Attachment A - B3280 Repair HVAC and Elec Systems Plans 07-15-20.pdf
PDF 11 MB Posted
- Attached to
- AMENDMENT 0004- RFI, Proposed Mod, Update Wage Determination Federal contract opportunity
- Solicitation number
- N4008020R0035
About this file
This document includes a federal contract solicitation and related file for repair work on an HVAC and electrical system. The solicitation seeks bids to repair the HVAC and electrical systems at Building 3280 on Marine Corps Base Quantico in Virginia. The general scope of work includes replacing the existing 300-ton chiller with a 200-ton chiller, replacing chilled water and condenser water pumps, boilers, and all ten central air handling units. Additional work includes replacing VAV boxes, renovating the building automation system, updating controls, correcting cooling tower issues, and commissioning mechanical and control systems. The solicitation includes one base bid and two bid options. The base bid covers the main repair work. Bid Option 1 is for a temporary relocatable trailer for displaced occupants. Bid Option 2 covers work in occupied areas that must be isolated from construction and provided with temporary heating, cooling, and dust control. Bids are due by the date specified in Solicitation Number N4008020R0035 issued by the Naval Facilities Engineering Command, Department of the Navy.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MCB QUANTICO
PROJECT LOCATION
P O
TO
M
A C
R
IV
E R
I-9
R O
U
TE
1ROUTE 234
R T
E
I-9
I-9
R O
U
TE
MCB QUANTICO
RUSSELL RD
BUFFALO RD
P U
R V
IS
R
D
CHOPAWAMSIC CREEK
CATLIN
AVE
McCARD RD
JO
H
N Q
U
IC
K R D
RUSSELL RD
PROJECT LOCATION
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
, V A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PWB NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAWFORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R
E P
A
IR
H V
A C
A N
D
E L
E C
T R
IC
A
L S
Y S
T E
M S
N40080-D-0452
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/2
/2
:3 :1
A
M C
U s e rs
\z a b a lo s \D o c u m e n ts \2
R
M
C e n z a b a lo s .r v t
G-001
C O
V E
R S
H E
E T
ZMASWL MJG
3191774
B-3280 - REPAIR HVAC AND
ELECTRICAL SYSTEMS
ISSUED FOR BID
NAVAL FACILITY ENGINEERING COMMAND
QU1827M, PWB 2017181
MARINE CORPS BASE QUANTICO
QUANTICO, VA
20 JANUARY 2020
VICINITY MAP
NO SCALE
LOCATION MAP
NO SCALE
GREG SMITH
WILLIAM ROBSON
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
, V A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PWB NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAWFORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R
E P
A
IR
H V
A C
A
E C
T R
IC
A
L S
Y S
T E
M S
N40080-D-0452
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/2
/2
:3 :1
A
M C
U s e rs
\z a b a lo s \D o c u m e n ts \2
R
M
C e n z a b a lo s .r v t
G-002
S H
E E
T
IN
D E
X A
N D
S U
M M
A R
Y O
F W
O R
K
ZMASWL MJG
3191775
INDEX OF DRAWINGS
Sheet # Sheet Name NAVFAC #
59 M-705 CONTROLS 3191832
60 M-706 CONTROLS 3191833
61 M-707 CONTROLS 3191834
62 M-708 CONTROLS 3191835
63 M-709 CONTROLS 3191836
64 M-710 CONTROLS 3191837
65 M-711 CONTROLS 3191838
66 M-712 CONTROLS 3191839
67 M-713 NATURAL GAS RISER AND DESIGN CONDITIONS 3191840
ELECTRICAL
68 E-001 LEGEND, ABBREVIATIONS & GENERAL NOTES 3191841
69 ES001 ELECTRICAL SITE PLAN - COOLING TOWER AND
TEMPORARY PROVISIONS
3191847
70 ED101 PARTIAL FIRST FLOOR DEMOLITION PLAN 3191848
71 ED102 PARTIAL FIRST FLOOR DEMOLITION PLAN 3191849
72 ED103 PARTIAL SECOND FLOOR DEMOLITION PLAN 3191850
73 ED104 PARTIAL SECOND FLOOR DEMOLITION PLAN 3191851
74 ED105 PARTIAL THIRD FLOOR DEMOLITION PLAN 3191852
75 ED106 PARTIAL THIRD FLOOR DEMOLITION PLAN 3191853
76 ED107 PARTIAL FOURTH FLOOR DEMOLITION PLAN 3191854
77 ED108 PARTIAL FOURTH FLOOR DEMOLITION PLAN 3191855
78 ED109 PARTIAL FIFTH FLOOR DEMOLITION PLAN 3191856
79 ED110 PARTIAL FIFTH FLOOR DEMOLITION PLAN 3191857
80 ED111 PARTIAL ROOF DEMOLITION PLAN 3191858
81 ED112 PARTIAL ROOF DEMOLITION PLAN 3191859
82 ED401 ENLARGED DEMOLITION PLAN 3191860
83 ED402 ENLARGED DEMOLITION PLAN 3191861
84 ED403 ENLARGED DEMOLITION PLAN 3191862
85 E-101 PARTIAL FIRST FLOOR NEW WORK PLAN 3191864
86 E-102 PARTIAL FIRST FLOOR NEW WORK PLAN 3191865
87 E-103 PARTIAL SECOND FLOOR NEW WORK PLAN 3191866
88 E-104 PARTIAL SECOND FLOOR NEW WORK PLAN 3191867
89 E-105 PARTIAL THIRD FLOOR NEW WORK PLAN 3191868
90 E-106 PARTIAL THIRD FLOOR NEW WORK PLAN 3191869
91 E-107 PARTIAL FOURTH FLOOR NEW WORK PLAN 3191870
92 E-108 PARTIAL FOURTH FLOOR NEW WORK PLAN 3191871
93 E-109 PARTIAL FIFTH FLOOR NEW WORK PLAN 3191872
94 E-110 PARTIAL FIFTH FLOOR NEW WORK PLAN 3191873
95 E-111 PARTIAL ROOF NEW WORK PLAN 3191874
96 E-112 PARTIAL ROOF NEW WORK PLAN 3191875
97 E-401 ENLARGED MECHANICAL ROOM PLAN 3191876
98 E-402 ENLARGED MECHANICAL ROOM PLAN 3191877
99 E-403 ENLARGED MECHANICAL ROOM PLAN 3191878
100 E-404 MCC ELEVATIONS 3191880
101 E-601 PARTIAL SINGLE LINE DIAGRAM 3191887
102 E-701 PANEL SCHEDULES 3191888
103 E-702 PANEL SCHEDULES 3191889
INDEX OF DRAWINGS
Sheet # Sheet Name NAVFAC #
GENERAL
1 G-001 COVER SHEET 3191774
2 G-002 SHEET INDEX AND SUMMARY OF WORK 3191775
CIVIL
3 C-101 SITE SURVEY AND DEMOLITION PLAN 3191776
4 C-102 SITE UTILITY PLAN 3191777
5 C-201 UTILITY PROFILES 3191778
6 C-501 SITE DETAILS 3191779
MECHANICAL
7 M-001 LEGEND, ABBREVIATIONS & GENERAL NOTES 3191780
8 M-002 PHASING NOTES 3191781
9 M-003 MECHANICAL SITE PLAN 3191782
10 M-004 FIRST FLOOR CEILING PLAN 3191783
11 MD101 PARTIAL FIRST FLOOR DEMOLITION PLAN 3191784
12 MD102 PARTIAL FIRST FLOOR DEMOLITION PLAN 3191785
13 MD103 PARTIAL SECOND FLOOR DEMOLITION PLAN 3191786
14 MD104 PARTIAL SECOND FLOOR DEMOLITION PLAN 3191787
15 MD105 PARTIAL THIRD FLOOR DEMOLITION PLAN 3191788
16 MD106 PARTIAL THIRD FLOOR DEMOLITION PLAN 3191789
17 MD107 PARTIAL FOURTH FLOOR DEMOLITION PLAN 3191790
18 MD108 PARTIAL FOURTH FLOOR DEMOLITION PLAN 3191791
19 MD109 PARTIAL FIFTH FLOOR DEMOLITION PLAN 3191792
20 MD110 PARTIAL FIFTH FLOOR DEMOLITION PLAN 3191793
21 MD111 PARTIAL ROOF DEMOLITION PLAN 3191794
22 MD112 PARTIAL ROOF DEMOLITION PLAN 3191795
23 MD401 ENLARGED DEMOLITION PLAN 3191796
24 MD402 ENLARGED DEMOLITION PLAN 3191797
25 MD403 ENLARGED DEMOLITION PLANS 3191798
26 MD404 ENLARGED DEMOLITION PLANS 3191799
27 M-101 PARTIAL FIRST FLOOR NEW WORK PLAN 3191800
28 M-102 PARTIAL FIRST FLOOR NEW WORK PLAN 3191801
29 M-103 PARTIAL SECOND FLOOR NEW WORK PLAN 3191802
30 M-104 PARTIAL SECOND FLOOR NEW WORK PLAN 3191803
31 M-105 PARTIAL THIRD FLOOR NEW WORK PLAN 3191804
32 M-106 PARTIAL THIRD FLOOR NEW WORK PLAN 3191805
33 M-107 PARTIAL FOURTH FLOOR NEW WORK PLAN 3191806
34 M-108 PARTIAL FOURTH FLOOR NEW WORK PLAN 3191807
35 M-109 PARTIAL FIFTH FLOOR NEW WORK PLAN 3191808
36 M-110 PARTIAL FIFTH FLOOR NEW WORK PLAN 3191809
37 M-111 PARTIAL ROOF NEW WORK PLAN 3191810
38 M-112 PARTIAL ROOF NEW WORK PLAN 3191811
39 M-301 SECTIONS 3191812
40 M-401 ENLARGED MECHANICAL ROOM PLAN 3191813
41 M-402 ENLARGED MECHANICAL ROOM PLAN 3191814
42 M-403 ENLARGED MECHANICAL ROOM PLANS 3191815
43 M-404 ENLARGED MECHANICAL ROOM PLANS 3191816
44 M-501 DETAILS 3191817
45 M-502 DETAILS 3191818
46 M-503 DETAILS 3191819
47 M-504 DETAILS 3191820
48 M-505 DETAILS 3191821
49 M-601 SCHEDULES 3191822
50 M-602 SCHEDULES 3191823
51 M-603 SCHEDULES 3191824
52 M-604 SCHEDULES 3191825
53 M-605 SCHEDULES 3191826
54 M-606 SCHEDULES 3191827
55 M-701 CONTROLS 3191828
56 M-702 CONTROLS 3191829
57 M-703 CONTROLS 3191830
58 M-704 CONTROLS 3191831
• REPLACE EXISTING 300 TON CHILLER WITH 200 TON CHILLER AND
RECONFIGURE TO A PRIMARY/SECONDARY PUMPING CONFIGURATION
• REPLACE CHILLED WATER AND CONDENSER WATER PUMPS
• REPLACE BOILER WITH CONDENSING BOILERS AND REPLACE HOT WATER
PUMPS
• REPLACE ALL TEN CENTRAL AIR HANDLING UNITS
• REPLACE ALL VAV BOXES
• COMPLETE BUILDING AUTOMATION SYSTEM RENOVATION
• COMMISSION ALL BUILDING MECHANICAL EQUIPMENT AND CONTROL SYSTEMS
• UPDATE BUILDING HVAC CONTROLS AND SEQUENCE OF OPERATIONS
• CORRECT COOLING TOWER MAKE-UP WATER ISSUES AND LEVEL CONTROLS
SUMMARY OF WORK
1. COMMISSIONING SERVICES MUST BE PROVIDED FOR ALL HVAC EQUIPMENT
AND CONTROL SYSTEMS INCLUDING EQUIPMENT THAT IS EXISTING TO REMAIN
SUCH AS UNIT HEATERS, FANS, COOLING TOWERS, AND CHILLERS.
