Attachment C Table 1 Tanks Spills dated 3.4.20 A6.docx
DOCX document 17 KB Posted
- Solicitation number
- N4008020R0010
About this file
This document contains a solicitation notice for multi-media compliance services with an emphasis on fuel storage tanks/spills, air, and waste/materials services. The resultant contract will be an Indefinite-Delivery/Indefinite Quantity contract for a five-year ordering period and 52.217-8 Option period of up to six months, executed through issuance of firm-fixed price task orders, and will provide services at various locations within Naval Facilities Engineering Command Washington's area of responsibility including Virginia, Maryland, and the District of Columbia, as well as other U.S. and overseas installations. Services will include compliance-related projects for stormwater, drinking water, wastewater, air quality, hazardous waste and materials, storage tanks, environmental management systems, other environmental liabilities, environmental planning, natural resources, cultural resources, and installation restoration in compliance with applicable DoD, DON, federal, state, and local statutes and regulations as well as DoD and DON policies, instructions, and guidance. This will be a lowest price technically acceptable negotiated procurement utilizing technical and price proposals. The minimum guarantee is $50,000 and the maximum contract value is $30,000,000 over the life of the contract.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C - TABLE 1 (TANKS/SPILLS) dated March 4, 2020
| Specialized Experience |
| Tank repairs/maintenance on at least 20 fuel storage tanks (both UST and AST) in a single project** |
| Tank and oil/water separator cleaning |
| Tank and/or piping integrity testing on at least 20 fuel storage tank systems in a single project |
| Tank compliance inspections on ASTs |
| Tank compliance inspections on USTs |
| Maryland Triennial Third-Party UST Inspections |
| Complete tank inventories |
| Tank ultrasonic thickness testing |
| MIC sampling and analysis |
| Tank system product compatibility evaluation |
| Aging tank system compliance evaluation and recommendation report |
| New fuel tank system design and installation, (10000 – 50000 gal system) |
| UST and/or AST removal |
| UST in-situ closure |
| UST site investigation |
| LUST site assessment, remediation and/or closure |
| POL spill site investigation, remediation and/or closure |
| Spill Contingency Plan development (OPNAVINST 5090 requirement) |
| SPCC Plan development |
| Facility Response Plan development |
| Tank Management Plan development |
Tanks/Spills
| Project Number |
| 1 |
** Mandatory Specialized Experience Product Category
File details come from the government source that posted it. Updated .