18R3003_Attachment_K_-_Technical_Proposal_Datasheets.docx
DOCX document 24 KB Posted
- Solicitation number
- N32205-18-R-3003
About this file
18R3003 Attachment K - Technical Proposal Datasheets
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT K-1
Exhibit (1) Ship Operating Experience – The offeror shall complete this table per L-14.B.3.1.A. Insert additional rows as applicable. Sample data has been provided as guidance.
| Ship Name |
| Ship Type |
| Ship Owner |
| Relationship of Contractor to Ship |
| Dates Operated (MM/YYYY) |
| DWT |
| Propulsion Type |
| Propulsion HP |
| LOA |
| Beam |
| M/V Noah Zark |
| Container |
| Theolmyti Inc. |
| Operator |
| 06/1999-01/2002; 02/2005-10/2012 |
| 15,000 |
| Slow Speed Diesel |
| 25,000 |
| 650’ |
| 85’ |
| M/V Kent Goh Strait |
| Oil Tanker |
| Dinoco |
| Maintenance Manager |
| 04/2002-09/2003 |
| 30,000 |
| Slow Speed Diesel |
| 28,500 |
| 705’ |
| 125’ |
ATTACHMENT K-2
Exhibit (2) – Dry Dock Repair Experience: The offeror shall complete this table per L-14.B.3.1.B. Insert additional rows as applicable. Sample data has been provided as guidance.
| Ship Name |
| Year Dry Docked |
| Dry Dock Location |
| Final Cost |
| Final Duration |
| Reason for Dry Docking the Ship |
| M/V Noah Zark |
| 2000 |
| Dubai |
| $6.6M |
| 45 days |
| Regulatory Surveys Due |
| M/V Noah Zark |
| 2005 |
| Singapore |
| $4.2M |
| 40 days |
| Regulatory Surveys Due |
| M/V Kent Goa Strait |
| 2003 |
| Portugal |
| $5.2M |
| 27 days |
| Repair U/W hull plating damaged by grounding. |
| Proposed Individual (First and Last Name) |
| Current Job Title |
| Current Employee? |
| Proposed Percent Dedication to this Contract |
| Proposed Total Percent Dedication to Other Duties |
| Minimum Key Billet Requirements |
| KEY PERSONNEL TO BE CONSIDERED FOR TECHNICAL TRADE-OFF FACTOR L-14.B.II.A.1 -Key Personnel Qualifications exceed requirements or number of Key Personnel proposed exceed requirements |
| Port Engineer (Example) |
| Jim Nasium |
| Engineering Superintendent |
| Yes |
| 100% |
| 0% |
| X |
| Assistant Operations Manager/POC for Operations (Example) |
| Rick O’Shay |
| Scheduler |
| Yes |
| 40% |
| 60% |
X
ATTACHMENT K-3
Exhibit (3) – Technical Approach, Key Shore Based Personnel: The offeror shall complete this table for individuals proposed as Key Shore Side Personnel as part of L-14. B.3.1.E. Insert additional rows as applicable. Sample data has been provided as guidance.
Attachment K – Technical Proposal Data Sheets
File details come from the government source that posted it.