Attachment L Mission Essential Contractor Services Plan (MECSP) Worksheet

View the file

Other files

File Type Posted
16-R-3503_Amendment_8.docx DOCX document
Q A__4_Summary_of_Ice_Class_Tanker_Amendments_to_date.docx DOCX document
Ice_Class_Tanker_QA__6.docx DOCX document
Ice__Class_Tanker_Q A__5.docx DOCX document
CONSOL_DRAWINGS_2227933.pdf PDF
16-R-3503_Amend_5.docx DOCX document
16-R-3503_Amend_extend_closing_date.docx DOCX document
Ice_Class_Tanker_RFP_N32205-16-R-3503_Fillable_Boxes.docx DOCX document
Revised__Attachment_K.xls XLS spreadsheet
16-R-3503_Attachment_J_revised_Vessel-Minimum-Requirements_(2).xlsx XLSX spreadsheet
CBA_WD_American_Maritime_Officers.htm HTM file
CBA_WD_Seafarers_International_Union.htm HTM file
16-R-3503_Attachment_J_Vessel-Minimum-Requirements.xlsx XLSX spreadsheet
16-R-3503_Amend_3_extend_closing_date.docx DOCX document
Q A__3__attachment_Decontamination_Station.doc DOC document
Q A__3_attachment.pdf PDF
Ice_Class_QA__3.docx DOCX document
Ice_Class_Tanker_QA___2_(3).docx DOCX document
Q A__2_answer_to_question_5__Shipboard_Force_Protection_5530.3_Series.pdf PDF
Ice_Class_Tanker_Q A__1.docx DOCX document
16-R-3503_Revised_K_-_Minimum_Technical_Experience_Requirements.xls XLS spreadsheet
Attachment_E_SIU_letter.pdf PDF
Attachment_E__Aggregate_cover_letter.pdf PDF
16-R-3501_ATTACHMENT_F_Disclosure_of_Lobbying_Activites.pdf PDF
16-R-3503_Ice_Class_Amend_2.docx DOCX document
Attachment_E_Aggregate_Fringe_Benefit_Contributions.pdf PDF
Attachment_K-_Vessel_Minimum_Requirements.xlsx XLSX spreadsheet
16-R-3503_Amendment_1.docx DOCX document
16-R-3503_ATTACHMENT_C_Crew_Complement.docx DOCX document
16-R-3503_Attachment_B_Basic_Pricing_Data_Post.xls XLS spreadsheet
16-R-3503_Attachment_B-1_Fuel_Consumption_Data_post.xlsx XLSX spreadsheet
16-R-3503_ATTACHMENT_H_-_Past_Performace_Data_Sheet.docx DOCX document
16-R-3503_ATTACHMENT_I_-_Past_Performance_Questionnaire.docx DOCX document
16-R-3503_ATTACHMENT_A_Government_Furnished_Property_and_Directives.docx DOCX document
16-R-3503_Ice_Class_Tanker_Final_RFP.docx DOCX document
16-R-3501_ATTACHMENT_D_-_DD254_Security_Classifications.pdf PDF
Solicitation_16-R-3503_Ice_Class_Tanker_DRAFT.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-16-R-3503 ATTACHMENT L

MISSION ESSENTIAL CONTRACTOR SERVICES PLAN WORKSHEET

In accordance with DFARS 252.237-7024, NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES, and Section L-6.1.2(9) of the RFP, offerors are required to submit a Mission Essential Contractor Services Plan (MECSP). Section L-4.11 of the RFP also requires that offerors on the subject procurement complete and submit this MECSP Worksheet.

For each of the below required elements of a MECSP, set forth by DFARS 252.237-7023, offerors must respond with a narrative description of how the proposed MECSP provides the required information. References to the section and page number of the MECSP in which the requirement is addressed must also be provided. If the required information is not included in the proposed MECSP, the response provided in the below worksheet will be considered an addendum to the proposed MECSP. Please attach additional sheets, if more space is required than provided below.

1. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed (DFARS 252.237-7024(b)(1)).

2. Address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves (DFARS 252.237-7024(b)(2)(i)).

3. Address the time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site (DFARS 252.237-7024(b)(2)(ii)).

4. Address the components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home (DFARS 252.237-7024(b)(2)(iii)).

5. Address any established alert and notification procedures for mobilizing identified ``essential contractor service'' personnel (DFARS 252.237-7024(b)(2)(iv)).

6. Address the approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis (DFARS 252.237-7024(b)(2)(v)).

MECSP Worksheet