COMMISSIONING MUST BE IN ACCORDANCE WITH SPECIFICATION 01 91 00.15.
2. MAKE ADJUSTMENTS TO EXISTING EQUIPMENT AS REQUIRED FOR PROPER
OPERATION. REPORT ALL DEFICIENCIES WITH EXISTING EQUIPMENT TO
GOVERNMENT.
COMMISSIONING NOTES
1. BEFORE COMMENCING PHASE 1 OF CONSTRUCTION, THE CONTRACTOR MUST
PERFORM A PRE-CONSTRUCTION SYSTEM FLUSH OF THE CHILLED,
CONDENSER, AND HEATING WATER SYSTEMS.
2. AFTER CONSTRUCTION IS COMPLETE, EACH SYSTEM SHALL BE FLUSHED
AGAIN.
HYDRONIC FLUSHING NOTES
1. ALL NEW AND EXISTING HVAC EQUIPMENT AND AIR TERMINALS MUST BE
TESTED AND BALANCED TO THE VALUES SHOWN IN THE CONSTRUCTION
DOCUMENTS ACCORDING TO SPECIFICATION SECTION 23 05 93.
2. MAKE ADJUSTMENTS TO EXISTING EQUIPMENT AS REQUIRED. REPORT ALL
DEFICIENCIES WITH EXISTING EQUIPMENT TO GOVERNMENT.
3. THE CONTRACTOR MUST PERFORM A DUCT AIR LEAKAGE TEST (DALT) FOR THE
EXISTING TO REMAIN MEDIUM PRESSURE SUPPLY DUCTWORK FOR EACH AIR
HANDLING UNIT. THE MEDIUM PRESSURE SUPPLY DUCTWORK CONSISTS OF
ALL DUCTWORK BETWEEN THE AIR HANDLING UNIT AND THE INLET TO EACH
VAV BOX. THE MAXIMUM ALLOWABLE DUCT LEAKAGE IS 12 CFM PER 100 SF AT 1
IN-H2O. IF THE SYSTEM FAILS THE DALT TEST, THE CONTRACTOR MUST
REMOVE THE DUCT INSULATION FOR THE ENTIRE MEDIUM PRESSURE SUPPLY
DUCT SYSTEM, SEAL ALL DUCT SEAMS, AND PENETRATIONS, PERFORM
SECOND DALT TO PROVE COMPLIANCE, AND REINSULATE THE DUCTWORK.
4. FOR BIDDING PURPOSES, THE CONTRACTOR SHALL OFFER A $/SF OF DUCT TO
PERFORM THE WORK IF AN EXISTING SYSTEM FAILS THE DALT TEST.
TAB AND DALT NOTES
W
1 1
W
DEMOLITION LEGEND
DEMOLITION KEY NOTES
2017181, 2017201
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
A S
H I N
G T
O N
M A
R I N
E
C
O R
P S
B
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
R E
V D
A T
E
F I
M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PWB NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
D E
P A
R T
M E
T
O
F
T
H
V
Y
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: 10 MAY 2014
XXX
XXX
OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
XXX
AS NOTED
B
R
E P
A I R
V A
C
A
N D
E L E
C T
R I C
A L
S
Y S
T E
M S
N40080-D-0452
C-101
3191776
N
O P
T
IO
N
IT
E M
2017181
KEY NOTES
GENERAL NOTES
EROSION AND SEDIMENT CONTROL NOTES
TRAFFIC CONTROL NOTES
PROJECT DESCRIPTION
WATER FITTING TABLE
SANITARY STRUCTURE TABLE
SANITARY PIPE TABLE
LEGEND
LINE TABLE
CURVE TABLE
2017181, 2017201
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
S
H I N
G T
O N
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
R E
V D
A T
E
F I
M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PWB NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
D E
P A
R T
M E
T
V
Y
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: 10 MAY 2014
XXX
XXX
OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
XXX
AS NOTED
B
R
E P
A
A
C
A
N D
E L E
C T
R I C
A L
S
Y S
T E
M S
N40080-D-0452
C-102
3191777
N
O P
T
IO
N
IT
E M
2017181
SANITARY SEWER STRUCTURES SS4 TO SS1 PROFILE
2-INCH WATER LINE PROFILE
WATER FITTING TABLE
SANITARY STRUCTURE TABLE
SANITARY PIPE TABLE
2017181, 2017201
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
S
H I N
G T
O N
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
R E
V D
A T
E
F I
M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PWB NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
D E
P A
R T
M E
T
V
Y
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: 10 MAY 2014
XXX
XXX
OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
XXX
AS NOTED
B
R
E P
A
A
C
A
N D
E L E
C T
R I C
A L
S
Y S
T E
M S
N40080-D-0452
C-201
3191778
O P
T
IO
N
IT
E M
2017181
CONCRETE SIDEWALK & JOINTS
PIPE TRENCH ASPHALT PATCHINGPIPE TRENCH THROUGH GRASSED AREASANITARY SEWER MANHOLE CURB AND GUTTER REPLACEMENT
FIGURE TTC-23.1
2017181, 2017201
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
S
H I N
G T
O N
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
R E
V D
A T
E
F I
M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PWB NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
D E
P A
R T
M E
T
V
Y
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: 10 MAY 2014
XXX
XXX
OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
XXX
AS NOTED
B
R
E P
A
A
C
A
N D
E L E
C T
R I C
A L
S
Y S
T E
M S
N40080-D-0452
C-501
3191779
O P
T
IO
N
IT
E M
2017181
MECHANICAL GENERAL NOTES
INTENT
1. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND INDICATE THE GENERAL AND APPROXIMATE LOCATION OF EQUIPMENT, PIPING AND DUCTWORK. THEY ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS. IT IS INTENDED THAT A COMPLETE HEATING, VENTILATING AND AIR CONDITIONING SYSTEM (HVAC) BE PROVIDED WITH ALL NECESSARY EQUIPMENT, APPURTENANCES AND CONTROLS. THE CONTRACTOR SHALL CAREFULLY REVIEW ALL THE CONTRACT DOCUMENTS AND COORDINATE BETWEEN ALL TRADES PRIOR TO SUBMITTING SHOP DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL SIZES, MATERIALS, TEMPERATURE AND PRESSURE RATINGS BEFORE ORDERING OR INSTALLING ANY MATERIALS OR EQUIPMENT. THE CONTRACTOR SHALL PREPARE INSTALLATION INSTRUCTIONS AND FABRICATION
DRAWINGS PRIOR TO ACTUAL INSTALLATION.
