing corner guards to remain, UON."

Genral Note 26 states "All outside wall corners to receive new 4'-0" high stainless steel corner guards."

No corner guards are shown on the finish plans. Please clarification on how many and where the new stainless steel corner guards are required?

See Amendment 0008.

Note should be “all new outside wall corners to receive 4’-0” high stainless steel corner guards”.

As this work is to be performed in a working hospital environment are there any ICRA requirements that we are to adher to?

Yes, Level 3 0005

Will there be alternate entries available to the adjacent suites that can be used while the work is being performed in the main corridors?

Bid per RFP, refer to Section 01 50 00 para 1.3

For seperation between phases will hard partitions be required or can plastic barriers be installed from the floor to the ceiling?

Bid per RFP, refer to Section 01 50 00 para 1.3

AD-

103 &

AF-

KEYNOTE 02.67 states "Demolish existing concrete for walk-off mat and frame - 1" depth". Per the Finish Materials Schedule on Drawing AF-110 the frame for the walk-off mat has a depth of 1-1/8".

Please clarify the depth of the concrete cut out for the Walk-off mat?

See Amendment 0008.

Revise keynote 02.67 to state "demolish existing concrete walk-off mat and frame 1-1/8" depth.

At the site visit it was noticed that the areas where there are the curved metal slat ceilings at Level 1 there are glass panels extending below the metal slat ceiling. These are not addressed anywhere on the demolition drawings. Please provide direction on what is to be done with these and details on how they are mounted?

Bid per RFP. Refer to Fireproofing and Smoke Control. There are smoke deflectors

Will the existing furniture be removed prior to commencement of work or is the furniture to be removed as part of this contract?

Bid per RFP, Refer to Sec 02 41 00 Para 1.2

130 51200 2.5.2 Per this pargraph the new structural steel is to be shopped primed. There is no indication on th plans as to what finish the exposed steel for the monumental stair is to receive.

Please provide direction on what the final finish will be for the exposed steel?

Are all of the existing wood caps on the glass rail systems to be sanded and refinsihed or only th eones that are marked with Keynote 06.07?

Bid per RFP 0005

Drawi ngs A-thru A-

General note 14 states "Penetrations through floor slab must be fire rated assemblies to match adjacent existing floor construction rating, VIF. Provide and install fire rated minimum closure firestop plug or concrete fill at abandoned core drill locations." As it is unable from the documents provided to determine the number of core drills to be plugged please provide a quantity of fire rated plugs that are required on this project?

Bid per RFP 0008

For the phasing of this project will we be able to work in multiple areas simultaneously?

Bid per RFP, See Section 01 30 00 para 1.7

Will we be able to close of the entire east entry during the renovation of this area? With the new entry layout and the monumental stairs it will be very hard to keep this area open safely.

Bid per RFP, Refer to Sec 02 41 00 Para 1.2

135 16 4 3

If an offerors' TCR and DART ratings are zero, is the offeror required to submit documentation that shows this?

Bid per RFP, Factor 4 Safety, "If the Offeror has no DART rate or a zero rate, for any year, affirmatively state so and explain why"..."If the Offeror has no TCR rate or a zero rate, for any year, affirmatively state so and explain why."

136 11 2 i

Per SBA regulations, we request the government allow the use of a small business' Mentor's for relevant projects Construction Experience?

Bid per RFP, Factor 1, Technical Approach "the Offeror shall submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement, approved mentor protégé agreement (MPA), or letter of commitment signed by each member of the Offeror’s team identified above" and

Factor 2, Experience, "If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. If a project was performed by a JV, and not all partners from that JV are on the JV proposed for this contract, the offeror shall clearly demonstrate what portion of the work was performed by the JV member offering on this contract and shall not include work performed by the JV as a whole."

Please also see amendment 0004 clarifying use of subcontractor experience for Factor 2.

137 11 2 i

We request the government consider lowering the $10M or greater Construction Experience project requirement to $5M or greater so as to not be dully unrestrictive.

Bid per RFP. 0004

138 11 2 i

We request the government allow the use of subbstantially completed projects to statify relevant Construction Experience.

Bid per RFP. 0004

139 13526 1.7.1.1.

Para. 1.7.1.1.1 mentions that the SSHO may not serve as the Quality Control Manager. The SSHO may not serve as the Superintendent. As currently written we are assuming that the Govt. would like three (3) sperate employees to function as the QC Manager, Superintendent and SSHO. To save cost would the Govt. entertain one (1) employee functioning as the QC Manager with one (1) employee serving a dual role as the Superintendent/ SSHO?

