Attachment I - 23 09 23.02.pdf

PDF 79 KB Posted

Attached to
AMENDMENT 0004- RFI, Proposed Mod, Update Wage Determination Federal contract opportunity
Solicitation number
N4008020R0035
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This solicitation is for repair work to the HVAC and electrical systems at Building 3280 aboard Marine Corps Base Quantico in Virginia. The scope of work includes replacing the 300-ton chiller with a 200-ton chiller and reconfiguring to a primary/secondary pumping system. Other items are replacing chilled water and condenser water pumps, the boiler, all 10 central air handling units, fan-powered and passive VAV boxes, and completing renovation of the building automation system. The work also involves commissioning all mechanical and control systems, updating controls and sequences of operation, and correcting cooling tower make-up water issues and level controls. There are two additive bid options - providing a temporary relocatable trailer for displaced occupants, and completing work in occupied areas at night and on weekends with temporary walls, heating, cooling and dust control for those spaces. The solicitation number is N4008020R0035 and it was issued by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files for this federal contract opportunity

Other files attached to AMENDMENT 0004- RFI, Proposed Mod, Update Wage Determination, newest first.
File Type Posted
Amendment 0004 RFI - Proposed Mod -Wage Determination.pdf PDF
Attachment D -General Decision Number VA20200162 09.1.2020.pdf PDF
Amendment 0003 Update to Section 00200.pdf PDF
Attachment M - Specification 01 52 00.00_REV 4SEP2020.pdf PDF
Attachment N -Specification 26 00 00 REV 4SEP2020.pdf PDF
Amendment 0002 Specification Changes.pdf PDF
Attachment L -Bldg. 3280 sign in sheet.pdf PDF
Amendment 0001.pdf PDF
Attachment K -26 29 23.pdf PDF
Attachment H -23 09 00.pdf PDF
Attachment J - 25 05 11.01.pdf PDF
Attachment F -102740_ESC_Short_Form_2020.pdf PDF
Attachment D -General Decision Number VA20200162 08.28.2020.pdf PDF
Attachment G -NREA.SWP3.Ver2.Template.docx DOCX document
Exhibits A- E.pdf PDF
Attachment D - General Decision Number VA20200162 07.10.2020.pdf PDF
Attachment C - B3280 Bid Schedule.pdf PDF
Attachment A - B3280 Repair HVAC and Elec Systems Plans 07-15-20.pdf PDF
Attachment 1 -Direction to VCC.pdf PDF
Special Notice - Base Access.pdf PDF
N4008020R0035 Bldg. 3280 Repair HVAC & Electrical Systems.pdf PDF
Attachment E - Salient Features for HVAC System.pdf PDF
Attachment B - B3280 Repair HVAC and Elec Systems Specifications 07-15-020.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B-3280 Repair HVAC and Electrical Systems MCB Quantico, VA

SECTION 23 09 23.02

BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS

02/19

PART 1 GENERAL

1.1 SUMMARY

Provide a complete Direct Digital Control (DDC) system, except for the front end which is specified in Section 25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS, suitable for the control of the heating, ventilating and air conditioning (HVAC) and other building-level systems as specified and shown and in accordance with Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC. See Paragraph 3.2 for project specific requirements regarding integration.

1.1.1 System Requirements

Provide a system meeting the requirements of both Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC and this Section and with the following characteristics:

a.

Except for Gateways, the control system must be an open implementation of BACnet technology using ASHRAE 135 as the communications protocol.

The system must use standard ASHRAE 135 Objects and Properties. The system must use standard ASHRAE 135 Services exclusively for communication over the network. Gateways to packaged units must communicate with other DDC hardware using ASHRAE 135 exclusively and may communicate with packaged equipment using other protocols. The control system must be installed such that any two devices on the Internetwork can communicate using standard ASHRAE 135 Services.

b. Install and configure control hardware to provide ASHRAE 135 Objects and Properties as indicated and as needed to meet the requirements of this specification.

1.1.2 Verification of Specification Requirements

Review all specifications related to the control system installation and advise the Contracting Officer of any discrepancies before performing any work. If Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC or any other Section referenced in this specification is not included in the project specifications advise the Contracting Officer and either obtain the missing Section or obtain Contracting Officer approval before performing any work.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING

ENGINEERS (ASHRAE)

ASHRAE 135 (2016) BACnet—A Data Communication Protocol for Building Automation and

SECTION 23 09 23.02 Page 1 REV 8/2020

Control Networks

BACNET INTERNATIONAL (BTL)

BTL Guide (v.49; 2017) BACnet Testing Laboratory Implementation Guidelines

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 802.3 (2018) Ethernet

TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)

TIA-485 (1998a; R 2012) Electrical Characteristics of Generators and Receivers for Use in Balanced Digital Multipoint Systems

U.S. FEDERAL COMMUNICATIONS COMMISSION (FCC)

FCC Part 15 Radio Frequency Devices (47 CFR 15)

UNDERWRITERS LABORATORIES (UL)

UL 916 (2007; Reprint Aug 2014) Standard for Energy Management Equipment

1.3 DEFINITIONS

For definitions related to this section, see Section 23 09 00

INSTRUMENTATION AND CONTROL FOR HVAC.

1.4 SUBMITTALS

Submittal requirements related to this Section are specified in Section

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC.

1.5 CONTRACTOR'S QUALIFICATIONS

The controls subcontractor for this project shall be regularly engaged in the design and installation of BACnet DDC systems for building HVAC systems in a network of multiple buildings similar to the size and scope of this project, shall have been a representative of the proposed control system manufacturer for a minimum of two years, have a staffed office within a 75-mile radius of the project location, and shall have performed design and installation of DDC systems for a minimum of 5 years. The controls sub-contractor shall ensure that their installing electricians have a copy of, have read and understand the mechanical sheets of the contract's design construction drawings in addition to the control drawings prepared by the sub-contractor.

