Amend 0002 Answers RFIs_Updated WD_Updated Proposal Delivery.pdf

PDF 738 KB Posted

Attached to
Amendment 0005 Updated Evaluation Factors for Install Macro Artifacts Gallery 13 and 14 at Bldg. 1775
Solicitation number
N4008020R5255
Issued by

About this file

This document contains an amendment to a solicitation for installing macro artifacts in museum galleries. The amendment provides updated evaluation factors, with the project involving fabricating and installing structural floor supports for large-scale museum artifacts in vacant Galleries 13 and 14 of the National Museum of the Marine Corps located in Triangle, Virginia. Five remaining structural supports and the artifact installation are within the scope of work, requiring responses by the amended due date to the solicitation issued by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
Amend 0005 Updated Evaluation Factors.pdf PDF
Attachment J - Revised Evaluation Factors-.pdf PDF
Amend 0004 Updated Evaluation Factors and Exhibits.pdf PDF
Attachment I - Revised Evaluation Factors.pdf PDF
Site visit log.pdf PDF
Revised Exhibits A - G.pdf PDF
Amend 0003 Updated WD_Updated Clauses_Closing Date.pdf PDF
Attachment H - General Decision Number VA20200162 9.18.2020.pdf PDF
Amend 0001 ATTACHMENT D Prescriptive Specifications- Drawings (Part 5) Revised.pdf PDF
N4008020R5255 0001 Site Visit Update and Spec Update.pdf PDF
Amend 0001 Part 5 01_32_16.00_20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES.pdf PDF
Part 5 01_31_23.13_20.pdf PDF
ATTACHMENT C Minimum Materials Engineering and Construction Requirements (Part 4).pdf PDF
ATTACHMENT B Statement of Work (Part 3).pdf PDF
ATTACHMENT A General Requirements (Part 2).pdf PDF
Part 5 01_35_26.05_20.pdf PDF
Part 5 01_33_29.05_20.pdf PDF
Attachment G - Bid Schedule.pdf PDF
Attachment H - General Decision Number VA20200162 08.26.2020.pdf PDF
N4008020R5255 Bldg. 1775 Install Macro Artifacts Gallery 13 and 14.pdf PDF
ATTACHMENT E Macro Artifact Mounts_IFC (Part 6).pdf PDF
ATTACHMENT D Prescriptive Specifications- Drawings (Part 5).pdf PDF
Exhibits A- E.pdf PDF
ATTACHMENT F NMMC MAP.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Deidre Parker, Contracting Officer

SOLICITATION: N40080-20-R-5255 National Museum of the Marine Corps - Gallery 13 & 14 - Macro Exhibits B. 1775, MARINE CORPS BASE, QUANTICO VA

THE PURPOSE OF THIS AMENDMENT IS TO ANSWER RFI QUESTIONS, PROVIDE UPDATED WAGE DETERMINATION.

AND UPDATE INSTRUCTIONS TO BIDDERS PORTION WITH ADDITIONAL INFORMATION. ALL OTHER TERMS AND

CONDITIONS REMAIN THE SAME.

PUBLIC WORKS DEPARTMENT

FEAD Quantico

P.O. BOX 1855

BLDG 2004 Barnett Ave Quantico, VA 22134

SEE ITEM 6

N40080-20-R-5255

1 2

09/16/2020

08/26/2020

09/16/2020

N4008020R5255

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

Update to Section 00100 –Bidding Schedule/Instructions to Bidders

INSTRUCTIONS TO BIDDERS page 14 of SF1442

2. INSTRUCTIONS FOR HAND DELIVERY OF PROPOSALS:

A. The proposals and all copies shall be sent via FedEx or hand‐delivery to the address and POC as shown below:

FEAD Quantico

ATTN: DEIDRE PARKER

2004 Barnett Avenue, Room 147

Marine Corps Base

Quantico, Virginia 22134‐0855

B. Boxes shall be marked in the bottom right corner “Solicitation N40080‐20‐R‐5255, DO NOT OPEN”.

Facsimile copies or electronic (email) copies will NOT be accepted.

C. Please allow SUFFICIENT TIME for your proposal to be received prior to the proposed closing date/time.

D. All proposals must be received prior to the due date and time. Any proposals submitted after the time set for receipt will be stamped with the date and hour of receipt and held unopened until after award.

The file shall be documented in accordance with FAR 15.208 (h).

E. The Government considers use of a courier service, such as FedEx or UPS, as hand delivery of proposals and the responsibility for timely delivery resides with the Offeror.

(End of Summary of Changes)

References Information Requested

1 DWGS S-301, 302, 303, 304, 306

1. Detail 1 on each of these pages shows a weight in KIPS for these vehicles. Are these the empty weights of these vehicles? If not, can we get them?

Answer

Please confirm that the plywood and platforms indicated in the details shown on these pages are to be installed by others.

