J-0200000-05 EPA Demolition-Renovation-Notification-Form_fillable.pdf
PDF 54 KB Posted
- Attached to
- Regional Asbestos Testing and Removal Services
- Solicitation number
- N4008020R6260
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTIFICATION OF DEMOLITION AND RENOVATION
Operator Project # Postmark Date Received Notification #
I. Type of Notification (O=Original R=Revised C=Canceled)
II. FACILITY INFORMATION (Identify owner, removal contractor, and other operator)
OWNER NAME:
Address:
City: State: Zip:
Contact: Tel:
REMOVAL CONTRACTOR:
Address:
City: State: Zip:
Contact: Tel:
OTHER OPERATOR:
Address:
City: State: Zip:
Contact: Tel:
III. TYPE OF OPERATION (D=Demo O= Ordered Demo R=Renovation E=Emer. Renovation)
IV. IS ASBESTOS PRESENT? (Yes/No)
V. FACILITY DESCRIPTION (Include building name, number and floor or room number)
Bldg. Name:
Address:
City: State: County:
Site Location:
Building Size: # of Floors: Age in Years:
Present Use: Prior Use:
VI. PROCEDURE, INCLUDING ANALYTICAL METHOD, IF APPROPRIATE, USED TO DETECT THE PRESENCE OF ASBESTOS MATERIAL:
VII. APPROXIMATE AMOUNT OF ASBESTOS
INCLUDING:
Nonfriable Asbestos
Material Not To Be Removed
Indicate Unit of Measurement Below
1. Regulated ACM to be Removed
2. Category I ACM Not Removed
3. Category II ACM Not Removed
RACM
To Be
Removed Category I Category II UNIT
Pipes LnFt: Ln M:
Surface Area SqFt: Sq M:
Vol RACM Off Facility Component CuFt: Cu M:
VIII. SCHEDULED DATES ASBESTOS REMOVAL (MM/DD/YY) Start: Complete:
IX. SCHEDULED DATES DEMO/RENOVATION (MM/DD/YY) Start: Complete:
X. DESCRIPTION OF PLANNED DEMOLITION OR RENOVATION WORK, AND METHOD(S) TO BE USED:
XI. DESCRIPTION OF WORK PRACTICES AND ENGINEERING CONTROLS TO BE USED TO PREVENT EMISSIONS OF ASBESTOS AT THE
DEMOLITION OR RENOVATION SITE:
XII. WASTE TRANSPORTER #1
Name:
Address:
City: State: Zip:
Contact Person: Tel:
WASTE TRANSPORTER #2
Name:
Address:
City: State: Zip:
Contact Person: Tel:
XIII. WASTE DISPOSAL SITE
Name:
Address:
City: State: Zip:
Tel:
XIV. IF DEMOLITION ORDERED BY A GOVERNMENT AGENCY, PLEASE IDENTIFY THE AGENCY BELOW:
Name: Title:
Authority:
Date of Order (MM/DD/YY): Date Ordered to Begin (MM/DD/YY):
XV. FOR EMERGENCY RENOVATIONS:
Date and Hour of Emergency (MM/DD/YY):
Description of the sudden unexpected event:
Explanation of how the event caused unsafe conditions or would cause equipment damage or an unreasonable financial burden:
XVI. DESCRIPTION OF PROCEDURES TO BE FOLLOWED IN THE EVENT THAT UNEXPECTED ASBESTOS IS FOUND OR PREVIOUSLY
NONFRIABLE ASTESTOS MATERIAL BECOMES CRUMBLED, PULVERIZED, OR REDUCED TO POWDER:
XVII. I CERTIFY THAT AN INDIVIDUAL TRAINED IN THE PROVISIONS OF THIS REGULATION (40 CFR PART 61, SUBPART M) WILL BE ON- SITE DURING THE DEMOLITION OR RENOVATION, AND EVIDENCE THAT THE REQUIRED TRAINING HAS BEEN ACCOMPLISHED BY THIS
PERSON WILL BE AVAILABLE FOR INSPECTION DURING NORMAL BUSINESS HOURS.