Submit documentation certifying the controls Contractor performing the work has:

a) Completed at least five EMCS/DDC/ICS systems installations of a similar size/design to this project, based on an open Architecture, BACnet IP or Ethernet IP model over the previous three years.

b) Programmed/configured similar sequences of operation.

SECTION 23 09 23.02 Page 2

c) Designed an EMCS compliant with IA controls for a MAC II, sensitive level system.

d) Supported Government efforts to achieve an "Authorization to Operate" (ATO) for a similar EMCS.

e) Permanent full-time staff with expert knowledge using MCCAST software to document and administer the Marine corps IA process.

f) Permanent full-time staff with expert knowledge of the following U.S. Government and DoD policies and instructions:

i. DoD Directive 8500.01E.

ii. DoD Instruction 8510.01.

iii. DoD Instruction 8551.01.

iv. DoD Instruction 8500.2.

v. DoD Directive 8570.10.

vi. NIST 800-53.

vii. NIST 800-82

g) Permanent full-time staff that possesses IAM/ISSM and IAT level

III

h) Certifications as defined by DoD Directive 8570.10 Information Assurance (IA) Training, Certification, and Workforce Management, August 15, 2004.

i) H. Permanent full-time staff or subcontractor that possesses experience with Supporting Certification and Accreditation (C&A) assessments by government resources as part of the ATO process.

PART 2 PRODUCTS

All products used to meet this specification must meet the indicated requirements, but not all products specified here will be required by every project. All products must meet the requirements both Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC and this Section.

2.1 NETWORK HARDWARE

2.1.1 BACnet Router

All BACnet Routers must be BACnet/IP Routers and must perform layer 3 routing of ASHRAE 135 packets over an IP network in accordance with ASHRAE 135 Annex J and Clause 6. The router must provide the appropriate connection to the IP network and connections to one or more ASHRAE 135 MS/TP networks. Devices used as BACnet Routers must meet the requirements for DDC Hardware, and must support the NM-RC-B BIBB.

2.1.2 BACnet Gateways

In addition to the requirements for DDC Hardware, the BACnet Gateway must meet the following requirements:

a. It must perform bi-directional protocol translation from one non- ASHRAE 135 protocol to ASHRAE 135. BACnet Gateways must incorporate a network connection to an ASHRAE 135 network (either BACnet over IP in accordance with Annex J or MS/TP) and a separate connection appropriate for the non- ASHRAE 135 protocol and media.

SECTION 23 09 23.02 Page 3

b. It must retain its configuration after a power loss of an indefinite time, and must automatically return to their pre-power loss state once power is restored.

c. It must allow bi-directional mapping of data between the non- ASHRAE 135 protocol and Standard Objects as defined in ASHRAE 135. It must support the DS-RP-B BIBB for Objects requiring read access and the DS-WP-B BIBB for Objects requiring write access.

d. It must support the DS-COV-B BIBB.

Although Gateways must meet DDC Hardware requirements they are not DDC Hardware and must not be used when DDC Hardware is required.

2.1.3 Ethernet Switch

Ethernet Switches must be managed switches and must autoconfigure between 10,100 and 1000 megabits per second (MBPS).

2.2 CONTROL NETWORK WIRING

a. BACnet MS/TP communications wiring must be in accordance with ASHRAE 135. The wiring must use shielded, three wire (twisted-pair with reference) cable with characteristic impedance between 100 and 120 ohms. Distributed capacitance between conductors must be less than 30 pF per foot.

b. Building Control Network Backbone IP Network must use Ethernet media.

Ethernet cables must be CAT-5e at a minimum and meet all requirements of IEEE 802.3 .

2.3 DIRECT DIGITAL CONTROL (DDC) HARDWARE

2.3.1 General Requirements

All DDC Hardware must meet the following requirements:

a. It must be locally powered and must incorporate a light to indicate the device is receiving power.

b. It must conform to the BTL Guide

c. It must be BACnet Testing Laboratory (BTL) Listed.

d. The Manufacturer's Product Data submittal for each piece of DDC Hardware must include the Protocol Implementation Conformance Statement (PICS) for that hardware as specified in Section 23 09 00

INSTRUMENTATION AND CONTROL FOR HVAC.

e. It must communicate and be interoperable in accordance with ASHRAE 135 and have connections for BACnet IP or MS/TP control network wiring.

f. Other than devices controlling terminal units or functioning solely as a BACnet Router, it must support DS-COV-B, DS-RPM-A and DS-RPM-B BIBBs.

g. Devices supporting the DS-RP-A BIBB must also support the DS-COV-A

BIBB.

SECTION 23 09 23.02 Page 4

h. Application programs, configuration settings and communication information must be stored in a manner such that they persist through loss of power:

(1) Application programs must persist regardless of the length of time power is lost.

(2) Configured settings must persist for any loss of power less than 2,500 hours.

(3) Communication information, including but not limited to COV subscriptions, event reporting destinations, Notification Class Object settings, and internal communication settings, must persist for any loss of power less than 2,500 hours.

i. Internal Clocks:

(1) Clocks in DDC Hardware incorporating a Clock must continue to function for 120 hours upon loss of power to the DDC Hardware.

(2) DDC Hardware incorporating a Clock must support the DM-TS-B or

DM-UTC-B BIBB.

j. It must have all functionality indicated and required to support the application (Sequence of Operation or portion thereof) in which it is used, including but not limited to providing Objects as specified and as indicated on the Points Schedule.

k. In addition to these general requirements and the DDC Hardware Input-Output (I/O) Function requirements, all DDC Hardware must also meet any additional requirements for the application in which it is used (e.g. scheduling, alarming, trending, etc.).

l. It must meet FCC Part 15 requirements and have UL 916 or equivalent safety listing.

m. Device must support Commandable Objects to support Override requirements as detailed in PART 3 EXECUTION

n. User interfaces which allow for modification of Properties or settings must be password-protected.

o. Devices communicating BACnet MS/TP must meet the following requirements:

(1) Must have a configurable Max_Master Property.