Answer

3 Section D, Factor 3 Page Number 13 of 43 May CPARS be used in lieu of the PPQ, Exhibit B?

Answer

4 the AN/AAS-38 TFLIR artifact on 1/S-401

Please confirm the highlighted(green) posts on the attached PDF are part of the scope for this project. If they are part of the scope, please provide details/elevation/post type/etc.

Answer

Demountable doors are the point of entry to move in the Macro artifacts. Will NAVFAC be responsible for removing and replacing the life safety fire pull, strobe and exit lights?

Answer It is the contractor's responsibility

If contractor is responsible for removing life safetyequipment off of the demountable doors, will this life safety equipment need to be temporarily relocated and energized for continued operation? Or due to short term nature of the demountable doors being removed, can this equipment be disabled at this location while temporary wall is installed and then reinstalled for operation back onto the demountable doors?

Answer

SOLICITION NUMBER: N40080‐20‐R‐5255

PROJECT TITLE/LOCATION: Museum Gallery 13 & 14 ‐ Macro Exhibits Bldg 1775, Marine Corps, Quantico, VA

Yes, they are empty vehicle weights. (Kips = 1,000 lbs)

Yes a completed CPARS Evaluations can be used.

Structural platforms to support the vehicles are part of this contract. The Plywood shown as part of displays and exhibits will be installed under separate contract.

Yes, all of the posts shown on sheet S-401 are in scope. As the drawing indicates, there are elevations and details on sheet S-401A. The subsequent drawings (S-401 A-E) provide detailed information. Please refer to 1/S-401E and 2/S-401A as well.

Facility must remain safe to occupy at all times. Temporary provisions must be in place if life safety components are disabled. Security provisions must also remain operable.

Access point at demountable doors requires loading in over grassy exterior. While protection will be provided for vehicle traffic, it is expected that some damage may occur to landscaping in this area. Is there a requirement to restore the landscaping in this area?

Answer

Part 3 of the statement of work section 2.0 project objectives states contractor is to secure additional structural engineering services to verify the shop drawings, validate shop/field welds, confirm anchorage and steel support sizes. My understanding is that the drawing package is prepared by a structural engineer, does this drawing set require a peer review with approving documentation?

Answer

For the welded assemblies, is there a requirement to have these welds inspected with documentation to prove welds are within spec? Would any of the welded assemblies require an ultrasonic weld inspection?

Answer

Can you please provide the final finish requirement for the Macro artifact mounts.

Answer

For the welded assemblies, is there a requirement to have these welds inspected with documentation to prove welds are within spec? Would any of the welded assemblies require an ultrasonic weld inspection?

Answer

Can you please provide the final finish requirement for the Macro artifact mounts.

Answer

Yes confirmation that all welds are compliant is a requirement.

Final finish requirement will be completed by others.

Damage to any/all existing facilities must be repair to like new conditions.

The contractor must retain a structural engineer to perform the services required and wet seal the shop drawings.

Yes confirmation that all welds are compliant is a requirement.

Final finish requirement will be completed by others.

Drawing pertains to Question 4

"General Decision Number: VA20200162 09/11/2020

Superseded General Decision Number: VA20190162

State: Virginia

Construction Type: Building

County: Prince William County in Virginia.

Includes the independent ciities of Manassas* and Manassas Park*

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 02/07/2020 2 04/17/2020 3 05/15/2020 4 05/29/2020 5 07/10/2020 6 08/07/2020 7 08/28/2020 8 09/11/2020

ASBE0024-006 04/01/2020

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 38.01 17.37+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas

9/14/2020https://beta.sam.gov/wage-determination/VA20200162/8?index=wd&is_active=true&date...

Day provided the employee works the regular work day before and after the paid holiday.

ASBE0024-009 04/01/2020

Rates Fringes

FIRESTOPPER......................$ 29.41 8.18+a

Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

BOIL0045-003 01/01/2017

Rates Fringes

BOILERMAKER......................$ 32.72 25.26

BRVA0001-008 05/03/2020

Rates Fringes

BRICKLAYER.......................$ 33.00 12.09

BRVA0001-009 05/03/2020

Rates Fringes

MASON - STONE....................$ 39.76 18.88

CARP0132-021 01/01/2016

Rates Fringes

CARPENTER (Includes Acoustical Ceiling Installation, Drywall Hanging and Form Work)...................$ 27.56 9.18

* ELEC0026-003 06/01/2020

Rates Fringes

ELECTRICIAN (Includes Low Voltage Wiring and Installation of Alarms and Sound and Communication Systems).........................$ 47.35 19.77

IRON0005-010 06/01/2017

Rates Fringes

IRONWORKER.......................$ 31.15 20.63

PAIN0051-033 06/01/2018

Rates Fringes

PAINTER: Spray Only..............$ 25.06 9.76

PAIN0051-034 06/01/2020

Rates Fringes

GLAZIER..........................$ 27.97 12.55

PAIN0051-036 06/01/2018

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 25.06 9.76

PLUM0005-014 08/01/2020

Rates Fringes

PLUMBER..........................$ 44.92 19.91+a a.PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.

