This document is an amendment to a federal solicitation providing answers to request for information questions and updating sections of the solicitation. The amendment increases the period of performance from 195 days to 320 days calendar days from award due to equipment lead times exceeding the original performance period of 180 days. It also adds a requirement for a 10 calendar day performance payment bond. The solicitation is for repair work to HVAC systems at Building 2032 at Marine Corps Base Quantico in Virginia, including heating, cooling, ventilation and zoning upgrades to meet load calculations and manufacturer specifications. The contracting agency is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0004 Extend Proposal Due Date.pdf | ||
| Amendment 0003- RFIs Answers.pdf | ||
| Amendment 0002- Various Changes.pdf | ||
| Attachment G - Pictures.pdf | ||
| Attachment F - Drawings.pdf | ||
| Attachment D - Wage Determination VA20220162.pdf | ||
| Attachment E-Special Notice - Base Access Corrected.pdf | ||
| Amendment 0001 Provide Corrected Attachment E - Special Notice - Base Access.pdf | ||
| Special Notice - Base Access.pdf | ||
| Attachment 1 -Direction to VCC.pdf | ||
| Attachment D - Wage Determination VA20210162.pdf | ||
| Attachment E - Special Notice - Base Access.pdf | ||
| Attachment A -Statement of Work.pdf | ||
| Attachment B - MCINCR-MCBQO 5530.2.pdf | ||
| Exhibits A-E N4008022R1007.pdf | ||
| RFP N4008022R1007 MCBQ B2032 Repair HVAC Systems.pdf | ||
| Attachment C - Price Schedule.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5898199
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0005 is issued to provide (1) Answ ers to RFIs received; (2) Update Box 11 and 12b of Section 00 10 00 of the Solicitation
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jan-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008022R1007
X 9B. DATED (SEE ITEM 11)
16-Dec-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jan-2022
CODE
PUBLIC WORKS DEPARTMENT
FEAD
P.O. BOX 1855
BLDG. 2004 BARNETT AVE.
QUANTICO VA 22134
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008022R1007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005 RFIS ANSWERS
I. PROVIDE ANSWERS TO RFIS RECEVIED
1. After discussion with equipment manufactures some mechanical equipment required for this project has a lead time of 23+ weeks exhausting the POP of 180 days. Considering this project is design build, has equipment 160+ days of lead time, and requires phased work please consider revising the POP to 320 days.
Answers: The period of performanc has changed to 320 days calendar days from award.
2. Will the Government provide swing space for the KTR to provide a phased approach to the ductwork modification as required after the design is completed?
Answers: The building will be vacant during construction time needed in office are. The Contractor shall coordinate with the Construction Manager/COR.
SECTION 00 10 00 - SOLICITATION
The contractor period of performance end date has increased by 125 days from 195 days to 320 days.
The performance payment bonds calendar days 10 has been added.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 320 calendars after award. The time stated for completion shall include final cleanup of the premises.
(End of clause)
(End of Summary of Changes)