(2) DDC Hardware other than hardware controlling a single terminal unit must have a configurable Max_Info_Frames Property.

(3) Must respond to any valid request within 50 msec with either the appropriate response or with a response of "Reply Postponed".

(4) Must use twisted pair with reference and shield (3-wire media) wiring, or twisted pair with shield (2-wire media) wiring and use half-wave rectification.

p. Devices communicating BACnet/IP must use UDP Port 0xBAC0. Devices with configurable UDP Ports must default to 0xBAC0.

SECTION 23 09 23.02 Page 5

q. All Device IDs, Network Numbers, and BACnet MAC addresses of devices must be fully configurable without limitation, except MS/TP MAC addresses may be limited by ASHRAE 135 requirements.

r. DDC Hardware controlling a single terminal unit must have:

(1) Objects (including the Device Object) with an Object Name Property of at least 8 characters in length.

(2) A configurable Device Object Name.

(3) A configurable Device Object Description Property at least 16 characters in length.

s. Except for Objects in DDC Hardware controlling a single terminal unit, all Objects (including Device Objects) must:

(1) Have a configurable Object Name Property of at least 12 characters in length.

(2) Have a configurable Object Description Property of at least 24 characters in length.

t. For programmable DDC Hardware, provide and license to the project site all programming software required to program the Hardware in accordance with Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC.

u. For programmable DDC Hardware, provide copies of the installed application programs (all software that is not common to every controller of the same manufacturer and model) as source code compatible with the supplied programming software in accordance with Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC. The submitted application program must be the complete application necessary for controller to function as installed and be sufficient to allow replacement of the installed controller with another controller of the same type.

2.3.2 Hardware Input-Output (I/O) Functions

DDC Hardware incorporating hardware input-output (I/O) functions must meet the following requirements:

2.3.2.1 Analog Inputs

DC Hardware analog inputs (AIs) must be implemented using ASHRAE 135 Analog Input Objects and perform analog to digital (A-to-D) conversion with a minimum resolution of 8 bits plus sign or better as needed to meet the accuracy requirements specified in Section 23 09 00. Signal conditioning including transient rejection must be provided for each analog input. Analog inputs must be capable of being individually calibrated for zero and span. Calibration via software scaling performed as part of point configuration is acceptable. The AI must incorporate common mode noise rejection of at least 50 dB from 0 to 100 Hz for differential inputs, and normal mode noise rejection of at least 20 dB at 60 Hz from a source impedance of 10,000 ohms.

SECTION 23 09 23.02 Page 6

2.3.2.2 Analog Outputs

DDC Hardware analog outputs (AOs) must be implemented using ASHRAE 135 Analog Output Objects and perform digital to analog (D-to-A) conversion with a minimum resolution of 8 bits plus sign, and output a signal with a range of 4-20 mAdc or 0-10 Vdc. Analog outputs must be capable of being individually calibrated for zero and span. Calibration via software scaling performed as part of point configuration is acceptable. DDC Hardware with Hand-Off-Auto (H-O-A) switches for analog outputs must provide for overriding the output to 0 percent and to 100 percent

2.3.2.3 Binary Inputs

DDC Hardware binary inputs (BIs) must be implemented using ASHRAE 135 Binary Input Objects and accept contact closures and must ignore transients of less than 5 milli-second duration. Protection against a transient 50VAC must be provided.

2.3.2.4 Binary Outputs

DDC Hardware binary outputs (BOs) must be implemented using ASHRAE 135 Binary Output Objects and provide relay contact closures or triac outputs for momentary and maintained operation of output devices. DDC Hardware with H-O-A switches for binary outputs must provide for overriding the output open or closed.

2.3.2.4.1 Relay Contact Closures

Closures must have a minimum duration of 0.1 second. Relays must provide at least 180V of isolation. Electromagnetic interference suppression must be provided on all output lines to limit transients to 50 Vac. Minimum contact rating must be 0.5 amperes at 24 Vac.

2.3.2.4.2 Triac Outputs

Triac outputs must provide at least 180 V of isolation. Minimum contact rating must be 0.5 amperes at 24 Vac.

2.3.2.5 Pulse Accumulator

DDC Hardware pulse accumulators must be implemented using either an ASHRAE 135 Accumulator Object or an ASHRAE 135 Analog Value Object where the Present_Value is the totalized pulse count. Pulse accumulators must accept contact closures, ignore transients less than 5 msec duration, protect against transients of 50 VAC, and accept rates of at least 20 pulses per second.

2.3.2.6 ASHRAE 135 Objects for Hardware Inputs and Outputs

The requirements for use of ASHRAE 135 objects for hardware input and outputs includes devices where the hardware sensor or actuator is integral to the controller (e.g. a VAV box with integral damper actuator, a smart sensor, a VFD, etc.)

2.3.2.7 Integrated H-O-A Switches

Where integrated H-O-A switches are provided on hardware outputs, controller must provide means of monitoring position or status of H-O-A

SECTION 23 09 23.02 Page 7 switch. This feedback may be provided via any valid BACnet method, including the use of proprietary Objects, Properties, or Services.

2.3.3 Local Display Panel (LDP)

The Local Display Panels (LDPs) must be DDC Hardware with a display and navigation buttons or a touch screen display, and must provide display and adjustment of ASHRAE 135 Properties as indicated on the Points Schedule and as specified. LDPs must be either BTL Listed as a B-OD, B-OWS, B-AWS, or be an integral part of another piece of DDC Hardware listed as a B-BC.

For LDPs listed as B-OWS or B-AWS, the hardware must be BTL listed and the product must come factory installed with all applications necessary for the device to function as an LDP.

The adjustment of values using display and navigation buttons must be password protected.

2.3.4 Expansion Modules and Tethered Hardware

A single piece of DDC Hardware may consist of a base unit and also:

a. An unlimited number of hardware expansion modules, where the individual hardware expansion modules are designed to directly connect, both mechanically and electrically, to the base unit hardware. The expansion modules must be commercially available as an optional add-on to the base unit.

b. A single piece of hardware connected (tethered) to a base unit by a single cable where the cable carries a proprietary protocol between the base unit and tethered hardware. The tethered hardware must not contain control logic and be commercially available as an optional add-on to the base unit as a single package.

Note that this restriction on tethered hardware does not apply to sensors or actuators using standard binary or analog signals (not a communications protocol); sensors or actuators using standard binary or analog signals are not considered part of the DDC Hardware.

Hardware capable of being installed stand-alone, or without a separate base unit, is DDC Hardware and must not be used as expansion modules or tethered hardware.

2.3.5 Supervisory Control Requirements

2.3.5.1 Scheduling Hardware

DDC Hardware used for scheduling must meet the following requirements:

a. It must be BTL Listed as a B-BC and support the SCHED-E-B BIBB.

b. It is preferred, but not required, that devices support the DM-OCD-B BIBB on all Calendar and Schedule Objects, such that a front end BTL listed as a B-AWS may create or delete Calendar and Schedule Objects.

It is also preferred but not required that devices supporting the DM-OCD-B BIBB accept any valid value for properties of Calendar and Schedule Objects. Note that there are additional requirements in the EXECUTION Part of this Section for Devices which do not support the DM-OCD-B BIBB as specified.

SECTION 23 09 23.02 Page 8

c. The Date_List property of all Calendar Objects must be writable.

d. The Present_Value Property of Schedule must support the following values: 1, 2, 3, 4.

2.3.5.2 Alarm Generation Hardware

DDC Hardware used for alarm generation must meet the following requirements:

a. Device must support the AE-N-I-B BIBB

b. The Recipient_List Property must be Writable for all Notification Class Objects used for alarm generation.

c. For all Objects implementing Intrinsic Alarming, the following Properties must be Writable:

(1) Time_Delay

(2) High_Limit

(3) Low_Limit

(4) Deadband

(5) Event_Enable

(6) If the issue date of this project specification is after 1 January

2016, Time_Delay_Normal must be writable.

d. For Event Enrollment Objects used for alarm generation, the following Properties must be Writable:

(1) Event_Parameters

(2) Event_Enable

(3) If the issue date of this project specification is after 1 January

2016, Time_Delay_Normal must be writable.

e. It is preferred, but not required, that devices support the DM-OCD-B BIBB on all Notification Class Objects and Event Enrollment Objects, such that a front end BTL listed as a B-AWS may create or delete Notification Class Objects and Event Enrollment Objects. It is also preferred, but not required that devices supporting the DM-OCD-B BIBB accept any valid value as an initial value for properties of Notification Class Objects and Event Enrollment Objects. Note that there are additional requirements in the EXECUTION Part of this Section for devices which do not support the DM-OCD-B BIBB as specified.

f. Devices provided to meet the the requirements indicated under "Support for Future Alarm Generation" in the EXECUTION part of this specification must support the AE-N-E-B BIBB.

2.3.5.3 Trending Hardware

DDC Hardware used for collecting trend data must meet the following requirements:

a. Device must support Trend Log or Trend Log Multiple Objects.

b. Device must support the T-VMT-I-B BIBB.

c. Devices provided to meet the EXECUTION requirement for support of

SECTION 23 09 23.02 Page 9

Future Trending must support the T-VMT-E-B BIBB.

d. The following properties of all Trend Log or Trend Log Multiple Objects must be present and Writable:

Start_Time Stop_Time Log_DeviceObjectProperty Log Interval Log interval must support an interval of at least 60 minutes duration.

e. Trend Log Objects must support using Intrinsic Reporting to send a BUFFER_FULL event.

f. The device must have a Notification Class Object for the BUFFER_FULL event. The Recipient_List Property must be Writable.

g. Devices must support values of at least 1,000 for Buffer_Size Properties.

h. It is preferred, but not required, that devices support the DM-OCD-B BIBB on all Trend Log Objects, such that a front end BTL listed as a A-AWS may create or delete Trend Log Objects. It is also preferred, but not required that devices supporting the DM-OCD-B BIBB accept any valid value as an initial value for properties of Trend Log Objects.

Note that there are additional EXECUTION requirements for devices which do not support the DM-OCD-B BIBB as specified.

2.4 OPERATOR WORKSTATION

Provide operator workstation (OWS) and notebook (laptop) computer and complete application software with all licenses. Locate OWS in government approved location. Workstation software shall allow monitoring and troubleshooting of the DDC system and adjustment of set points, operation schedules, control graphics, and control programs. DDC software shall allow for modification to dead band limits and spans, time, timed local override time, alarm points, trend points, runtime accumulation, calculated energy consumption or input, and passwords. Provide editing capacity for creating, deleting, and modifying graphics and text. Provide three levels of password protection to limit access to authorized personnel.

Provide color graphics for each of the building's mechanical systems and DDC system control panels. The current value, set point, and point name of every input and output point shall be shown on at least one graphic in its appropriate physical location relative to the mechanical system. Graphics shall have an associated identifying title. Point data shall be updated dynamically on the graphic images. Provide hierarchal-graphical navigation of the system. Utilize A&E CAD floor plans to provide graphic representations of the floor plans that allow the operator to see heating or cooling zone temperatures, set points, and locations where temperature and/or other alarms/problems have occurred. Provide visual indication of each point in alarm.

Provide appropriate rates of actuation, hardware, and software to avoid hunting and nuisance trips for freeze safety devices.