2. REFER TO EACH DRAWING FOR NOTES SPECIFIC TO THAT DRAWING SHEET.
3. DO NOT SCALE FOR DUCT, PIPE, OR EQUIPMENT LOCATIONS.
WORK SAFETY AND QUALITY
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF CONTRACTOR'S PERSONNEL EMPLOYED ON THIS PROJECT AND IN PARTICULAR, WHEN WORKING IN CONFINED SPACES. THE CONTRACTOR SHALL COMPLY WITH ALL
OCCUPATIONAL SAFETY HEALTH ADMINISTRATION (OSHA) REQUIREMENTS.
2. ALL MISCELLANEOUS MATERIAL REQUIRED TO ENSURE PROPER INSTALLATION FOR PIPING, DUCTS, AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.
3. ALL MECHANICAL EQUIPMENT AND SYSTEMS SHALL BE INSTALLED IN A MANNER WHICH MINIMIZES NOISE AND
VIBRATION.
COORDINATION WITH OTHER TRADES
1. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF WORK W ITH THE WORK OF OTHER TRADES. MINOR
DEVIATIONS FROM THE PLANS MAY BE MADE TO AVOID CONFLICTS.
2. COORDINATE DUCTWORK AND PIPING WITH ELECTRICAL, STRUCTURE, AND PLUMBING. MAKE OFFSETS AND TRANSITIONS TO COORDINATE WITH OTHER TRADES WITHOUT ADDITIONAL EXPENSE TO THE OWNER.
3. COORDINATE MECHANICAL EQUIPMENT AND MATERIAL LOCATIONS WITH ELECTRICAL, PLUMBING, FIRE PROTECTION, STRUCTURAL AND ARCHITECTURAL PLANS TO AVOID CONFLICTS.
4. COORDINATE THE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT WITH DIVISION 26 (ELECTRICAL CONTRACT DOCUMENTS) PRIOR TO ORDERING. PROVIDE WRITTEN VERIFICATION OF COORDINATION WITH DIVISION 26 PRIOR TO
INSTALLATION OF EQUIPMENT.
5. PROVIDE OPENINGS IN BUILDING CONSTRUCTION FOR PASSAGE OF PIPING AND DUCTWORK. DO NOT PENETRATE
STRUCTURAL MEMBERS WITHOUT PRIOR APPROVAL.
6. ALL NECESSARY ALLOWANCES AND PROVISIONS SHALL BE MADE BY THIS CONTRACTOR FOR BEAMS, COLUMNS, TRUSSES OR OTHER OBSTRUCTIONS OF THE BUILDING OR THE WORK OF OTHER CONTRACTORS, WHETHER OR NOT SAME IS INDICATED. W HERE NECESSARY TO AVOID OBSTRUCTIONS, THE DUCTS SHALL BE TRANSFORMED, DIVIDED, OFFSET, RAISED OR LOWERED WITH THE REQUIRED FREE AREA BEING MAINTAINED.
DUCTWORK
1. DUCT SIZES ARE SHOWN AS INSIDE CLEAR DIMENSIONS. WHERE INTERNAL INSULATION IS CALLED FOR, DIMENSIONS SHALL BE INCREASED FOR THE THICKNESS OF THE INSULATION. SEE SPECIFICATION FOR THICKNESS
2. ALL BRANCH DUCTWORK SHALL BE SIZED TO MATCH THE TERMINAL CONNECTION SERVED UNLESS NOTED OTHERWISE.
FLEXIBLE DUCT TO DIFFUSERS SHALL BE INSTALLED FREE OF KINKS AND SAGS. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 6'-0". ALL RUNOUT AND BRANCH DUCTS SHALL CONTAIN A MANUAL VOLUME DAMPER FOR BALANCING.
3. ALL DUCT TRANSITIONS FROM SQUARE TO ROUND SHALL BE SMOOTH SQUARE TO ROUND TRANSITIONS.
4. ALL DIFFUSERS SHALL HAVE FOUR-WAY BLOW UNLESS NOTED OTHERWISE.
5. ALL DAMPERS, DAMPER OPERATORS, AND FANS SHALL BE ACCESSIBLE. LOCATE ALL EQUIPMENT OR APPURTENANCES
IN AREAS WITH ACCESSIBLE CEILINGS. THE CONTRACTOR MAY UTILIZE ACCESS PANELS FOR THOSE AREAS NOT EASILY ACCESSIBLE. ALL ACCESS PANEL LOCATIONS SHALL BE COORDINATED WITH THE CONTRACT DOCUMENTS AND
APPROVED BY THE OWNER PRIOR TO INSTALLATION OF EQUIPMENT.
6. ALL OPEN ENDED DUCTS SHALL BE REINFORCED WITH STEEL ANGLES (1-1/2" X 1-1/2" X 1/8") BOLTED OR RIVETED 6" ON
CENTER (MAXIMUM) ALL AROUND THE PERIMETER OF THE DUCT MINIMUM 2 PER SIDE.
7. ALL DUCTWORK SHALL BE SLEEVED THROUGH WALL PENETRATIONS.
8. PROVIDE AIR TURNING DEVICES IN DUCTWORK AT ANY CHANGES INDIRECTION OF 30 DEGREES OR GREATER.
9. PROVIDE CONICAL TEES FOR ROUND AND FLAT OVAL DUCT TAKE-OFFS.
PIPING
1. SLOPE CONDENSATE DRAINS AT 1/8 INCHES FALL PER FOOT MINIMUM IN THE DIRECTION OF FLOW. PROVIDE DRAINAGE
TYPE FITTINGS.
2. ALL PIPING SHALL BE SLEEVED THROUGH W ALL PENETRATIONS.
3. SIZE AND ROUTE REFRIGERANT PIPING PER EQUIPMENT MANUFACTURER'S RECOMMENDATIONS.
EQUIPMENT
1. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.
2. ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED IN SUCH A MANNER SO THAT ALL FILTERS, VALVES, MOTORS, DAMPERS, ETC., ARE COMPLETELY ACCESSIBLE AND SERVICEABLE, INCLUDING ACCESS DOORS IF REQUIRED.
3. COMPLETE AND PROPER INSTALLATION OF THERMOSTATS AND ALL OTHER NECESSARY FIELD MOUNTED CONTROL COMPONENTS SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR. THE EQUIPMENT MANUFACTURERS SHALL FURNISH COMPLETE WIRING CONTROLS. ALL CONTROL WIRING SHALL BE IN CONDUIT AND INSTALLED PER
DIVISION 26 OF THE SPECIFICATIONS.
4. PROVIDE FLEXIBLE CONNECTIONS BETW EEN HVAC EQUIPMENT AND SHEET METAL DUCTWORK.
5. PROVIDE 10% ADDITIONAL FILTERS FOR ALL AIR HANDLING UNITS, VAV BOXES, AND OUTSIDE AIR FANS.
CONTROLS
1. PROVIDE THERMOSTATS OR HUMIDISTATS WHERE SHOWN ON THE DRAWINGS. MOUNT DEVICES AT THE SAME
ELEVATION AS LIGHT SWITCH UNLESS NOTED OTHERWISE.
2. PROVIDE FIVE ADDITIONAL VAV BOX THERMOSTATS.
RENOVATION WORK
1. THIS PROJECT IS A RENOVATION OF AN EXISTING FACILITY, AND PREVIOUS RECORD DRAW INGS FORM THE BASIS FOR MANY OF THESE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION OR PURCHASE OF EQUIPMENT, MATERIALS, AND ASSEMBLIES. FIELD CONDITIONS MAY EXIST WHICH DIFFER FROM THOSE SHOWN ON THESE DRAWINGS. ANY SUCH DEVIATIONS SHALL BE BROUGHT TO THE ATTENTION OF OWNER FOR RESOLUTION BEFORE PROCEEDING WITH ANY CONSTRUCTION, FABRICATION, OR MATERIAL/EQUIPMENT PURCHASE
W HICH WOULD BE UNUSABLE UNDER THOSE CIRCUMSTANCES.
MECHANICAL PIPING LEGEND
PHASES
EXISTING TO REMAIN
DEMOLITION WORK
NEW WORK
PIPE SYSTEM - CHILLED WATER RETURN
PIPING SYSTEMS
PIPE ACCESSORIES & FITTINGS
CHR
CHS
CD
CWR
CWS
HWR
HWS
NG
PIPE SYSTEM - CHILLED WATER SUPPLY
PIPE SYSTEM - CONDENSATE DRAIN
PIPE SYSTEM - CONDENSER WATER RETURN
PIPE SYSTEM - CONDENSER WATER SUPPLY
PIPE SYSTEM - HOT WATER RETURN
PIPE SYSTEM - HOT WATER SUPPLY
PIPE SYSTEM - NATURAL GAS
POINT OF CONNECTION
POINT OF DISCONNECT
CHECK VALVE
BALL VALVE
GLOBE VALVE
Y STRAINER
GATE
VALVE
BUTTERFLY VALVE
CONTROL VALVE, THREE WAY
MOTORIZED CONTROL VALVE
BALANCING VALVE
PLUG VALVE
PIPE TURN UP
PIPE TURN
DOWN
PIPE CONCENTRIC
REDUCER
PIPE FLANGE & UNION
HVAC LEGEND
PHASES
EXISTING TO REMAIN
DEMOLITION WORK
NEW WORK
DUCT SYSTEM -
SUPPLY AIR
DUCT SYSTEMS
DUCT SYSTEM - RETURN AIR
DUCT SYSTEM - EXHAUST AIR
AIR TERMINALS
CEILING DIFFUSER - SUPPLY AIR
CEILING GRILLE - RETURN AIR
CEILING GRILLE - EXHAUST AIR
AIR TERMINAL TAGS
NUMBER INDICATED AIRFLOW(150)
SS
FSFS
MM
DUCT ACCESSORIES & FITTINGS
DAMPER, MANUAL BALANCING
DAMPER, MOTORIZED CONTROL
DAMPER, SMOKE
DAMPER, FIRE
DAMPER, COMBINATION
FIRE & SMOKE
DAMPER, BACKDRAFT
DUCT ELBOW,
RECTANGULAR,
MITERED WITH
TURNING VANES
DUCT ELBOW,
ROUND / RECTANGULAR,
RADIUS BEND.