(Signature of Owner/Operator)
(Date)
XVIII. I CERTIFY THAT THE ABOVE INFORMATION IS CORRECT:
(Signature of Owner/Operator)
(Date)
| NOTIFICATION OF DEMOLITION AND RENOVATION |
| Operator Project # |
| Postmark |
| Date Received |
| Notification # |
| Postmark: |
| Date Received: |
| Notification: |
| I Type of Notification OOriginal RRevised CCanceled: |
| II FACILITY INFORMATION Identify owner removal contractor and other operator: |
| OWNER NAME: |
| Address: |
| City: |
| State: |
| Zip: |
| Contact: |
| Tel: |
| REMOVAL CONTRACTOR: |
| Address_2: |
| City_2: |
| State_2: |
| Zip_2: |
| Contact_2: |
| Tel_2: |
| OTHER OPERATOR: |
| Address_3: |
| City_3: |
| State_3: |
| Zip_3: |
| Contact_3: |
| Tel_3: |
| III TYPE OF OPERATION DDemo O Ordered Demo RRenovation EEmer Renovation: |
| IV IS ASBESTOS PRESENT YesNo: |
| V FACILITY DESCRIPTION Include building name number and floor or room number: |
| Bldg Name: |
| Address_4: |
| City_4: |
| State_4: |
| County: |
| Site Location: |
| Building Size: |
| of Floors: |
| Age in Years: |
| Present Use: |
| Prior Use: |
| VI PROCEDURE INCLUDING ANALYTICAL METHOD IF APPROPRIATE USED TO DETECT THE PRESENCE OF ASBESTOS MATERIAL: |
| RACM To Be RemovedPipes: |
| Category IPipes: |
| Category IIPipes: |
| LnFt: |
| Ln M: |
| RACM To Be RemovedSurface Area: |
| Category ISurface Area: |
| Category IISurface Area: |
| SqFt: |
| Sq M: |
| RACM To Be RemovedVol RACM Off Facility Component: |
| Category IVol RACM Off Facility Component: |
| Category IIVol RACM Off Facility Component: |
| CuFt: |
| Cu M: |
| X DESCRIPTION OF PLANNED DEMOLITION OR RENOVATION WORK AND METHODS TO BE USED: |
| XI DESCRIPTION OF WORK PRACTICES AND ENGINEERING CONTROLS TO BE USED TO PREVENT EMISSIONS OF ASBESTOS AT THE DEMOLITION OR RENOVATION SITE: |
| XII WASTE TRANSPORTER 1: |
| Name: |
| Address_5: |
| City_5: |
| State_5: |
| Zip_4: |
| Contact Person: |
| Tel_4: |
| WASTE TRANSPORTER 2: |
| Name_2: |
| Address_6: |
| City_6: |
| State_6: |
| Zip_5: |
| Contact Person_2: |
| Tel_5: |
| XIII WASTE DISPOSAL SITE: |
| Name_3: |
| Address_7: |
| City_7: |
| State_7: |
| Zip_6: |
| Tel_6: |
| Name_4: |
| Title: |
| Authority: |
| Date of Order MMDDYY: |
| Date Ordered to Begin MMDDYY: |
| XV FOR EMERGENCY RENOVATIONS: |
| Date and Hour of Emergency MMDDYY: |
| Description of the sudden unexpected event: |
| Explanation of how the event caused unsafe conditions or would cause equipment damage or an unreasonable financial burden: |
| XVI DESCRIPTION OF PROCEDURES TO BE FOLLOWED IN THE EVENT THAT UNEXPECTED ASBESTOS IS FOUND OR PREVIOUSLY NONFRIABLE ASTESTOS MATERIAL BECOMES CRUMBLED PULVERIZED OR REDUCED TO POWDER: |
| Date: |
| Date_2: |
| Operator Project: |
| Complete: |
| Start: |
File details come from the government source that posted it. Updated .