PLUM0602-016 08/01/2020

Rates Fringes

PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 44.14 22.64+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.

SFVA0669-006 04/01/2020

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 35.70 23.60

SHEE0100-004 07/01/2018

Rates Fringes

SHEET METAL WORKER (Includes HVAC Duct Installation)..........$ 40.27 20.34+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's

Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day

SUVA2013-046 01/11/2016

Rates Fringes

BRICK POINTER/CAULKER/CLEANER....$ 19.68 0.00

CEMENT MASON/CONCRETE FINISHER...$ 21.94 3.36

FLOOR LAYER: SOFT FLOORS........$ 18.75 0.00

IRONWORKER, REINFORCING..........$ 25.85 6.94

LABORER: Common or General, including brick mason tending and cement mason tending.........$ 13.28 1.03

LABORER: Pipelayer..............$ 16.81 4.26

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 23.50 4.50

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03

OPERATOR: Bulldozer.............$ 21.99 4.98

OPERATOR: Crane.................$ 31.68 2.64

OPERATOR: Forklift..............$ 21.56 7.57

OPERATOR: Loader................$ 22.26 3.57

OPERATOR: Roller................$ 16.25 4.88

PAINTER (Brush and Roller).......$ 18.92 0.00

ROOFER...........................$ 15.83 3.06

TILE FINISHER....................$ 23.40 0.00

TILE SETTER......................$ 27.80 10.25

TRUCK DRIVER: Dump Truck........$ 19.22 2.58

WATERPROOFER.....................$ 21.75 1.57

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

"General Decision Number: VA20200162 09/11/2020

Superseded General Decision Number: VA20190162

State: Virginia

Construction Type: Building

County: Prince William County in Virginia.

Includes the independent ciities of Manassas* and Manassas Park*

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 02/07/2020 2 04/17/2020 3 05/15/2020 4 05/29/2020 5 07/10/2020 6 08/07/2020 7 08/28/2020 8 09/11/2020

ASBE0024-006 04/01/2020

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 38.01 17.37+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas

Day provided the employee works the regular work day before and after the paid holiday.

ASBE0024-009 04/01/2020

Rates Fringes

FIRESTOPPER......................$ 29.41 8.18+a

Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

BOIL0045-003 01/01/2017

Rates Fringes

BOILERMAKER......................$ 32.72 25.26

BRVA0001-008 05/03/2020

Rates Fringes

BRICKLAYER.......................$ 33.00 12.09

BRVA0001-009 05/03/2020

Rates Fringes

MASON - STONE....................$ 39.76 18.88

CARP0132-021 01/01/2016

Rates Fringes

CARPENTER (Includes Acoustical Ceiling Installation, Drywall Hanging and Form Work)...................$ 27.56 9.18

* ELEC0026-003 06/01/2020

Rates Fringes

ELECTRICIAN (Includes Low Voltage Wiring and Installation of Alarms and Sound and Communication Systems).........................$ 47.35 19.77

IRON0005-010 06/01/2017

Rates Fringes

IRONWORKER.......................$ 31.15 20.63

PAIN0051-033 06/01/2018

Rates Fringes

PAINTER: Spray Only..............$ 25.06 9.76

PAIN0051-034 06/01/2020

Rates Fringes

GLAZIER..........................$ 27.97 12.55

PAIN0051-036 06/01/2018

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 25.06 9.76

PLUM0005-014 08/01/2020

Rates Fringes

PLUMBER..........................$ 44.92 19.91+a a.PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.

PLUM0602-016 08/01/2020

Rates Fringes

PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 44.14 22.64+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.

SFVA0669-006 04/01/2020

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 35.70 23.60

SHEE0100-004 07/01/2018

Rates Fringes

SHEET METAL WORKER (Includes HVAC Duct Installation)..........$ 40.27 20.34+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's

Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day

SUVA2013-046 01/11/2016

Rates Fringes

BRICK POINTER/CAULKER/CLEANER....$ 19.68 0.00

CEMENT MASON/CONCRETE FINISHER...$ 21.94 3.36

FLOOR LAYER: SOFT FLOORS........$ 18.75 0.00

IRONWORKER, REINFORCING..........$ 25.85 6.94

LABORER: Common or General, including brick mason tending and cement mason tending.........$ 13.28 1.03

LABORER: Pipelayer..............$ 16.81 4.26

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 23.50 4.50

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03

OPERATOR: Bulldozer.............$ 21.99 4.98

OPERATOR: Crane.................$ 31.68 2.64

OPERATOR: Forklift..............$ 21.56 7.57

OPERATOR: Loader................$ 22.26 3.57

OPERATOR: Roller................$ 16.25 4.88

PAINTER (Brush and Roller).......$ 18.92 0.00

ROOFER...........................$ 15.83 3.06

TILE FINISHER....................$ 23.40 0.00

TILE SETTER......................$ 27.80 10.25

TRUCK DRIVER: Dump Truck........$ 19.22 2.58

WATERPROOFER.....................$ 21.75 1.57

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"