DUCT ELBOW, FLAT OVAL,
GORED / MITERED BEND.
FLEXIBLE DUCT,
ROUND / RECTANGULAR
RECTANGLE OVAL
ROUND
DUCT TRANSITIONS: RECTANGLE
TO RECTANGLE; RECTANGLE TO
ROUND; ROUND TO OVAL.
T
H
S
CO
CO2
SENSORS
SENSOR - TEMPERATURE
SENSOR - HUMIDITY
SENSOR - SMOKE
SENSOR - CARBON MONOXIDE
SENSOR - CARBON DIOXIDE
POINT OF DISCONNECTION
POINT OF CONNECTION
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
, V A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PW B NO.
SHEET
NAVFAC DRAW ING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAW FORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R
E P
A
IR
H V
A C
A
E C
T R
IC
A
L S
Y S
T E
M S
N40080-D-0452
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/2
/2
:3
:5
A
M fs h \U s e rP ro fi le \s li tt le \D o c u m e n ts \2
R
M
C e n s li tt le .r v t
M-001
LE
G
E N
D , A
B B
R E
V
IA
T
IO
N S
G
E N
E R
A L
N O
T E
S
ZMASWL MJG
3191780
MECHANICAL ABBREVIATIONS
(E) EXISTING ELEMENT TO REMAIN
AC AIR CONDITIONER
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASUREMENT STATION
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
BEL BELLMOUTH FITTING
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
CC COOLING COIL
CD CONDENSATE DRAIN
CFM CUBIC FEET PER MINUTE
CHP CHILLED WATER PUMP
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CT COOLING TOWER
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
DB DRY BULB
DDC DIRECT DIGITAL CONTROL
DEG DEGREES
DI DIGITAL INPUT
DIA DIAMETER
DN DOWN
DO DIGITAL OUTPUT
DP DIFFERENTIAL PRESSURE
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
F OR °F DEGREES FARENHEIT
FCU FAN COIL UNIT
FD FIRE DAMPER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FT FOOT OR FEET
FZ FREEZESTAT
G OR GAL GALLON (U.S.)
GPM GALLON PER MINUTE
GR/LB GRAINS OF MOISTURE PER LB OF DRY AIR
HP HORSE POWER
HWP HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
ID INSIDE DIAMETER
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LB POUND
LWT LEAVING WATER TEMPERATURE
MBH THOUSAND BTU'S PER HOUR
NC NOISE CRITERIA OR NORMALLY CLOSED
NO NUMBER OR NORMALLY OPEN
OA OUTSIDE AIR
OD OUTSIDE DIAMETER
PD PRESSURE DROP
PSI POUNDS PER SQUARE INCH
RA RETURN AIR
RH RELATIVE HUMIDITY
RLF RELIEF AIR
SA SUPPLY AIR
SD SMOKE DAMPER
SF SQUARE FEET
SFD COMBINATION FIRE & SMOKE DAMPER
STD STANDARD
TB TERMINAL BOX
TRF TRANSFER
TSTAT THERMOSTAT
TUC TERMINAL UNIT CONTROLLER
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
W WATT
WB WET BULB
WG WATER GAUGE
WPD WATER PRESSURE DROP
01/20/2020
GREG SMITH
01/20/2020
FIRST FLOOR
(PHASE 1)
SECOND FLOOR
(PHASE 1)
THIRD FLOOR
(PHASE 4)
FOURTH FLOOR
(PHASE 3)
FIFTH FLOOR
(PHASE 2)
ROOF AND PENTHOUSE
(PHASE 2)
PENTHOUSE
MECH ROOM
PENTHOUSE
MECH ROOM
AREA TO REMAIN SECURE
DURING CONSTRUCTION.
SEE NOTE 10 ON THIS SHEET
AREA TO REMAIN
OCCUPIED DURING
CONSTRUCTION. SEE
NOTE 12, OPTION B.
AREA TO REMAIN
OCCUPIED DURING
CONSTRUCTION. SEE
NOTE 12, OPTION B.
AREA TO REMAIN
OCCUPIED DURING
CONSTRUCTION. SEE
NOTE 12, OPTION B.
AREA TO REMAIN
OCCUPIED DURING
CONSTRUCTION. SEE
NOTE 12, OPTION B.
AREA TO REMAIN
OCCUPIED DURING
CONSTRUCTION. SEE
NOTE 12, OPTION B.
AREA TO REMAIN
OCCUPIED DURING
CONSTRUCTION. SEE
NOTE 12, OPTION B.
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PW B NO.
SHEET
NAVFAC DRAW ING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAW FORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R E
P A
IR
H
V A
C A
E
C T
R
IC
A L
S Y
S T
E M
S
N40080-D-0452
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/1
/2
:3 :0
A
M fs h \U s e rP ro fi le \s li tt le \D o c u m e n ts \2
R
M
C e n s li tt le .r v t
M-002
P H
A S
IN
G
N O
T E
S
ZMASWL MJG
3191781
1. THE BUILDING WILL BE OCCUPIED AT ALL TIMES DURING CONSTRUCTION EXCEPT FOR THE FLOORS TURNED OVER TO THE CONTRACTOR. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER REGARDING ALL INTERRUPTIONS OF UTILITIES, TEMPORARY EXITS, DUST PARTITIONS, DELIVERIES, AND ALL OTHER JOB
REQUIREMENTS.
2. PHASE DEMOLITION AND NEW WORK AS REQUIRED TO MAINTAIN BUILDING OPERATIONS. PROTECT BUILDING OCCUPANTS, AND MAINTAIN REQUIRED ENTRANCES AND EXITS THROUGHOUT THE DURATION OF THE PROJECT.
SUBMIT PROPOSED PHASING PLAN THAT MEETS THE INTENT AND REQUIREMENTS OUTLINED BELOW FOR REVIEW
AND APPROVAL PRIOR TO COMMENCING THE WORK.
3. THE CONTRACTOR SHALL ANTICIPATE 14 CALENDAR DAYS FOR THE GOVERNMENT TO COMPLETE RELOCATION FOR
EACH FLOOR BETWEEN EACH PHASE.
4. THE BUILDING IS SERVED BY 10 AIR HANDLING UNITS (AHUS) WITH EACH AHU SERVING HALF OF ONE FLOOR.
THE CONSTRUCTION SCHEDULE SHALL CONSIST OF A TOTAL OF 4 PHASES AS FOLLOWS:
PHASE 1 - FLOOR 1 SHALL BE VACATED UPON NTP. FLOOR 2 SHALL BE TURNED OVER TO THE CONTRACTOR 120 CALENDAR DAYS PRIOR TO THE COMPLETION OF FLOOR 1 WORK SUCH THAT IT IS COMPLETED AND READY FOR OCCUPANCY AT SAME TIME AS FLOOR 1. FLOOR 1, INCLUDING WORK EXTERIOR TO THE BUILDING, SHALL BE
COMPLETED AND USABLE W ITHIN 300 CALENDAR DAYS FROM NTP.
THE FOLLOWING PHASES SHALL BE WORKED CONSECUTIVELY:
PHASE 2 - FLOOR 5 SHALL BE COMPLETED AND USABLE WITHIN 90 CALENDAR DAYS.
PHASE 3 - FLOOR 4 SHALL BE COMPLETED AND USABLE WITHIN 90 CALENDAR DAYS.
PHASE 4 - FLOOR 3 SHALL BE COMPLETED AND USABLE WITHIN 90 CALENDAR DAYS.
FOLLOWING COMPLETION OF PHASE 4, THERE IS AN ALLOWANCE OF 45 ADDITIONAL CALENDAR DAYS FOR FINAL
TEST & BALANCE AND COMMISSIONING ACTIVITIES.
5. BEFORE BEGINNING THE FIRST PHASE AFFECTING FLOORS TWO, THREE, FOUR OR FIVE, REMOVE AND INSTALL NEW EF-3 AND EF-5 IN PENTHOUSE MECHANICAL ROOMS. AFTER EACH PHASE OF CONSTRUCTION, BALANCE THE CORRESPONDING BATHROOM EXHAUST FAN AND TERMINALS ON FLOORS TW O THROUGH FIVE TO ENSURE PROPER
TOILET EXHAUST FOR ALL OCCUPIED FLOORS THROUGHOUT CONSTRUCTION.