Bid per RFP, Refer to section 01 30 00 Para 1.6

140 11400 1.2.4

Para. 1.2.4. states that the work will be done in an occupied space. Are Govt. escorts required for the KTR to work in any areas of the facility?

Bid per RFP 0005

141 12000 1.3.3

Para. 1.3.3 mentions TAB testing of both Season I and Season II. When we looked at Section 23 05 93 Testing, Adjusting and Balancing for HVAC it doesn’t specifically mention either. Please confirm the Govt.'s intent for TAB testing during both seasons.

Confirmed, TAB both seasons.

142 92900 What level of finish is required of the GWB?

Bid per RFP, see section 09 29 00 3.3

143 AD102

Does the Govt. have a Phasing Plan available outlining how the Govt.

anticipates the work to be performed to provide as mininum disruption to the existing tenants as possible?

Any upfront information that could be provided would be beneficial with helping GCs to price the phasing apples to apples.

Bid per RFP, See Section 01 30 00 para 1.7

General Conditio ns

Is negative air going to be required? Refer to PPI #10. 0008

General Conditio ns

Is there going to be inside office space for GC?

Bid per RFP, Refer to Section 01 30 00

General

Where is contractor parking and laydown area located?

Bid per RFP, Refer to Sec 02 41 00 Para 1.2

General

Is this project going to be broken down into phases?

Bid per RFP, Refer to Sec 02 41 00 Para 1.2

General

Constrcution access and dumpter locations?

Bid per RFP, Refer to Sec 02 41 00 Para 1.2

General

What is the construction schedule?

Number of days for completion?

Refer to PPI Response #29

General

Will the hospital want the rooms back inservice after demo?

Bid per RFP, Refer to Sec 02 41 00 Para 1.2

151 13300

How are we to transmit submittals to the Govt for review? Both hard copies and electronic files are mentioned in the specifications.

Can we use Procore? Or does the Govt. intend on having us to use eCMS? Ideally, we would perfer to transmit submittals electronically via email and DODSafe for larger submissions.

See Amendment 0008.

Add Spec Section 01 31

23.13 20

RFP

Technica l

In light of the new experience sheet(Atachment A), would you consider extending the page count to 3 pages for factor 2

Yes, See Amendment 0004.

Sol.

Page 10 of

The instructions for Factor 1 say to "include a brief description of the role and responsibility of each entity not to exceed (1) page." Please confirm that the "simple organizational chart that clearly identifies the lines of authority between the proposed primary construction firms and primary design firms for this contract" can be on a separate page.

Confirmed, See Amendment 0004.

Specs

PDF

page

Section 01 14 00, p 3

1.2.3

Which parts of the work areas are required to be accessible to the hospital workers and patients on a 24/7 basis?

Bid per RFP, Refer to Sec 02 41 00 Para 1.2

Specs

PDF

page

Section 01 14 00, p 3

1.2.3

Which parts of the work areas do not need to be accessible to the hospital workers and patients on a 24/7 basis?

Bid per RFP, Refer to Sec 02 41 00 Para 1.2

Are we correct to assume that NAVFAC would prefer that demolition and construction activities that create vibration and noise be performed the day (normal contract working hours)?

Bid per RFP, Refer to Sec 02 41 00 Para 1.2.

Hospital to remain operational during construction.

If offerors are required/expected to develop their own phasing plan, would NAVFAC please provide information that can be used to support one? For example, for each renovated space (billing counters, lobbies, waiting rooms, reception areas, etc.) what is the maximum duration that each can be turned over to the contractor for control during renovation. Also, what areas can be renovated in zones, with the contractor controlling the work zone and hospital worker/patient access maintained outsize of those zones.

Bid per RFP, See Section 01 30 00 para 1.7

Are we correct to assume that this project will require infection controls? If so, please specify the ASHE's Infection Control Risk Assessment project activity type and patient risk group.

See Amendment 0005. 0008

Please confirm the millowrk contractors are to follow the AWI guidelines and it is not a requiredment to be AWI certified.

Bid per RFP. Specs include other requirements by reference.

Please provide the security contractor information to coordinate the proposed for controls& BMS, unless the work is propriotary to the security company.

Johnson Controls maintains the BMS for this facility.

Please provide the contact for the HVAC controls for the building.

See PPI #160 0008

162 1 11400 1.2.1.2.

