18R3003_Attachment_P_-_Mission_Essential_Contractor_Services.doc

DOC document 28 KB Posted

Attached to
OPERATION AND MAINTENANCE OF EXPEDITIONARY TRANSFER DOCK (ESD)
Solicitation number
N32205-18-R-3003
Issued by

About this file

18R3003 Attachment P - Mission Essential Contractor Services

View the file

Other files

File Type Posted
N32205-18-R-3003-0008_conform.pdf PDF
N32205-18-R-3003-0008_SF30.pdf PDF
N32205-18-R-3003-0007_conform.pdf PDF
Q&A__5.pdf PDF
N32205-18-R-3003-0007_SF30.pdf PDF
18R3003_Attachment_O-2_PRICING_FORM_B_-_ESD-0007.xls XLS spreadsheet
18R3003_Attachment_I_Past_Performance_Narrative_-_0006.docx DOCX document
N32205-18-R-3003-0006_SF30.pdf PDF
18R3003_Attachment_O-2_PRICING_FORM_B_-_ESD-0006.xls XLS spreadsheet
18R3003_Attachment_B_DOL_CBA_Wage_Determination_-_0006.pdf PDF
18R3003_Q&A__4.pdf PDF
N32205-18-R-3003-0006_conform.pdf PDF
18R3003_Attachment_O-1_PRICING_FORM_A_-_ESD-0006.xls XLS spreadsheet
18R3003_Attachment_A_Tech_Man-0006.pdf PDF
18R3003_Attachment_O_Pricing_Sheets-_ESD-0005.xls XLS spreadsheet
N32205-18-R-3003-0005_conform.pdf PDF
18R3003_Q&A__3.pdf PDF
18R3003_Attachment__A_Tech_Man-0005.pdf PDF
18R3003_Attachment_B_DOL_CBA_Wage_Determination_-_0005.pdf PDF
N32205-18-R-3003-0005_SF_30.pdf PDF
N32205-18-R-3003-0004_conform.pdf PDF
N32205-18-R-3003-0004_SF_30.pdf PDF
N32205-18-R-3003-0003_SF30.pdf PDF
18R3003_Attachment_B_-_DOL_CBA_Wage_Determination_-_0003.pdf PDF
N32205-18-R-3003-0003.pdf PDF
18R3003_Q&A__2.pdf PDF
18R3003_Attachment_O_Pricing_Sheets-_ESD-0002.xls XLS spreadsheet
18R3003_Q&A__1.pdf PDF
N32205-18-R-3003-0002.pdf PDF
N32205-18-R-3003-0002_SF30.pdf PDF
18R3003_Attachment_E_-_Hull_Clauses.pdf PDF
18R3003_Attachment_O-__Pricing_Sheets-_ESD.xls XLS spreadsheet
18R3003_Attachment_M_-_Award_Fee_Plan.pdf PDF
18R3003_Attachment_L-_Govt._Estimate_of_Reimbursable_Costs.pdf PDF
N32205-18-R-3003.pdf PDF
18R3003_Attachment_N-1_-_GFP_JOHN_GLENN_-_DMP_INVENTORY.xlsm XLSM spreadsheet
18R3003_Attachment_F_Oversight_and_Metrics.PDF PDF
18R3003_Attachment_B_-_DOL_CBA_Wage_Determination.pdf PDF
18R3003_Attachment_I_-_Past_Performance_Narrative.docx DOCX document
18R3003_Attachment_G_-_SFLLL.pdf PDF
18R3003_Attachment_C_-_DD254.pdf PDF
18R3003_Attachment_J_-_Monthly_Budget_Status_Report.xlsx XLSX spreadsheet
18R3003_Attachment__A_Tech_Man.pdf PDF
18R3003_Attachment_K_-_Technical_Proposal_Datasheets.docx DOCX document
18R3003_Attachment_D_-_P&I_Guidelines.pdf PDF
18R3003_Attachment_Q_-Training_Information.pdf PDF
18R3003_Attachment_D_-_P&I_Guidelines.pdf PDF
18R3003_Attachment_L-_Govt._Estimate_of_Reimbursable_Costs.pdf PDF
18R3003_Attachment_E_-_Hull_Clauses.pdf PDF
18R3003_Attachment_O-__Pricing_Sheets-_ESD.xls XLS spreadsheet
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-17-R-3003

MISSION ESSENTIAL CONTRACTOR SERVICES PLAN WORKSHEET

In accordance with DFARS 252.237-7024, NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES, and the draft contract, [Contractor, Insert Name] is required to submit a Mission Essential Contractor Services Plan (MECSP) and complete and submit this MECSP Worksheet.

For each of the below required elements of a MECSP, set forth by DFARS 252.237-7023, respond with a narrative description of how the proposed MECSP provides the required information. References to the section and page number of the MECSP in which the requirement is addressed must also be provided. If the required information is not included in the proposed MECSP, the response provided in the below worksheet will be considered an addendum to the proposed MECSP. Please attach additional sheets, if more space is required than provided below.

1. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed (DFARS 252.237-7024(b)(1)).

2. Address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves (DFARS 252.237-7024(b)(2)(i)).

3. Address the time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site (DFARS 252.237-7024(b)(2)(ii)).

4. Address the components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home (DFARS 252.237-7024(b)(2)(iii)).

5. Address any established alert and notification procedures for mobilizing identified ``essential contractor service'' personnel (DFARS 252.237-7024(b)(2)(iv)).

6. Address the approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis (DFARS 252.237-7024(b)(2)(v)).

Attachment P – Mission Essential Contractor Services Worksheet

File details come from the government source that posted it.