For government review, submit the proposed OWS graphic interface and product data for all information system equipment and software.

SECTION 23 09 23.02 Page 10

The BAS owner shall determine the location of all computer devices.

PART 3 EXECUTION

3.1 CONTROL SYSTEM INSTALLATION

3.1.1 Building Control Network (BCN)

Install the Building Control Network (BCN) as a single BACnet Internetwork consisting of a single IP network as the BCN Backbone and zero or more BACnet MS/TP networks. Note that in some cases there may only be a single device on the BCN Backbone.

Except as permitted for the non-BACnet side of Gateways, use exclusively ASHRAE 135 networks.

3.1.1.1 Building Control Network IP Backbone

Install IP Network Cabling in conduit. Install Ethernet Switches in lockable enclosures. Install the Building Control Network (BCN) IP Backbone such that it is available at the Facility Point of Connection (FPOC) location as indicated. When the FPOC location is a room number, provide sufficient additional media to ensure that the Building Control Network (BCN) IP Backbone can be extended to any location in the room.

Use UDP port 0xBAC0 for all BACnet traffic on the IP network.

3.1.1.2 BACnet MS/TP Networks

When using MS/TP, provide MS/TP networks in accordance with ASHRAE 135 and in accordance with the ASHRAE 135 figure "Mixed Devices on 3-Conductor Cable with Shield" (Figure 9-1.4 in the 2012 version of ASHRAE 135).

Ground the shield at the BACnet Router and at no other point. Ground the reference wire at the BACnet Router through a 100 ohm resistor and do not ground it at any other point. In addition:

a. Provide each segment in a doubly terminated bus topology in accordance with TIA-485 .

b. Provide each segment with 2 sets of network bias resistors in accordance with ASHRAE 135, with one set of resistors at each end of the MS/TP network.

c. Use 3 wire (twisted pair and reference) with shield media for all MS/TP media installed inside. Use fiber optic isolation in accordance with ASHRAE 135 for all MS/TP media installed outside buildings, or between multiple buildings.

d. For 18 AWG cable, use segments with a maximum length of 4000 ft. When using greater distances or different wire gauges comply with the electrical specifications of TIA-485 .

e. For each controller that does not use the reference wire provide transient suppression at the network connection of the controller if the controller itself does not incorporate transient suppression.

f. Install no more than 32 devices on each MS/TP segment. Do not use MS/TP to MS/TP routers.

SECTION 23 09 23.02 Page 11

g. Connect each MS/TP network to the BCN backbone via a BACnet Router.

h. For BACnet Routers, configure the MS/TP MAC address to 0. Assign MAC Addresses to other devices consecutively beginning at 1, with no gaps.

i. Configure the Max_Master Property of all devices to be 31.

3.1.1.3 Building Control Network (BCN) Installation

Provide a building control network meeting the following requirements:

a. Install all DDC Hardware connected to the Building Control Network.

b. Where multiple pieces of DDC Hardware are used to execute one sequence, install all DDC Hardware executing that sequence on a single MS/TP network dedicated to that sequence.

c. Traffic between BACnet networks must be exclusively via BACnet routers.

3.1.2 DDC Hardware

Install all DDC Hardware that connects to an IP network in lockable enclosure. Install other DDC Hardware that is not in suspended ceilings in lockable enclosures. For all DDC hardware with a user interface, coordinate with site to determine proper passwords and configure passwords into device.

a. Except for zone sensors (thermostats), install all Tethered Hardware within 6 feet of its base unit.

b. Install and configure all BTL-Listed devices in a manner consistent with their BTL Listing such that the device as provided still meets all requirements necessary for its BTL Listing.

c. Install and configure all BTL-Listed devices in a manner consistent with the BTL Device Implementation Guidelines such that the device as provided meets all those Guidelines.

3.1.2.1 Device Identifiers, Network Addresses, and IP addresses

a. Do not use any Device Identifier or Network Number already used by another BACnet system at the project site. Coordinate Device IDs and Network Numbers with the installation.

3.1.2.2 Object Name Property and Object Description Property

Configure the Object_Names and Object_Descriptions properties of all Objects (including Device Objects) as indicated on the Points Schedule (Point Name and Point Description) and as specified. At a minimum:

a. Except for DDC Hardware controlling a single terminal unit, configure the Object_Name and Object_Description properties of all Objects (including Device Objects) as indicated on the Points Schedule and as specified.

b. In DDC Hardware controlling a single terminal unit, configure the Device Object_Name and Device Object_Description as indicated on the Points Schedule and as specified.

SECTION 23 09 23.02 Page 12

When Points Schedule entries exceed the length limitations in the device, notify Contracting Officer and provide recommended alternatives for approval.

3.1.2.3 Hand-Off-Auto (H-O-A) Switches

Provide Hand-Off-Auto (H-O-A) switches for all DDC Hardware analog outputs and binary outputs used for control of systems other than terminal units, as specified and as indicated on the Points Schedule. Provide H-O-A switches that are integral to the controller hardware, an external device co-located with (in the same enclosure as) the controller, integral to the controlled equipment, or an external device co-located with (in the same enclosure as) the controlled equipment.

a. For H-O-A switches integral to DDC Hardware, meet the requirements specified in paragraph DIRECT DIGITAL CONTROL (DDC) HARDWARE.

b. For external H-O-A switches used for binary outputs, provide for overriding the output open or closed.

c. For eternal H-O-A switches used for analog outputs, provide for overriding to 0 percent or 100 percent.

3.1.2.4 Local Display Panels

Provide LDPs to display values of ASHRAE 135 Object Properties as indicated on the Points Schedule as indicated.

3.1.2.5 MS/TP Slave Devices

Configure all MS/TP devices as Master devices. Do not configure any devices to act as slave devices.

3.1.2.6 Change of Value (COV) and Read Property

a. To the greatest extent possible, configure all devices to support the SubscribeCOV service (the DS-COV-B BIBB). At a minimum, all devices supporting the DS-RP-B BIBB, other than devices controlling only a single terminal unit, must be configured to support the DS-COV-B BIBB.

b. Whenever supported by the server side, configure client devices to use the DS-COV-A BIBB.

3.1.2.7 Engineering Units

Configure devices to use English (Inch-Pound) engineering units as follows:

a. Temperature in degrees F

b. Air or natural gas flows in cubic feet per minute (CFM)

c. Water in gallons per minute (GPM)

d. Steam flow in pounds per hour (pph)

e. Differential Air pressures in inches of water column (IWC)

f. Water, steam, and natural gas pressures in PSI

SECTION 23 09 23.02 Page 13

g. Enthalpy in BTU/lb

h. Heating and cooling energy in MBTU (1MBTU = 1,000,000 BTU))

i. Cooling load in tons (1 ton = 12,000 BTU/hour)

j. Heating load in MBTU/hour (1MBTU = 1,000,000 BTU)

k. Electrical Power: kilowatts (kW)

l. Electrical Energy: kilowatt-hours (kWh)

3.1.2.8 Occupancy Modes

Use the following correspondence between value and occupancy mode whenever an occupancy state or value is required:

a. OCCUPIED mode: a value of one

b. UNOCCUPIED mode: a value of two

c. WARM-UP/COOL-DOWN (PRE-OCCUPANCY) mode: a value of three

Note that elsewhere in this Section the Schedule Object is required to also support a value of four, which is reserved for future use. Also note that the behavior of a system in each of these occupancy modes is indicated in the sequence of operation for the system.

3.1.2.9 Use of BACnet Objects

Use only standard non-proprietary ASHRAE 135 Objects and services to accomplish the project scope of work as follows:

a. Use Analog Input or Analog Output Objects for all analog hardware I/O. Do not use Analog Value Object for analog hardware I/O) .

b. Use Binary Input or Binary Output Objects for all binary hardware I/O. Do not use Binary Value Objects for binary hardware I/O.

c. Use Analog Value Objects for analog setpoints.

d. Use Accumulator Objects or Analog Value Objects for pulse inputs.

e. For occupancy modes, use Multistate Value Objects and the correspondence between value and occupancy mode specified in paragraph

OCCUPANCY MODES.

f. Use Schedule Objects and Calendar Objects for all scheduling. Use Trend Log Objects or Trend Log Multiple Objects for all trending and Notification Class Objects for trend log upload. Use a combination of Event Enrollment Objects,Intrinsic Alarming, and Notification Class Objects for alarm generation.

g. For all other points shown on the Points Schedule as requiring an ASHRAE 135 Object, use the Object type shown on the Points Schedule or, if no Object Type is shown, use a standard Object appropriate to the point.

3.1.2.10 Use of Standard BACnet Services

Except as noted in this paragraph, for all DDC Hardware use Standard

SECTION 23 09 23.02 Page 14

BACnet Services as defined in this specification (which excludes some ASHRAE 135 services) exclusively for application control functionality and communication.

DDC Hardware that cannot meet this requirement may use non-standard services provided they can provide identical functionality using Standard BACnet Services when communicating with BACnet devices from a different vendor. When implementing non-standard services, document all non-standard services in the DDC Hardware Schedule as specified and as specified in Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC.

3.1.2.11 Device Application Configuration

a. For every property, setting or value shown on the Points Schedule or otherwise indicated as Configurable, provide a value that is retained through loss of power and can be changed via one or more of:

(1) BACnet services (including proprietary services)

(2) Hardware settings on the device

b. For every property, setting or value shown on the Points Schedule or otherwise indicated as Operator Configurable, provide a value that is retained through loss of power and can be changed via one or more of:

(1) A Writable Property of a standard BACnet Object

(2) A Property of a standard BACnet Object that is Writable when Out_Of_Service is TRUE and Out_Of_Service is Writable.

3.1.3 Scheduling, Alarming, Trending, and Overrides

3.1.3.1 Scheduling

Configure schedules in BACnet Scheduling Objects to schedule systems as indicated on the Points Schedule and as specified using the indicated correspondence between value and occupancy mode. If no devices supports both the SCHED-E-B and DM-OCD-B BIBBS for Schedule Objects, provide 5 blank Schedule Objects in DDC Hardware BTL listed as B-BCs and supporting the SCHED-E-B BIBB for later use by the site.

Provide a separate schedule for each AHU including it's associated Terminal Units and for each stand-alone Terminal Unit (those not dependent upon AHU service) or group of stand-alone Terminal Units acting according to a common schedule as indicated.

3.1.3.2 Configuration of Alarm Generation

a. Send alarm events as Alarms (not Events).

b. Use the ConfirmedNotification Service for alarm events.

c. For alarm generation, support two priority levels for alarms: critical and non-critical. Configure the Priority of Notification Class Objects to use Priority 112 for critical and 224 for non-critical alarms.

SECTION 23 09 23.02 Page 15

d. Number of Notification Class Objects for Alarm Generation:

(1) If the device implements non-critical alarms, or if any Object in the device supports Intrinsic Alarms, then provide a single Notification Class Object specifically for (shared by) all non-critical alarms.

(2) If the device implements critical alarms, provide a single Notification Class Object specifically for (shared by) all critical alarms.

(3) If the device implements both critical and non-critical alarms, provide both Notification Class Objects (one for critical, one for non-critical).

(4) If the device controls equipment other than a single terminal unit, provide both Notification Class Objects (one for critical, one for non-critical) even if no alarm generation is required at time of installation.

e. For all intrinsic alarms configure the Limit_Enable Property to set both HighLimitEnable and LowLimitEnable to TRUE. If the specified alarm conditions are for a single-sided alarm (only High_Limit used or only Low_Limit used) assign a value to the unused limit such that the unused alarm condition will not occur.

f. For all objects supporting intrinsic alarming, even if no alarm generation is required during installation, configure the following Properties as follows:

(1) Notification_Class to point to the non-Critical Notification Class Object in that device.