6. PROVIDE TEMPORARY CHILLED WATER WHILE THE BUILDING CHILLED WATER SYSTEM IS UNAVAILABLE. THE TEMPORARY CHILLER TIE-IN TO THE BUILDING DISTRIBUTION SYSTEM SHALL OCCUR OVER THE WEEKEND AS WELL AS THE SWITCH BACK TO THE BUILDING CHILLED WATER SYSTEM. THE TEMPORARY CHILLED WATER SYSTEM SHALL HAVE A MINIMUM CAPACITY OF 300 TONS WITH PUMPS SIZED FOR 600 GPM AT 75 FT-H2O. ALL TEMPORARY HYDRONIC PIPING AND CONNECTIONS MUST BE ABOVE GRADE, INSULATED, AND ROUTED IN SUCH A WAY AS TO MAINTAIN
CLEAR W ALKING PATHS AND PREVENT TRIPPING HAZARDS.
7. PROVIDE TEMPORARY HEATING WATER WHILE THE BUILDING HEATING WATER SYSTEM IS UNAVAILABLE. THE TEMPORARY BOILER TIE-IN TO THE BUILDING DISTRIBUTION SYSTEM SHALL OCCUR OVER THE WEEKEND AS WELL AS THE SWITCH BACK TO THE BUILDING HEATING WATER SYSTEM. THE TEMPORARY HEATING WATER SYSTEM SHALL HAVE A MINIMUM OUTPUT CAPACITY OF 2,500 MBH WITH TWO PUMPS IN PARALLEL SIZED FOR 200 GPM AT 115 FT- H2O. PROVIDE A TEMPORARY NATURAL GAS CONNECTION TO THE TEMPORARY BOILER FROM THE BUILDING SERVICE. ALL TEMPORARY HYDRONIC PIPING AND CONNECTIONS MUST BE ABOVE GRADE, INSULATED, AND ROUTED
IN SUCH A WAY AS TO MAINTAIN CLEAR WALKING PATHS AND PREVENT TRIPPING HAZARDS.
8. THE CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY WORK AND COMPONENTS REQUIRED TO MAKE TEMPORARY SYSTEMS WORK INCLUDING PIPING AND POWER. AFTER REMOVAL OF THE TEMPORARY SYSTEMS
RETURN HARDSCAPES AND OTHER AFFECTED AREAS TO THEIR ORIGINAL CONDITION.
9. THE CONTRACTOR IS RESPONSIBLE FOR OPERATION AND MAINTENANCE OF THE TEMPORARY HEATING AND COOLING EQUIPMENT. IF A PROBLEM WITH THE TEMPORARY HEATING AND COOLING EQUIPMENT OCCURS OR IS REPORTED, THE CONTRACTOR MUST RESPOND WITHIN FOUR HOURS. THE CONTRACTOR MUST ENSURE THE TEMPORARY HEATING AND COOLING EQUIPMENT IS NOT OUT OF SERVICE FOR MORE THAN EIGHT HOURS.
10. ROOMS ON FLOOR 5 INCLUDING 561 - CONFERENCE, 562 - MAP/WAR ROOM, AND 545.1 – STORAGE ARE CONSIDERED SECURE SPACES AND ALL WORKERS IN THIS AREA MUST BE VETTED THROUGH PMO AND SECURITY OFFICER OF THE BUILDING, AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THESE LOCATIONS SHALL REQUIRE
TEMPORARY COOLING AT ALL TIMES (SERVERS).
11. CONTRACTOR IS REQUIRED TO COORDINATE OUTAGES WITH THE CONTRACTOR PERFORMING ELECTRICAL UTILITY
W ORK ALONG RUSSELL ROAD UNDER SEPARATE CONTRACT.
12. BID OPTIONS:
OPTION A
OPTION A INCLUDES THE INSTALLATION AND RENTAL OF TEMPORARY RELOCATABLE OFFICES (TRAILERS) ON CATLIN AVENUE ADJACENT TO THE LSSS OFFICE TRAILER. IN THE EVENT THIS OPTION (OPTION A) IS AWARDED, THE OFFICE MUST BE INSTALLED COMPLETE AND USABLE PRIOR TO THE NTP FOR THE CONTRACTOR COMMENCE WORK WITHIN THE BUILDING. THE CONTRACTOR MUST ALLOW 21 CALENDAR DAYS FOR THE FIRST BUILDING OCCUPANTS TO OCCUPY THE TRAILER. PERFORMANCE PERIOD AND TECHNICAL SPECIFICATION FOR THE TRAILER OPTION IS AS
DESCRIBED IN SPECIFICATION SECTION 01 52 00.00.
OPTION B
CERTAIN AREAS IDENTIFIED AS “OPTION B” WILL BE OCCUPIED DURING CONSTRUCTION. PROVIDE TEMPORARY AIRSIDE HEATING AND COOLING IN THESE AREAS WHILE THE SYSTEMS SERVING EACH AREA ARE UNAVAILABLE. IN ADDITION, PROVIDE ANY TEMPORARY WALLS AND DUST CONTROL REQUIRED TO MAINTAIN NORMAL OPERATIONS IN EACH AREA. EACH OFFICE, CONFERENCE ROOM, AND RECEPTION SPACE IN THESE AREAS MUST BE PROVIDED W ITH ITS OWN DEDICATED TEMPERATURE CONTROL AND THERMOSTAT. COORDINATE WITH THE USERS OF THESE AREAS W HEN EACH VAV BOX IS TO BE REPLACED OR OTHER CONSTRUCTION ACTIVITIES MAY DISRUPT THEIR WORK. WORK IN THESE AREAS MUST OCCUR AT NIGHT OR ON WEEKENDS WHEN THE SPACE IS TYPICALLY UNOCCUPIED.
CONSTRUCTION W ORK MUST NOT TAKE PLACE IN THESE AREAS DURING OCCUPIED HOURS. SUBMIT A WRITTEN PLAN FOR PRIOR APPROVAL DESCRIBING TEMPORARY HEATING AND COOLING AND SEQUENCE OF CONSTRUCTION WORK
FOR EACH AREA.
PHASING NOTES:
R
E V
IS
E
D F
O R
A D
V E
R T
IS
E
M E
N T
/1
/2
01/20/202001/20/2020
UP
PARKING LOT
GRASS MEDIAN
GRASS MEDIAN
DRIVE PATH
R O
A D
W A
Y
R O
A D
W A
Y
(E) COOLING TOWER
(E) EQUIPMENT YARD FENCE
2" DCW MAKE UP
UNDERGROUND
4" SAN
UNDERGROUND
ROUTE 2" DCW MAKE-UP TO
FLOAT VALVE ASSEMBLY IN
EACH CELL BASIN. SEE
DIAGRAM ON SHEET M-703
NEW 4" HUB DRAIN
ROUTE COOLING
TOWER DRAIN AND
OVERFLOW TO NEW
HUB DRAIN
STAIR
CORRIDOR
BOILER
MECHANICAL
FITNESS
CENTER
OFFICE
135.2
61' FINISHED
FLOOR ELEVATION
45.5' FINISHED
FLOOR ELEVATION
LOCATION FOR TEMPORARY
CHILLER AND BOILER
PARKING LOT
PROVIDE HEAT TRACE
FOR ABOVE GROUND
DOMESTIC WATER PIPING
COOLING TOWER CONTROL PANELS
ARE EXISTING TO REMAIN. INTEGRATE
EXISTING COOLING TOWER
CONTROLLERS WITH NEW DDC
NOTE: SEE CIVIL SHEET C-102 FOR ROUTING
OF UTILITES TO COOLING TOWER YARD.
SEE SHEET M-402
FOR TIE-IN DETAILS
1/8" / 1'-0"
PROVIDE 1" PVC
SCHEDULE 80 CONDUIT
WITH PULL STRING IN
SAME TRENCH AS 2" DCW
8' 16' 32'0' 1/16" =1'-0"
GRAPHIC SCALE:
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
, V A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PW B NO.
SHEET
NAVFAC DRAW ING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAW FORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R
E P
A
IR
H V
A C
A
E C
T R
IC
A
L S
Y S
T E
M S
N40080-D-0452
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/2
/2
:3
:0
A
M fs h \U s e rP ro fi le \s li tt le \D o c u m e n ts \2
R
M
C e n s li tt le .r v t
M-003
M E
C H
A N
IC
A
L S
IT
E
P
LA
N
ZMASWL MJG
3191782
PLAN
NORTH
SCALE: 1/16" = 1'-0"
MECHANICAL SITE PLAN
01/20/2020
GREG SMITH
GENERAL NOTES
1. REMOVE AND SALVAGE ALL ACOUSTIC CEILING
TILES LOCATED ON THE FIRST FLOOR AS
INDICATED FOR USE TO REPLACE ANY
DISCOLORED, STAINED, OR BROKEN ACOUSTIC
CEILING TILES ON THE SECOND THROUGH FIFTH
FLOORS.
2. REPAIR OR REPLACE SUSPENSION GRID W HERE
DAMAGED FROM CONSTRUCTION (TYPICAL ALL
FLOORS).
3. CEILING MOUNTED EQUIPMENT, LIGHTS,
DIFFUSERS, GRILLES, AND OTHER DEVICES ARE TO
REMAIN AND MUST BE PROTECTED. REPAIR OR
REPLACE ANY CEILING MOUNTED DEVICE
DAMAGED FROM CONSTRUCTION (TYPICAL ALL
FLOORS).
4. PROVIDE NEW ACOUSTICAL CEILING TILE IN
EXISTING GRID ON FIRST FLOOR AS INDICATED.
NEW CEILING TILES SHALL MATCH EXISTING IN
SIZE, TYPE, AND STYLE. CUT ACOUSTIC CEILING
TILE TO FIT IN EXISTING GRID AND SUSPENSION
SYSTEM WHERE REQUIRED. PROVIDE ADDITIONAL
10% CEILING TILES TO GOVERNMENT.
5. TURN OVER ALL UNUSED ACOUSTIC CEILING TILES
TO GOVERNMENT.
ACOUSTIC TILE CEILING.
REFER TO GENERAL NOTES
FOR SALVAGE, RE-USE, AND
REPLACEMENT INSTRUCTIONS
LEGEND
8' 16' 32'0' 1/16" =1'-0"
GRAPHIC SCALE:
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
, V A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PW B NO.
SHEET
NAVFAC DRAW ING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAW FORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R
E P
A
IR
H V
A C
A
E C
T R
IC
A
L S
Y S
T E
M S
N40080-D-0452
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/2
/2
:3
:0
A
M fs h \U s e rP ro fi le \s li tt le \D o c u m e n ts \2
R
M
C e n s li tt le .r v t
M-004
F
IR
S T
F
LO
O R
C E
IL
IN
G P
LA
N
SWLSWL MJG
3191783
PLAN
NORTH
SCALE: 1/16" = 1'-0"
FIRST FLOOR ACOUSTIC CEILING TILE PLAN
01/20/2020
GREG SMITH
T T
T
T
T
T
T
T T
T
T
T
T
2 2
REMOVE FAN POWERED VAV
BOX, FLEXIBLE DUCT, DUCT
TRANSITIONS, CONTROLS, AND
PIPING ASSEMBLY UP TO AND
INCLUDING ISOLATION VALVES.
REMOVE SINGLE DUCT VAV BOX,
FLEXIBLE DUCT, DUCT
TRANSITIONS, AND CONTROLS.
REMOVE FAN POWERED VAV
BOX, FLEXIBLE DUCT, DUCT
TRANSITIONS, AND CONTROLS.
EXISTING TO REMAIN CHILLED
WATER AND HEATING WATER UP
TO SHAFT.
REMOVE PNEUMATIC DAMPER
AND CONTROLS.
KEYNOTE LEGEND
S
E E
M A
T C
H L
IN
E
M
D
GENERAL NOTES
1. SALVAGE, RE-USE, AND REPLACE
CEILING TILES AND GRID AS
NECESSARY TO REMOVE AND
INSTALL VAV BOXES. SEE SHEET
M-004.
2. FURNITURE IS EXISTING TO REMAIN.
PROTECT FURNITURE FROM
CONSTRUCTION DUST AND DEBRIS.
3. CLOSE HOT W ATER ISOLATION
VALVES FOR PIPING THAT SERVES
REHEAT COILS IN THIS PHASE.
ONLY DRAIN SYSTEM SERVING THIS
PHASE BEFORE REMOVING ANY
PIPING OR COILS.
STAIRS
PAY
PHONES
125.1
RM.
TRASH
ROOM
VEST
CORRIDOR
CORRIDOR
WOMEN'S
SHWRS
OFFICE
106.4
VENDING
OPEN
OFFICE
SECURE
FILE/STOR
106.2
CONF
RM
VENDING
RECEIVING
STAGING
AREA
VENDING
STORAGE
103.1
ELEC
COMM
ROOM
BUILDING
STOR
LOBBY
124.1
HAIR
CUTS
WOMEN'S
TOILET
BLDG
MGR
ELEVATOR
LOBBY
OFFICE
106.1
OFFICE
106.3
WOMEN'S
LOCKERS
VEST
DUTY
RM
STOR
129.1 STORAGE
(E)EF-4
(E)EF-6
(E)EF-9
(E) 24x22
TO AHU-1-1
(E) UH-6
(E) FC-1
(E) UH-5
(E) UH-11A
(E) 6" CHILLER REFRIGERANT
RELIEF TERMINATION
4' 8' 16'0' 1/8" =1'-0"
GRAPHIC SCALE:
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
, V A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PW B NO.
SHEET
NAVFAC DRAW ING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAW FORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R
E P
A
IR
H V
A C
A
E C
T R
IC
A
L S
Y S
T E
M S
N40080-D-0452
B
KEY PLAN
A
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/2
/2
:3
:2
A
M fs h \U s e rP ro fi le \s li tt le \D o c u m e n ts \2
R
M
C e n s li tt le .r v t
MD101
P A
R T
IA
L
F
IR
S T
F
LO
O R
D E
M O
LI
T
IO
N
P
LA
N
ZMASWL MJG
3191784
PLAN
NORTH
SCALE: 1/8" = 1'-0"
PARTIAL FIRST FLOOR DEMOLITION PLAN
01/20/2020
GREG SMITH
T T
T
T
T
T
MD401
MD402
REMOVE FAN POWERED VAV
BOX, FLEXIBLE DUCT, DUCT
TRANSITIONS, CONTROLS, AND
PIPING ASSEMBLY UP TO AND
INCLUDING ISOLATION VALVES.
REMOVE SINGLE DUCT VAV BOX,
FLEXIBLE DUCT, DUCT
TRANSITIONS, AND CONTROLS.
CHILLED WATER AND HEATING
WATER UP TO SHAFT.
KEYNOTE LEGEND
S
E E
M A
T C
H L
IN
E
M
D
GENERAL NOTES
1. SALVAGE, RE-USE, AND REPLACE
CEILING TILES AND GRID AS
NECESSARY TO REMOVE AND INSTALL
VAV BOXES. SEE SHEET M-004.
2. FURNITURE IS EXISTING TO REMAIN.
PROTECT FURNITURE FROM
CONSTRUCTION DUST AND DEBRIS.
3. CLOSE HOT WATER ISOLATION
VALVES FOR PIPING THAT SERVES
REHEAT COILS IN THIS PHASE. ONLY
DRAIN SYSTEM SERVING THIS PHASE
BEFORE REMOVING ANY PIPING OR
COILS.
VESTIBULE
STAIR
MEN'S
LOCKER
ROOM
LAUNDRY
STOR
138 MEN'S
TOILET
VEST
CORRIDOR
MEN'S
SHWR'S
MEN'S
SHWR'S
CHILLER
MECHANICAL
BOILER
MECHANICAL
FITNESS
CENTER
OFFICE
135.2
LOBBY
124.1
ELEVATOR
LOBBY
ELEC
COMM
RM
STORAGE
(E) FC-1
(E) UH-11B
4' 8' 16'0' 1/8" =1'-0"
GRAPHIC SCALE:
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
, V A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PW B NO.
SHEET
NAVFAC DRAW ING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAW FORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R
E P
A
IR
H V
A C
A
E C
T R
IC
A
L S
Y S
T E
M S
N40080-D-0452
B
KEY PLAN
A
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/2
/2
:3
:2
A
M fs h \U s e rP ro fi le \s li tt le \D o c u m e n ts \2
R
M
C e n s li tt le .r v t
MD102
P A
R T
IA
L
F
IR
S T
F
LO
O R
D E
M O
LI
T
IO
N
P
LA
N
ZMASWL MJG
3191785
PLAN
NORTH
SCALE: 1/8" = 1'-0"
PARTIAL FIRST FLOOR DEMOLITION PLAN
01/20/2020
GREG SMITH
DN
T
T
T
T
T
T
T
T
T
T
T
T
T
T
TT
TT
T
T
T
T
2 2
MD403
REMOVE FAN POWERED VAV
BOX, FLEXIBLE DUCT, DUCT
TRANSITIONS, CONTROLS, AND
PIPING ASSEMBLY UP TO AND
INCLUDING ISOLATION VALVES.
REMOVE SINGLE DUCT VAV BOX,
FLEXIBLE DUCT, DUCT
TRANSITIONS, AND CONTROLS.
KEYNOTE LEGEND
S
E E
M A
T C
H L
IN
E
M
D
GENERAL NOTES
1. SALVAGE, RE-USE, AND REPLACE
CEILING TILES AND GRID AS
NECESSARY TO REMOVE AND
INSTALL VAV BOXES. SEE SHEET
M-004.
2. FURNITURE IS EXISTING TO REMAIN.
PROTECT FURNITURE FROM
CONSTRUCTION DUST AND DEBRIS.
3. CLOSE HOT W ATER ISOLATION
VALVES FOR PIPING THAT SERVES
REHEAT COILS IN THIS PHASE.
ONLY DRAIN SYSTEM SERVING THIS
PHASE BEFORE REMOVING ANY
PIPING OR COILS.
HEAD
RECRUITER
207 CONFERENCE
RECEPTION
OFFICE
CHIEF
OF
STAFF
BATH
WORK
RM
FILES/KIT
OFFICE
215.2
OFFICE
215.1
OPEN
OFFICE
VEST
MULTI-
PURPOSE
DRESSING
COMM
OFFICE
220.6
ELEC
STOR
MECH
OFFICE
220.4
OFFICE
220.3
OFFICE
220.2
STOR
220.1
STAIR
OFFICE
220.5
VEST
CORRIDOR
ELEVATOR
LOBBY
MAIN
LOBBY
OPEN
OFFICE
MEN
(E) FC-2
4' 8' 16'0' 1/8" =1'-0"
GRAPHIC SCALE:
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
, V A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PW B NO.
SHEET
NAVFAC DRAW ING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAW FORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R
E P
A
IR
H V
A C
A
E C
T R
IC
A
L S
Y S
T E
M S
N40080-D-0452
B
KEY PLAN
A
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/2
/2
:3
:3
A
M fs h \U s e rP ro fi le \s li tt le \D o c u m e n ts \2
R
M
C e n s li tt le .r v t
MD103
P A
R T
IA
L
S E
C O
N D
F
LO
O R
D E
M O
LI
T
IO
N
P
LA
N
ZMASWL MJG
3191786
PLAN
NORTH
SCALE: 1/8" = 1'-0"
PARTIAL SECOND FLOOR DEMOLITION PLAN
01/20/2020
GREG SMITH
T
TT
T
T
T
T
T
T
T
T
T
T
T
T
T
T
TT
T
T
T
T
T
C C
C
C
C
C
C
C
T
T
MD403
REMOVE FAN POWERED VAV
BOX, FLEXIBLE DUCT, DUCT
TRANSITIONS, CONTROLS, AND
PIPING ASSEMBLY UP TO AND
INCLUDING ISOLATION VALVES.
REMOVE SINGLE DUCT VAV BOX,
FLEXIBLE DUCT, DUCT
TRANSITIONS, AND CONTROLS.
KEYNOTE LEGEND
S
E E
M A
T C
H L
IN
E
M
D
GENERAL NOTES
1. SALVAGE, RE-USE, AND REPLACE
CEILING TILES AND GRID AS
NECESSARY TO REMOVE AND INSTALL
VAV BOXES. SEE SHEET M-004.
2. FURNITURE IS EXISTING TO REMAIN.
PROTECT FURNITURE FROM
CONSTRUCTION DUST AND DEBRIS.
3. CLOSE HOT WATER ISOLATION
VALVES FOR PIPING THAT SERVES
REHEAT COILS IN THIS PHASE. ONLY
DRAIN SYSTEM SERVING THIS PHASE
BEFORE REMOVING ANY PIPING OR
COILS.
MULTI-
PURPOSE
VEST
OFFICE
260.1
OFFICE
260.3 OFFICE
265.1
OFFICE
265.2
OFFICE
265.3
EDC
CONFERENCE
ROOM
CONF
RM 5
AV
STORAGE
STORAGE
EDC
LAN
ROOM
EDC
WORK
ROOM
MECH
234 MP
STOR
STAIR
WORK
ROOM
250.1
STOR
ELEC
COMM
WOMEN
VEST
CORRIDOR
ELEVATOR
LOBBY
MAIN
LOBBY
OPEN
OFFICE
FILES
260.2
OPEN
OFFICE
SUPPLIES
250.2
ALCOVE
250.3
CORRIDOR
VESTIBULE
DRESSING
JAN
CONF
RM 4
CONF
RM 3
CONF
RM 2
CONF
RM 1
(E) FC-3
4' 8' 16'0' 1/8" =1'-0"
GRAPHIC SCALE:
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
, V A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PW B NO.
SHEET
NAVFAC DRAW ING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAW FORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R
E P
A
IR
H V
A C
A
E C
T R
IC
A
L S
Y S
T E
M S
N40080-D-0452
B
KEY PLAN
A
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/2
/2
:3
:3
A
M fs h \U s e rP ro fi le \s li tt le \D o c u m e n ts \2
R
M
C e n s li tt le .r v t
MD104
P A
R T
IA
L
S E
C O
N D
F
LO
O R
D E
M O
LI
T
IO
N
P
LA
N
ZMASWL MJG
3191787
PLAN
NORTH
SCALE: 1/8" = 1'-0"
PARTIAL SECOND FLOOR DEMOLITION PLAN
01/20/2020
GREG SMITH
T
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
MD403
REMOVE FAN POWERED VAV
BOX, FLEXIBLE DUCT, DUCT
TRANSITIONS, CONTROLS, AND
PIPING ASSEMBLY UP TO AND
INCLUDING ISOLATION VALVES.
REMOVE SINGLE DUCT VAV BOX,
FLEXIBLE DUCT, DUCT
TRANSITIONS, AND CONTROLS.
KEYNOTE LEGEND
S
E E
M A
T C
H L
IN
E
M
D
GENERAL NOTES
1. SALVAGE, RE-USE, AND REPLACE
CEILING TILES AND GRID AS
NECESSARY TO REMOVE AND
INSTALL VAV BOXES. SEE SHEET
M-004.
2. FURNITURE IS EXISTING TO REMAIN.
PROTECT FURNITURE FROM
CONSTRUCTION DUST AND DEBRIS.
3. CLOSE HOT W ATER ISOLATION
VALVES FOR PIPING THAT SERVES
REHEAT COILS IN THIS PHASE.
ONLY DRAIN SYSTEM SERVING THIS
PHASE BEFORE REMOVING ANY
PIPING OR COILS.
OFFICE
CONFERENCE
RECEPTION
DIRECTOR
BATH
DEPUTY
DIRECTOR
OFFICE
OFFICE
WORK
RM/
FILE/KIT
OPEN
OFFICE
OFFICE
315.1
OFFICE
315.2
OFFICE
315.3
MECH
STOR
ELEC
COMM
DRESSING
OFFICE
320.4
OFFICE
320.5
OFFICE
320.3
OFFICE
320.2
STAIR
OPEN
OFFICE
MULTI-
PURPOSE
CORRIDOR
ELEVATOR
LOBBY
OPEN
OFFICE
MEN
4' 8' 16'0' 1/8" =1'-0"
GRAPHIC SCALE:
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
, V A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PW B NO.
SHEET
NAVFAC DRAW ING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAW FORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R
E P
A
IR
H V
A C
A
E C
T R
IC
A
L S
Y S
T E
M S
N40080-D-0452
B
KEY PLAN
A
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/2
/2
:3
:3
A
M fs h \U s e rP ro fi le \s li tt le \D o c u m e n ts \2
R
M
C e n s li tt le .r v t
MD105
P A
R T
IA
L
T H
IR
D
F
LO
O R
D E
M O
LI
T
IO
N
P
LA
N
ZMASWL MJG
3191788
PLAN
NORTH
SCALE: 1/8" = 1'-0"
PARTIAL THIRD FLOOR DEMOLITION PLAN
01/20/2020
GREG SMITH
T
T
T T
T
T
T T T
T
T
T
T
T
T
T
T T
T
T
T
T
T
MD403
REMOVE FAN POWERED VAV
BOX, FLEXIBLE DUCT, DUCT
TRANSITIONS, CONTROLS, AND
PIPING ASSEMBLY UP TO AND
INCLUDING ISOLATION VALVES.
REMOVE SINGLE DUCT VAV BOX,
FLEXIBLE DUCT, DUCT
TRANSITIONS, AND CONTROLS.
KEYNOTE LEGEND
S
E E
M A
T C
H L
IN
E
M
D
GENERAL NOTES
1. SALVAGE, RE-USE, AND REPLACE
CEILING TILES AND GRID AS
NECESSARY TO REMOVE AND INSTALL
VAV BOXES. SEE SHEET M-004.
2. FURNITURE IS EXISTING TO REMAIN.
PROTECT FURNITURE FROM
CONSTRUCTION DUST AND DEBRIS.
3. CLOSE HOT WATER ISOLATION
VALVES FOR PIPING THAT SERVES
REHEAT COILS IN THIS PHASE. ONLY
DRAIN SYSTEM SERVING THIS PHASE
BEFORE REMOVING ANY PIPING OR
COILS.
WOMEN
MECH
OFFICE
360.2
OFFICE
360.1
STORAGE
360.4
RM
360.3
SERVER
LAN
ROOM
OFFICE
350.2
STOR
STAIR
ELEC
COMM
JAN
MULTI-
PURPOSE
CORRIDOR
ELEVATOR
LOBBY
OPEN
OFFICE
OPEN
OFFICE
OPEN
OFFICE
DRESSING
4' 8' 16'0' 1/8" =1'-0"
GRAPHIC SCALE:
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
, V A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PW B NO.
SHEET
NAVFAC DRAW ING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAW FORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R
E P
A
IR
H V
A C
A
E C
T R
IC
A
L S
Y S
T E
M S
N40080-D-0452
B
KEY PLAN
A
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/2
/2
:3
:3
A
M fs h \U s e rP ro fi le \s li tt le \D o c u m e n ts \2
R
M
C e n s li tt le .r v t
MD106
P A
R T
IA
L
T H
IR
D
F
LO
O R
D E
M O
LI
T
IO
N
P
LA
N
ZMASWL MJG
3191789
PLAN
NORTH
SCALE: 1/8" = 1'-0"
PARTIAL THIRD FLOOR DEMOLITION PLAN
01/20/2020
GREG SMITH
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
1 1
2 2 2
MD404
REMOVE FAN POWERED VAV
BOX, FLEXIBLE DUCT, DUCT
TRANSITIONS, CONTROLS, AND
PIPING ASSEMBLY UP TO AND
INCLUDING ISOLATION VALVES.
REMOVE SINGLE DUCT VAV BOX,
FLEXIBLE DUCT, DUCT
TRANSITIONS, AND CONTROLS.
KEYNOTE LEGEND
S
E E
M A
T C
H L
IN
E
M
D
GENERAL NOTES
1. SALVAGE, RE-USE, AND REPLACE
CEILING TILES AND GRID AS
NECESSARY TO REMOVE AND
INSTALL VAV BOXES. SEE SHEET
M-004.
2. FURNITURE IS EXISTING TO REMAIN.
PROTECT FURNITURE FROM
CONSTRUCTION DUST AND DEBRIS.
3. CLOSE HOT W ATER ISOLATION
VALVES FOR PIPING THAT SERVES
REHEAT COILS IN THIS PHASE.
ONLY DRAIN SYSTEM SERVING THIS
PHASE BEFORE REMOVING ANY
PIPING OR COILS.
OFFICE
BATH
OFFICE
RECEPTION
OFFICE
WORK
RM/
FILES/KIT
OFFICE
415.1
CONFERENCE
OFFICE
415.2
OPEN
OFFICE
OFFICE
415.3
DRESSING
COMM
ELEC
STOR
MECH
STAIR
OFFICE
420.2
OFFICE
445.2
OFFICE
445.1
MULTI-
PURPOSE
ELEVATOR
LOBBY
OPEN
OFFICE
CORRIDOR
MEN
4' 8' 16'0' 1/8" =1'-0"
GRAPHIC SCALE:
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
, V A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PW B NO.
SHEET
NAVFAC DRAW ING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAW FORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R
E P
A
IR
H V
A C
A
E C
T R
IC
A
L S
Y S
T E
M S
N40080-D-0452
B
KEY PLAN
A
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/2
/2
:3
:3
A
M fs h \U s e rP ro fi le \s li tt le \D o c u m e n ts \2
R
M
C e n s li tt le .r v t
MD107
P A
R T
IA
L
F O
U R
T H
F
LO
O R
D E
M O
LI
T
IO
N
P
LA
N
ZMASWL MJG
3191790
PLAN
NORTH
SCALE: 1/8" = 1'-0"
PARTIAL FOURTH FLOOR DEMOLITION PLAN
01/20/2020
GREG SMITH
T
T T
T
T
T
T
T T
T
T
T T
T
T
T
C
C
T
T
T
T
T
1 1
MD404
REMOVE FAN POWERED VAV
BOX, FLEXIBLE DUCT, DUCT
TRANSITIONS, CONTROLS, AND
PIPING ASSEMBLY UP TO AND
INCLUDING ISOLATION VALVES.
REMOVE SINGLE DUCT VAV BOX,
FLEXIBLE DUCT, DUCT
TRANSITIONS, AND CONTROLS.
KEYNOTE LEGEND
S
E E
M A
T C
H L
IN
E
M
D
GENERAL NOTES
1. SALVAGE, RE-USE, AND REPLACE
CEILING TILES AND GRID AS
NECESSARY TO REMOVE AND INSTALL
VAV BOXES. SEE SHEET M-004.
2. FURNITURE IS EXISTING TO REMAIN.
PROTECT FURNITURE FROM
CONSTRUCTION DUST AND DEBRIS.
3. CLOSE HOT WATER ISOLATION
VALVES FOR PIPING THAT SERVES
REHEAT COILS IN THIS PHASE. ONLY
DRAIN SYSTEM SERVING THIS PHASE
BEFORE REMOVING ANY PIPING OR
COILS.
OFFICE
460.2
OFFICE
460.1
OFFICE
460.3
OFFICE
465A
OFFICE
465E
OFFICE
465D
OFFICE
465C
OFFICE
465B
STAIR
OFFICE
450.2
COMP
RM
450.5
STORAGE
450.4
MECH
STOR
ELEC
COMM
DRESSING
JAN
OFFICE
445.3
OFFICE
445.4
OFFICE
445.5
MULTI-
PURPOSE
ELEVATOR
LOBBY
OPEN
OFFICE
OPEN
OFFICE
OPEN
OFFICE
OFFICE
450.3
OPEN
OFFICE
WOMEN
T
4' 8' 16'0' 1/8" =1'-0"
GRAPHIC SCALE:
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
, V A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PW B NO.
SHEET
NAVFAC DRAW ING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAW FORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R
E P
A
IR
H V
A C
A
E C
T R
IC
A
L S
Y S
T E
M S
N40080-D-0452
B
KEY PLAN
A
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/2
/2
:3
:4
A
M fs h \U s e rP ro fi le \s li tt le \D o c u m e n ts \2
R
M
C e n s li tt le .r v t
MD108
P A
R T
IA
L
F O
U R
T H
F
LO
O R
D E
M O
LI
T
IO
N
P
LA
N
ZMASWL MJG
3191791
PLAN
NORTH
SCALE: 1/8" = 1'-0"
PARTIAL FOURTH FLOOR DEMOLITION PLAN
01/20/2020
GREG SMITH
T T
T
T
T
T
T
T
T
T
T
T T
T
T
2 2
REMOVE FAN POWERED VAV
BOX, FLEXIBLE DUCT, DUCT
TRANSITIONS, CONTROLS, AND
PIPING ASSEMBLY UP TO AND
INCLUDING ISOLATION VALVES.
REMOVE SINGLE DUCT VAV BOX,
FLEXIBLE DUCT, DUCT
TRANSITIONS, AND CONTROLS.
KEYNOTE LEGEND
S
E E
M A
T C
H L
IN
E
M
D
GENERAL NOTES
1. SALVAGE, RE-USE, AND REPLACE
CEILING TILES AND GRID AS
NECESSARY TO REMOVE AND
INSTALL VAV BOXES. SEE SHEET
M-004.
2. FURNITURE IS EXISTING TO REMAIN.
PROTECT FURNITURE FROM
CONSTRUCTION DUST AND DEBRIS.
3. CLOSE HOT W ATER ISOLATION
VALVES FOR PIPING THAT SERVES
REHEAT COILS IN THIS PHASE.
ONLY DRAIN SYSTEM SERVING THIS
PHASE BEFORE REMOVING ANY
PIPING OR COILS.
DIRECTOR
BATH
OFFICE
RECEPTION
CONFERENCE
OFFICE
515.1
WORK
RM/
FILES/KIT
GCCS
RM
OPEN
OFFICE
OFFICE
515.3
OFFICE
515.2
DRESSING
COMM
ELECT
STORAGE
545.1
MAP/WAR
ROOM
CONFERENCE
OFFICE
520.2
OFFICE
545.5
OFFICE
545.6
MULTI-
PURPOSE
CORRIDOR
ELEVATOR
LOBBY
OPEN
OFFICE
MEN
OPEN
OFFICE
CORRIDOR
520.3
STAIR
4' 8' 16'0' 1/8" =1'-0"
GRAPHIC SCALE:
2017181
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
, V A
M A
R
IN
E C
O R
P S
B A
S E
Q U
A N
T
IC
O Q
U A
N T
IC
O
V
A
R E
V D
A T
E
F
IL
E N
A M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PW B NO.
SHEET
NAVFAC DRAW ING NO.
DES DRW
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
DRAW FORM REVISION: 10 MAY 2014
103OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
B -3
R
E P
A
IR
H V
A C
A
E C
T R
IC
A
L S
Y S
T E
M S
N40080-D-0452
B
KEY PLAN
A
GIZANA KASSAY
GREG SMITH
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
/2
/2
:3
:4
A
M fs h \U s e rP ro fi le \s li tt le \D o c u m e n ts \2
R
M
C e n s li tt le .r v t
MD109
P A
R T
IA
L
F
IF
T H
F
LO
O R
D E
M O
LI
T
IO
N
P
LA
N
ZMASWL MJG
3191792
PLAN
NORTH
SCALE: 1/8" = 1'-0"
PARTIAL FIFTH FLOOR DEMOLITION PLAN
01/20/2020
GREG SMITH
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
2 2
REMOVE FAN POWERED VAV
BOX, FLEXIBLE DUCT, DUCT
TRANSITIONS, CONTROLS, AND
PIPING ASSEMBLY UP TO AND
INCLUDING ISOLATION VALVES.
REMOVE SINGLE DUCT VAV BOX,
FLEXIBLE DUCT, DUCT
TRANSITIONS, AND CONTROLS.
REMOVE FAN POWERED VAV
BOX, FLEXIBLE DUCT, DUCT
TRANSITIONS, AND CONTROLS.
KEYNOTE LEGEND
S
E E
M A
T C
H L
IN
E
M
D
GENERAL NOTES
1. SALVAGE, RE-USE, AND REPLACE
CEILING TILES AND GRID AS
NECESSARY TO REMOVE AND INSTALL
VAV BOXES. SEE SHEET M-004.
2. FURNITURE IS EXISTING TO REMAIN.
PROTECT FURNITURE FROM
CONSTRUCTION DUST AND DEBRIS.
3. CLOSE HOT WATER ISOLATION
VALVES FOR PIPING THAT SERVES
REHEAT COILS IN THIS PHASE. ONLY
DRAIN SYSTEM SERVING THIS PHASE
BEFORE REMOVING ANY PIPING OR
COILS.
OFFICE
563.1
OFFICE
563.2
OFFICE
563.3
OFFICE
563.4
CONFERENCE
563.5
CONFERENCE
545.4
ELEC
DRESSING
COMM
JAN
OFFICE
563.6
OFFICE
BATH
OFFICE
RECEPTION
OFFICE
BATH
OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .