N4008020R62600004.pdf

PDF 13 KB Posted

Attached to
Regional Asbestos Testing and Removal Services
Solicitation number
N4008020R6260
Issued by

View the file

Other files

File Type Posted
N40080-20-R-6202-0008.pdf PDF
1800000 F Environmental Final JSM.pdf PDF
1800000 M Environmental Updated 11-25-2020.pdf PDF
N4008020R6202 0007.pdf PDF
Asbestos_License_Application_MDE240_ 10-17 revised.pdf PDF
J-0200000-07 ELINS Updated 12-14-2020.xlsx XLSX spreadsheet
N4008020R6202 0006.pdf PDF
N40080-20-R-6260-0005.pdf PDF
N40080-20-R-6260-0003.pdf PDF
PRE-PROPOSAL MTG ATTENDEES -- REGIONAL ASBESTOS TESTING.pdf PDF
Pre-Proposal Meeting 16NOV20 Asbestos Revised.pdf PDF
N40080-20-R-6260-0002.pdf PDF
N40080-20-R-6260-0001.pdf PDF
J-0200000-05 Clearance Receipt Acknowledgement Form Final 2-13-18.pdf PDF
J-0200000-05 Asbestos-Compliance-Form VA.pdf PDF
J-0200000-05 EPA Demolition-Renovation-Notification-Form_fillable.pdf PDF
J-0200000-02 Davis-Bacon Act WD VA20200013 Arlington Mod 2.pdf PDF
J-0200000-05(a) DBIDS Standard Operating Procedures.pdf PDF
0200000 F Management and Administration Final JSM.docx DOCX document
J-0200000-05(b) SECNAV Form 5512-1.pdf PDF
J-0200000-03 OPNAVINST 5090.1E.pdf PDF
J-0200000-05-06 Form Contractor Significant Incident Report.pdf PDF
J-0200000-07 ELINS.xlsx XLSX spreadsheet
N40080-20-R-6260 FINAL.pdf PDF
SPCC JBAB Final SEPT 2016.pdf PDF
J-0200000-02 Davis-Bacon Act WD VA20200162 Prince William Mod 1.pdf PDF
J-0200000-05 Maryland Lead Form B_Visual Inspection.pdf PDF
J-0200000-05 2080 Asbestos Abatement Forms.pdf PDF
NSASP_RWMP_DRAFT_FINALjs-rev(2).pdf PDF
Past Performance Questionnaire.pdf PDF
J-0200000-02 Davis-Bacon Act WD VA20200007 King George Mod 3.pdf PDF
1800000 F Environmental Final JSM.doc DOC document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT: Regional Asbestos Testing and Removal Services

The purpose of this admendment is to extend proposal due date to Monday, February 12, 2020.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Jan-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008020R6260

X 9B. DATED (SEE ITEM 11)

05-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Jan-2021

CODE

NAVAL FACILITIES ENG COMMAND WASHINGTON

1314 HARWOOD ST

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008020R6260

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

File details come from the government source that posted it. Updated .