The referenced paragraph indicates that general construction and finish work is to be performed by US Citizens. Please confirm that the entire scope of the project is to be performed by US Citizens.

Confirmed. 0005

163 10 13526 1.7.1.2.

The referenced paragraph indicates that the SSHO can not act as either the Superintendent or the QC Manager. Is the SSHO permitted to have duties other than those described in paragraph 1.7.2.1 of the same specification section?

Bid per RFP , see Section 01 45 00.00.20

164 7 15000 3.1 Please define the quantity of and location of parking that will be available to contractor personnel.

Bid per RFP, See Section 01 50 00 para 1.3

165 7 15000 3.2.2a

Will power and water be available from existing sources free of utilization charges or will we be required to pay for consumption charges?

Bid per RFP, See Section 01 50 00 para 1.3

13 of

RFP

Factor 2 Experie nce

The referenced RFP section indicates the requirements for the designer to be submitted in our technical proposal. As we are permitted to submit five design projects from designers, can we submit the qualifications of more than one designer, provided that we do not exceed the five project maximum?

Yes, Design projects submitted under Factor 2, Experience shall demonstrate experience for the DOR(s) as identified under Factor 1 and to be used during performance under this contract in accordance with the RFP.

12 of

RFP

Factor 2 Experie nce

The referenced RFP section indicates the requirements for a Joint Venture Project Submissions for the technical proposal. If the Joint Venture is a large contractor and a small business contractor with no prior common JV experience, how many of the 5 required projects are to be submitted by the small business partner to the joint venture?

Bid per RFP, "If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members."

12 of

RFP

Factor 2 Experie nce

The referenced RFP section indicates the requirements for a Joint Venture Project Submissions for the technical proposal. If the Joint Venture is a large contractor and a small business contractor with no prior common JV experience, how many of the 5 required projects are to be submitted by the small business partner to the joint venture?

See Response 167. 0005

169 1 11100 1.3

The facility is indicated to remain fully occupied, however, the scope of work indicates bulk demolition throughout most of the existing access/corridor areas. Are there any specific phasing requirements that need to be compiled to provide continuous occupant use and access?

Bid per RFP, See Section 01 30 00 para 1.7

170 3 14500 1.4.1

Is a third party commissioning agent required for the project and if so will this organization be hired by the contractor or by NAVFAC.

Bid per RFP.

Commissioning not required, TAB to be performed per RFP

171 3 of 69 RFP

Section 001 10 00 - Item

Please confirm that Item No 0001 of Section 00 10 00 of the SF1442 does not need to be filled out with our bid submission as explained on page 9 of the RFP.

Confirmed. 0004

172 8 of 69 RFP 4.3.1 Price (i), #5

This section requests VETS-4212 registration for the 2022 filing cycle.

Please confirm that the intent for the offeror to instead submit confirmation of filing for the 2023 filing cycle.

173 9 of 69 RFP 1 and 2

Please confirm that all bank letters, statements, and other financial information required within paragraphs #1 and #2 can be emailed to the contracting officer under the "N40080-23-R-002

FINANCIAL STATEMENTS"

email heading.

Bid per RFP, ADDITIONAL

INFORMATION TO BE

SUBMITTED WITH

PRICE

PROPOSALPACKAGE,

2., "Offerors may send proprietary financial statements to Deanna.d.ward.civ@us.n avy.mil with aclearly marked subject line:

“N40080-23-R-0022

[OFFEROR NAME]

FINANCIALSTATEME

NTS”

10 of

RFP 4.3.2 (i)

Are the formatting requirements for paper size, font type, and font size required throughout the remainder of the proposal or are these requirements limited to the cover page only?

Paper size, Font type, and font size apply to the entire proposal.

11 of

RFP

Factor 2 Recenc y

Please consider extending the acceptable project recency threshold from five (5) years to seven (7) years for the submitted Factor 2 Construction projects to match the seven (7) year threshold provided for the design projects.

No, Bid per RFP. 0004

11 of

RFP

Factor 2 Recenc y

Can ongoing projects that comply with the Factor 2 submission requirements be submitted if they are over 75% complete?

No, Bid per RFP, Factor 1.

18 of

RFP

Factor 5 (i)

Can previously completed PPQs be submitted if they do not reference another solicitation?

Yes, Bid per RFP Factor 5.

15 of

RFP

Factor 3 (i)

Please clarify the required geographic coverage of this contract.

Bid per RFP, "NAVFAC Washington Area of Responsibility (AOR)" and See Amendment…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .