WORK ITEM 1013
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS ARCTIC
(T-AOE 8)
UNREP GEAR RFP NO. N32205-14-R-2000
6 January, 2014 ITEM NO. 1013 Category "A" PHDNSWC/KRUG/jb
STATION NO.6 EQUIPMENT OPEN AND INSPECT
1013-1
1.0 ABSTRACT
This item describes the requirements for inspection of Station No. 6 Heavy Unrep Equipment.
2.0 REFERENCES: None additional
3.0 ITEM DESCRIPTION
3.1 Location/Quantity
3.1.1 Location
a. Highline Winch
b. Inhaul Winch
c. Outhaul Winch
d. Sliding Block Drive
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES
4.1 Government Furnished Equipment (GFE): None additional
4.2 Government Furnished Material (GFM): None additional
4.3 Government Furnished Services (GFS)
Port Hueneme representative will provide technical support/guidance during the accomplishment of this work item.
4.4 Government Furnished Information (GFI): None
additional
5.0 NOTES
5.1 The contractor and all subcontractors, regardless of
tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1-7, 22, 1013-2
23, 24, 28 and 29.
5.2 The contractor and all subcontractors, regardless of
tier, are advised to review other work items under this contract to determine their effect on the work required under this work item.
5.3 Contractor Furnished Materials (CFM)
Contractor is to supply Anti-seize compound (MIL-PRF- 907), Grease (MIL-PRF-24139A), Gasket Eliminator Loctite part number, and other consumables as required.
5.4 All equipment identified for removal and re-
installation shall be tagged, segregated and preserved to ensure equipment availability upon request of installing activity
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional
7.0 STATEMENT OF WORK REQUIRED
7.1 Arrangements/Outfitting: None additional
7.2 Structural: None additional
7.3 Mechanical/Fluids: None additional
7.4 Electrical: None additional
7.5 Electronics: None additional
7.6 Preparation of Drawings/Documentation/Test Memo: None
additional
7.7 Inspection/Test
7.7.1 Inspection
a. Provide one hundred twenty (120) hours of electrician support for the tear down and re-assemble of the equipment listed in 3.1.1.
1013-3
b. Provide four hundred (400) hours of outside machinist support for teardown and re-assembly of the equipment list in 3.1.1.
c. Provide eighty (80) hours of rigging support for the teardown and re-assembly of the equipment listed in para 3.1.1. Note: The rigging hours include crane hook up time.
d. Provide condition reports with As Found conditions.
e. Conditions discovered requiring repair action is subject to a change order.
7.8 Painting
Paint all new and modified surfaces to match surrounding surfacea.
7.9 Marking
Install name plates, notices, and markings for all new and modified systems (or areas).
7.10 Manufacturer's Representative
Government representatives from NSWC will be on site to provide technical oversight and guidance upon request from contractor
8.0 GENERAL REQUIREMENTS: None additional