J-0200000-05 EPA Demolition-Renovation-Notification-Form_fillable.pdf

PDF 54 KB Posted

Attached to
Regional Asbestos Testing and Removal Services
Solicitation number
N4008020R6260
Issued by

View the file

Other files

File Type Posted
N40080-20-R-6202-0008.pdf PDF
1800000 F Environmental Final JSM.pdf PDF
N4008020R6202 0007.pdf PDF
1800000 M Environmental Updated 11-25-2020.pdf PDF
N4008020R6202 0006.pdf PDF
Asbestos_License_Application_MDE240_ 10-17 revised.pdf PDF
J-0200000-07 ELINS Updated 12-14-2020.xlsx XLSX spreadsheet
N40080-20-R-6260-0005.pdf PDF
N4008020R62600004.pdf PDF
Pre-Proposal Meeting 16NOV20 Asbestos Revised.pdf PDF
PRE-PROPOSAL MTG ATTENDEES -- REGIONAL ASBESTOS TESTING.pdf PDF
N40080-20-R-6260-0003.pdf PDF
N40080-20-R-6260-0002.pdf PDF
N40080-20-R-6260-0001.pdf PDF
J-0200000-07 ELINS.xlsx XLSX spreadsheet
J-0200000-02 Davis-Bacon Act WD VA20200162 Prince William Mod 1.pdf PDF
J-0200000-03 OPNAVINST 5090.1E.pdf PDF
J-0200000-05 2080 Asbestos Abatement Forms.pdf PDF
J-0200000-05 Asbestos-Compliance-Form VA.pdf PDF
SPCC JBAB Final SEPT 2016.pdf PDF
J-0200000-05-06 Form Contractor Significant Incident Report.pdf PDF
J-0200000-05 Clearance Receipt Acknowledgement Form Final 2-13-18.pdf PDF
N40080-20-R-6260 FINAL.pdf PDF
0200000 F Management and Administration Final JSM.docx DOCX document
J-0200000-02 Davis-Bacon Act WD VA20200013 Arlington Mod 2.pdf PDF
J-0200000-05 Maryland Lead Form B_Visual Inspection.pdf PDF
J-0200000-05(a) DBIDS Standard Operating Procedures.pdf PDF
J-0200000-05(b) SECNAV Form 5512-1.pdf PDF
Past Performance Questionnaire.pdf PDF
1800000 F Environmental Final JSM.doc DOC document
J-0200000-02 Davis-Bacon Act WD VA20200007 King George Mod 3.pdf PDF
NSASP_RWMP_DRAFT_FINALjs-rev(2).pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTIFICATION OF DEMOLITION AND RENOVATION

Operator Project # Postmark Date Received Notification #

I. Type of Notification (O=Original R=Revised C=Canceled)

II. FACILITY INFORMATION (Identify owner, removal contractor, and other operator)

OWNER NAME:

Address:

City: State: Zip:

Contact: Tel:

REMOVAL CONTRACTOR:

Address:

City: State: Zip:

Contact: Tel:

OTHER OPERATOR:

Address:

City: State: Zip:

Contact: Tel:

III. TYPE OF OPERATION (D=Demo O= Ordered Demo R=Renovation E=Emer. Renovation)

IV. IS ASBESTOS PRESENT? (Yes/No)

V. FACILITY DESCRIPTION (Include building name, number and floor or room number)

Bldg. Name:

Address:

City: State: County:

Site Location:

Building Size: # of Floors: Age in Years:

Present Use: Prior Use:

VI. PROCEDURE, INCLUDING ANALYTICAL METHOD, IF APPROPRIATE, USED TO DETECT THE PRESENCE OF ASBESTOS MATERIAL:

VII. APPROXIMATE AMOUNT OF ASBESTOS

INCLUDING:

Nonfriable Asbestos

Material Not To Be Removed

Indicate Unit of Measurement Below

1. Regulated ACM to be Removed

2. Category I ACM Not Removed

3. Category II ACM Not Removed

RACM

To Be

Removed Category I Category II UNIT

Pipes LnFt: Ln M:

Surface Area SqFt: Sq M:

Vol RACM Off Facility Component CuFt: Cu M:

VIII. SCHEDULED DATES ASBESTOS REMOVAL (MM/DD/YY) Start: Complete:

IX. SCHEDULED DATES DEMO/RENOVATION (MM/DD/YY) Start: Complete:

X. DESCRIPTION OF PLANNED DEMOLITION OR RENOVATION WORK, AND METHOD(S) TO BE USED:

XI. DESCRIPTION OF WORK PRACTICES AND ENGINEERING CONTROLS TO BE USED TO PREVENT EMISSIONS OF ASBESTOS AT THE

DEMOLITION OR RENOVATION SITE:

XII. WASTE TRANSPORTER #1

Name:

Address:

City: State: Zip:

Contact Person: Tel:

WASTE TRANSPORTER #2

Name:

Address:

City: State: Zip:

Contact Person: Tel:

XIII. WASTE DISPOSAL SITE

Name:

Address:

City: State: Zip:

Tel:

XIV. IF DEMOLITION ORDERED BY A GOVERNMENT AGENCY, PLEASE IDENTIFY THE AGENCY BELOW:

Name: Title:

Authority:

Date of Order (MM/DD/YY): Date Ordered to Begin (MM/DD/YY):

XV. FOR EMERGENCY RENOVATIONS:

Date and Hour of Emergency (MM/DD/YY):

Description of the sudden unexpected event:

Explanation of how the event caused unsafe conditions or would cause equipment damage or an unreasonable financial burden:

XVI. DESCRIPTION OF PROCEDURES TO BE FOLLOWED IN THE EVENT THAT UNEXPECTED ASBESTOS IS FOUND OR PREVIOUSLY

NONFRIABLE ASTESTOS MATERIAL BECOMES CRUMBLED, PULVERIZED, OR REDUCED TO POWDER:

XVII. I CERTIFY THAT AN INDIVIDUAL TRAINED IN THE PROVISIONS OF THIS REGULATION (40 CFR PART 61, SUBPART M) WILL BE ON- SITE DURING THE DEMOLITION OR RENOVATION, AND EVIDENCE THAT THE REQUIRED TRAINING HAS BEEN ACCOMPLISHED BY THIS

PERSON WILL BE AVAILABLE FOR INSPECTION DURING NORMAL BUSINESS HOURS.

(Signature of Owner/Operator)

(Date)

XVIII. I CERTIFY THAT THE ABOVE INFORMATION IS CORRECT:

(Signature of Owner/Operator)

(Date)

NOTIFICATION OF DEMOLITION AND RENOVATION
Operator Project #
Postmark
Date Received
Notification #
Postmark:
Date Received:
Notification:
I Type of Notification OOriginal RRevised CCanceled:
II FACILITY INFORMATION Identify owner removal contractor and other operator:
OWNER NAME:
Address:
City:
State:
Zip:
Contact:
Tel:
REMOVAL CONTRACTOR:
Address_2:
City_2:
State_2:
Zip_2:
Contact_2:
Tel_2:
OTHER OPERATOR:
Address_3:
City_3:
State_3:
Zip_3:
Contact_3:
Tel_3:
III TYPE OF OPERATION DDemo O Ordered Demo RRenovation EEmer Renovation:
IV IS ASBESTOS PRESENT YesNo:
V FACILITY DESCRIPTION Include building name number and floor or room number:
Bldg Name:
Address_4:
City_4:
State_4:
County:
Site Location:
Building Size:
of Floors:
Age in Years:
Present Use:
Prior Use:
VI PROCEDURE INCLUDING ANALYTICAL METHOD IF APPROPRIATE USED TO DETECT THE PRESENCE OF ASBESTOS MATERIAL:
RACM To Be RemovedPipes:
Category IPipes:
Category IIPipes:
LnFt:
Ln M:
RACM To Be RemovedSurface Area:
Category ISurface Area:
Category IISurface Area:
SqFt:
Sq M:
RACM To Be RemovedVol RACM Off Facility Component:
Category IVol RACM Off Facility Component:
Category IIVol RACM Off Facility Component:
CuFt:
Cu M:
X DESCRIPTION OF PLANNED DEMOLITION OR RENOVATION WORK AND METHODS TO BE USED:
XI DESCRIPTION OF WORK PRACTICES AND ENGINEERING CONTROLS TO BE USED TO PREVENT EMISSIONS OF ASBESTOS AT THE DEMOLITION OR RENOVATION SITE:
XII WASTE TRANSPORTER 1:
Name:
Address_5:
City_5:
State_5:
Zip_4:
Contact Person:
Tel_4:
WASTE TRANSPORTER 2:
Name_2:
Address_6:
City_6:
State_6:
Zip_5:
Contact Person_2:
Tel_5:
XIII WASTE DISPOSAL SITE:
Name_3:
Address_7:
City_7:
State_7:
Zip_6:
Tel_6:
Name_4:
Title:
Authority:
Date of Order MMDDYY:
Date Ordered to Begin MMDDYY:
XV FOR EMERGENCY RENOVATIONS:
Date and Hour of Emergency MMDDYY:
Description of the sudden unexpected event:
Explanation of how the event caused unsafe conditions or would cause equipment damage or an unreasonable financial burden:
XVI DESCRIPTION OF PROCEDURES TO BE FOLLOWED IN THE EVENT THAT UNEXPECTED ASBESTOS IS FOUND OR PREVIOUSLY NONFRIABLE ASTESTOS MATERIAL BECOMES CRUMBLED PULVERIZED OR REDUCED TO POWDER:
Date:
Date_2:
Operator Project:
Complete:
Start:

File details come from the government source that posted it. Updated .