N4008020R6202 0007.pdf

PDF 397 KB Posted

Attached to
Regional Asbestos Testing and Removal Services
Solicitation number
N4008020R6260
Issued by

View the file

Other files

File Type Posted
N40080-20-R-6202-0008.pdf PDF
1800000 F Environmental Final JSM.pdf PDF
1800000 M Environmental Updated 11-25-2020.pdf PDF
N4008020R6202 0006.pdf PDF
Asbestos_License_Application_MDE240_ 10-17 revised.pdf PDF
J-0200000-07 ELINS Updated 12-14-2020.xlsx XLSX spreadsheet
N40080-20-R-6260-0005.pdf PDF
N4008020R62600004.pdf PDF
Pre-Proposal Meeting 16NOV20 Asbestos Revised.pdf PDF
PRE-PROPOSAL MTG ATTENDEES -- REGIONAL ASBESTOS TESTING.pdf PDF
N40080-20-R-6260-0003.pdf PDF
N40080-20-R-6260-0002.pdf PDF
N40080-20-R-6260-0001.pdf PDF
J-0200000-07 ELINS.xlsx XLSX spreadsheet
J-0200000-02 Davis-Bacon Act WD VA20200162 Prince William Mod 1.pdf PDF
J-0200000-03 OPNAVINST 5090.1E.pdf PDF
J-0200000-05 2080 Asbestos Abatement Forms.pdf PDF
J-0200000-05 Asbestos-Compliance-Form VA.pdf PDF
J-0200000-05 EPA Demolition-Renovation-Notification-Form_fillable.pdf PDF
SPCC JBAB Final SEPT 2016.pdf PDF
J-0200000-05-06 Form Contractor Significant Incident Report.pdf PDF
J-0200000-05 Clearance Receipt Acknowledgement Form Final 2-13-18.pdf PDF
N40080-20-R-6260 FINAL.pdf PDF
0200000 F Management and Administration Final JSM.docx DOCX document
J-0200000-02 Davis-Bacon Act WD VA20200013 Arlington Mod 2.pdf PDF
J-0200000-05 Maryland Lead Form B_Visual Inspection.pdf PDF
J-0200000-05(a) DBIDS Standard Operating Procedures.pdf PDF
J-0200000-05(b) SECNAV Form 5512-1.pdf PDF
Past Performance Questionnaire.pdf PDF
1800000 F Environmental Final JSM.doc DOC document
J-0200000-02 Davis-Bacon Act WD VA20200007 King George Mod 3.pdf PDF
NSASP_RWMP_DRAFT_FINALjs-rev(2).pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT: Region Asbestos, Lead and Mold Testing and Removal (ACQR 5793501)

The purpose of this amendment is to:

A. Extend proposal due date to Thursday, April 22, 2021.

B. Post Govt Responses to Questions from RFI due March 22, 2021 and incorporate changes.

C. Correct the follow ing: Incorporated “Questions for Environmental, Specification 1800000 in Section M; not ANNEX 1800000 Environmental in Amendment 0006.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Mar-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008020R6260

X 9B. DATED (SEE ITEM 11)

05-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Mar-2021

CODE

NAVAL FACILITIES ENG COMMAND WASHINGTON

1314 HARWOOD ST

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008020R6260

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0007

N40080-20-R-6260 GOVERNMENT RESPONSES TO QUESTIONS SUBMITTED March 22, 2021.

1. I saw your solicitation is set aside for 8A. Is that strictly set aside for 8A only? We are a Veteran Owned business and wanted to know if it would be worth our time to apply?

GOVERNMENT RESPONSE: Yes, solicitation N4008020R6261, Regional Asbestos, Lead and Mold Testing and Removal Services is being procured as an 8(a) Set-Aside.

2. Regarding the above solicitation, beta.sam.gov does not have active links to download the following files uploaded on March 12, 2021:

J-0200000-07 ELINS.xlsx 1800000 F Environmental Final JSM.doc

GOVERNMENT RESPONSE: J-0200000-07, ELINs Updated 14 Dec 2020 is attached. 1800000 F Environmental Final JSM.doc is attached and also incorporated in Section M titled ”Questions for Environmental, Specification 1800000”.

3. Can you email those files to me or correct the link on beta.sam.gov?

GOVERNMENT RESPONSE: All documents are available on beta.SAM for all interested vendors to obtain them.

4. Is the $750,000 referenced to only one project or can it be multiple projects on multiple different contracts for one year?

GOVERNMENT RESPONSE: At least one relevant project valued at least $750,000.00/year per contract. Multiple relevant Task Order projects valued at least $750,000.00/year per are acceptable per contract.

5. We understand the need of the environmental manager but to what degree is the energy plan applicable in this scenario and could you elaborate how it will be needed on this project since this isn’t a new build construction?

GOVERNMENT RESPONSE: The Contractor shall provide an Environmental/Energy Manager whose primary duty and responsibility is to ensure Contractor operations adhere to the goals and policies of the Environmental Management System, the Installation Energy Plan, and other specified Sustainability requirements affecting this contract. Compliance with the environmental legislation and energy policies is required, where applicable for

N4008020R6260

Annex 0200000 - Management and Administration, Spec Items: 2.5 Contractor-Furnished Items; 2.6.8 System and Equipment Replacement; 2.10 Environmental Management and Sustainability; and 2.10.1.2 Energy Efficient

6. Do you anticipate the need for being present at multiple sites at the same time for the SSHO?

GOVERNMENT RESPONSE: Reference Annex 0200000 - Management and Administration, Spec Item: 2.7.1.3 Site Safety and Health Officer: The SSHO or an equally-qualified Designated Representative/alternate shall be on-site at all times when work is being performed to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. This includes work performed simultaneously at multiple sites.

7. Clarification on due date as Beta.Sam lists the proposal date as April 22 but the amendment 6 lists April

12. Seeing as Beta Sam has listed the due date as April 22nd since February 10th, could you consider extending the due date from April 12th to April 22nd as it is currently reflected on Beta.Sam?

GOVERNMENT RESPONSE: The response due date has been corrected to Thursday, April 22, 2021 at 1:00 PM.

8. Could you confirm the Evaluation Factors for Award on page 139 of the solicitation document as the Factor list does not correlate to the proceeding descriptions and Factor 4 is listed twice.

GOVERNMENT RESPONSE: Question 26 in Amendment 0006 demonstrated a mistake made in numbering of factors on the solicitation. The Factors are listed correctly in Amendment 0006, Section M to reflect the following:

Factor 1 – Price Factor 2 – Corporate Experience Factor 3 – Technical Approach Factor 4 – Safety Factor 5 –Past Performance

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 12-Apr-2021 01:00 PM to 22-Apr-2021 01:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .