ATTACHMENT F OVERSIGHT AND METRICS
In successfully providing these services to the Fleets, there are two basic performance requirements for MSC’s ships: 1) keep the vessel in a readiness state that allows it to perform any mission assigned to it by the Fleet Commander, and 2) perform assigned missions.
Accordingly, in measuring the extent to which a contractor meets the Performance Work Statement, MSC monitors and measures both the condition/readiness of the vessel, and the performance of specific missions/tasks.
MSC will routinely conduct Onboard Condition Inspections (OCI) (normally conducted annually) to monitor performance elements through ship visits and site audits as outlined in the Performance Work Statement.
On an annual basis, the contractor’s performance will be evaluated for its Contractor Performance Assessment Reporting System (CPARS) rating. This evaluation will use, primarily, the metrics below. The results of these metrics will be communicated to the contractor as part of contract administration and any discrepancies or issues will be addressed using the contract remedies available.
Requirements Metric Cost: The metric will be used to manage expenses within established ship operating budgets.
Differences between expected/budgeted and actual costs.
Schedule/Performance: This metric will be used to determine MSC primary output of Ships Ready for Tasking (RFT), the key indicator of MSC readiness. COMSC is responsible to deliver MSC ships Ready for Tasking and to maintain this readiness during operational fleet time.
The RFT metric is a cumulative total of calendar days that a ship is deemed Ready for Tasking (RFT) or Not ready for Tasking (NRFT) in the preceding rolling 12 month period compared to an accepted baseline.
Inspection: This metric will track planned maintenance against performed maintenance, supplemented by periodic inspections of actual vessel condition.
The difference between SAMM System planned maintenance completion levels for ships and actual completion levels. MSC will track findings of annual vessel condition inspections to identify degraded or poor vessel condition and the operating contractor’s corrective action.
Manning & Training: This metric will be used to ensure fully trained mariners are aboard ship in accordance with the Performance Work Statement.
Difference between offered/required mariner shipboard billets versus those that are currently embarked.