(2) Limit_Enable to enable both the HighLimitEnable and LowLimitEnable

(3) Notify_Type to Alarm

g. Use of alarm generation types:

(1) Only use algorithmic alarm generation when intrinsic alarm generation is not supported by the device or object, or when the specific alarm conditions cannot be implemented using intrinsic alarm generation.

(2) Only use remote alarm generation when the alarm cannot be generated using intrinsic or local algorithmic alarm generation on the device containing the referenced property. If remote alarm generation is used, use the same DDC Hardware for all remote alarm generation within a single sequence.

3.1.3.3 Trend Log Configuration

a. Configure trends in Trend Log or Trend Log Multiple Objects as indicated on the Points Schedule and as specified.

b. Configure all trend logs (including any provided to support future

SECTION 23 09 23.02 Page 16 trends) to save data on regular intervals using the BUFFER_FULL event to request trend upload from the front end.

c. Configure Trend Log Objects with a minimum Buffer_Size property value of 1,000 and Trend Log Multiple Objects with a minimum Buffer_Size property value of 1,000 per point trended (for example, a Trend Log Multiple Object used to trend 3 points must have a Buffer_Size Property value of at least 3,000).

d. Configure a Notification Class Object in devices doing trending (including devices supporting future trends) to handle the BUFFER_FULL event.

e. When possible, trend each point using an Object in the device containing the point. When it is necessary to trend using a an Object in another device, all trends not on the same Device as the Object being trended must be on a singe device (i.e. all Trend Log and Trend Log Multiple Objects used for remote trending within a sequence must be on the same device).

f. For each trend log, including any trend logs provided to support future trending, configure the following properties as specified:

(1) Logging_Type: Set to Polling

(2) Stop_When_Full: Set to Wrap Around

(3) Buffer_Size: Set to 400 or greater.

(4) Notification_Threshold: Set to 90 percent of full

(5) Notification_Class: Set to the Notification Class Object in that device

(6) Event_Enable: Set to TRUE

(7) Log_Interval: Set to 15 minutes.

3.1.3.4 Overrides

Provide an override for each point shown on the Points Schedule as requiring an override.

Unless otherwise approved, provide Commandable Objects to support all Overrides . With specific approval from the contracting officer, Overrides for points which are not hardware outputs and which are in DDC hardware controlling a single terminal unit may support overrides via an additional Object provided for the override. No other means of implementing Overrides may be used.

a. Where Commandable Objects are used, ensure that WriteProperty service requests with a Priority of 10 or less take precedence over the SEQUENCE VALUE and that WriteProperty service request with a priority of 11 or more have a lower precedence than the SEQUENCE VALUE.

b. For devices implementing overrides via additional Objects, provide Objects which are NOT Written to as part of the normal Sequence of Operations and are Writable when Out_Of_Service is TRUE and Out_Of_Service is Writable. Use this point as an Override of the

SECTION 23 09 23.02 Page 17 normal value when Out_Of_Service is TRUE and the normal value otherwise. Note these Objects may be modified as part of the sequence via local processes, but must not be modified by local processes when Out_Of_Service is TRUE.

3.1.4 BACnet Gateways

The requirements in this paragraph do not permit the installation of hardware not meeting the other requirements of this section. All control hardware installed under this project must meet the requirements of this specification, including control hardware provided as part of a package unit or as part of HVAC equipment specified under another section. Except as indicated in paragraph Gateways for Boiler or Chiller Plants, all package units must be provided with a BACnet interface meeting the requirements of this Section. Only use gateways to connect to pre-existing control devices, and to boiler or chiller plants as indicated.

3.1.4.1 General Gateway Requirements

Provide BACnet Gateways to connect non-BACnet control hardware in accordance with the following:

a. Configure gateways to map writable data points in the controlled equipment to Writable Properties of Standard Objects as indicated in the Points Schedule and as specified.

b. Configure gateway to map readable data points in the controlled equipment to Readable Properties of Standard Objects as indicated in the Points Schedule and as specified.

c. Configure gateway to support the DS-COV-B BIBB for all points mapped to BACnet Objects.

d. Do not use non-BACnet control hardware for controlling built-up units or any other equipment that was not furnished with factory-installed controls.

e. Do not use non-BACnet control hardware for system scheduling functions.

3.1.4.2 Gateways for Boiler or Chiller Plants

A non-BACnet network of multiple boilers or multiple chillers with a single gateway is permitted only when all the following conditions are met:

a. All units are from the same manufacturer.

b. All units are co-located in the same room, and the network connecting them is fully contained in that room.

c. Units are operating using a common "plant" sequence of operation which stages the units in a manner that requires operational parameters be shared between them and which cannot be accomplished with a single lead-lag command from a third-party controller.

d. A request for use of a boiler or chiller plant gateway has been submitted and approved in accordance with Section 23 09 00

INSTRUMENTATION AND CONTROL FOR HVAC.

Connect one network port on the gateway to the Building Control Backbone

SECTION 23 09 23.02 Page 18

IP Network or to a BACnet MS/TP network and the other port to the boiler or chiller network.

3.1.4.3 Gateways for Application Other than Boiler and Chiller Plants

In addition to the General Gateway Requirements, provide BACnet Gateways to non-BACnet control hardware other than boiler and chiller plants in accordance with the following

a. Each gateway must communicate with and perform protocol translation for non-BACnet control hardware controlling one and only one package unit.

b. Connect one network port on the gateway to the Building Control Backbone IP Network or to a BACnet MS/TP network and the other port to the single piece of controlled equipment.

c. Non-BACnet network wiring connecting the gateway to the package unit must not exceed 10 feet in length and must connect to exactly two devices: the controlled equipment (packaged unit) and the gateway.

3.2 CONTROL SYSTEM INTEGRATION

Any new Industrial Control System (ICS) shall seamlessly integrate into existing primary MCB Quantico EMCS application database, utilizing existing communication infrastructure, network protocols, and data storage. If existing communication infrastructure is not available, then contractor shall provide.

Any new Industrial Control System (ICS) shall seamlessly integrate into existing MCB Quantico EMCS cybersecurity authority to operate (ATO), or in progress ATO package. Existing or in progress Cyber security package's for EMCS should simply require an update for any new EMCS to be added to existing EMCS system. Contractor shall provide update and all support needed to achieve approval for updated cyber security Authority to Operate for existing EMCS system.

The building DDC shall use Ethernet IP or BACnet IP at the building and management levels.

The DDC system shall operate successfully for 45 consecutive calendar days prior to acceptance by the Contracting Officer's Technical Representative (COTR). During DDC testing operations, emergency shutdowns and all modes of operation. Provide trend data to document HVAC system performance during various modes of operation.

3.2.1 Energy Management and Base DDC Integration

The building DDC system shall be seamlessly compatible with the existing Base Energy Management Control System (EMCS) Network. The Base EMCS Network consists of building HVAC control devices connected via LAN to a central, Siemen's Apogee Application Database. The Siemen's Apogee

Database is a government-owned, government-operated network. Bldg DDC shall be connected to the existing Base EMCS system.

The existing Base EMCS Network shall be coordinated through G6 and public works. All network and computer/peripheral equipment must meet shall meet current cyber-security Authority to Operate (ATO), requirements, contractor shall provide all support to achieve the ATO.

SECTION 23 09 23.02 Page 19

After the contract award, the Contractor's Basis of Design shall include a thorough explanation of how a successful, seamless interface between the new and existing DDC systems will be accomplished. As part of construction, provide:

a) Advanced proof (including an existing case study) that the system blends seamlessly with the servers, network and Siemens application Database. This shall be submitted for Government approval.

b) Thorough testing and advanced commissioning that shall include vendor supported technicians from both systems (the building DDC and Siemen's Apogee Database if these are not from the same vendor as the MCB EMCS) once the integration is complete, to achieve a fully functional local and remotely controlled systems. A thorough testing of all integrational functionalities shall be performed.

The contractor shall provide a 60 days' notice for network connection. All network devices shall be configured by the MCB Quantico G6 TMB.

Terminate all DDC Panel home runs in the base telecommunications closet, MPOP (Minimum Point of Presence) to a government-approved (contractor-provided) network switch.

Provide DDC software license and configure DDC monitoring to Public Works.

3.2.2 Quantico MCB BACnet Naming Convention

Utilize the existing points naming convention from the matrix that is standard for Quantico MCB (available from Quantico Public Works Department after award), subject to government approval. The contractor shall adhere to the BACnet Device numbering sequence and submit the updated MCBQ spread sheet provided by the government to ensure there are no default or duplicate address numbers. Provide unique BACnet naming ID sequences in accordance with the following Quantico standard: Bldg Name, BLdg #, BLN Name, Assigned Insight, Insight Instance #, Site Name, Field Panel Name, Field Panel IP Address, Field Panel Instance #, Field Panel Mac Address, MSTP/FLN Network #, FLN Device Name, FLN Device Instance #, FLN Device Mac Address, Application #.

3.2.3 Quantico MCB BACnet Device Instance Number Address

The contractor shall coordinate with the BAS owner and shall follow Quantico Device Instance Numbering spread sheet. The contractor shall work with in detail the BAS owner to ensure the BACnet device instance numbering spread sheet has no duplications. The contractor shall ensure all third party devices are configured properly with no global broadcast features.

3.2.4 Trend Reports

Provide software to produce trend reports for any variable controlled or measured by the system including but not limited to alarm status, measured temperature, set points, actuator positions, etc. Provide easy startup with user adjustable duration and frequency for variable trending. Trend reports shall include data automatically saved into a Microsoft Excel spreadsheet file format as well as automatically generated trend graphs.

SECTION 23 09 23.02 Page 20

3.2.5 Control Panels

Provide 20-percent spare memory, input connection, and output connection capacity for future expansion within each DDC control panel. Provide panels capable of standalone operation, digital and analog input and output, custom control, trending, manual override, with communication ports and keypad interface and digital display, adjacent to the equipment they control.

3.2.6 Utility Meters

Provide utility grade metering devices for building consumption of gas, water and electricity and integrate into the Advanced Metering Infrastructure (AMI) application/servers/network at MCB Quantico.

Any new metering system shall seamlessly integrate into existing primary MCB Quantico AMI application database, utilizing existing communication infrastructure, network protocols, and data storage. If existing communication infrastructure is not available, then contractor shall provide.

Any new metering system shall seamlessly integrate into existing MCB Quantico AMI cybersecurity authority to operate (ATO). Existing Cyber security package for AMI should simply require an update for any new AMI to be added to existing AMI system. Contractor shall provide update and all support needed to achieve approval for updated cyber security Authority to Operate for existing AMI system. Provide interface with water meters in makeup water stations. Provide pulse type water meters in makeup water stations. Provide the ability to read total and instantaneous water flows. Provide venture flow meters for heating water system water flow measurement. Provide items necessary to translate differential pressure across flow meter to electronic signal for digital control system. Provide input from flow meters to digital control system.

All network devices shall be configured by the MCB Quantico G6 TMB/G5.

For government review, submit product data for metering devices and associated network interface switches.

3.2.7 Alarms

Hardwire critical alarms such as low temperature limits, smoke dampers, smoke detectors, and refrigerant leak detectors. Also, provide an individual alarm point for each critical alarm in the DDC system.